Prevailing wage rates: Benton County, Washington

Heavy construction · WA20260121 modification 2, published May 18, 2026

The short answer

This sheet sets 33 classifications for heavy work in Benton County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $30.21 an hour (laborer: fence erector) to $88.71 (line construction: line person). Your contract may lock an earlier modification.

Scope

Excludes D.O.E. Hanford Site

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification.

Latest change

May 18, 2026 · modification 2

Classification names reworded; 2 fringe formulas changed among the 32 lines we could match

  • Line construction: 2 fringe formulas changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (2)
ClassificationWasNowChange
LINE CONSTRUCTION: LINE PERSON$64.17 + 23.58+1.5%$64.17 + $24.54changed
LINE CONSTRUCTION: EQUIPMENT OPERATOR$55.19 + 20.11+1.5%$55.19 + $20.94changed

Earlier modifications

  • January 23, 2026 · modification 17 classifications added, 15 classifications removed
    Classifications added or removed
    • Added: POWER EQUIPMENT OPERATOR Group 1 $38.17 + $23.40
    • Added: POWER EQUIPMENT OPERATOR Group 2 $38.56 + $23.40
    • Added: POWER EQUIPMENT OPERATOR Group 3 $39.31 + $23.40
    • Added: POWER EQUIPMENT OPERATOR Group 4 $39.51 + $23.40
    • Added: POWER EQUIPMENT OPERATOR Group 5 $39.71 + $23.40
    • Added: POWER EQUIPMENT OPERATOR Group 6 $40.05 + $23.40
    • Added: POWER EQUIPMENT OPERATOR Group 7 $40.39 + $23.40
    • Removed: OPERATOR: Backhoe/Excavator/Trackhoe (45,000 gw & under)
    • Removed: OPERATOR: Bobcat/Skid Steer/Skid Loader
    • Removed: OPERATOR: Loader Overhead 4 yards including 8 yards
    • Removed: OPERATOR: Loader Overhead under 4 yards
    • Removed: OPERATOR: Mechanic
    • Removed: OPERATOR: Bulldozer (D9 & under)
    • Removed: OPERATOR: Concrete Pump Boom Truck
    • Removed: OPERATOR: Concrete Pump Squeeze-Crete, Flow-Crete, Whitman & similar
    • Removed: OPERATOR: Drill (Drilling Machine,Horizontal/Directional Drill Locator/Operator)
    • Removed: OPERATOR: Grader/Blade
    • Removed: OPERATOR: Oiler Drill Oilers: Auger Type, Truck or Crane Mount
    • Removed: OPERATOR: Oiler Truck Crane Oiler/Driver
    • Removed: OPERATOR: Paver (Asphalt, Aggregate, and Concrete)
    • Removed: OPERATOR: Roller
    • Removed: OPERATOR: Scraper

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
CARP0059-012 · Carpenters agreement, June 1, 2025
CARPENTER$44.21$17.28$61.49no changeAgreement, 2025
ELEC0077-002 · Electrical Workers (IBEW) agreement, February 1, 2024
LINE CONSTRUCTION: LINE PERSON$64.17$24.54$88.71changedAgreement, 2024
ELEC0077-003 · Electrical Workers (IBEW) agreement, February 1, 2023
TREE TRIMMER: GROUND PERSON$22.60$16.37$38.97no changeAgreement, 2023
TREE TRIMMER$42.57$17.97$60.54no changeAgreement, 2023
ELEC0077-005 · Electrical Workers (IBEW) agreement, February 1, 2024
LINE CONSTRUCTION: EQUIPMENT OPERATOR$55.19$20.94$76.13changedAgreement, 2024
ELEC0077-006 · Electrical Workers (IBEW) agreement, February 1, 2023
LINE CONSTRUCTION: (GROUND PERSON)$37.53$17.74$55.27no changeAgreement, 2023
ELEC0112-010 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN$60.00$27.78$87.78no changeAgreement, 2025
ENGI0302-143 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: Group 7…
Full text

POWER EQUIPMENT OPERATOR: Group 7 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$40.39$23.40$63.79—Agreement, 2025
POWER EQUIPMENT OPERATOR: Group 6…
Full text

POWER EQUIPMENT OPERATOR: Group 6 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$40.05$23.40$63.45—Agreement, 2025
POWER EQUIPMENT OPERATOR: Group 5…
Full text

POWER EQUIPMENT OPERATOR: Group 5 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$39.71$23.40$63.11—Agreement, 2025
POWER EQUIPMENT OPERATOR: Group 4…
Full text

POWER EQUIPMENT OPERATOR: Group 4 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$39.51$23.40$62.91—Agreement, 2025
POWER EQUIPMENT OPERATOR: Group 3…
Full text

POWER EQUIPMENT OPERATOR: Group 3 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$39.31$23.40$62.71—Agreement, 2025
POWER EQUIPMENT OPERATOR: Group 2…
Full text

POWER EQUIPMENT OPERATOR: Group 2 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$38.56$23.40$61.96—Agreement, 2025
POWER EQUIPMENT OPERATOR: Group 1…
Full text

POWER EQUIPMENT OPERATOR: Group 1 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount; Loader-Overhead Under 4 Yards Group 5: Backhoe/Excavator/Trackhoe (45,000 GW & Under) Group 6: Concrete Pump-Boom Truck; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yar

$38.17$23.40$61.57—Agreement, 2025
IRON0014-010 · Ironworkers agreement, July 7, 2025
IRONWORKER$43.40$32.77$76.17no changeAgreement, 2025
LABO0238-040 · Laborers agreement, June 1, 2025
TRAFFIC CONTROL: FLAGGER$34.03$16.90$50.93no changeAgreement, 2025
LABO0242-010 · Laborers agreement, June 1, 2025
LABORER: NOZZLE PERSON$52.31$17.01$69.32no changeAgreement, 2025
LABO0348-010 · Laborers agreement, June 1, 2025
LABORER: PIPELAYER$37.80$16.90$54.70no changeAgreement, 2025
PAIN0300-002 · Painters and Allied Trades agreement, July 1, 2025
PAINTER$41.24$14.70$55.94no changeAgreement, 2025
PLAS0072-005 · Plasterers and Cement Masons agreement, June 1, 2025
CEMENT MASON/CONCRETE FINISHER$40.89$18.64$59.53no changeAgreement, 2025
SUWA2018-021 · Survey of contractors in WA, March 1, 2024
TRUCK DRIVER: WATER TRUCK$31.62$16.84$48.46no changeSurvey, 2024
TRUCK DRIVER: DUMP TRUCK$29.55$15.38$44.93no changeSurvey, 2024
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$30.61$10.89$41.50no changeSurvey, 2024
OPERATOR: FORKLIFT$45.93$19.20$65.13no changeSurvey, 2024
LABORER: FENCE ERECTOR$30.21$0.00$30.21no changeSurvey, 2024
LABORER: MASON TENDER - CEMENT/CONCRETE$27.51$2.96$30.47no changeSurvey, 2024
LABORER: HOD CARRIER$35.06$10.94$46.00no changeSurvey, 2024
LABORER: CONCRETE SAW CHAIN$36.24$10.89$47.13no changeSurvey, 2024
LABORER: COMMON OR GENERAL$29.27$12.01$41.28no changeSurvey, 2024
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$36.96$8.56$45.52no changeSurvey, 2024
GRADE CHECKER$31.40$14.10$45.50no changeSurvey, 2024
TEAM0313-001 · Teamsters agreement, June 1, 2025
TRUCK DRIVER: ASPHALT MIX$55.43$27.52$82.95no changeAgreement, 2025
UAVGWA0010 · Union average, March 1, 2024
OPERATOR: CRANE$54.45$25.57$80.02—Union average

Modification history

Modification 1January 23, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WA20260121?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and WA20260121 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 33 classifications in 16 rate groups
  • 14 from agreements, 1 from surveys
  • Counties: Benton