Prevailing wage rates · Wisconsin · Wage determination
Prevailing wage rates: Adams, Ashland, Barron and 49 more counties, Wisconsin
Building construction · WI20260011 modification 1, published May 18, 2026
The short answer
This sheet sets 120 classifications for building work in Adams, Ashland, Barron and 49 more counties, Wisconsin. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $15.97 an hour (painters: spray) to $98.39 (ironworker (green (s.e. 1/3) and walworth (except n.e. part) counties)). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0019-002 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT (COLUMBIA, CRAWFORD, DODGE, GRANT, GREEN, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, MARQUETTE, MONROE, RICHLAND, SAUK, VERNON, AND WALWORTH COUNTIES) | $45.88 | $38.15 | $84.03 | Agreement |
| ASBE0034-005 · Asbestos Workers and Heat & Frost Insulators agreement, June 9, 2025 | ||||
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COATINGS, COVERINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT (BARRON, BUFFALO, DUNN, PEPIN, AND POLK COUNTIES) | $55.34 | $34.03 | $89.37 | Agreement |
| ASBE0049-003 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025 | ||||
ASBESTOS WORKERS/INSULATOR…Full textASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT (ASHLAND, BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES) | $49.17 | $23.83 | $73.00 | Agreement |
| ASBE0127-002 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
HEAT AND FROST INSULATOR…Full textHEAT AND FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS; AND THE APPLICATION OF FIRESTOPPING MATERIAL IN WALLS, FLOORS, CEILINGS. INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT (ADAMS, CLARK, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, JACKSON, KEWAUNEE, | $45.24 | $30.56 | $75.80 | Agreement |
| BOIL0107-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER (BOILERMAKER) | $46.52 | $34.63 | $81.15 | Agreement |
| BRWI0001-003 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER & TILE SETTER (CRAWFORD,JUNEAU, MONROE,TREMPEALEAU, AND VERNON COUNTIES) | $40.09 | $28.10 | $68.19 | Agreement |
| BRWI0002-003 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER: CEMENT MASON/CONCRETE FINISHER (ASHLAND, BURNETT, IRON, WASHBURN) | $46.01 | $29.31 | $75.32 | Agreement |
| BRICKLAYER: BRICKLAYER, TILE SETTER (ASHLAND, BURNETT, IRON, WASHBURN) | $48.60 | $29.31 | $77.91 | Agreement |
| BRWI0002-004 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER: BRICKLAYER & TILE SETTER (BAYFIELD COUNTY) | $48.60 | $29.31 | $77.91 | Agreement |
| BRWI0003-001 · Bricklayers agreement, June 1, 2024 | ||||
BRICKLAYER: BRICKLAYER…Full textBRICKLAYER: BRICKLAYER, CEMENT MASON, TILE SETTER (DOOR, KEWAUNEE, FLORENCE, FOND DU LAC, GREEN LAKE, MANITOWOC, MARINETTE, MARQUETTE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA COUNTIES) | $38.45 | $27.41 | $65.86 | Agreement |
| BRWI0004-003 · Bricklayers agreement, June 1, 2025 | ||||
| TILE SETTER (WALWORTH COUNTY) | $39.19 | $28.90 | $68.09 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (WALWORTH COUNTY) | $40.50 | $28.90 | $69.40 | Agreement |
| BRICKLAYER (WALWORTH COUNTY) | $44.71 | $28.90 | $73.61 | Agreement |
| BRWI0006-001 · Bricklayers agreement, June 1, 2025 | ||||
BRICKLAYER: BRICKLAYER,CEMENT MASON,TILE SETTER…Full textBRICKLAYER: BRICKLAYER,CEMENT MASON,TILE SETTER (ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MENOMINEE, ONEIDA, PORTAGE, TAYLOR, VILAS AND WOOD COUNTIES) | $39.36 | $28.83 | $68.19 | Agreement |
| BRWI0006-004 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER & TILE SETTER (PRICE COUNTY) | $39.36 | $28.83 | $68.19 | Agreement |
| BRWI0007-003 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER & TILE SETTER (GREEN AND LAFAYETTE COUNTIES) | $40.34 | $29.49 | $69.83 | Agreement |
| BRWI0013-003 · Bricklayers agreement, June 1, 2025 | ||||
| TILE LAYER (GRANT, IOWA, AND RICHLAND COUNTIES) | $38.39 | $29.79 | $68.18 | Agreement |
| BRICKLAYER (GRANT, IOWA, AND RICHLAND COUNTIES) | $41.17 | $28.66 | $69.83 | Agreement |
| BRWI0019-004 · Bricklayers agreement, June 1, 2025 | ||||
BRICKLAYER: BRICKLAYER…Full textBRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER (BARRON, BURNETT (SOUTHERN HALF), DUNN, PEPIN, POLK, RUSK, AND WASHBURN (SOUTHERN HALF) COUNTIES) | $39.50 | $28.69 | $68.19 | Agreement |
| BRWI0019-005 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER & TILE SETTER (SAWYER COUNTY) | $39.50 | $28.69 | $68.19 | Agreement |
| BRWI0021-001 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER (DODGE AND JEFFERSON COUNTIES) | $40.14 | $29.67 | $69.81 | Agreement |
| BRWI0034-001 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER (COLUMBIA AND SAUK COUNTIES) | $41.17 | $28.66 | $69.83 | Agreement |
| CARP0068-013 · Carpenters agreement, May 5, 2025 | ||||
CARPENTER: INCLUDING DRYWALL HANGING…Full textCARPENTER: INCLUDING DRYWALL HANGING, ACOUSTICAL WORK (BURNETT (WEST OF HIGHWAY 48) AND POLK(WEST OF HIGHWAYS 35, 48 & 65) COUNTIES) | $48.54 | $28.84 | $77.38 | Agreement |
| CARP0310-007 · Carpenters agreement, June 1, 2025 | ||||
PILEDRIVERMAN (ADAMS…Full textPILEDRIVERMAN (ADAMS, BAYFIELD (EASTERN 2/3), FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO (WESTERN PORTION OF THE COUNTY), TAYLOR, VILAS, AND WOOD COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING…Full textCARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (ADAMS, BAYFIELD (EASTERN 2/3), FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO (WESTERN PORTION OF THE COUNTY), TAYLOR, VILAS, AND WOOD COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP0310-008 · Carpenters agreement, June 1, 2025 | ||||
| CABINET INSTALLER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (ASHLAND COUNTY) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP0314-006 · Carpenters agreement, June 2, 2025 | ||||
CARPENTER, INCLUDING DRYWALL HANGING…Full textCARPENTER, INCLUDING DRYWALL HANGING, ACOUSTICAL WORK: PILEDRIVERMAN (COLUMBIA, DODGE, GRANT, GREEN, IOWA, JEFFERSON, LAFAYETTE, RICHLAND, SAUK, AND WALWORTH COUNTIES) | $44.45 | $28.78 | $73.23 | Agreement |
| CARP0361-006 · Carpenters agreement, May 5, 2025 | ||||
| CARPENTERS: INCLUDING DRYWALL HANGING, ACOUSTICAL WORK (BAYFIELD COUNTY (WEST OF HWY 63)) | $40.79 | $27.90 | $68.69 | Agreement |
| CARP0731-006 · Carpenters agreement, June 1, 2025 | ||||
| PILEDRIVERMAN (FOND DU LAC (EASTERN PORTION OF THE COUNTY) AND MANITOWOC COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING…Full textCARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (FOND DU LAC (EASTERN PORTION OF THE COUNTY) AND MANITOWOC COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP0955-004 · Carpenters agreement, June 1, 2025 | ||||
PILEDRIVERMAN (FOND DU LAC…Full textPILEDRIVERMAN (FOND DU LAC (WESTERN PORTION OF THE COUNTY), GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING…Full textCARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (FOND DU LAC (WESTERN PORTION OF THE COUNTY), GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP1056-004 · Carpenters agreement, June 1, 2024 | ||||
MILLWRIGHT (ADAMS, ASHLAND…Full textMILLWRIGHT (ADAMS, ASHLAND, BARRON, BAYFIELD (EASTERN 2/3), BUFFALO, BURNETT, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, PEPIN, POLK (E. OF HWY. 35, 48 & 65), PORTAGE, PRICE, RICHLAND, RUSK, SAUK, SAWYER, SHAWANO, TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA | $42.00 | $28.85 | $70.85 | Agreement |
| CARP1074-009 · Carpenters agreement, June 1, 2025 | ||||
PILEDRIVERMAN (BARRON…Full textPILEDRIVERMAN (BARRON, BURNETT (EAST OF HWY 48), CLARK, DUNN, POLK (EAST OF HWY 35, 48, 65), RUSK, SAWYER, AND WASHBURN COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING…Full textCARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (BARRON, BURNETT (EAST OF HWY 48), CLARK, DUNN, POLK (EAST OF HWY 35, 48, 65), RUSK, SAWYER, AND WASHBURN COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP1143-006 · Carpenters agreement, June 1, 2025 | ||||
| PILEDRIVERMAN (BUFALO, CRAWFORD, JACKSON, MONROE, TREMPEALEAU, AND VERNON COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING…Full textCARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (BUFALO, CRAWFORD, JACKSON, MONROE, TREMPEALEAU, AND VERNON COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP1146-006 · Carpenters agreement, June 1, 2025 | ||||
PILEDRIVERMAN (DOOR…Full textPILEDRIVERMAN (DOOR, FLORENCE (EXCEPT AREA BORDERING MICHIGAN), KEWAUNEE, MARINETTE (EXCEPT N.E. CORNER), MENOMINEE, OCONTO, AND SHAWANO (WESTERN PORTION OF THE COUNTY) COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING…Full textCARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (DOOR, FLORENCE (EXCEPT AREA BORDERING MICHIGAN), KEWAUNEE, MARINETTE (EXCEPT N.E. CORNER), MENOMINEE, OCONTO, AND SHAWANO (WESTERN PORTION OF THE COUNTY) COUNTIES) | $41.43 | $29.99 | $71.42 | Agreement |
| CARP1348-006 · Carpenters agreement, May 1, 2025 | ||||
| MILLWRIGHT (BAYFIELD COUNTY (WESTERN 1/3)) | $41.90 | $29.51 | $71.41 | Agreement |
| ELEC0014-001 · Electrical Workers (IBEW) agreement, May 25, 2025 | ||||
ELECTRICIAN (ASHLAND…Full textELECTRICIAN (ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK (EXCEPT COLBY, FREMONT, LYNN, MARYVILLE, SHERMAN, SHERWOOD, UNITY), CRAWFORD, DUNN, GRANT, IRON, JACKSON, MONROE, PEPIN, POLK, PRICE, RICHLAND, RUSK, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN COUNTIES) | $44.29 | $25.21 | $69.50 | Agreement |
| ELEC0014-005 · Electrical Workers (IBEW) agreement, May 25, 2025 | ||||
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION…Full textELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 | $51.25 | Agreement |
| ELEC0158-007 · Electrical Workers (IBEW) agreement, May 25, 2025 | ||||
ELECTRICIANS: (DOOR…Full textELECTRICIANS: (DOOR, KEWAUNEE, MANITOWOC (EXCEPT SCHLESWIG), MARINETTE(WAUSUAKEE AND AREA SOUTH THEREOF), OCONTO, MENOMINEE (EAST OF A INE 6 MILES WEST OF THE WEST BOUNDARY OF OCONTO COUNTY), SHAWANO (EXCEPT AREA NORTH OF TOWNSHIPS OF ANIWA AND HUTCHINS) COUNTIES) | $42.00 | $23.93 | $65.93 | Agreement |
| ELEC0159-001 · Electrical Workers (IBEW) agreement, May 26, 2024 | ||||
ELECTRICIANS: (COLUMBIA…Full textELECTRICIANS: (COLUMBIA, DODGE (WEST OF HWY 26 EXCEPT CHESTER AND EMMET TWPS), GREEN LAKE COUNTY (EXCEPT TOWNSHIPS OF BERLIN, SENECA & ST. MARIE), IOWA, MARQUETTE COUNTY (EXCEPT TOWNSHIPS OF NESHKOKA, CRYSTAL LAKE, NEWTON, AND SPRINGFIELD), AND SAUK COUNTIES) | $48.55 | $25.91 | $74.46 | Agreement |
| ELEC0219-006 · Electrical Workers (IBEW) agreement, June 1, 2019 | ||||
ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $180,000…Full textELECTRICIAN: ELECTRICAL CONTRACTS UNDER $180,000 (FLORENCE COUNTY (TOWNSHIPS OF AURORA, COMMONWEALTH, FERN, FLORENCE AND HOMESTEAD) AND MARINETTE COUNTY (TOWNSHIP OF NIAGARA)) | $31.75 | $21.73 | $53.48 | Agreement |
ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000…Full textELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000 (FLORENCE COUNTY (TOWNSHIPS OF AURORA, COMMONWEALTH, FERN, FLORENCE AND HOMESTEAD) AND MARINETTE COUNTY (TOWNSHIP OF NIAGARA)) | $33.94 | $21.80 | $55.74 | Agreement |
| ELEC0388-004 · Electrical Workers (IBEW) agreement, June 1, 2024 | ||||
ELECTRICIAN (ADAMS…Full textELECTRICIAN (ADAMS, CLARK (COLBY, FREEMONT, LYNN, MAYVILLE, SHERMAN, SHERWOOD, UNITY), FOREST, JUNEAU, LANGLADE, LINCOLN, MARINETTE (BEECHER, DUNBAR, GOODMAN & PEMBINE), MENOMINEE (AREA WEST OF A LINE 6 MILES WEST OF THE WEST BOUNDARY OF OCONTO COUNTY), ONEIDA, PORTAGE, SHAWANO (ANIWA AND HUTCHINS), VILAS AND WOOD COUNTIES) | $40.19 | $22.90 | $63.09 | Agreement |
| ELEC0494-010 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN (DODGE COUNTY…Full textELECTRICIAN (DODGE COUNTY (AREA EAST OF HWY 26 INCLUDING ALL OF CHESTER TOWNSHIP, BUT EXCLUDING EMMET TOWNSHIP), FOND DU LAC (EXCEPT WAUPUN), AND MANITOWOC (SCHLESWIG) COUNTIES) | $45.20 | $25.27 | $70.47 | Agreement |
| ELEC0494-014 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
SOUND & COMMUNICATIONS…Full textSOUND & COMMUNICATIONS: TECHNICIAN (DODGE (AREA EAST OF HWY 26 INCLUDING CHESTER TWP BUT EXCLUDING EMMET TWP), FOND DU LAC (EXCEPT WAUPUN), AND MANITOWOC (SCHLESWIG) COUNTIES) | $37.13 | $21.58 | $58.71 | Agreement |
SOUND & COMMUNICATIONS…Full textSOUND & COMMUNICATIONS: INSTALLER (DODGE (AREA EAST OF HWY 26 INCLUDING CHESTER TWP BUT EXCLUDING EMMET TWP), FOND DU LAC (EXCEPT WAUPUN), AND MANITOWOC (SCHLESWIG) COUNTIES) | $37.13 | $21.58 | $58.71 | Agreement |
| ELEC0577-001 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
ELECTRICIAN (GREEN LAKE…Full textELECTRICIAN (GREEN LAKE (N. PART INCLUDING TWPS OF BERLIN, ST MARIE, AND SENECA), MARQUETTE (N. PART INCLUDING TWPS OF CRYSTAL LAKE, NESHKORO, NEWTON, AND SPRINGFIELD), WAUPACA, AND WAUSHARA COUNTIES,) | $41.76 | $23.65 | $65.41 | Agreement |
| ELEC0890-005 · Electrical Workers (IBEW) agreement, June 1, 2024 | ||||
ELECTRICIAN (DODGE…Full textELECTRICIAN (DODGE (EMMET TOWNSHIP ONLY), GREEN, JEFFERSON, LAFAYETTE, AND WALWORTH COUNTIES) | $43.65 | $23.59 | $67.24 | Agreement |
| ENGI0139-004 · Operating Engineers agreement, June 2, 2025 | ||||
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (6) FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $41.60 | $27.89 | $69.49 | Agreement |
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (4) HYDRAULIC CRANE, 10 TONS OR LESS. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $45.20 | $27.89 | $73.09 | Agreement |
