Prevailing wage rates · Wisconsin · Wage determination
Prevailing wage rates: Winnebago County, Wisconsin
Residential construction · WI20260032 modification 2, published May 18, 2026
The short answer
This sheet sets 13 classifications for residential work in Winnebago County, Wisconsin. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $31.66 an hour (cement mason/concrete finisher) to $73.31 (plumber). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| CARP0955-003 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER | $30.21 | $22.26 | $52.47 | Agreement |
| ELEC0577-006 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN | $41.76 | $23.65 | $65.41 | Agreement |
| ENGI0139-006 · Operating Engineers agreement, June 1, 2025 | ||||
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (BULLDOZER UNDER 40 H.P.; ROLLER 5 TONS AND UNDER; RUBBER TIRE ROLLER) | $44.62 | $27.35 | $71.97 | Agreement |
| OPERATOR: POWER EQUIPMENT (BULLDOZER OVER 40 H.P.; ROLLER OVER 5 TONS) | $45.67 | $27.35 | $73.02 | Agreement |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR UNDER 130,000 LBS.) | $44.92 | $27.35 | $72.27 | Agreement |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR 130,000 LBS. AND OVER) | $45.67 | $27.35 | $73.02 | Agreement |
| LABO0330-005 · Laborers agreement, June 1, 2025 | ||||
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK | $23.90 | $16.48 | $40.38 | Agreement |
| PLUM0400-005 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER | $50.02 | $23.29 | $73.31 | Agreement |
| ROOF0096-003 · Roofers agreement, November 1, 2025 | ||||
| ROOFER | $33.73 | $16.34 | $50.07 | Agreement |
| SHEE0018-010 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $41.84 | $16.60 | $58.44 | Agreement |
| SUWI2012-016 · Survey of contractors in WI, April 4, 2012 | ||||
| OPERATOR: LOADER | $25.70 | $9.58 | $35.28 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 | $34.00 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $24.37 | $7.29 | $31.66 | Survey |
Modification history
| Modification 1 | January 23, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WI20260032?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator