Prevailing wage rates: Asotin and Pend Oreille Counties, Washington

Heavy construction · WA20260136 modification 2, published May 18, 2026

The short answer

This sheet sets 42 classifications for heavy work in Asotin and Pend Oreille Counties, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.21 an hour (laborer: fence erector) to $88.71 (line construction: line person). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ELEC0073-009 · Electrical Workers (IBEW) agreement, July 1, 2025
ELECTRICIAN$49.55$19.09$68.64Agreement
ELEC0077-002 · Electrical Workers (IBEW) agreement, February 1, 2024
LINE CONSTRUCTION: LINE PERSON$64.17$24.54$88.71Agreement
ELEC0077-003 · Electrical Workers (IBEW) agreement, February 1, 2023
TREE TRIMMER: GROUND PERSON$22.60$16.37$38.97Agreement
TREE TRIMMER$42.57$17.97$60.54Agreement
ENGI0302-137 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: Group 8…
Full text

POWER EQUIPMENT OPERATOR: Group 8(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$42.36$23.40$65.76Agreement
POWER EQUIPMENT OPERATOR: Group 6…
Full text

POWER EQUIPMENT OPERATOR: Group 6(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$40.05$23.40$63.45Agreement
POWER EQUIPMENT OPERATOR: Group 5…
Full text

POWER EQUIPMENT OPERATOR: Group 5(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$39.71$23.40$63.11Agreement
POWER EQUIPMENT OPERATOR: Group 4…
Full text

POWER EQUIPMENT OPERATOR: Group 4(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$39.51$23.40$62.91Agreement
POWER EQUIPMENT OPERATOR: Group 3…
Full text

POWER EQUIPMENT OPERATOR: Group 3(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$39.31$23.40$62.71Agreement
POWER EQUIPMENT OPERATOR: Group 2…
Full text

POWER EQUIPMENT OPERATOR: Group 2(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$38.56$23.40$61.96Agreement
POWER EQUIPMENT OPERATOR: Group 1…
Full text

POWER EQUIPMENT OPERATOR: Group 1(ASOTIN COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grade Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/D

$38.17$23.40$61.57Agreement
ENGI0302-138 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: Group 9…
Full text

POWER EQUIPMENT OPERATOR: Group 9(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$46.34$23.40$69.74Agreement
POWER EQUIPMENT OPERATOR: Group 8…
Full text

POWER EQUIPMENT OPERATOR: Group 8(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$45.36$23.40$68.76Agreement
POWER EQUIPMENT OPERATOR: Group 6…
Full text

POWER EQUIPMENT OPERATOR: Group 6(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$43.05$23.40$66.45Agreement
POWER EQUIPMENT OPERATOR: Group 5…
Full text

POWER EQUIPMENT OPERATOR: Group 5(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$42.71$23.40$66.11Agreement
POWER EQUIPMENT OPERATOR: Group 4…
Full text

POWER EQUIPMENT OPERATOR: Group 4(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$42.51$23.40$65.91Agreement
POWER EQUIPMENT OPERATOR: Group 3…
Full text

POWER EQUIPMENT OPERATOR: Group 3(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$42.31$23.40$65.71Agreement
POWER EQUIPMENT OPERATOR: Group 2…
Full text

POWER EQUIPMENT OPERATOR: Group 2(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$41.56$23.40$64.96Agreement
POWER EQUIPMENT OPERATOR: Group 1…
Full text

POWER EQUIPMENT OPERATOR: Group 1(PEND OREILLE COUNTY) Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mech

$41.17$23.40$64.57Agreement
IRON0014-010 · Ironworkers agreement, July 7, 2025
IRONWORKER$43.40$32.77$76.17Agreement
LABO0238-039 · Laborers agreement, June 1, 2025
LABORER: COMMON OR GENERAL$37.13$16.90$54.03Agreement
LABO0238-040 · Laborers agreement, June 1, 2025
TRAFFIC CONTROL: FLAGGER$34.03$16.90$50.93Agreement
LABO0242-010 · Laborers agreement, June 1, 2025
LABORER: NOZZLE PERSON$52.31$17.01$69.32Agreement
PAIN0300-002 · Painters and Allied Trades agreement, July 1, 2025
PAINTER$41.24$14.70$55.94Agreement
PLAS0072-005 · Plasterers and Cement Masons agreement, June 1, 2025
CEMENT MASON/CONCRETE FINISHER$40.89$18.64$59.53Agreement
SUWA2018-036 · Survey of contractors in WA, March 1, 2024
TRUCK DRIVER: WATER TRUCK$31.62$16.84$48.46Survey
TRUCK DRIVER: DUMP TRUCK$31.24$18.60$49.84Survey
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$30.61$10.89$41.50Survey
PILEDRIVER PERSON$36.50$10.16$46.66Survey
OPERATOR: MECHANIC$34.97$15.31$50.28Survey
OPERATOR: LOADER$33.61$13.62$47.23Survey
OPERATOR: FORKLIFT$45.93$19.20$65.13Survey
OPERATOR: CRANE$31.97$15.15$47.12Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$33.72$13.15$46.87Survey
LABORER: FENCE ERECTOR$30.21$0.00$30.21Survey
LABORER: PIPELAYER$37.55$0.00$37.55Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$27.51$2.96$30.47Survey
LABORER: HOD CARRIER$35.06$10.94$46.00Survey
LABORER: CONCRETE SAW CHAIN$36.24$10.89$47.13Survey
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$36.96$8.56$45.52Survey
CARPENTER$39.31$3.42$42.73Survey
TEAM0313-001 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: ASPHALT MIX$55.43$27.52$82.95Agreement

Modification history

Modification 1January 23, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WA20260136?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.