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (3) TRAVELLING CRANE (BRIDGE TYPE). HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $45.73 | $27.89 | $73.62 | Agreement |
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (2) CRANES, TOWER CRANES WITH OR W/O ATTACHMENTS 100 TONS OR LESS; CRANES, TOWER CRANES WITH BOOM, LEADS, AND OR JIB LENGTHS 175 FT OR LESS HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $49.28 | $27.89 | $77.17 | Agreement |
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (1) CRANES, TOWER CRANES WITH OR W/O ATTACHMENTS OVER 100 TONS; CRANES, TOWER CRANES WITH BOOM, LEADS AND OR JIB LENGTH 176 FT OR LONGER HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $50.53 | $27.89 | $78.42 | Agreement |
| IRON0008-012 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (CALUMET…Full textIRONWORKER (CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE, OCONTO, OUTAGAMIE, SHAWANO AND WALWORTH (NORTHEASTERN PART) COUNTIES) | $44.66 | $33.67 | $78.33 | Agreement |
| IRON0383-004 · Ironworkers agreement, June 1, 2025 | ||||
IRONWORKER (ADAMS, COLUMBIA…Full textIRONWORKER (ADAMS, COLUMBIA, CRAWFORD, DODGE, FLORENCE, FOREST, GRANT, GREENE (EXCEPT S.E. TIP), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES) | $44.00 | $32.66 | $76.66 | Agreement |
| IRON0498-007 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER (GREEN (S.E. 1/3) AND WALWORTH (EXCEPT N.E. PART) COUNTIES) | $48.74 | $49.65 | $98.39 | Agreement |
| IRON0512-009 · Ironworkers agreement, May 1, 2025 | ||||
Group definitions, zones and premiums for IRON0512-009IRONWORKER (BARRON, BUFFALO, CLARK, DUNN, JACKSON, PEPIN, POLK, RUSK, TAYLOR AND TREMPEALEAU COUNTIES).$ 46.35 36.86 | ||||
| IRON0512-023 · Ironworkers agreement, May 1, 2025 | ||||
IRONWORKER (ASHLAND…Full textIRONWORKER (ASHLAND, BAYFIELD, BURNETT, IRON, LINCOLN, ONEIDA, PRICE, SAWYER, VILAS AND WASHBURN COUNTIES) | $42.89 | $36.86 | $79.75 | Agreement |
| LABO0140-003 · Laborers agreement, June 1, 2025 | ||||
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND, TREMPEALEAU (SOUTHERN PART), AND VERNON COUNTIES) | $36.65 | $19.97 | $56.62 | Agreement |
LABORER, GENERAL (BUFFALO…Full textLABORER, GENERAL (BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND, TREMPEALEAU (SOUTHERN PART), AND VERNON COUNTIES) | $37.70 | $19.97 | $57.67 | Agreement |
| LABO0268-005 · Laborers agreement, June 2, 2025 | ||||
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER | $36.65 | $19.97 | $56.62 | Agreement |
LABORER, GENERAL: AREA 3…Full textLABORER, GENERAL: AREA 3 (AREA 1: BARRON, CLARK (WEST 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (WEST 1/3) AREA 2: CLARK (EAST 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (EAST 2/3), VILAS, WOOD AREA 3: BURNETT, IRON, SAWYER, WASHBURN) | $36.35 | $19.97 | $56.32 | Agreement |
LABORER, GENERAL: AREA 2…Full textLABORER, GENERAL: AREA 2 (AREA 1: BARRON, CLARK (WEST 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (WEST 1/3) AREA 2: CLARK (EAST 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (EAST 2/3), VILAS, WOOD AREA 3: BURNETT, IRON, SAWYER, WASHBURN) | $37.05 | $19.97 | $57.02 | Agreement |
LABORER, GENERAL: AREA 1…Full textLABORER, GENERAL: AREA 1 (AREA 1: BARRON, CLARK (WEST 1/3), DUNN, PEPIN, POLK, RUSK TAYLOR (WEST 1/3) AREA 2: CLARK (EAST 2/3), LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR (EAST 2/3), VILAS, WOOD AREA 3: BURNETT, IRON, SAWYER, WASHBURN) | $37.70 | $19.97 | $57.67 | Agreement |
| LABO0330-001 · Laborers agreement, June 1, 2025 | ||||
LABORERS, GENERAL (DODGE…Full textLABORERS, GENERAL (DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, PORTAGE, SHAWANO, WAUPACA,WAUSHARA) | $37.05 | $19.97 | $57.02 | Agreement |
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (DODGE, DOOR, FLORENCE, FOND DU LAC, FOREST, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, PORTAGE, SHAWANO, WAUPACA,WAUSHARA) | $36.65 | $19.97 | $56.62 | Agreement |
| LABO0464-005 · Laborers agreement, June 1, 2025 | ||||
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) (Remaining Area) | $36.65 | $19.97 | $56.62 | Agreement |
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) (Adams County) | $36.65 | $19.97 | $56.62 | Agreement |
LABORER, GENERAL: REMAINING AREA…Full textLABORER, GENERAL: REMAINING AREA (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) | $37.70 | $19.97 | $57.67 | Agreement |
LABORER, GENERAL: ADAMS COUNTY…Full textLABORER, GENERAL: ADAMS COUNTY (ADAMS, COLUMBIA, GREEN, IOWA, JEFFERSON, LAFAYETTE, SAUK, AND WALWORTH COUNTIES) | $37.05 | $19.97 | $57.02 | Agreement |
| LABO0464-008 · Laborers agreement, June 1, 2025 | ||||
| LANDSCAPE LABORER | $21.52 | $18.94 | $40.46 | Agreement |
| LABO1091-001 · Laborers agreement, May 1, 2025 | ||||
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BAYFIELD (WEST OF COUNTY TRUNK A INCLUDING THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTY) | $37.04 | $23.47 | $60.51 | Agreement |
LABORER, GENERAL (BAYFIELD…Full textLABORER, GENERAL (BAYFIELD (WEST OF COUNTY TRUNK A INCLUDING THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTY) | $36.04 | $23.47 | $59.51 | Agreement |
| LABO1091-002 · Laborers agreement, May 1, 2025 | ||||
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ASHLAND & BAYFIELD (EAST OF COUNTY TRUNK A EXCLUSIVE OF THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTIES) | $35.59 | $23.47 | $59.06 | Agreement |
LABORER, GENERAL (ASHLAND & BAYFIELD…Full textLABORER, GENERAL (ASHLAND & BAYFIELD (EAST OF COUNTY TRUNK A EXCLUSIVE OF THE IRON RIVER NATIONAL FISH HATCHERY AND GREAT LAKES TRANSMISSION CO., STATION 6) COUNTIES) | $34.59 | $23.47 | $58.06 | Agreement |
| PLAS0599-003 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| PLASTERER (PEPIN COUNTY) | $39.75 | $25.10 | $64.85 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (PEPIN COUNTY) | $37.25 | $27.84 | $65.09 | Agreement |
| PLAS0599-007 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
PLASTERER (BUFFALO…Full textPLASTERER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $39.75 | $25.10 | $64.85 | Agreement |
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (BUFFALO, CRAWFORD, JACKSON, JUNEAU, MONROE, POLK, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.25 | $27.84 | $65.09 | Agreement |
| PLAS0599-011 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| PLASTERER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $39.89 | $28.04 | $67.93 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (GRANT, GREEN, IOWA, AND LAFAYETTE COUNTIES) | $43.27 | $25.69 | $68.96 | Agreement |
| PLAS0633-046 · Plasterers and Cement Masons agreement, May 1, 2025 | ||||
| PLASTERER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $40.84 | $25.66 | $66.50 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $47.22 | $31.90 | $79.12 | Agreement |
| PLAS0633-046 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| PLASTERER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $40.84 | $25.66 | $66.50 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (BAYFIELD, PRICE, AND SAWYER COUNTIES) | $47.22 | $31.90 | $79.12 | Agreement |
| PLUM0011-009 · Plumbers and Pipefitters agreement, May 6, 2024 | ||||
PLUMBER/PIPEFITTER…Full textPLUMBER/PIPEFITTER: INCLUDING HVAC WORK (ASHLAND BAYFIELD, BURNETT, IRON, SAWYER, AND WASHBURN COUNTIES) | $49.32 | $27.18 | $76.50 | Agreement |
| PLUM0075-006 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER: INCLUDING HVAC WORK (DODGE (WATERTOWN), GREEN, JEFFERSON, AND LAFAYETTE COUNTIES) | $60.05 | $27.90 | $87.95 | Agreement |
| PLUM0075-008 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER: INCLUDING HVAC WORK (COLUMBIA, IOWA, MARQUETTE, RICHLAND, AND SAUK COUNTIES) | $60.57 | $27.34 | $87.91 | Agreement |
| PLUM0118-003 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER/PIPEFITTER: INCLUDING HVAC WORK (WALWORTH COUNTY) | $57.35 | $29.37 | $86.72 | Agreement |
| PLUM0400-002 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PLUMBER/PIPEFITTER…Full textPLUMBER/PIPEFITTER, INCLUDING HVAC WORK (ADAMS, CALUMET, DODGE (EXCEPT WATERTOWN), DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE (EXCEPT NIAGARA), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES) ((2) All other work) | $53.23 | $23.40 | $76.63 | Agreement |
PLUMBER/PIPEFITTER…Full textPLUMBER/PIPEFITTER, INCLUDING HVAC WORK (ADAMS, CALUMET, DODGE (EXCEPT WATERTOWN), DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE (EXCEPT NIAGARA), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES) ((1) Small buildings (except industrial and power plants) where plumbing or heating is $50,000 or less) | $50.02 | $23.29 | $73.31 | Agreement |
| PLUM0434-004 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PLUMBER/PIPEFITTER…Full textPLUMBER/PIPEFITTER: INCLUDING HVAC WORK (BARRON, BUFFALO, CLARK, CRAWFORD, DUNN, FLORENCE, FOREST, GRANT, JACKSON, JUNEAU, LANGLADE, LINCOLN, MONROE, ONEIDA, PEPIN, PIERCE, POLK, PORTAGE, PRICE, RUSK, TAYLOR, TREMPEALEAU, VERNON, VILAS, AND WOOD COUNTIES) | $50.94 | $25.98 | $76.92 | Agreement |
| PLUM0601-006 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
PIPEFITTER: INCLUDING HVAC WORK…Full textPIPEFITTER: INCLUDING HVAC WORK (DODGE (WATERTOWN), GREEN, JEFFERSON, AND LAFAYETTE COUNTIES) | $58.92 | $31.34 | $90.26 | Agreement |
| PLUM0601-008 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PIPEFITTER: INCLUDING HVAC WORK (COLUMBIA, IOWA, MARQUETTE, RICHLAND, AND SAUK COUNTIES) | $60.13 | $30.16 | $90.29 | Agreement |
| SHEE0010-031 · Sheet Metal Workers agreement, May 1, 2025 | ||||
| SHEET METAL WORKER (ASHLAND, BAYFIELD AND IRON COUNTIES) | $40.43 | $29.99 | $70.42 | Agreement |
| SHEE0010-035 · Sheet Metal Workers agreement, June 5, 2023 | ||||
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $31.97 | $20.67 | $52.64 | Agreement |
| SHEE0018-003 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER: INCLUDING HVAC WORK (FOND DU LAC AND MANITOWOC COUNTIES) | $45.07 | $31.04 | $76.11 | Agreement |
| SHEE0018-004 · Sheet Metal Workers agreement, June 1, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER: INCLUDING HVAC WORK (ADAMS, DOOR, FLORENCE, FOREST, GREEN LAKE, KEWAUNEE, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, SHAWANO, WAUPACA, AND WAUSHARA COUNTIES) | $46.47 | $31.33 | $77.80 | Agreement |
| SHEE0018-014 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER: INCLUDING HVAC WORK (DODGE AND JEFFERSON COUNTIES) | $58.03 | $29.98 | $88.01 | Agreement |
| SHEE0018-015 · Sheet Metal Workers agreement, September 1, 2025 | ||||
| SHEET METAL WORKER: INCLUDING HVAC WORK (WALWORTH COUNTY) | $48.92 | $38.21 | $87.13 | Agreement |
| SHEE0018-017 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER: INCLUDING HVAC WORK (GREEN AND IOWA COUNTIES) | $48.51 | $35.86 | $84.37 | Agreement |
| SHEE0018-022 · Sheet Metal Workers agreement, June 1, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER: INCLUDING HVAC WORK (BARRON, BUFFALO, BURNETT, CLARK, DUNN, JACKSON, PEPIN, POLK, PRICE, RUSK, SAWYER, TAYLOR, TREMPEALEAU, AND WASHBURN COUNTIES) | $42.00 | $31.56 | $73.56 | Agreement |
| SHEE0018-023 · Sheet Metal Workers agreement, June 2, 2025 | ||||
| SHEET METAL WORKER: INCLUDING HVAC WORK (COLUMBIA AND SAUK COUNTIES) | $51.92 | $34.78 | $86.70 | Agreement |
| SHEE0018-024 · Sheet Metal Workers agreement, June 1, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER: INCLUDING HVAC WORK (CRAWFORD, GRANT, JUNEAU, MONROE, RICHLAND, AND VERNON COUNTIES) | $45.63 | $29.02 | $74.65 | Agreement |
| SHEE0018-036 · Sheet Metal Workers agreement, May 26, 2025 | ||||
SHEET METAL WORKER…Full textSHEET METAL WORKER: INCLUDING HVAC WORK (LANGLADE, LINCOLN, ONEIDA, PORTAGE, AND WOOD COUNTIES) | $42.90 | $32.47 | $75.37 | Agreement |
| SUWI2002-001 · Survey of contractors in WI, January 23, 2002 | ||||
| TRUCK DRIVER (3-AXLE) | $15.28 | $4.78 | $20.06 | Survey |
| ROOFER | $15.52 | $3.21 | $18.73 | Survey |
| POWER EQUIPMENT OPERATOR (FRONT END LOADER) | $23.36 | $4.61 | $27.97 | Survey |
| POWER EQUIPMENT OPERATOR (EXCAVATOR) | $17.37 | $7.45 | $24.82 | Survey |
| POWER EQUIPMENT OPERATOR (BACKHOE) | $17.45 | $7.61 | $25.06 | Survey |
| PAINTERS: SPRAY | $13.72 | $2.25 | $15.97 | Survey |
| PAINTERS: (BRUSH & ROLLER (EXCLUDING DRYWALL FINISHING)) | $14.64 | $2.55 | $17.19 | Survey |
| GLAZIER | $20.21 | $1.86 | $22.07 | Survey |
| FENCE INSTALLERS | $15.00 | $2.37 | $17.37 | Survey |
| TEAM0346-003 · Teamsters agreement, May 1, 2025 | ||||
| TRUCK DRIVER: 2 AXLE TRUCKS (ASHLAND, BAYFIELD, BURNETT, SAWYER & WASHINGTON COUNTIES) | $35.79 | $24.13 | $59.92 | Agreement |
| TEAM0662-002 · Teamsters agreement, June 1, 2025 | ||||
TRUCK DRIVER: 3 OR MORE AXLES…Full textTRUCK DRIVER: 3 OR MORE AXLES (ADAMS, BARRON, BUFFALO, CLARK , DOOR, DUNN, JACKSON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MENOMINEE, OCONTO, ONEIDA, PEPIN, POLK, PORTAGE, PRICE, RUSK, SHAWANO, TAYLOR, TEMPEALEAU, WAUPACA & WOOD COUNTIES) | $39.72 | $28.57 | $68.29 | Agreement |
TRUCK DRIVER: 2 AXLE TRUCKS…Full textTRUCK DRIVER: 2 AXLE TRUCKS (ADAMS, BARRON, BUFFALO, CLARK , DOOR, DUNN, JACKSON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC, MENOMINEE, OCONTO, ONEIDA, PEPIN, POLK, PORTAGE, PRICE, RUSK, SHAWANO, TAYLOR, TEMPEALEAU, WAUPACA & WOOD COUNTIES) | $39.57 | $28.57 | $68.14 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WI20260011?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator