Prevailing wage rates · Washington · Wage determination
Prevailing wage rates: Chelan County, Washington
Heavy construction · WA20260122 modification 1, published May 18, 2026
The short answer
This sheet sets 50 classifications for heavy work in Chelan County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.21 an hour (laborer: fence erector) to $92.46 (ironworker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| CARP0059-012 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER | $44.21 | $17.28 | $61.49 | Agreement |
| ELEC0077-002 · Electrical Workers (IBEW) agreement, February 1, 2024 | ||||
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 | Agreement |
| ELEC0077-003 · Electrical Workers (IBEW) agreement, February 1, 2023 | ||||
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | Agreement |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | Agreement |
| ELEC0077-005 · Electrical Workers (IBEW) agreement, February 1, 2024 | ||||
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 | $76.13 | Agreement |
| ELEC0077-006 · Electrical Workers (IBEW) agreement, February 1, 2023 | ||||
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 | $55.27 | Agreement |
| ELEC0191-002 · Electrical Workers (IBEW) agreement, January 1, 2024 | ||||
| ELECTRICIAN | $53.20 | $29.15 | $82.35 | Agreement |
| ENGI0302-069 · Operating Engineers agreement, June 1, 2025 | ||||
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE…Full textOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE: OVER 30 METRIC TONS AND UP TO 50 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | Agreement |
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE…Full textOPERATOR: BACKHOE/EXCAVATOR/TRACKHOE: 15 TO 30 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
| ENGI0302-090 · Operating Engineers agreement, June 1, 2025 | ||||
OPERATOR: CRANE: 100 TONS THROUGH 199 TONS…Full textOPERATOR: CRANE: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (WEST OF THE 120TH MERIDIAN) | $61.56 | $27.57 | $89.13 | Agreement |
| ENGI0302-106 · Operating Engineers agreement, June 1, 2025 | ||||
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR…Full textOPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | Agreement |
OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR…Full textOPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
| OPERATOR: DRILL: DRILLING MACHINE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | Agreement |
| OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | Agreement |
| ENGI0302-111 · Operating Engineers agreement, June 1, 2025 | ||||
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS…Full textOPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER…Full textOPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | Agreement |
OPERATOR: OILER: DRILL OILERS…Full textOPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
OPERATOR: CONCRETE PUMP…Full textOPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
OPERATOR: CONCRETE PUMP…Full textOPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | Agreement |
OPERATOR: CONCRETE PUMP…Full textOPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | Agreement |
| ENGI0302-111 · Operating Engineers agreement, July 7, 2025 | ||||
OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS…Full textOPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
OPERATOR: OILER: TRUCK CRANE OILER/DRIVER…Full textOPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | Agreement |
OPERATOR: OILER: DRILL OILERS…Full textOPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
OPERATOR: CONCRETE PUMP…Full textOPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | Agreement |
OPERATOR: CONCRETE PUMP…Full textOPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | Agreement |
OPERATOR: CONCRETE PUMP…Full textOPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | Agreement |
| IRON0086-005 · Ironworkers agreement, July 7, 2025 | ||||
| IRONWORKER | $57.94 | $34.52 | $92.46 | Agreement |
| LABO0242-009 · Laborers agreement, June 1, 2025 | ||||
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 | Agreement |
| LABO0242-010 · Laborers agreement, June 1, 2025 | ||||
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | Agreement |
| LABO0292-009 · Laborers agreement, June 1, 2025 | ||||
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $53.99 | $17.05 | $71.04 | Agreement |
| LABO0348-011 · Laborers agreement, June 1, 2025 | ||||
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 | $50.93 | Agreement |
| PAIN0300-002 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| PAINTER | $41.24 | $14.70 | $55.94 | Agreement |
| PLAS0528-008 · Plasterers and Cement Masons agreement, June 1, 2024 | ||||
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | Agreement |
| SUWA2018-022 · Survey of contractors in WA, March 1, 2024 | ||||
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | Survey |
| TRUCK DRIVER: DUMP TRUCK | $26.27 | $8.56 | $34.83 | Survey |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 | Survey |
| OPERATOR: ROLLER | $45.11 | $11.08 | $56.19 | Survey |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 | $45.79 | Survey |
| OPERATOR: MECHANIC | $34.39 | $14.95 | $49.34 | Survey |
| OPERATOR: LOADER | $37.92 | $12.05 | $49.97 | Survey |
| OPERATOR: GRADER/BLADE | $40.28 | $16.17 | $56.45 | Survey |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.60 | $0.00 | $43.60 | Survey |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 | Survey |
| LABORER: PIPELAYER | $40.85 | $10.89 | $51.74 | Survey |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 | Survey |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 | $47.13 | Survey |
| LABORER: COMMON OR GENERAL | $27.99 | $3.04 | $31.03 | Survey |
| GRADE CHECKER | $34.79 | $13.87 | $48.66 | Survey |
| TEAM0313-001 · Teamsters agreement, June 1, 2025 | ||||
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WA20260122?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator