Prevailing wage rates · Rhode Island · Wage determination
Prevailing wage rates: Bristol, Kent, Newport and 2 more counties, Rhode Island
Building, Heavy, Highway construction · RI20260001 modification 4, published July 30, 2026
The short answer
This sheet sets 84 classifications for building, heavy, highway work in Bristol, Kent, Newport and 2 more counties, Rhode Island. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $38.51 an hour (sign painter) to $102.96 (elevator mechanic (addtional fringe to be paid a.). Your contract may lock an earlier modification.
Scope
Includes Marine Construction Projects
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0006-006 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 | Agreement |
| ASBE0006-008 · Asbestos Workers and Heat & Frost Insulators agreement, September 1, 2024 | ||||
ASBESTOS WORKER/INSULATOR…Full textASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $49.91 | $36.63 | $86.54 | Agreement |
| BOIL0029-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $50.62 | $28.82 | $79.44 | Agreement |
| BRRI0003-001 · Bricklayers agreement, June 1, 2022 | ||||
| BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER | $46.86 | $29.14 | $76.00 | Agreement |
| BRRI0003-002 · Bricklayers agreement, September 1, 2022 | ||||
| MARBLE SETTER, TERRAZZO WORKER & TILE SETTER | $46.54 | $30.34 | $76.88 | Agreement |
| BRRI0003-003 · Bricklayers agreement, September 1, 2022 | ||||
| MARBLE, TILE & TERRAZZO FINISHER | $38.78 | $29.61 | $68.39 | Agreement |
| CARP0330-001 · Carpenters agreement, June 2, 2025 | ||||
DIVER (WHEN NOT DIVING OR TENDING THE DIVER…Full textDIVER (WHEN NOT DIVING OR TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.) | $60.83 | $30.50 | $91.33 | Agreement |
DIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER…Full textDIVER TENDER (WHEN NOT DIVING OR TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN TENDING THE DIVER.) | $48.68 | $30.50 | $79.18 | Agreement |
CARPENTER: INCLUDES SOFT FLOOR LAYER…Full textCARPENTER: INCLUDES SOFT FLOOR LAYER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.) | $47.88 | $30.50 | $78.38 | Agreement |
PILEDRIVER (WORK ON FREE-STANDING STACKS…Full textPILEDRIVER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER, KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL | $41.53 | $29.35 | $70.88 | Agreement |
WELDER (WORK ON FREE-STANDING STACKS…Full textWELDER (WORK ON FREE-STANDING STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER HOUR ADDITIONAL.) | $48.68 | $30.50 | $79.18 | Agreement |
| CARP1121-002 · Carpenters agreement, April 21, 2025 | ||||
| MILLWRIGHT | $45.72 | $31.50 | $77.22 | Agreement |
| ELEC0099-002 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN (WORK OF A HAZARDOUS NATURE…Full textELECTRICIAN (WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20% PER HOUR ADDITIONAL.) | $56.11 | $24.74 | $80.85 | Agreement |
TELEDATA SYSTEM INSTALLER…Full textTELEDATA SYSTEM INSTALLER (WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20% PER HOUR ADDITIONAL.) | $42.09 | $19.71 | $61.80 | Agreement |
| ELEV0039-001 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC (ADDTIONAL FRINGE TO BE PAID A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT.) | $64.52 | $38.44 | $102.96 | Agreement |
| ENGI0057-001 · Operating Engineers agreement, December 1, 2025 | ||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $51.30 | $29.95 | $81.25 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 2: DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, GRADERS, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS, FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE PLANTS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $49.30 | $29.95 | $79.25 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 3: OILERS ON CRANES. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $44.92 | $29.95 | $74.87 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 4: OILER ON CRAWLER BACKHOE. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $42.07 | $29.95 | $72.02 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 5: BULLDOZER, BOBCATS, SKID STEER LOADER, TRACTOR, SCRAPER, COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD. CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP). (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $48.35 | $29.95 | $78.30 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 6: WELL-POINT INSTALLATION CREW. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $39.15 | $29.95 | $69.10 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 7: UTILITY ENGINEERS AND SIGNAL PERSONS. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $33.15 | $29.95 | $63.10 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR COMPRESSOR. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $45.00 | $29.95 | $74.95 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER TREATMENT PLANTS, PUMPING STATIONS, TUNNELS, CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES, SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION WORK: GROUP 9: BOAT & TUG OPERATOR. (BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $ 2.00; 180 FEET AND OVER + $ 3.00; 210 FEET AND OVER + $ 4.00; 240 FEET AND OVER + $ 5.00; 270 FEET AND OVER + $ 7.00; 300 FEET AND OVER + $ 8.00; 350 FEET AND OVER + $ 9.00; 400 FEET AND OVER + $10.00); (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $48.92 | $29.95 | $78.87 | Agreement |
| ENGI0057-003 · Operating Engineers agreement, December 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1: CRANES, LIGHTERS, BOOM TRUCKS AND DERRICKS. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $50.57 | $29.95 | $80.52 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2: DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER (3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM TRUCK. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $48.57 | $29.95 | $78.52 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3: TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE PUMP & ON-SITE CONCRETE PLANT. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $48.35 | $29.95 | $78.30 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4: FIREMAN & OILER ON CRANES. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $44.35 | $29.95 | $74.30 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5: OILER ON CRAWLER BACKHOE. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $41.50 | $29.95 | $71.45 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6: BULLDOZER,SKID STEER LOADERS,BOBCATS, TRACTOR, GRADER, SCRAPER,COMBINATION LOADER BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3 YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS. CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP). (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $47.65 | $29.95 | $77.60 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 7: WELL POINT INSTALLATION CREW. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $47.22 | $29.95 | $77.17 | Agreement |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 8: HEATER, CONCRETE MIXER, STONE CRUSHER, WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND ELECTRIC DRIVEN PUMP & AIR COMPRESSOR. (BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00; 180 FT. AND OVER: + $ 3.00; 210 FT. AND OVER: + $ 4.00; 240 FT. AND OVER: + $ 5.00; 270 FT. AND OVER: + $ 7.00; 300 FT. AND OVER: + $ 8.00; 350 FT. AND OVER: + $ 9.00; 400 FT. AND OVER: + $10.00) (PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY.) (HAZMAT WORK: $2.00 PER HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.) | $44.54 | $29.95 | $74.49 | Agreement |
| ENGI0057-005 · Operating Engineers agreement, December 1, 2025 | ||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1: CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS, HOISTS, DERRICKS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $46.45 | $29.95 | $76.40 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2: DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS, FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK, DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS, CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER MACHINES, ROTATING TELEHANDLERS, SPMT TYPE EQUIPMENT. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY | $44.45 | $29.95 | $74.40 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3: WELLPOINT INSTALLATION AND DRILL/BORING MACHINE ASSISTANTS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $39.15 | $29.95 | $69.10 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4: UTILITY ENGINEERS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $25.75 | $29.95 | $55.70 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5: SIGNAL PERSONS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $33.15 | $29.95 | $63.10 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6: OILERS ON CRANES AND DECKHANDS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $39.73 | $29.95 | $69.68 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7: COMBINATION LOADER / BACKHOES, FRONT-END LOADERS (LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS, BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS, OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $43.43 | $29.95 | $73.38 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8: GAS AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS. (ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY & CHRISTMAS DAY.) | $38.70 | $29.95 | $68.65 | Agreement |
| IRON0037-001 · Ironworkers agreement, September 16, 2025 | ||||
| IRONWORKER | $43.03 | $33.53 | $76.56 | Agreement |
| LABO0271-001 · Laborers agreement, December 3, 2023 | ||||
LABORER (BUILDING CONSTRUCTION): GROUP 1…Full textLABORER (BUILDING CONSTRUCTION): GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems | $37.00 | $26.90 | $63.90 | Agreement |
LABORER (BUILDING CONSTRUCTION): GROUP 2…Full textLABORER (BUILDING CONSTRUCTION): GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator | $37.00 | $26.90 | $63.90 | Agreement |
| LABORER (BUILDING CONSTRUCTION): GROUP 3: Pre-Cast Floor & Roof Plank Erectors | $37.00 | $26.90 | $63.90 | Agreement |
LABORER (BUILDING CONSTRUCTION): GROUP 4…Full textLABORER (BUILDING CONSTRUCTION): GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster | $37.00 | $26.90 | $63.90 | Agreement |
| LABORER (BUILDING CONSTRUCTION): GROUP 5: Toxic Waste Remover | $39.00 | $26.90 | $65.90 | Agreement |
| LABO0271-002 · Laborers agreement, November 27, 2022 | ||||
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 1…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 1:Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air | $55.40 | $24.15 | $79.55 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 2…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 2: Change house attendant, powder watchperson, top person on iron | $52.93 | $24.15 | $77.08 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 3…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): COMPRESSED AIR: GROUP 3: Hazardous waste work within the ""HOT"" zone | $42.45 | $24.15 | $66.60 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 1…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator | $46.00 | $24.15 | $70.15 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 2…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 2: Change house attendant, powder watchperson $ 45.00 24.15 LABORER (HEAVY AND HIGHWAY CONSTRUCTION): FREE AIR: GROUP 3: Hazardous waste work within the ""HOT"" zone.$ 42.45 24.15 LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 1: Laborer; Carpenter tender; Cement finisher tender; Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries | $33.05 | $24.05 | $57.10 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator; Pipelayer; Pipe trench bracer | $35.75 | $24.85 | $60.60 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster | $36.50 | $24.85 | $61.35 | Agreement |
| LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 4: Flagger & signaler | $29.00 | $24.85 | $53.85 | Agreement |
| LABORER (HEAVY AND HIGHWAY CONSTRUCTION): GROUP 5: Toxic waste remover | $33.05 | $24.05 | $57.10 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION)…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW: BOTTOM MAN | $41.50 | $24.15 | $65.65 | Agreement |
LABORER (HEAVY AND HIGHWAY CONSTRUCTION)…Full textLABORER (HEAVY AND HIGHWAY CONSTRUCTION): OPEN AIR CAISSON, UNDERPINNING WORK AND BORING CREW: TOP MAN & LABORER | $35.60 | $24.15 | $59.75 | Agreement |
| LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: DRILLER | $41.95 | $24.15 | $66.10 | Agreement |
| LABORER (HEAVY AND HIGHWAY CONSTRUCTION): TEST BORING: LABORER | $41.95 | $24.15 | $66.10 | Agreement |
| PAIN0011-005 · Painters and Allied Trades agreement, June 1, 2025 | ||||
| PAINTER (BRUSH AND ROLLER) | $39.57 | $26.60 | $66.17 | Agreement |
| PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE & STRUCTURAL STEEL) | $41.57 | $26.60 | $68.17 | Agreement |
| PAINTER (SPRAY, SAND & WATER BLASTING) | $42.57 | $26.60 | $69.17 | Agreement |
| PAINTER (TAPER) | $38.82 | $25.80 | $64.62 | Agreement |
| PAINTER (WALL COVERER) | $38.57 | $25.80 | $64.37 | Agreement |
| PAIN0011-006 · Painters and Allied Trades agreement, June 1, 2024 | ||||
| GLAZIER (SWING STAGE: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY & CHRISTMAS DAY.) | $41.63 | $26.15 | $67.78 | Agreement |
| PAIN0011-011 · Painters and Allied Trades agreement, June 1, 2024 | ||||
| PAINTER (BRIDGE WORK) | $57.85 | $26.40 | $84.25 | Agreement |
| PAIN0035-008 · Painters and Allied Trades agreement, June 1, 2011 | ||||
| SIGN PAINTER | $24.79 | $13.72 | $38.51 | Agreement |
| PLAS0040-001 · Plasterers and Cement Masons agreement, January 1, 2025 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (BUILDING CONSTRUCTION) (CEMENT MASON: WORK ON FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL.) | $44.75 | $29.10 | $73.85 | Agreement |
| PLAS0040-002 · Plasterers and Cement Masons agreement, January 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY CONSTRUCTION) | $40.45 | $25.30 | $65.75 | Agreement |
| PLAS0040-003 · Plasterers and Cement Masons agreement, January 1, 2025 | ||||
| PLASTERER | $45.52 | $29.43 | $74.95 | Agreement |
| PLUM0051-002 · Plumbers and Pipefitters agreement, August 25, 2025 | ||||
| PLUMBERS AND PIPEFITTERS | $54.34 | $34.50 | $88.84 | Agreement |
| ROOF0033-004 · Roofers agreement, December 1, 2025 | ||||
| ROOFER | $47.49 | $31.44 | $78.93 | Agreement |
| SFRI0669-001 · SFRI, April 1, 2025 | ||||
| SPRINKLER FITTER | $53.76 | $33.44 | $87.20 | SFRI |
| SHEE0017-002 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER | $44.42 | $41.94 | $86.36 | Agreement |
| TEAM0251-001 · Teamsters agreement, May 1, 2025 | ||||
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 1: PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $31.86 | $34.51 | $66.37 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 2: TWO-AXLE ON LOW BEDS (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.01 | $34.51 | $66.52 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 3: TWO-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.06 | $34.51 | $66.57 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 4: THREE-AXLE DUMP TRUCK (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.11 | $34.51 | $66.62 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 5: FOUR- AND FIVE-AXLE EQUIPMENT. (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.21 | $34.51 | $66.72 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 6: LOW-BED OR BOOM TRAILER. (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.61 | $34.51 | $67.12 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 7: TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING 2 TRAILERS). (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.81 | $34.51 | $67.32 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 8…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 8: SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS.(ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.31 | $34.51 | $66.82 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 9…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 9: SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER. (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.56 | $34.51 | $67.07 | Agreement |
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10…Full textTRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP 10: TRACTOR TRAILER. (ADDITIONAL FRINGE TO BE PAID PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. EMPLOYEE WHO HAS BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3 WEEK'S PAID VACATION.) (EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS ($500.00)) (ALL DRIVERS WORKING ON A DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.) | $32.36 | $34.51 | $66.87 | Agreement |
Modification history
| Modification 2 | January 30, 2026 |
| Modification 3 | May 18, 2026 |
| Modification 4 | July 30, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on RI20260001?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 4 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.