Prevailing wage rates · Alaska · Wage determination
Prevailing wage rates: Aleutians East, Aleutians West, Anchorage and 23 more counties, Alaska
Building, Heavy construction · AK20260001 modification 1, published May 18, 2026
The short answer
This sheet sets 79 classifications for building, heavy work in Aleutians East, Aleutians West, Anchorage and 23 more counties, Alaska. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $53.39 an hour (tile & terrazzo finisher) to $119.25 (piledriver (piledriver). Your contract may lock an earlier modification.
Scope
Building Construction Projects
Heavy Construction Projects
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0007-006 · Asbestos Workers and Heat & Frost Insulators agreement, February 27, 2023 | ||||
HAZARDOUS MATERIAL HANDLER…Full textHAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS) | $37.38 | $19.55 | $56.93 | Agreement |
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $41.35 | $16.46 | $57.81 | Agreement |
| BOIL0502-002 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $58.33 | $28.79 | $87.12 | Agreement |
| BRAK0001-002 · Bricklayers agreement, July 1, 2024 | ||||
| TILE & TERRAZZO FINISHER | $40.91 | $12.48 | $53.39 | Agreement |
| BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON, TILE SETTER, TERRAZZO WORKER | $52.77 | $12.36 | $65.13 | Agreement |
| CARP1281-001 · Carpenters agreement, April 1, 2025 | ||||
| CARPENTER (INCLUDING LATHER AND DRYWALL HANGING) | $50.79 | $26.42 | $77.21 | Agreement |
| CARP1281-002 · Carpenters agreement, June 1, 2025 | ||||
| MILLWRIGHT | $56.44 | $25.87 | $82.31 | Agreement |
| CARP2520-003 · Carpenters agreement, April 1, 2025 | ||||
| PILEDRIVER (WELDER) | $54.28 | $26.42 | $80.70 | Agreement |
| PILEDRIVER (SHEET STABBER) | $48.72 | $26.42 | $75.14 | Agreement |
PILEDRIVER (PILEDRIVER…Full textPILEDRIVER (PILEDRIVER; SKIFF OPERATOR AND RIGGER) $ 48.72 26.42 DIVER (WORKING) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00 PER FOOT/DAY 51-100 FEET $2.00 PER FOOT/DAY 101 FEET AND ABOVE $3.00 PER FOOT/DAY SATURATION DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $92.83 | $26.42 | $119.25 | Agreement |
DIVER (TENDER) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE…Full textDIVER (TENDER) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00 PER FOOT/DAY 51-100 FEET $2.00 PER FOOT/DAY 101 FEET AND ABOVE $3.00 PER FOOT/DAY SATURATION DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $53.03 | $25.34 | $78.37 | Agreement |
DIVER (STAND BY) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE…Full textDIVER (STAND BY) DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE: 50-100 FEET $1.00 PER FOOT 101 FEET AND DEEPER $2.00 PER FOOT ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT: 5-50 FEET $1.00 PER FOOT/DAY 51-100 FEET $2.00 PER FOOT/DAY 101 FEET AND ABOVE $3.00 PER FOOT/DAY SATURATION DIVING: THE STANDBY RATE APPLIES UNTIL SATURATION STARTS. THE SATURATION DIVING RATE APPLIES WHEN DIVERS ARE UNDER PRESSURE CONTINUOUSLY UNTIL WORK TASK AND DECOMPRESSION ARE COMPLETE. THE DIVER RATE SHALL BE PAID FOR ALL SATURATION HOURS. WORK IN COMBINATION OF CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT | $61.42 | $25.34 | $86.76 | Agreement |
| ELEC1547-004 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
| ELECTRICIAN | $55.44 | $30.33 | $85.77 | Agreement |
| CABLE SPLICER | $55.44 | $30.33 | $85.77 | Agreement |
| ELEC1547-005 · Electrical Workers (IBEW) agreement, April 1, 2025 | ||||
| TREE TRIMMER, LINE CONSTRUCTION | $42.23 | $30.10 | $72.33 | Agreement |
| POWDERMAN, LINE CONSTRUCTION | $70.59 | $35.59 | $106.18 | Agreement |
| LINEMEN: LINE CONSTRUCTION (INCLUDING EQUIPMENT OPERATORS, TECHNICIAN) | $72.59 | $35.65 | $108.24 | Agreement |
| CABLE SPLICER (LINE CONSTRUCTION) | $74.34 | $35.70 | $110.04 | Agreement |
| ELEV0019-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTE: A. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $71.44 | $38.44 | $109.88 | Agreement |
| ENGI0302-002 · Operating Engineers agreement, January 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1 (TUNNEL WORK) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE (16 INCH OR OVER); DRILLING MACHINES, CORE, CABLE, ROTARY AND EXPLORATION; FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER SCREED, SIDEWALK, CURB AND GUTTER MACHINE; HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER BUNCHER AND SIMILAR; LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE CLAMPS; LOADERS, ELEVATING BELT TYPE, EUCLID AND SIMILAR TYPES; MECHANICS, BODYMAN; MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE W/HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, L. B. FOSTER, PULLER OR SIMILAR PAVING BREAKER; POWER PLANT, TURBINE OPERATOR, 200 K.W. AND OVER (POWER PLANTS OR COMBINATION OF POWER UNITS OVER 300 K.W.); SCRAPERS-THROUGH 40 YARDS; SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER), SPREADERS, BLAW KNOX, CEDARAPIDS, BARBER GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER KOTE MACHINE; UNLICENSED OFF ROAD HAULER FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $58.55 | $29.50 | $88.05 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 4…Full textPOWER EQUIPMENT OPERATOR GROUP 4 (TUNNEL WORK) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $48.47 | $29.50 | $77.97 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 3…Full textPOWER EQUIPMENT OPERATOR GROUP 3 (TUNNEL WORK) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND SIMILAR TYPES (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITE) (C) FORKLIFTS WITH TOWER (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 YDS. LOCOMOTIVES:DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION; POST HOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $56.60 | $29.50 | $86.10 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 2…Full textPOWER EQUIPMENT OPERATOR GROUP 2 (TUNNEL WORK) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $57.55 | $29.50 | $87.05 | Agreement |
POWER EQUIPMENT OPERATOR GROUP 1A…Full textPOWER EQUIPMENT OPERATOR GROUP 1A (TUNNEL WORK) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS; | $60.86 | $29.50 | $90.36 | Agreement |
POWER EQUIPMENT OPERATOR (GROUP 4…Full textPOWER EQUIPMENT OPERATOR (GROUP 4) RIG OILER/CRANE ASSISTANT ENGINEER;PARTS AND EQUIPMENT COORDINATOR; SWAMPER (ON TRENCHING MACHINES OR SHOVEL TYPE EQUIPMENT); SPOTTER; STEAM CLEANER; DRILL HELPER. FOOTNOTE: GROUPS 1-4 RECEIVE 10% PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM | $44.06 | $29.50 | $73.56 | Agreement |
POWER EQUIPMENT OPERATOR (GROUP 3…Full textPOWER EQUIPMENT OPERATOR (GROUP 3) ""A"" FRAME TRUCKS, DECK WINCHES: SINGLE POWER DRUM; BOMBARDIER (TACK OR TOW RIG); BORING MACHINE; BROOMS-POWER; BUMP CUTTER; COMPRESSOR; FARM TRACTOR; FORKLIFT, INDUSTRIAL TYPE; GIN TRUCK OR WINCH TRUCK WITH POLES WHEN USED FOR HOISTING; GRADE CHECKER AND STAKE HOPPER; HOIST, AIR TUGGERS, ELEVATORS; LOADERS: (A) ELEVATING-ATHEY, BARBER GREEN AND SIMILAR TYPES (B) FORKLIFTS OR LUMBER CARRIER (ON CONSTRUCTION JOB SITE) (C) FORKLIFTS WITH TOWER (D) OVERHEAD AND FRONT-END, UNDER 2 1/2 YDS. LOCOMOTIVES:DINKEY (AIR, STEAM, GAS AND ELECTRIC) SPEEDERS; MECHANICS (LIGHT DUTY); OIL, BLOWER DISTRIBUTION; POST HOLE DIGGERS, MECHANICAL; POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR | $51.46 | $29.50 | $80.96 | Agreement |
POWER EQUIPMENT OPERATOR (GROUP 2…Full textPOWER EQUIPMENT OPERATOR (GROUP 2) BOILER-FIREMAN; CEMENT HOG AND CONCRETE PUMP OPERATOR; CONVEYORS (EXCEPT AS LISTED IN GROUP 1); HOIST ON STEEL ERECTION; TOWERMOBILES AND AIR TUGGERS; HORIZONTAL/DIRECTIONAL DRILL LOCATOR;LICENSED GRADE TECHNICIAN; LOADERS, (I.E., ELEVATING GRADER AND MATERIAL TRANSFER VEHICLE); LOCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR | $52.32 | $29.50 | $81.82 | Agreement |
POWER EQUIPMENT OPERATOR (GROUP 1A…Full textPOWER EQUIPMENT OPERATOR (GROUP 1A) CAMERA/TOOL/VIDEO OPERATOR (SLIPLINE), CRANES-OVER 45 TONS OR 150 FOOT (INCLUDING JIB AND ATTACHMENTS): (A) CLAMSHELLS AND DRAGLINES (OVER 3 YARDS), (B) TOWER CRANES; LICENSED WATER/WASTE WATER TREATMENT OPERATOR; LOADERS OVER 5 YDS.; CERTIFIED WELDER, ELECTRICAL MECHANIC, CAMP MAINTENANCE ENGINEER, MECHANIC (OVER 10,000 HOURS); MOTOR PATROL GRADER, DOZER, GRADE TRACTOR, ROTO-MILL/PROFILER (FINISH: WHEN FINISHING TO FINAL GRADE AND/OR TO HUBS, OR FOR ASPHALT); POWER PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS; | $55.33 | $29.50 | $84.83 | Agreement |
POWER EQUIPMENT OPERATOR (GROUP 1…Full textPOWER EQUIPMENT OPERATOR (GROUP 1) ASPHALT ROLLER: BREAKDOWN, INTERMEDIATE, AND FINISH; BACK FILLER; BARRIER MACHINE (ZIPPER); BELTCRETE WITH POWER PACK AND SIMILAR CONVEYORS; BENDING MACHINE; BOAT COXWAINS; BULLDOZERS; CABLEWAYS, HIGHLINES AND CABLECARS; CLEANING MACHINE; COATING MACHINE; CONCRETE HYDRO BLASTER; CRANES-45 TONS AND UNDER OR 150 FOOT BOOM AND UNDER (INCLUDING JIB AND ATTACHMENTS): (A) HYDRALIFTS OR TRANSPORTERS, ALL TRACK OR TRUCK TYPE,(B) DERRICKS; CRUSHERS; DECK WINCHES-DOUBLE DRUM; DITCHING OR TRENCHING MACHINE (16 INCH OR OVER); DRILLING MACHINES, CORE, CABLE, ROTARY AND EXPLORATION; FINISHING MACHINE OPERATOR, CONCRETE PAVING, LASER SCREED, SIDEWALK, CURB AND GUTTER MACHINE; HELICOPTERS; HOVER CRAFT, FLEX CRAFT, LOADMASTER, AIR CUSHION, ALL TERRAIN VEHICLE, ROLLAGON, BARGECABLE, NODWELL, AND SNOW CAT; HYDRO AX: FELLER BUNCHER AND SIMILAR; LOADERS (2 1/2 YARDS THROUGH 5 YARDS, INCLUDING ALL ATTACHMENTS): FORKLIFTS WITH TELESCOPIC BOOM AND SWING ATTACHMENT, OVERHEAD AND FRONT END, 2 1/2 YARDS THROUGH 5 YARDS, LOADERS WITH FORKS OR PIPE CLAMPS; LOADERS, ELEVATING BELT TYPE, EUCLID AND SIMILAR TYPES; MECHANICS, BODYMAN; MICRO TUNNELING MACHINE; MIXERS: MOBILE TYPE W/HOIST COMBINATION; MOTOR PATROL GRADER; MUCKING MACHINES: MOLE, TUNNEL DRILL, HORIZONTAL/DIRECTIONAL DRILL OPERATOR, AND/OR SHIELD; OPERATOR ON DREDGES; PILEDRIVER ENGINEERS, L. B. FOSTER, PULLER OR SIMILAR PAVING BREAKER; POWER PLANT, TURBINE OPERATOR, 200 K.W. AND OVER (POWER PLANTS OR COMBINATION OF POWER UNITS OVER 300 K.W.); SCRAPERS-THROUGH 40 YARDS; SERVICE OILER/SERVICE ENGINEER; SIDEBOOMS-UNDER 45 TONS; SHOT BLAST MACHINE; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS, AND GRADEALLS (3 YARDS AND UNDER), SPREADERS, BLAW KNOX, CEDARAPIDS, BARBER GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER KOTE MACHINE; UNLICENSED OFF ROAD HAULER | $53.23 | $29.50 | $82.73 | Agreement |
| IRON0751-003 · Ironworkers agreement, July 1, 2025 | ||||
| IRONWORKER (HELICOPTER, TOWER) | $47.89 | $39.48 | $87.37 | Agreement |
| IRONWORKER (GUARDRAIL LAYOUT MAN) | $44.22 | $39.48 | $83.70 | Agreement |
| IRONWORKER (GUARDRAIL INSTALLERS) | $44.48 | $39.48 | $83.96 | Agreement |
| IRONWORKER (FENCE, BARRIER INSTALLER) | $43.48 | $39.48 | $82.96 | Agreement |
IRONWORKER (BRIDGE…Full textIRONWORKER (BRIDGE, STRUCTURAL, ORNAMENTAL, REINFORCING MACHINERY MOVER, RIGGER, SHEETER, STAGE RIGGER, BENDER OPERATOR) | $46.98 | $39.48 | $86.46 | Agreement |
| IRONWORKER (BENDER OPERATOR) | $46.98 | $39.48 | $86.46 | Agreement |
| LABO0341-001 · Laborers agreement, April 1, 2025 | ||||
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B…Full textLABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $59.41 | $28.81 | $88.22 | Agreement |
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A…Full textLABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $51.18 | $34.26 | $85.44 | Agreement |
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3…Full textLABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $46.37 | $34.26 | $80.63 | Agreement |
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 2…Full textLABORER: TUNNELS, SHAFTS, AND RAISES GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $45.38 | $34.26 | $79.64 | Agreement |
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1…Full textLABORER: TUNNELS, SHAFTS, AND RAISES GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $44.28 | $34.26 | $78.54 | Agreement |
LABORER: GROUP 4…Full textLABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $29.82 | $34.26 | $64.08 | Agreement |
LABORER: GROUP 3B…Full textLABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $54.01 | $28.81 | $82.82 | Agreement |
LABORER: GROUP 3A…Full textLABORER: GROUP 3A (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $46.53 | $34.26 | $80.79 | Agreement |
LABORER: GROUP 3…Full textLABORER: GROUP 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $42.15 | $34.26 | $76.41 | Agreement |
LABORER: GROUP 2…Full textLABORER: GROUP 2 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $41.25 | $34.26 | $75.51 | Agreement |
LABORER: GROUP 1…Full textLABORER: GROUP 1 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $40.25 | $34.26 | $74.51 | Agreement |
| LABO0942-001 · Laborers agreement, April 1, 2025 | ||||
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3B…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3B (TUNNELS, SHAFTS, AND RAISES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $59.41 | $28.81 | $88.22 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 3…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 3 (TUNNELS, SHAFTS, AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $46.37 | $34.26 | $80.63 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 2…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 2 (TUNNELS, SHAFTS, AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $45.38 | $34.26 | $79.64 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 1…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES: GROUP 1 (TUNNELS, SHAFTS, AND RAISES) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $44.28 | $34.26 | $78.54 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 4…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 4) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS | $29.82 | $34.26 | $64.08 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3B…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3B) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE) | $54.01 | $28.81 | $82.82 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3A…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3A) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $46.53 | $34.26 | $80.79 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN | $42.15 | $34.26 | $76.41 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 2…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 2) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER (SACK OR BULK); CHOKER SPLICER; CHUCKTENDER (WAGON, AIRTRACK AND HYDRAULIC DRILLS); CONCRETE LABORERS (POWER BUGGY, CONCRETE SAWS, PUMPCRETE NOZZLEMAN, VIBRATORMAN); CULVERT PIPE LABORER; CURED IN PLACE PIPELAYER; ENVIRONMENTAL LABORER (MARINE WORK, OIL SPILL SKIMMER OPERATOR, SMALL BOAT OPERATOR); FOAM GUN OR FOAM MACHINE OPERATOR; GREEN CUTTER (DAM WORK); GUNNITE OPERATOR; HOD CARRIERS; JACKHAMMER OR PAVEMENT BREAKERS (MORE THAN 45 POUNDS);LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK ABOVE 4 FEET); MASON TENDER AND MUD MIXER (SEWER WORK); PILOT CAR; PLASTERER, BRICKLAYER AND CEMENT FINISHER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN | $41.25 | $34.26 | $75.51 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 1…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 1) ASPHALT WORKERS (SHOVELMAN, PLANT CREW); BRUSH CUTTERS; CAMP MAINTENANCE LABORER; CARPENTER TENDERS; CHOKE SETTERS, HOOK TENDER, RIGGER, SIGNALMAN; CONCRETE LABORER(CURB AND GUTTER, CHUTE HANDLER, GROUTING, CURING, SCREEDING); CRUSHER PLANT LABORER; DEMOLITION LABORER; DITCH DIGGERS; DUMP MAN; ENVIRONMENTAL LABORER (ASBESTOS (LIMITED TO NONMECHANICAL SYSTEMS), HAZARDOUS AND TOXIC WASTE, OIL SPILL); FENCE INSTALLER; FIRE WATCH LABORER; FLAGMAN; FORM STRIPPERS; GENERAL LABORER; GUARDRAIL LABORER, BRIDGE RAIL INSTALLERS; HYDRO-SEEDER NOZZLEMAN; LABORERS (BUILDING); LANDSCAPE OR PLANTER; LAYING OF DECORATIVE BLOCK (RETAINING WALLS, FLOWERED DECORATIVE BLOCK 4 FEET AND BELOW); MATERIAL HANDLERS; PNEUMATIC OR POWER TOOLS; PORTABLE OR CHEMICAL TOILET SERVICEMAN; PUMP MAN OR MIXER MAN; RAILROAD TRACK LABORER; SANDBLAST, POT TENDER; SAW TENDERS; SCAFFOLD BUILDING AND ERECTING; SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER | $40.25 | $34.26 | $74.51 | Agreement |
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3A…Full textLABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3A (TUNNELS, SHAFTS, AND RAISES) ASPHALT RAKER, ASPHALT BELLY DUMP LAY DOWN; DRILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS | $51.18 | $34.26 | $85.44 | Agreement |
| PAIN1959-001 · Painters and Allied Trades agreement, July 1, 2025 | ||||
PAINTER: TAPING, TEXTURING…Full textPAINTER: TAPING, TEXTURING, STRUCTURAL PAINTING, SANDBLASTING, POT TENDER, FINISH METAL, SPRAY, BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT ABATEMENT, HAZARDOUS MATERIAL HANDLER (NORTH OF THE 63RD PARALLEL) | $43.57 | $26.45 | $70.02 | Agreement |
| PAINTER: BRUSH/ROLLER PAINT OR WALL COVERER (NORTH OF THE 63RD PARALLEL) | $43.05 | $26.45 | $69.50 | Agreement |
| PAIN1959-002 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| PAINTER: TAPER / PAPER & VINYL HANGER (SOUTH OF THE 63RD PARALLEL) | $38.54 | $30.20 | $68.74 | Agreement |
| PAINTER: INDUSTRIAL PAINTER (SOUTH OF THE 63RD PARALLEL) | $38.64 | $30.20 | $68.84 | Agreement |
| PAINTER: GENERAL PAINTER (SOUTH OF THE 63RD PARALLEL) | $37.29 | $30.20 | $67.49 | Agreement |
| PAIN1959-003 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| GLAZIER (NORTH OF THE 63RD PARALLEL) | $46.76 | $30.46 | $77.22 | Agreement |
| PAIN1959-004 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| FLOOR LAYER: CARPET | $39.48 | $16.25 | $55.73 | Agreement |
| PAIN1959-006 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| GLAZIER (SOUTH OF THE 63RD PARALLEL) | $47.42 | $29.10 | $76.52 | Agreement |
| PLAS0528-006 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
| PLASTERER (SOUTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | $71.56 | Agreement |
| PLASTERER (NORTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | $71.56 | Agreement |
| PLAS0528-007 · Plasterers and Cement Masons agreement, April 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER (SOUTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | $71.56 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (NORTH OF THE 63RD PARALLEL) | $49.28 | $22.28 | $71.56 | Agreement |
| PLUM0262-002 · Plumbers and Pipefitters agreement, January 1, 2023 | ||||
Group definitions, zones and premiums for PLUM0262-002PLUMBER; STEAMFITTER (EAST OF THE 141ST MERIDIAN).$ 41.50 27.62 | ||||
| PLUM0367-002 · Plumbers and Pipefitters agreement, September 1, 2025 | ||||
Group definitions, zones and premiums for PLUM0367-002PLUMBER; STEAMFITTER (SOUTH OF THE 63RD PARALLEL).$ 50.00 33.20 | ||||
| PLUM0375-002 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
Group definitions, zones and premiums for PLUM0375-002PLUMBER; STEAMFITTER (NORTH OF THE 63RD PARALLEL).$ 55.66 34.90 | ||||
| PLUM0669-002 · Plumbers and Pipefitters agreement, April 1, 2025 | ||||
| SPRINKLER FITTER | $60.67 | $31.39 | $92.06 | Agreement |
| ROOF0189-006 · Roofers agreement, April 1, 2025 | ||||
| ROOFER | $52.07 | $19.62 | $71.69 | Agreement |
| SHEE0023-003 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER (SOUTH OF THE 63RD PARALLEL) | $52.08 | $30.81 | $82.89 | Agreement |
| SHEE0023-004 · Sheet Metal Workers agreement, July 1, 2025 | ||||
| SHEET METAL WORKER (NORTH OF THE 63RD PARALLEL) | $58.73 | $29.54 | $88.27 | Agreement |
| TEAM0959-003 · Teamsters agreement, January 1, 2025 | ||||
TRUCK DRIVER (GROUP 5…Full textTRUCK DRIVER (GROUP 5) GRAVEL SPREADER BOX OPERATOR ON TRUCK; FLAT BEDS, SINGLE REAR AXLE; BOOM TRUCK/KNUCKLE TRUCK UP TO AND INCLUDING 5 TONS; PICKUPS (PILOT CARS AND ALL LIGHT DUTY VEHICLES); WATER WAGON (BELOW 250 BBLS); GIN POLE TRUCK, WINCH TRUCK, WRECKER, TRUCK MOUNTED ""A"" FRAME, MANUFACTURED RATING 5 TONS AND UNDER; BULL LIFTS AND FORK LIFTS (FORK LIFTS WITH POWER BROOM AND SWING ATTACHMENTS UP TO AND INCLUDING 5 TONS); BUFFER TRUCK; TACK TRUCK; FARM TYPE RUBBER TIRED TRACTOR (WHEN MATERIAL HANDLING OR PULLING WAGONS ON A CONSTRUCTION PROJECT); FOAM DISTRIBUTOR, SINGLE AXLE; HYDRO-SEEDERS, SINGLE AXLE; TEAM DRIVERS (HORSES, MULES AND SIMILAR EQUIPMENT); FUEL HANDLER (STATION/BULK ATTENDANT); BATCH TRUCK, UP TO AND INCLUDING 7 YARDS; GEAR/SUPPLY TRUCK; BUS OPERATOR, UP TO 30 PASSENGERS; RIGGER/SWAMPER | $47.62 | $26.43 | $74.05 | Agreement |
TRUCK DRIVER (GROUP 4…Full textTRUCK DRIVER (GROUP 4) BUGGYMOBILE; SEMI OR TRUCK AND TRAILER; DUMPSTER; TIREMAN (LIGHT DUTY); DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCK WITH PUPS) UP TO AND INCLUDING 10 YARDS; TRACK TRUCK EQUIPMENT; GREASE TRUCK; FLAT BEDS, DUAL REAR AXLE; HYSTER OPERATORS (HANDLING BULK AGGREGATE); LUMBER CARRIER; WATER WAGON, SEMI; WATER TRUCK, DUAL AXLE; GIN POLE TRUCK, WINCH TRUCK, WRECKER, TRUCK MOUNTED ""A"" FRAME MANUFACTURED RATING OVER 5 TONS; BULL LIFTS AND FORK LIFTS WITH POWER BOOM AND SWING ATTACHMENTS, OVER 5 TONS; FRONT END LOADER WITH FORKS; BUS OPERATOR OVER 30 PASSENGERS; ALL TERRAIN VEHICLES; BOOM TRUCK/KNUCKLE TRUCK OVER 5 TONS; FOAM DISTRIBUTOR TRUCK/DUAL AXLE; HYDRO-SEEDERS, DUAL AXLE; VACUUM TRUCKS, TRUCK VACUUM SWEEPERS; LOADMASTER (AIR AND WATER); AIR CUSHION OR SIMILAR TYPE VEHICLE; FIRE TRUCK/AMBULANCE DRIVER; COMBINATION TRUCK-FUEL AND GREASE; COMPACTOR (WHEN PULLED BY RUBBER TIRED EQUIPMENT); RIGGER (AIR/WATER/OILFIELD); READY MIX, UP TO AND INCLUDING 7 YARDS; | $48.50 | $26.43 | $74.93 | Agreement |
TRUCK DRIVER (GROUP 3…Full textTRUCK DRIVER (GROUP 3) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 10 YARDS UP TO AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND UP; OIL DISTRIBUTOR DRIVERS; OIL DISTRIBUTOR DRIVERS; TRUCKS/JEEPS (PUSH OR PULL); TRAFFIC CONTROL TECHNICIAN | $49.17 | $26.43 | $75.60 | Agreement |
TRUCK DRIVER (GROUP 2…Full textTRUCK DRIVER (GROUP 2) TURN-O-WAGON OR DW-10 NOT SELF-LOADING; ALL DELTAS, COMMANDERS, ROLLOGANS, AND SIMILAR EQUIPMENT; MECHANICS; DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 20 YARDS UP TO AND INCLUDING 40 YARDS; LOWBOYS INCLUDING ATTACHED TRAILERS AND JEEPS UP TO AND INCLUDING 8 AXLES; SUPER VAC TRUCK/CACASCO TRUCK/HEAT STRESS TRUCK; READY-MIX OVER 7 YARDS UP TO AND INCLUDING 12 YARDS; PARTSMAN; STRINGING TRUCK | $50.12 | $26.43 | $76.55 | Agreement |
TRUCK DRIVER (GROUP 1A…Full textTRUCK DRIVER (GROUP 1A) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 60 YARDS UP TO AND INCLUDING 100 YARDS; JEEPS (DRIVER UNDER LOAD) | $53.05 | $26.43 | $79.48 | Agreement |
TRUCK DRIVER (GROUP 1…Full textTRUCK DRIVER (GROUP 1) SEMI WITH DOUBLE BOX MIXER; DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 40 YARDS UP TO AND INCLUDING 60 YARDS; DELTAS, COMMANDERS, ROLLOGANS AND SIMILAR EQUIPMENT WHEN PULLING SLEDS, TRAILERS OR SIMILAR EQUIPMENT; BOAT COXSWAIN; LOWBOYS INCLUDING ATTACHED TRAILERS AND JEEPS, UP TO AND INCLUDING 12 AXLES; READY-MIX OVER 12 YARDS UP TO AND INCLUDING 15 YARDS); WATER WAGON (250 BBLS AND ABOVE); TIREMAN, HEAVY DUTY/FUELER | $51.58 | $26.43 | $78.01 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on AK20260001?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator