CertifiedHours

Prevailing wage rates · West Virginia · Wage determination

Prevailing wage rates: Lincoln County, West Virginia

Building construction · WV20260039 modification 1, published May 18, 2026

The short answer

This sheet sets 31 classifications for building work in Lincoln County, West Virginia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $39.85 an hour (laborer: power tool operator) to $78.63 (plumber). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0002-002 · Asbestos Workers and Heat & Frost Insulators agreement, August 1, 2024
ASBESTOS WORKER/HEAT & FROST INSULATOR$46.50$29.43$75.93Agreement
BOIL0667-005 · Boilermakers agreement, January 1, 2025
BOILERMAKER$47.13$28.93$76.06Agreement
BRWV0009-006 · Bricklayers agreement, December 1, 2022
BRICKLAYER (BRICKLAYER & BRICK POINTER/CAULKER/CLEANER)$31.65$25.56$57.21Agreement
BRWV0009-007 · Bricklayers agreement, December 1, 2022
TILE SETTER$31.65$25.56$57.21Agreement
BRWV0009-008 · Bricklayers agreement, December 1, 2022
MASON - STONE$31.65$25.56$57.21Agreement
BRWV0015-014 · Bricklayers agreement, June 1, 2024
TILE FINISHER$27.00$22.57$49.57Agreement
CARP0439-003 · Carpenters agreement, December 1, 2024
CARPENTER (INCLUDING DRYWALL HANGING…
Full text

CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK, SCAFFOLD BUILDER AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL)

$33.84$25.51$59.35Agreement
CARP0443-009 · Carpenters agreement, June 1, 2023
MILLWRIGHT$37.40$26.06$63.46Agreement
ELEC0317-003 · Electrical Workers (IBEW) agreement, September 2, 2025
ELECTRICIAN$32.75$15.00$47.75Agreement
ELEC0466-009 · Electrical Workers (IBEW) agreement, June 1, 2023
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$39.00$23.45$62.45Agreement
ENGI0132-011 · Operating Engineers agreement, December 1, 2024
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER$34.71$22.05$56.76Agreement
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS

$45.21$22.05$67.26Agreement
POWER EQUIPMENT OPERATOR: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER

$46.21$22.05$68.26Agreement
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW

$46.56$22.05$68.61Agreement
IRON0549-006 · Ironworkers agreement, December 1, 2022
IRONWORKER: ORNAMENTAL$35.19$25.66$60.85Agreement
IRON0787-004 · Ironworkers agreement, December 1, 2025
IRONWORKER (REINFORCING AND STRUCTURAL)$36.10$24.65$60.75Agreement
LABO1353-005 · Laborers agreement, December 1, 2020
LABORER: GROUP 3 PIPELAYER$25.62$17.25$42.87Agreement
LABORER: GROUP 2…
Full text

LABORER: GROUP 2 BOBCAT OPERATOR (CLEAN UP/DEMOLITION), CHIPPING GUNS, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, FENCE ERECTION, GRADE CHECKER, JACK HAMMER, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR

$24.78$17.25$42.03Agreement
LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION, LANDSCAPE, WATER BOY$24.16$17.25$41.41Agreement
PAIN0970-008 · Painters and Allied Trades agreement, December 1, 2022
PAINTER (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY)$30.85$17.80$48.65Agreement
PAIN1195-002 · Painters and Allied Trades agreement, December 1, 2024
GLAZIER$32.89$13.38$46.27Agreement
PLAS0926-010 · Plasterers and Cement Masons agreement, December 1, 2024
CEMENT MASON/CONCRETE FINISHER$32.52$22.34$54.86Agreement
PLAS0926-011 · Plasterers and Cement Masons agreement, June 1, 2024
PLASTERER (EIFS)$32.52$22.34$54.86Agreement
CEMENT MASON/CONCRETE FINISHER$34.77$26.66$61.43Agreement
PLUM0083-004 · Plumbers and Pipefitters agreement, July 1, 2025
PIPEFITTER$38.04$39.72$77.76Agreement
PLUM0565-004 · Plumbers and Pipefitters agreement, July 1, 2025
PLUMBER$41.00$37.63$78.63Agreement
ROOF0034-003 · Roofers agreement, May 1, 2023
ROOFER$29.75$16.71$46.46Agreement
SHEE0033-013 · Sheet Metal Workers agreement, June 1, 2023
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$32.07$27.52$59.59Agreement
TEAM0175-005 · Teamsters agreement, October 1, 2024
TRUCK DRIVER: GROUP 3…
Full text

TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI)

$29.96$22.50$52.46Agreement
TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT)$29.81$22.50$52.31Agreement
UAVGWV0026 · Union average, January 1, 2019
LABORER: POWER TOOL OPERATOR$23.10$16.75$39.85Union average

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WV20260039?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator