Prevailing wage rates · West Virginia · Wage determination
Prevailing wage rates: Summers County, West Virginia
Building construction · WV20260026 modification 1, published May 18, 2026
The short answer
This sheet sets 30 classifications for building work in Summers County, West Virginia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $28.27 an hour (laborer: common or general) to $76.06 (boilermaker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0080-002 · Asbestos Workers and Heat & Frost Insulators agreement, February 24, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 | Agreement |
| BOIL0667-005 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $47.13 | $28.93 | $76.06 | Agreement |
| BRWV0009-001 · Bricklayers agreement, December 1, 2022 | ||||
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 | $57.21 | Agreement |
| BRWV0015-010 · Bricklayers agreement, June 1, 2024 | ||||
| MASON - STONE | $33.00 | $26.18 | $59.18 | Agreement |
| CARP1024-001 · Carpenters agreement, June 1, 2023 | ||||
| CARPENTER (SCAFFOLD BUILDER ONLY) | $30.00 | $21.15 | $51.15 | Agreement |
| CARP1911-007 · Carpenters agreement, December 1, 2020 | ||||
| CARPENTER (INCLUDING FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $30.03 | $23.65 | $53.68 | Agreement |
| ENGI0132-007 · Operating Engineers agreement, December 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 | $56.76 | Agreement |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 | $67.26 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 | $68.61 | Agreement |
| IRON0549-006 · Ironworkers agreement, December 1, 2022 | ||||
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 | Agreement |
| IRON0787-006 · Ironworkers agreement, December 1, 2025 | ||||
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 | Agreement |
| LABO0453-003 · Laborers agreement, December 1, 2017 | ||||
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $22.76 | $16.75 | $39.51 | Agreement |
| LABO0543-003 · Laborers agreement, June 1, 2020 | ||||
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 | $42.16 | Agreement |
| PAIN0970-007 · Painters and Allied Trades agreement, December 1, 2024 | ||||
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 | Agreement |
| SUWV2012-024 · Survey of contractors in WV, August 13, 2012 | ||||
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $27.21 | $8.97 | $36.18 | Survey |
| ROOFER | $24.28 | $9.32 | $33.60 | Survey |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 | $45.73 | Survey |
| PAINTER: BRUSH, ROLLER AND SPRAY | $28.55 | $3.00 | $31.55 | Survey |
| OPERATOR: FORKLIFT | $33.09 | $3.00 | $36.09 | Survey |
| OPERATOR: EXCAVATOR | $37.69 | $3.00 | $40.69 | Survey |
| OPERATOR: BULLDOZER | $30.24 | $10.26 | $40.50 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 | $30.59 | Survey |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 | $29.76 | Survey |
| LABORER: DEMOLITION | $20.58 | $9.47 | $30.05 | Survey |
| LABORER: COMMON OR GENERAL | $25.27 | $3.00 | $28.27 | Survey |
| IRONWORKER, STRUCTURAL | $26.01 | $12.18 | $38.19 | Survey |
| ELECTRICIAN | $28.16 | $15.11 | $43.27 | Survey |
| CARPENTER (DRYWALL HANGING ONLY) | $25.08 | $12.58 | $37.66 | Survey |
| BRICKLAYER | $27.50 | $12.35 | $39.85 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WV20260026?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator