This sheet sets 27 classifications for highway work in Calhoun, Grant, Pendleton and Upshur Counties, West Virginia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $42.45 an hour (laborer: common or general) to $63.31 (cement mason/concrete finisher). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ENGI0132-002 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: CRANE | $40.35 | $20.30 | $60.65 | Agreement |
| ENGI0132-003 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-004 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-005 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: BROOM/SWEEPER | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-030 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: BULLDOZER | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-031 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: DRILL | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-032 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: FORKLIFT | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-033 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: GRADER/BLADE | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-034 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: MILLING MACHINE | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-035 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT(ASPHALT, AGGREGATE, & CONCRETE) | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-038 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: POST DRIVER (GUARDRAIL/FENCES) | $37.59 | $20.30 | $57.89 | Agreement |
| ENGI0132-039 · Operating Engineers agreement, December 1, 2024 | ||||
| OPERATOR: ROLLER | $36.48 | $20.30 | $56.78 | Agreement |
| LADC0001-002 · LADC, December 1, 2024 | ||||
| TRAFFIC CONTROL PERSON | $27.91 | $17.40 | $45.31 | LADC |
| LADC0001-004 · LADC, December 1, 2024 | ||||
| LABORER: GRADE CHECKER | $29.00 | $17.40 | $46.40 | LADC |
| LADC0001-005 · LADC, December 1, 2024 | ||||
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.00 | $17.40 | $46.40 | LADC |
| LADC0001-006 · LADC, December 1, 2024 | ||||
| LABORER: LASER SCREED OPERATOR | $30.03 | $17.40 | $47.43 | LADC |
| LADC0001-007 · LADC, December 1, 2024 | ||||
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.00 | $17.40 | $46.40 | LADC |
| LADC0001-008 · LADC, December 1, 2024 | ||||
| LABORER: GUARDRAIL INSTALLATION | $29.00 | $17.40 | $46.40 | LADC |
| LADC0001-009 · LADC, December 1, 2024 | ||||
| LABORER: SIGN AND DISPLAY ERECTOR | $29.00 | $17.40 | $46.40 | LADC |
| PLAS0926-004 · Plasterers and Cement Masons agreement, December 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 | Agreement |
| SUWV2022-016 · Survey of contractors in WV, September 11, 2024 | ||||
| TRUCK DRIVER: DUMP TRUCK | $28.58 | $18.60 | $47.18 | Survey |
| OPERATOR: CONCRETE SCREED | $31.35 | $17.96 | $49.31 | Survey |
| OPERATOR: MECHANIC | $35.04 | $20.10 | $55.14 | Survey |
| OPERATOR: LOADER | $34.70 | $18.98 | $53.68 | Survey |
| LABORER: COMMON OR GENERAL | $25.98 | $16.47 | $42.45 | Survey |
| IRONWORKER | $34.20 | $22.71 | $56.91 | Survey |
| CARPENTER | $29.39 | $20.49 | $49.88 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WV20260096?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator