Prevailing wage rates · Wisconsin · Wage determination
Prevailing wage rates: Chippewa and Eau Claire Counties, Wisconsin
Building construction · WI20260006 modification 1, published May 18, 2026
The short answer
This sheet sets 34 classifications for building work in Chippewa and Eau Claire Counties, Wisconsin. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $13.63 an hour (laborers: landscape) to $100.96 (elevator mechanic). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0034-006 · Asbestos Workers and Heat & Frost Insulators agreement, June 9, 2025 | ||||
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER…Full textASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS WHETHER THEY CONTAIN ASBESTOS OR NOT) | $55.34 | $34.03 | $89.37 | Agreement |
| BOIL0107-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER (BOILERMAKER) | $46.52 | $34.63 | $81.15 | Agreement |
| BRWI0019-001 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER & TILE SETTER | $39.50 | $28.69 | $68.19 | Agreement |
| CARP1056-001 · Carpenters agreement, June 1, 2024 | ||||
| MILLWRIGHT | $42.00 | $28.85 | $70.85 | Agreement |
| CARP1074-007 · Carpenters agreement, June 1, 2025 | ||||
| SOFT FLOOR LAYER | $41.43 | $29.99 | $71.42 | Agreement |
Group definitions, zones and premiums for CARP1074-007CARPENTER (INCLUDING ACOUSTICAL WORK, DRYWALL HANGING & PILEDRIVERMAN; EXCLUDING BATT INSULATION).$ 41.43 29.99 | ||||
| ELEC0014-004 · Electrical Workers (IBEW) agreement, May 25, 2025 | ||||
| ELECTRICIAN | $44.29 | $25.21 | $69.50 | Agreement |
| ELEC0014-005 · Electrical Workers (IBEW) agreement, May 25, 2025 | ||||
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION…Full textELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK) | $31.17 | $20.08 | $51.25 | Agreement |
| ELEV0009-003 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTE: A.PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B.PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $62.52 | $38.44 | $100.96 | Agreement |
| ENGI0139-002 · Operating Engineers agreement, June 2, 2025 | ||||
HAZARDOUS WASTE PREMIUMS…Full textHAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $41.60 | $27.89 | $69.49 | Agreement |
HAZARDOUS WASTE PREMIUMS…Full textHAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $43.13 | $27.89 | $71.02 | Agreement |
HAZARDOUS WASTE PREMIUMS…Full textHAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $45.20 | $27.89 | $73.09 | Agreement |
HAZARDOUS WASTE PREMIUMS…Full textHAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $45.73 | $27.89 | $73.62 | Agreement |
HAZARDOUS WASTE PREMIUMS…Full textHAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $49.28 | $27.89 | $77.17 | Agreement |
HAZARDOUS WASTE PREMIUMS…Full textHAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $50.53 | $27.89 | $78.42 | Agreement |
Group definitions, zones and premiums for ENGI0139-002POWER EQUIPMENT OPERATOR: GROUP 6 SHOULDERING MACHINE OPERATOR; FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; AUGER (VERTICAL AND HORIZONTAL); SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; ROBOTIC TOOL CARRIER WITH OR WITHOUT ATTACHMENTS; POWER PACK VIBRATORY/ULTRA SOUND DRIVER AND EXTRACTOR; FIREMAN (ASPHALT PLANTS); SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; AIR, ELECTRIC, HYDRAULIC JACKS (SLIP FORM); PRESTRESS MACHINES; AIR COMPRESSOR, 400 CFM OR OVER; REFRIGERATION PLANT/FREESE MACHINE; BOILER OPERATORS (TEMPORARY HEAT); FORKLIFTS; WELDING MACHINES; GENERATORS; PUMPS OVER 3""; COMPRESSORS, UNDER 400 CFM; HEATERS, MECHANICAL; COMBINATION SMALL EQUIPMENT OPERATOR; WINCHES, SMALL ELECTRIC; OILER; GREASER; ROTARY DRILL TENDER; CONVEYOR; ELEVATOR OPERATOR POWER EQUIPMENT OPERATOR: GROUP 5 TRACTOR, BULLDOZER, OR ENDLOADER (UNDER 40 HP); TAMPERS -COMPACTORS, RIDING TYPE; STUMP CHIPPER, LARGE; ROLLER, RUBBER TIRE; BACKFILLER; TRENCHER, CHAIN TYPE (BUCKET UNDER 8 INCH); CONCRETE AUTO BREAKER, LARGE; CONCRETE FINISHING MACHINE (ROAD TYPE); CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; CONCRETE MIXERS, 14S OR OVER; PUMPS, SCREW TYPE AND GYPSUM); HYDROHAMMERS, SMALL; BROOMS AND SWEEEPRS; LIFT SLAB MACHINE; ROLLER UNDER 5 TONS; INDUSTRIAL LOCOMOTIVES; FIREMAN (PILE DRIVERS AND DERRICKS); PUMPS (WELL POINTS); HOISTS, AUTOMATIC; A-FRAMES AND WINCH TRUCKS; HOISTS (TUGGERS); BOATS (TUG, SAFETY, WORK BARGES AND LAUNCHES); ASSISTANT ENGINEER POWER EQUIPMENT OPERATOR: GROUP 4 HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 10 TONS OR LESS; TRACTOR, BULLDOZER, OR END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; BITUMINOUS PLANT AND PAVER OPERATOR; SCREED-MILLING MACHINE; ROLLER OVER 5 TONS; CONCRETE PUMPS 46 METER & UNDER; GROUT PUMPS; ROTEC TYPE MACHINE; HYDRO BLASTER, 10,000 PSI AND OVER; ROTARY DRILL OPERATOR; PERCUSSION DRILLING MACHINE; AIR TRACK DRILL WITH OR WITHOUT INTEGRAL HAMMER; BLASTER; BORING MACHINE (VERTICAL OR HORIZONTAL); SIDE BOOM; TRENCHER, WHEEL TYPE OR CHAIN TYPE HAVING 8 INCH OR LARGER BUCKET; RAIL LEVELING MACHINE (RAILROAD); TIE PLACER; TIE EXTRACTOR; TIE TAMPER; STONE LEVELER; STRADDLE CARRIER; MATERIAL HOISTS; STACK HOIST; MAN HOISTS; MECHANIC AND WELDER; OFF ROAD MATERIAL HAULERS POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOES (EXCAVATORS) WEIGHING UNDER 130,000 LBS; TRAVELLING CRANE (BRIDGE TYPE); MILLING MACHINE; CONCRETE PAVER OVER 27 E; CONCRETE SPREADER AND DISTRIBUTOR; CONCRETE LASER SCREED; CONCRETE GRINDER AND PLANING MACHINE; SLIPFORM CURB AND GUTTER MACHINE; BORING MACHINE (DIRECTIONAL); DREDGE OPERATOR; SKID RIGS; OVER 46 METER CONCRETE PUMP. POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOES (EXCAVATORS) WEIGHING 130,000 LBS & OVER; CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS 175 FT OR LESS; CAISSON RIGS; PILE DRIVER POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER. | ||||
| IRON0512-007 · Ironworkers agreement, May 1, 2025 | ||||
| IRONWORKER | $46.35 | $36.86 | $83.21 | Agreement |
| LABO0268-002 · Laborers agreement, May 1, 2025 | ||||
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $36.65 | $19.97 | $56.62 | Agreement |
| LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $37.70 | $19.97 | $57.67 | Agreement |
| LABO0268-002 · Laborers agreement, June 1, 2025 | ||||
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER…Full textLABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $36.65 | $19.97 | $56.62 | Agreement |
| LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER | $37.70 | $19.97 | $57.67 | Agreement |
| PAIN0259-001 · Painters and Allied Trades agreement, May 1, 2008 | ||||
| PAINTER | $24.11 | $12.15 | $36.26 | Agreement |
| DRYWALL FINISHER/TAPER | $24.61 | $12.15 | $36.76 | Agreement |
| PAIN1324-004 · Painters and Allied Trades agreement, March 3, 2025 | ||||
| GLAZIER | $42.72 | $11.93 | $54.65 | Agreement |
| PLAS0599-008 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| PLASTERER | $39.75 | $25.10 | $64.85 | Agreement |
| CEMENT MASON/CONCRETE FINISHER | $37.25 | $27.84 | $65.09 | Agreement |
| PLUM0434-001 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER/PIPEFITTER (INCLUDING HVAC WORK) | $50.94 | $25.98 | $76.92 | Agreement |
| SFWI0669-002 · SFWI, April 1, 2025 | ||||
| SPRINKLER FITTER | $51.68 | $29.73 | $81.41 | SFWI |
| SHEE0018-007 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS) | $42.00 | $31.56 | $73.56 | Agreement |
| SUWI2002-007 · Survey of contractors in WI, January 23, 2002 | ||||
| TILE & MARBLE FINISHER | $13.89 | $8.25 | $22.14 | Survey |
| ROOFER | $18.01 | $3.28 | $21.29 | Survey |
| LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 | Survey |
| LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 | Survey |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 | $33.73 | Survey |
| TEAM0662-001 · Teamsters agreement, June 1, 2025 | ||||
| TRUCK DRIVER (3 OR MORE AXLES) | $39.72 | $28.70 | $68.42 | Agreement |
| TRUCK DRIVER (1 & 2 AXLES) | $39.57 | $28.70 | $68.27 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WI20260006?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator