Prevailing wage rates · Alaska · Wage determination
Prevailing wage rates: Aleutians East, Aleutians West, Skagway-Yakutat-Angoon and 15 more counties, Alaska
Residential construction · AK20260005 modification 3, published October 15, 2026
The short answer
This sheet sets 48 classifications for residential work in Aleutians East, Aleutians West, Skagway-Yakutat-Angoon and 15 more counties, Alaska. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $13.18 an hour (fence erector (including wood and chain link)) to $92.54 (laborer: group 3b). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
What changed this year
First published January 2, 2026, this sheet is now on modification 3, and its rates have changed in 1 modification. Of the 22 rates we can follow line by line from the first publication to today, 6 are higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
October 15, 2026 · modification 3
Classification names reworded; no change among the 38 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Earlier modifications
October 1, 2026 · modification 2Classification names reworded; 6 rates raised among the 32 lines we could match
- Laborer: 6 rates raised by $2.75 to $3.95 an hour
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (6)
Classification Was Now Change LABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WO… $40.25 + $34.26 $42.25 + $35.01 +$2.75 (+3.7%) LABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AN… $41.25 + $34.26 $43.25 + $35.01 +$2.75 (+3.6%) LABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INST… $42.15 + $34.26 $44.15 + $35.01 +$2.75 (+3.6%) LABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT R… $46.53 + $34.26 $48.68 + $35.01 +$2.90 (+3.6%) LABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHE… $54.01 + $28.81 $57.71 + $29.06 +$3.95 (+4.8%) LABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUIL… $29.82 + $34.26 $31.82 + $35.01 +$2.75 (+4.3%) May 18, 2026 · modification 1Classification names reworded; no change among the 48 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 3 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| ENGI0302-005 · Operating Engineers agreement, January 25, 2026 | |||||
POWER EQUIPMENT OPERATOR (GROUP 1…Full textPOWER EQUIPMENT OPERATOR (GROUP 1) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK, AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXSWAINS; BULLDOZER; CABLEWAYS, HIGHLINES AND CABLE CARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT OF BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRA-LIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE, (B) DERRICKS, (C) OVERHEAD; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE (16 INCH OR OVER); DRAG SCRAPER, YARDER, AND SIMILAR TYPES; DRILLING MACHINES, CORE, CABLE, ROTARY, AND EXPLORATION; FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER SCREED, AND SIDEWALK, CURB AND GUTTER MACHINE; GRADE CHECKER AND/OR LINE AND GRADE INCLUDING DRONE; HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER BUNCHER, AND SIMILAR; HYDRO EXCAVATION (VAC-TRUCK AND SIMILAR); LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE CLAMPS, LOADERS, ELEVATING BELT TYPE, EUCLID, AND SIMILAR TYPES; MATERIAL TRANSFER VEHICLE (ELEVATING GRADER, PICKUP MACHINE, AND SIMILAR TYPES); MECHANICS, WELDERS, BODYMAN, ELECTRICAL, CAMP MAINTENANCE ENGINEER; MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE WITH HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, L.B. FOSTER, PULLER, OR SIMILAR PAVING BREAKER; PLANT OPERATOR (ASPHALT AND CONCRETE); POWER PLANT, TURBINE OPERATOR, 200 KW AND OVER (POWER PLANTS OR COMBINATION OF POWER UNITS OVER 300 KW); REMOTE CONTROLLED EQUIPMENT; SCRAPER-THROUGH 40 YARDS; SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER); SUB GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED: CONCRETE PUMP, CONVEYOR/TELE-BELT, AND CRETER; OFF ROAD HAULER (INCLUDING ARTICULATING AND HAUL TRUCKS); WATER KOTE MACHINE | $55.75 | $30.60 | $86.35 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR (GROUP 1A…Full textPOWER EQUIPMENT OPERATOR (GROUP 1A) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE); CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS, AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTEWATER TREATMENT OPERATOR; LOADERS OVER 5 YARDS; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 KW AND OVER; QUAD; ROTO MILL, PROFILER, AND RECLAIMER; SCRAPERS OVER 40 YARDS; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS); SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I., AND SIMILAR TYPES; TOPSIDE (ASPHALT PAVER, SLURRY MACHINE, SPREADERS, AND SIMILAR TYPES) | $57.95 | $30.60 | $88.55 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR (GROUP 2…Full textPOWER EQUIPMENT OPERATOR (GROUP 2) BOILER-FIREMAN; CEMENT HOGS AND CONCRETE PUMP OPERATORS; CONVEYORS (EXCEPT AS LISTED IN GROUP I); HOISTS ON STEEL ERECTION, TOWER-MOBILES, AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR; LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCHING MACHINES UNDER 16 INCHES; WATER/WASTEWATER TREATMENT OPERATOR | $54.80 | $30.60 | $85.40 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR (GROUP 3…Full textPOWER EQUIPMENT OPERATOR (GROUP 3) ""A"" FRAME TRUCKS, DECK WINCHES; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER (SWEEPER, ELEVATOR, VACUUM OR SIMILAR); BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; HOISTS, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREENE, AND SIMILAR TYPES, (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITES), (C) FORKLIFTS WITH TOWER, (D) OVERHEAD AND FRONT END, UNDER 2 1/2 YARDS; LOCOMOTIVES: DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION; POSTHOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLERS (OTHER THAN ASPHALT); SAWS, CONCRETE; SKID HUSTLER; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; STAKE HOPPER; TOW TRACTOR | $53.90 | $30.60 | $84.50 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR (GROUP 4…Full textPOWER EQUIPMENT OPERATOR (GROUP 4) CRANE ASSISTANT ENGINEER/RIG OILER; PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. (FOOTNOTE: A) OPERATION OF ANY EQUIPMENT REQUIRING A CDL WILL BE PAID AT A GROUP 1 WAGE AND BENEFIT RATE. B) CRANE ASSISTANT ENGINEER/RIG OILER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM.) | $46.17 | $30.60 | $76.77 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR GROUP 1…Full textPOWER EQUIPMENT OPERATOR GROUP 1 (TUNNEL WORK) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK, AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXSWAINS; BULLDOZER; CABLEWAYS, HIGHLINES AND CABLE CARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT OF BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRA-LIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE, (B) DERRICKS, (C) OVERHEAD; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE (16 INCH OR OVER); DRAG SCRAPER, YARDER, AND SIMILAR TYPES; DRILLING MACHINES, CORE, CABLE, ROTARY, AND EXPLORATION; FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER SCREED, AND SIDEWALK, CURB AND GUTTER MACHINE; GRADE CHECKER AND/OR LINE AND GRADE INCLUDING DRONE; HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER BUNCHER, AND SIMILAR; HYDRO EXCAVATION (VAC-TRUCK AND SIMILAR); LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE CLAMPS, LOADERS, ELEVATING BELT TYPE, EUCLID, AND SIMILAR TYPES; MATERIAL TRANSFER VEHICLE (ELEVATING GRADER, PICKUP MACHINE, AND SIMILAR TYPES); MECHANICS, WELDERS, BODYMAN, ELECTRICAL, CAMP MAINTENANCE ENGINEER; MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE WITH HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, L.B. FOSTER, PULLER, OR SIMILAR PAVING BREAKER; PLANT OPERATOR (ASPHALT AND CONCRETE); POWER PLANT, TURBINE OPERATOR, 200 KW AND OVER (POWER PLANTS OR COMBINATION OF POWER UNITS OVER 300 KW); REMOTE CONTROLLED EQUIPMENT; SCRAPER-THROUGH 40 YARDS; SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER); SUB GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED: CONCRETE PUMP, CONVEYOR/TELE-BELT, AND CRETER; OFF ROAD HAULER (INCLUDING ARTICULATING AND HAUL TRUCKS); WATER KOTE MACHINE. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK | $61.33 | $30.60 | $91.93 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR GROUP 1A…Full textPOWER EQUIPMENT OPERATOR GROUP 1A (TUNNEL WORK) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE); CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS, AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTEWATER TREATMENT OPERATOR; LOADERS OVER 5 YARDS; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 KW AND OVER; QUAD; ROTO MILL, PROFILER, AND RECLAIMER; SCRAPERS OVER 40 YARDS; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS); SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I., AND SIMILAR TYPES; TOPSIDE (ASPHALT PAVER, SLURRY MACHINE, SPREADERS, AND SIMILAR TYPES). FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK | $63.75 | $30.60 | $94.35 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR GROUP 2…Full textPOWER EQUIPMENT OPERATOR GROUP 2 (TUNNEL WORK) BOILER-FIREMAN; CEMENT HOGS AND CONCRETE PUMP OPERATORS; CONVEYORS (EXCEPT AS LISTED IN GROUP I); HOISTS ON STEEL ERECTION, TOWER-MOBILES, AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR; LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCHING MACHINES UNDER 16 INCHES; WATER/WASTEWATER TREATMENT OPERATOR. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $60.28 | $30.60 | $90.88 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR GROUP 3…Full textPOWER EQUIPMENT OPERATOR GROUP 3 (TUNNEL WORK)""A"" FRAME TRUCKS, DECK WINCHES; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER (SWEEPER, ELEVATOR, VACUUM OR SIMILAR); BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; HOISTS, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREENE, AND SIMILAR TYPES, (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITES), (C) FORKLIFTS WITH TOWER, (D) OVERHEAD AND FRONT END, UNDER 2 1/2 YARDS; LOCOMOTIVES: DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION; POSTHOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLERS (OTHER THAN ASPHALT); SAWS, CONCRETE; SKID HUSTLER; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; STAKE HOPPER; TOW TRACTOR. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $59.29 | $30.60 | $89.89 | — | Agreement, 2026 |
POWER EQUIPMENT OPERATOR GROUP 4…Full textPOWER EQUIPMENT OPERATOR GROUP 4 (TUNNEL WORK) CRANE ASSISTANT ENGINEER/RIG OILER; PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. (FOOTNOTE: A) GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. B) OPERATION OF ANY EQUIPMENT REQUIRING A CDL WILL BE PAID AT A GROUP 1 WAGE AND BENEFIT RATE. C) CRANE ASSISTANT ENGINEER/RIG OILER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM.) | $50.79 | $30.60 | $81.39 | — | Agreement, 2026 |
| LABO0341-001 · Laborers agreement, April 1, 2026 | |||||
LABORER: GROUP 1…Full textLABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $42.25 | $35.01 | $77.26 | +$2.75 (+3.7%) | Agreement, 2026 |
LABORER: GROUP 1…Full textLABORER: GROUP 1 TUNNELS, SHAFTS, AND RAISES (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $46.48 | $35.01 | $81.49 | — | Agreement, 2026 |
LABORER: GROUP 2…Full textLABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $43.25 | $35.01 | $78.26 | +$2.75 (+3.6%) | Agreement, 2026 |
LABORER: GROUP 2…Full textLABORER: GROUP 2 TUNNELS, SHAFTS, AND RAISES (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $47.58 | $35.01 | $82.59 | — | Agreement, 2026 |
LABORER: GROUP 3…Full textLABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $44.15 | $35.01 | $79.16 | +$2.75 (+3.6%) | Agreement, 2026 |
LABORER: GROUP 3…Full textLABORER: GROUP 3 TUNNELS, SHAFTS, AND RAISES (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $48.57 | $35.01 | $83.58 | — | Agreement, 2026 |
LABORER: GROUP 3A…Full textLABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $48.68 | $35.01 | $83.69 | +$2.90 (+3.6%) | Agreement, 2026 |
LABORER: GROUP 3A…Full textLABORER: GROUP 3A TUNNELS, SHAFTS, AND RAISES (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $53.55 | $35.01 | $88.56 | — | Agreement, 2026 |
LABORER: GROUP 3B…Full textLABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $57.71 | $29.06 | $86.77 | +$3.95 (+4.8%) | Agreement, 2026 |
LABORER: GROUP 3B…Full textLABORER: GROUP 3B TUNNELS, SHAFTS, AND RAISES (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $63.48 | $29.06 | $92.54 | — | Agreement, 2026 |
LABORER: GROUP 4…Full textLABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $31.82 | $35.01 | $66.83 | +$2.75 (+4.3%) | Agreement, 2026 |
| LABO0942-001 · Laborers agreement, April 1, 2026 | |||||
LABORER: GROUP 1…Full textLABORER: GROUP 1 (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $42.25 | $35.01 | $77.26 | — | Agreement, 2026 |
LABORER: GROUP 1…Full textLABORER: GROUP 1 TUNNELS, SHAFTS, AND RAISES (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $46.48 | $35.01 | $81.49 | — | Agreement, 2026 |
LABORER: GROUP 2…Full textLABORER: GROUP 2 (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $43.25 | $35.01 | $78.26 | — | Agreement, 2026 |
LABORER: GROUP 2…Full textLABORER: GROUP 2 TUNNELS, SHAFTS, AND RAISES (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $47.58 | $35.01 | $82.59 | — | Agreement, 2026 |
LABORER: GROUP 3…Full textLABORER: GROUP 3 (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $44.15 | $35.01 | $79.16 | — | Agreement, 2026 |
LABORER: GROUP 3…Full textLABORER: GROUP 3 TUNNELS, SHAFTS, AND RAISES (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $48.57 | $35.01 | $83.58 | — | Agreement, 2026 |
LABORER: GROUP 3A…Full textLABORER: GROUP 3A (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $48.68 | $35.01 | $83.69 | — | Agreement, 2026 |
LABORER: GROUP 3A…Full textLABORER: GROUP 3A TUNNELS, SHAFTS, AND RAISES (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $53.55 | $35.01 | $88.56 | — | Agreement, 2026 |
LABORER: GROUP 3B…Full textLABORER: GROUP 3B (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $57.71 | $29.06 | $86.77 | — | Agreement, 2026 |
LABORER: GROUP 3B…Full textLABORER: GROUP 3B TUNNELS, SHAFTS, AND RAISES (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $63.48 | $29.06 | $92.54 | — | Agreement, 2026 |
LABORER: GROUP 4…Full textLABORER: GROUP 4 (NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP | $31.82 | $35.01 | $66.83 | — | Agreement, 2026 |
| SUAK1999-008 · Survey of contractors in AK, May 14, 1999 | |||||
| CARPENTER (EXCLUDING BATT & BLOW INSULATION AND DRYWALL HANGING) | $17.68 | $0.00 | $17.68 | no change | Survey, 1999 |
| CEMENT MASON/CONCRETE FINISHER | $20.00 | $0.00 | $20.00 | no change | Survey, 1999 |
| DRYWALL FINISHER/TAPER | $20.10 | $0.00 | $20.10 | no change | Survey, 1999 |
| DRYWALL HANGER | $15.00 | $0.00 | $15.00 | no change | Survey, 1999 |
| ELECTRICIAN/WIREMAN | $17.45 | $3.18 | $20.63 | no change | Survey, 1999 |
| FENCE ERECTOR (INCLUDING WOOD AND CHAIN LINK) | $13.18 | $0.00 | $13.18 | no change | Survey, 1999 |
| FLOOR LAYER: CARPET | $20.64 | $0.00 | $20.64 | no change | Survey, 1999 |
| INSTALLER (BATT & BLOWN) | $18.55 | $0.00 | $18.55 | no change | Survey, 1999 |
| LABORER, GENERAL (EXCLUDING SITE AND STREET WORK) | $13.88 | $0.00 | $13.88 | no change | Survey, 1999 |
| PAINTER (EXCLUDING DRYWALL FINISHING) | $20.60 | $4.47 | $25.07 | no change | Survey, 1999 |
| PIPEFITTER (HVAC PIPING) | $14.00 | $0.00 | $14.00 | no change | Survey, 1999 |
| PLUMBER/PIPEFITTER (EXCLUDING HVAC WORK) | $22.80 | $0.00 | $22.80 | no change | Survey, 1999 |
| ROOFER | $19.27 | $0.00 | $19.27 | no change | Survey, 1999 |
| SHEET METAL WORKER (HVAC DUCT WORK) | $16.79 | $0.00 | $16.79 | no change | Survey, 1999 |
| TRUCK DRIVER (EXCLUDING DUMP, OVER 8 YARDS AND DUMP 8 YARDS OR UNDER) | $17.56 | $0.00 | $17.56 | no change | Survey, 1999 |
| TEAM0959-004 · Teamsters agreement, January 1, 2025 | |||||
| TRUCK DRIVER ((1A) DUMP, OVER 8 YARDS) | $48.50 | $26.43 | $74.93 | no change | Agreement, 2025 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | October 1, 2026 |
| Modification 3 | October 15, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on AK20260005?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 3 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and AK20260005 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 48 classifications in 5 rate groups
- 4 from agreements, 1 from surveys
- Counties: Aleutians East, Aleutians West, Skagway-Yakutat-Angoon, Bethel, Bristol Bay, Dillingham, Haines, Juneau, Kenai Peninsula, Ketchikan Gateway, Kodiak Island, Peninsula & Lake, Matanuska-Susitna, Prince Of Wales-Outer Ketchika, Sitka, Wrangell-Petersburg, Valdez-Cordova, Wade Hampton