Prevailing wage rates · Washington · Wage determination
Prevailing wage rates: Stevens County, Washington
Heavy construction · WA20260131 modification 2, published May 18, 2026
The short answer
This sheet sets 35 classifications for heavy work in Stevens County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.21 an hour (laborer: fence erector) to $88.71 (line construction: line person). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ELEC0073-009 · Electrical Workers (IBEW) agreement, July 1, 2025 | ||||
| ELECTRICIAN | $49.55 | $19.09 | $68.64 | Agreement |
| ELEC0077-002 · Electrical Workers (IBEW) agreement, February 1, 2024 | ||||
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 | Agreement |
| ELEC0077-003 · Electrical Workers (IBEW) agreement, February 1, 2023 | ||||
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | Agreement |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | Agreement |
| ENGI0302-139 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: Group 9Power…Full textPOWER EQUIPMENT OPERATOR: Group 9Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $46.34 | $23.40 | $69.74 | Agreement |
POWER EQUIPMENT OPERATOR: Group 8Power…Full textPOWER EQUIPMENT OPERATOR: Group 8Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $45.36 | $23.40 | $68.76 | Agreement |
POWER EQUIPMENT OPERATOR: Group 6Power…Full textPOWER EQUIPMENT OPERATOR: Group 6Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $43.05 | $23.40 | $66.45 | Agreement |
POWER EQUIPMENT OPERATOR: Group 5Power…Full textPOWER EQUIPMENT OPERATOR: Group 5Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $42.71 | $23.40 | $66.11 | Agreement |
POWER EQUIPMENT OPERATOR: Group 4Power…Full textPOWER EQUIPMENT OPERATOR: Group 4Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $42.51 | $23.40 | $65.91 | Agreement |
POWER EQUIPMENT OPERATOR: Group 3Power…Full textPOWER EQUIPMENT OPERATOR: Group 3Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $42.31 | $23.40 | $65.71 | Agreement |
POWER EQUIPMENT OPERATOR: Group 2Power…Full textPOWER EQUIPMENT OPERATOR: Group 2Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $41.56 | $23.40 | $64.96 | Agreement |
POWER EQUIPMENT OPERATOR: Group 1Power…Full textPOWER EQUIPMENT OPERATOR: Group 1Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul | $41.17 | $23.40 | $64.57 | Agreement |
| IRON0014-010 · Ironworkers agreement, July 7, 2025 | ||||
| IRONWORKER | $43.40 | $32.77 | $76.17 | Agreement |
| LABO0238-040 · Laborers agreement, June 1, 2025 | ||||
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 | $50.93 | Agreement |
| LABO0242-010 · Laborers agreement, June 1, 2025 | ||||
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | Agreement |
| PAIN0300-002 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| PAINTER | $41.24 | $14.70 | $55.94 | Agreement |
| PLAS0072-005 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 | $59.53 | Agreement |
| SUWA2018-031 · Survey of contractors in WA, March 1, 2024 | ||||
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | Survey |
| TRUCK DRIVER: DUMP TRUCK | $31.24 | $18.60 | $49.84 | Survey |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 | Survey |
| PILEDRIVER PERSON | $36.50 | $10.16 | $46.66 | Survey |
| OPERATOR: MECHANIC | $34.97 | $15.31 | $50.28 | Survey |
| OPERATOR: LOADER | $33.61 | $13.62 | $47.23 | Survey |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 | Survey |
| OPERATOR: CRANE | $31.97 | $15.15 | $47.12 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $33.72 | $13.15 | $46.87 | Survey |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 | Survey |
| LABORER: PIPELAYER | $37.55 | $0.00 | $37.55 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.51 | $2.96 | $30.47 | Survey |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 | Survey |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 | $47.13 | Survey |
| LABORER: COMMON OR GENERAL | $37.01 | $0.00 | $37.01 | Survey |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $36.96 | $8.56 | $45.52 | Survey |
| CARPENTER | $39.31 | $3.42 | $42.73 | Survey |
| TEAM0313-001 · Teamsters agreement, June 1, 2025 | ||||
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | Agreement |
Modification history
| Modification 1 | January 23, 2026 |
| Modification 2 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WA20260131?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.