CertifiedHours

Prevailing wage rates · Washington · Wage determination

Prevailing wage rates: Yakima County, Washington

Heavy construction · WA20260135 modification 1, published May 18, 2026

The short answer

This sheet sets 71 classifications for heavy work in Yakima County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $29.72 an hour (carpenter, excludes form work) to $89.13 (heavy equipment operator: mechanic (west of the 120th meridian)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ELEC0077-002 · Electrical Workers (IBEW) agreement, February 1, 2024
LINE CONSTRUCTION: LINE PERSON$64.17$24.54$88.71Agreement
ELEC0077-003 · Electrical Workers (IBEW) agreement, February 1, 2023
TREE TRIMMER: GROUND PERSON$22.60$16.37$38.97Agreement
TREE TRIMMER$42.57$17.97$60.54Agreement
ELEC0077-005 · Electrical Workers (IBEW) agreement, February 1, 2024
LINE CONSTRUCTION: EQUIPMENT OPERATOR$55.19$20.94$76.13Agreement
ELEC0112-010 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN$60.00$27.78$87.78Agreement
ENGI0302-106 · Operating Engineers agreement, June 1, 2025
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR…
Full text

OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.23$27.57$86.80Agreement
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR…
Full text

OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: DRILL: DRILLING MACHINE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$60.67$27.57$88.24Agreement
OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.23$27.57$86.80Agreement
ENGI0302-110 · Operating Engineers agreement, June 1, 2024
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN$38.91$22.45$61.36Agreement
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH…
Full text

OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN

$40.18$22.45$62.63Agreement
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF…
Full text

OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN

$40.69$22.45$63.14Agreement
Heavy Equipment Operator: Screed (East of the 120th Meridian)$40.69$22.45$63.14Agreement
Heavy Equipment Operator…
Full text

Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian)

$40.69$22.45$63.14Agreement
Heavy Equipment Operator: Mechanic (East of the 120th Meridian)$38.96$22.45$61.41Agreement
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE…
Full text

OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$59.23$27.57$86.80Agreement
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH…
Full text

OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$55.43$27.57$83.00Agreement
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH…
Full text

OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$59.88$27.57$87.45Agreement
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN…
Full text

OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$60.67$27.57$88.24Agreement
Heavy Equipment Operator: Screed (West of the 120th Meridian)$60.67$27.57$88.24Agreement
Heavy Equipment Operator…
Full text

Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian)

$60.67$27.57$88.24Agreement
Heavy Equipment Operator: Mechanic (West of the 120th Meridian)$61.56$27.57$89.13Agreement
ENGI0302-110 · Operating Engineers agreement, June 1, 2025
OPERATOR: ROLLER WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN$38.91$22.45$61.36Agreement
OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH…
Full text

OPERATOR: LOADER OVERHEAD UNDER 4 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN

$40.18$22.45$62.63Agreement
OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF…
Full text

OPERATOR: LOADER OVERHEAD 4 YARDS INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN EAST OF THE 120TH MERIDIAN

$40.69$22.45$63.14Agreement
Heavy Equipment Operator: Screed (East of the 120th Meridian)$40.69$22.45$63.14Agreement
Heavy Equipment Operator…
Full text

Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (East of the 120th Meridian)

$40.69$22.45$63.14Agreement
Heavy Equipment Operator: Mechanic (East of the 120th Meridian)$38.96$22.45$61.41Agreement
OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE…
Full text

OPERATOR: ROLLER PLANT MIX OR MULTI-LIFT MATERIALS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$59.23$27.57$86.80Agreement
OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH…
Full text

OPERATOR: ROLLER OTHER THAN PLANT MIX WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$55.43$27.57$83.00Agreement
OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH…
Full text

OPERATOR: LOADER OVERHEAD UNDER 6 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$59.88$27.57$87.45Agreement
OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN…
Full text

OPERATOR: LOADER OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS WEST OF THE 120TH MERIDIAN WEST OF THE 120TH MERIDIAN

$60.67$27.57$88.24Agreement
Heavy Equipment Operator: Screed (West of the 120th Meridian)$60.67$27.57$88.24Agreement
Heavy Equipment Operator…
Full text

Heavy Equipment Operator: Paver (Asphalt, Aggregate, And Concrete) (West of the 120th Meridian)

$60.67$27.57$88.24Agreement
Heavy Equipment Operator: Mechanic (West of the 120th Meridian)$61.56$27.57$89.13Agreement
ENGI0302-111 · Operating Engineers agreement, June 1, 2025
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS…
Full text

OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER…
Full text

OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.23$27.57$86.80Agreement
OPERATOR: OILER: DRILL OILERS…
Full text

OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: CONCRETE PUMP…
Full text

OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: CONCRETE PUMP…
Full text

OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$60.67$27.57$88.24Agreement
OPERATOR: CONCRETE PUMP…
Full text

OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.23$27.57$86.80Agreement
ENGI0302-111 · Operating Engineers agreement, July 7, 2025
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS…
Full text

OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER…
Full text

OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.23$27.57$86.80Agreement
OPERATOR: OILER: DRILL OILERS…
Full text

OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: CONCRETE PUMP…
Full text

OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.88$27.57$87.45Agreement
OPERATOR: CONCRETE PUMP…
Full text

OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$60.67$27.57$88.24Agreement
OPERATOR: CONCRETE PUMP…
Full text

OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)

$59.23$27.57$86.80Agreement
LABO0242-010 · Laborers agreement, June 1, 2025
LABORER: NOZZLE PERSON$52.31$17.01$69.32Agreement
LABO0348-010 · Laborers agreement, June 1, 2025
LABORER: PIPELAYER$37.80$16.90$54.70Agreement
PAIN0300-002 · Painters and Allied Trades agreement, July 1, 2025
PAINTER$41.24$14.70$55.94Agreement
SUWA2018-035 · Survey of contractors in WA, March 1, 2024
TRUCK DRIVER: WATER TRUCK$31.62$16.84$48.46Survey
TRUCK DRIVER: DUMP TRUCK$34.94$15.63$50.57Survey
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$30.61$10.89$41.50Survey
TRAFFIC CONTROL: FLAGGER$27.75$11.15$38.90Survey
OPERATOR: GRADER/BLADE$40.28$16.17$56.45Survey
OPERATOR: FORKLIFT$45.93$19.20$65.13Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$43.60$0.00$43.60Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$48.70$0.00$48.70Survey
LABORER: FENCE ERECTOR$30.21$0.00$30.21Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$38.46$0.00$38.46Survey
LABORER: HOD CARRIER$35.06$10.94$46.00Survey
LABORER: CONCRETE SAW CHAIN$37.30$4.30$41.60Survey
LABORER: COMMON OR GENERAL$34.41$0.00$34.41Survey
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$37.63$11.25$48.88Survey
IRONWORKER$43.29$25.63$68.92Survey
GRADE CHECKER$37.54$0.00$37.54Survey
FORM WORKER$37.16$14.74$51.90Survey
CEMENT MASON/CONCRETE FINISHER$39.33$0.00$39.33Survey
CARPENTER, EXCLUDES FORM WORK$29.72$0.00$29.72Survey
TEAM0313-001 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: ASPHALT MIX$55.43$27.52$82.95Agreement
UAVGWA0011 · Union average, March 1, 2024
OPERATOR: CRANE$54.11$18.14$72.25Union average

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WA20260135?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator