CertifiedHours

Prevailing wage rates · West Virginia · Wage determination

Prevailing wage rates: Logan County, West Virginia

Heavy construction · WV20260055 modification 1, published May 18, 2026

The short answer

This sheet sets 18 classifications for heavy work in Logan County, West Virginia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $41.76 an hour (laborer: (pipeline) chain saw, common, flagger, landscape, pipelayer, sandblaster) to $65.66 (millwright). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0443-008 · Carpenters agreement, June 1, 2023
MILLWRIGHT$39.60$26.06$65.66Agreement
ELEC0307-008 · Electrical Workers (IBEW) agreement, December 1, 2025
ELECTRICIAN$42.20$20.39$62.59Agreement
ENGI0132-014 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: GROUP 4 OILER$34.62$20.45$55.07Agreement
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER$38.08$20.45$58.53Agreement
POWER EQUIPMENT OPERATOR: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX (6) CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND (110,000) POUNDS

$39.19$20.45$59.64Agreement
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1 CRANES (ALL TYPES), BOOM TRUCKS, LOADERS OF SIX (6) CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND (110,000) POUNDS AND OVER

$41.95$20.45$62.40Agreement
ENGI0132-027 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 2 OILER$39.19$20.45$59.64Agreement
POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 1 BOOM, BULLDOZER, EXCAVATOR, MECHANIC, PIPE BENDING MACHINE

$41.95$20.45$62.40Agreement
ENGI0132-029 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: SINGLE AND DOUBLE AXLE DUMP TRUCKS$41.95$20.45$62.40Agreement
IRON0549-011 · Ironworkers agreement, December 1, 2024
IRONWORKER: ORNAMENTAL$35.50$29.11$64.61Agreement
IRON0568-020 · Ironworkers agreement, December 1, 2023
IRONWORKER: REINFORCING AND STRUCTURAL$34.84$25.40$60.24Agreement
LABO0379-040 · Laborers agreement, December 1, 2020
LABORER: (PIPELINE) CHAIN SAW, COMMON, FLAGGER, LANDSCAPE, PIPELAYER, SANDBLASTER$25.26$16.50$41.76Agreement
LABO0379-043 · Laborers agreement, December 1, 2021
LABORER: GROUP 3 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER, LANDSCAPE$25.26$16.50$41.76Agreement
LABORER: GROUP 2…
Full text

LABORER: GROUP 2 AIR TOOL OPERATOR, CHAIN SAW, COMPACTOR (DIRT) HAND HELD, CONCRETE WORKER, HAND HELD DRILL, FORM WORK ONLY, GRADE CHECKER, GROUTING, PIPELAYER, SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR

$26.32$16.50$42.82Agreement
LABORER: GROUP 1 TUNNEL DRILLER, TUNNEL MINER$27.35$16.50$43.85Agreement
PLAS0926-001 · Plasterers and Cement Masons agreement, December 1, 2025
CEMENT MASON/CONCRETE FINISHER$35.77$27.54$63.31Agreement
UAVGWV0010 · Union average, January 1, 2019
LABORER: MASON TENDER - CEMENT/CONCRETE$26.17$16.50$42.67Union average
UAVGWV0012 · Union average, January 1, 2024
POWER EQUIPMENT OPERATOR: MECHANIC$36.57$19.18$55.75Union average

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WV20260055?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator