Prevailing wage rates · Washington · Wage determination
Prevailing wage rates: Asotin and Pend Oreille Counties, Washington
Heavy construction · WA20260136 modification 2, published May 18, 2026
The short answer
This sheet sets 42 classifications for heavy work in Asotin and Pend Oreille Counties, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.21 an hour (laborer: fence erector) to $88.71 (line construction: line person). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ELEC0073-009 · Electrical Workers (IBEW) agreement, July 1, 2025 | ||||
| ELECTRICIAN | $49.55 | $19.09 | $68.64 | Agreement |
| ELEC0077-002 · Electrical Workers (IBEW) agreement, February 1, 2024 | ||||
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 | Agreement |
| ELEC0077-003 · Electrical Workers (IBEW) agreement, February 1, 2023 | ||||
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | Agreement |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | Agreement |
| ENGI0302-137 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: Group 8…Full textPOWER EQUIPMENT OPERATOR: Group 8(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $42.36 | $23.40 | $65.76 | Agreement |
POWER EQUIPMENT OPERATOR: Group 6…Full textPOWER EQUIPMENT OPERATOR: Group 6(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $40.05 | $23.40 | $63.45 | Agreement |
POWER EQUIPMENT OPERATOR: Group 5…Full textPOWER EQUIPMENT OPERATOR: Group 5(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $39.71 | $23.40 | $63.11 | Agreement |
POWER EQUIPMENT OPERATOR: Group 4…Full textPOWER EQUIPMENT OPERATOR: Group 4(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $39.51 | $23.40 | $62.91 | Agreement |
POWER EQUIPMENT OPERATOR: Group 3…Full textPOWER EQUIPMENT OPERATOR: Group 3(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $39.31 | $23.40 | $62.71 | Agreement |
POWER EQUIPMENT OPERATOR: Group 2…Full textPOWER EQUIPMENT OPERATOR: Group 2(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $38.56 | $23.40 | $61.96 | Agreement |
POWER EQUIPMENT OPERATOR: Group 1…Full textPOWER EQUIPMENT OPERATOR: Group 1(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D | $38.17 | $23.40 | $61.57 | Agreement |
| ENGI0302-138 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: Group 9…Full textPOWER EQUIPMENT OPERATOR: Group 9(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $46.34 | $23.40 | $69.74 | Agreement |
POWER EQUIPMENT OPERATOR: Group 8…Full textPOWER EQUIPMENT OPERATOR: Group 8(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $45.36 | $23.40 | $68.76 | Agreement |
POWER EQUIPMENT OPERATOR: Group 6…Full textPOWER EQUIPMENT OPERATOR: Group 6(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $43.05 | $23.40 | $66.45 | Agreement |
POWER EQUIPMENT OPERATOR: Group 5…Full textPOWER EQUIPMENT OPERATOR: Group 5(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $42.71 | $23.40 | $66.11 | Agreement |
POWER EQUIPMENT OPERATOR: Group 4…Full textPOWER EQUIPMENT OPERATOR: Group 4(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $42.51 | $23.40 | $65.91 | Agreement |
POWER EQUIPMENT OPERATOR: Group 3…Full textPOWER EQUIPMENT OPERATOR: Group 3(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $42.31 | $23.40 | $65.71 | Agreement |
POWER EQUIPMENT OPERATOR: Group 2…Full textPOWER EQUIPMENT OPERATOR: Group 2(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $41.56 | $23.40 | $64.96 | Agreement |
POWER EQUIPMENT OPERATOR: Group 1…Full textPOWER EQUIPMENT OPERATOR: Group 1(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech | $41.17 | $23.40 | $64.57 | Agreement |
| IRON0014-010 · Ironworkers agreement, July 7, 2025 | ||||
| IRONWORKER | $43.40 | $32.77 | $76.17 | Agreement |
| LABO0238-039 · Laborers agreement, June 1, 2025 | ||||
| LABORER: COMMON OR GENERAL | $37.13 | $16.90 | $54.03 | Agreement |
| LABO0238-040 · Laborers agreement, June 1, 2025 | ||||
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 | $50.93 | Agreement |
| LABO0242-010 · Laborers agreement, June 1, 2025 | ||||
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | Agreement |
| PAIN0300-002 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| PAINTER | $41.24 | $14.70 | $55.94 | Agreement |
| PLAS0072-005 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 | $59.53 | Agreement |
| SUWA2018-036 · Survey of contractors in WA, March 1, 2024 | ||||
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | Survey |
| TRUCK DRIVER: DUMP TRUCK | $31.24 | $18.60 | $49.84 | Survey |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 | Survey |
| PILEDRIVER PERSON | $36.50 | $10.16 | $46.66 | Survey |
| OPERATOR: MECHANIC | $34.97 | $15.31 | $50.28 | Survey |
| OPERATOR: LOADER | $33.61 | $13.62 | $47.23 | Survey |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 | Survey |
| OPERATOR: CRANE | $31.97 | $15.15 | $47.12 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.72 | $13.15 | $46.87 | Survey |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 | Survey |
| LABORER: PIPELAYER | $37.55 | $0.00 | $37.55 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.51 | $2.96 | $30.47 | Survey |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 | Survey |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 | $47.13 | Survey |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $36.96 | $8.56 | $45.52 | Survey |
| CARPENTER | $39.31 | $3.42 | $42.73 | Survey |
| TEAM0313-001 · Teamsters agreement, June 1, 2025 | ||||
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | Agreement |
Modification history
| Modification 1 | January 23, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WA20260136?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator