Prevailing wage rates · Washington · Wage determination
Prevailing wage rates: Thurston County, Washington
Building construction · WA20260116 modification 1, published May 18, 2026
The short answer
This sheet sets 65 classifications for building work in Thurston County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $42.25 an hour (laborer: asphalt, includes raker, shoveler, spreader and distributor) to $103.25 (sheet metal worker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0007-007 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025 | ||||
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 | Agreement |
| BRWA0001-013 · Bricklayers agreement, June 1, 2025 | ||||
| TILE SETTER | $49.70 | $18.62 | $68.32 | Agreement |
| TILE FINISHER | $40.98 | $18.17 | $59.15 | Agreement |
| BRWA0001-015 · Bricklayers agreement, June 1, 2025 | ||||
| BRICKLAYER | $55.34 | $20.05 | $75.39 | Agreement |
| CARP0360-001 · Carpenters agreement, June 1, 2025 | ||||
| CARPENTER (INCLUDES DRYWALL HANGER) | $63.98 | $19.13 | $83.11 | Agreement |
| ELEC0076-003 · Electrical Workers (IBEW) agreement, August 31, 2025 | ||||
| ELECTRICIAN | $65.14 | $26.56 | $91.70 | Agreement |
| ENGI0612-011 · Operating Engineers agreement, June 1, 2025 | ||||
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | $59.46 | $27.32 | $86.78 | Agreement |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $60.14 | $27.32 | $87.46 | Agreement |
| ENGI0612-021 · Operating Engineers agreement, June 1, 2024 | ||||
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $60.14 | $27.32 | $87.46 | Agreement |
| POWER EQUIPMENT OPERATOR: DOZER (D-9 & UNDER) | $59.46 | $27.32 | $86.78 | Agreement |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $59.46 | $27.32 | $86.78 | Agreement |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $55.68 | $27.32 | $83.00 | Agreement |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.46 | $27.32 | $86.78 | Agreement |
OPERATOR: OILER (DRILL OILERS…Full textOPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.14 | $27.32 | $87.46 | Agreement |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.14 | $27.32 | $87.46 | Agreement |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT IINCLUDING 8 YARD) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: GRADER/BLADE | $60.91 | $27.32 | $88.23 | Agreement |
OPERATOR: CRANE (45 TONS THROUGH 99 TONS…Full textOPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: CRANE (20 THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.14 | $27.32 | $87.46 | Agreement |
| OPERATOR: CRANE (100 THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.81 | $27.32 | $89.13 | Agreement |
| OPERATOR: BLADE FINISH | $60.91 | $27.32 | $88.23 | Agreement |
| ENGI0612-021 · Operating Engineers agreement, June 1, 2025 | ||||
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $60.14 | $27.32 | $87.46 | Agreement |
| POWER EQUIPMENT OPERATOR: DOZER (D-9 & UNDER) | $59.46 | $27.32 | $86.78 | Agreement |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $59.46 | $27.32 | $86.78 | Agreement |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $55.68 | $27.32 | $83.00 | Agreement |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.46 | $27.32 | $86.78 | Agreement |
OPERATOR: OILER (DRILL OILERS…Full textOPERATOR: OILER (DRILL OILERS: AUGER TYPE; TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.14 | $27.32 | $87.46 | Agreement |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.14 | $27.32 | $87.46 | Agreement |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT IINCLUDING 8 YARD) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: GRADER/BLADE | $60.91 | $27.32 | $88.23 | Agreement |
OPERATOR: CRANE (45 TONS THROUGH 99 TONS…Full textOPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $60.91 | $27.32 | $88.23 | Agreement |
| OPERATOR: CRANE (20 THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.14 | $27.32 | $87.46 | Agreement |
| OPERATOR: CRANE (100 THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.81 | $27.32 | $89.13 | Agreement |
| OPERATOR: BLADE FINISH | $60.91 | $27.32 | $88.23 | Agreement |
| IRON0086-006 · Ironworkers agreement, July 7, 2025 | ||||
| IRONWORKER | $57.94 | $34.52 | $92.46 | Agreement |
| LABO0242-011 · Laborers agreement, June 1, 2025 | ||||
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $50.38 | $16.96 | $67.34 | Agreement |
| LABO0242-015 · Laborers agreement, June 1, 2025 | ||||
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 | Agreement |
| LABO0242-017 · Laborers agreement, June 1, 2025 | ||||
| LABORER: GRADE CHECKER | $52.31 | $17.01 | $69.32 | Agreement |
| LABO0242-018 · Laborers agreement, June 1, 2025 | ||||
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 | Agreement |
| LABO0242-019 · Laborers agreement, June 1, 2025 | ||||
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 | Agreement |
| LABO0242-020 · Laborers agreement, June 1, 2025 | ||||
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | Agreement |
| LABO0252-015 · Laborers agreement, June 1, 2025 | ||||
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 | Agreement |
| LABO0252-016 · Laborers agreement, June 1, 2025 | ||||
| LABORER: HOD CARRIER | $53.99 | $17.05 | $71.04 | Agreement |
| LABO0252-017 · Laborers agreement, June 1, 2025 | ||||
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 | Agreement |
| LABO0335-007 · Laborers agreement, June 1, 2025 | ||||
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 | Agreement |
| PAIN0300-003 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| PAINTER | $41.24 | $14.70 | $55.94 | Agreement |
| PAIN0364-001 · Painters and Allied Trades agreement, July 1, 2025 | ||||
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 | $77.24 | Agreement |
| PLAS0528-009 · Plasterers and Cement Masons agreement, June 1, 2024 | ||||
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | Agreement |
| PLAS0528-010 · Plasterers and Cement Masons agreement, June 1, 2024 | ||||
| PLASTERER | $52.50 | $20.67 | $73.17 | Agreement |
| PLUM0026-015 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PIPEFITTER | $60.72 | $34.15 | $94.87 | Agreement |
| PLUM0026-018 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER | $60.72 | $34.15 | $94.87 | Agreement |
| ROOF0153-003 · Roofers agreement, February 1, 2024 | ||||
| ROOFER | $48.01 | $16.44 | $64.45 | Agreement |
| SFWA0699-004 · SFWA, July 1, 2025 | ||||
| SPRINKLER FITTER | $68.89 | $33.80 | $102.69 | SFWA |
| SHEE0066-014 · Sheet Metal Workers agreement, June 1, 2025 | ||||
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 | Agreement |
| SUWA2018-016 · Survey of contractors in WA, March 1, 2024 | ||||
| TRUCK DRIVER: DUMP TRUCK | $46.71 | $8.58 | $55.29 | Survey |
| OPERATOR: MECHANIC | $45.17 | $19.20 | $64.37 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 | Survey |
| LABORER: PIPELAYER | $35.83 | $10.89 | $46.72 | Survey |
| LABORER: COMMON OR GENERAL | $38.17 | $6.88 | $45.05 | Survey |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $42.25 | $0.00 | $42.25 | Survey |
| TEAM0174-009 · Teamsters agreement, June 1, 2025 | ||||
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 | Agreement |
| UAVGWA0002 · Union average, March 1, 2024 | ||||
| OPERATOR: DRILL | $56.42 | $21.15 | $77.57 | Union average |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on WA20260116?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator