Prevailing wage rates: Lewis County, Washington

Heavy construction · WA20260051 modification 1, published May 18, 2026

The short answer

This sheet sets 26 classifications for heavy work in Lewis County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $14.67 an hour (laborer: landscape) to $92.46 (ironworker (reinforcing & structural)). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 1, but none of its modifications has changed a rate.

Latest change

May 18, 2026 · modification 1

Classification names reworded; no change among the 26 lines we could match

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP0096-004 · Carpenters agreement, June 1, 2025
MILLWRIGHT$55.39$22.38$77.77Agreement, 2025
CARP0360-005 · Carpenters agreement, June 1, 2025
CARPENTER, INCLUDES FORM WORK$63.98$19.13$83.11Agreement, 2025
ELEC0076-005 · Electrical Workers (IBEW) agreement, August 31, 2025
ELECTRICIAN$65.14$26.56$91.70Agreement, 2025
ENGI0612-014 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 CRANES-A FRAME-10 TONS AND UNDER; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS; BOOM TRUCK 10 TONS AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$55.13$27.32$82.45Agreement, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; A-FRAME CRANE OVER 10 TONS; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OILER; GRADER-NONFINISHING; BOOM TRUCK OVER 10 TONS

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$58.89$27.32$86.21Agreement, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; CRANE-OVERHEAD, BRIDGE TYPE-20 TONS THROUGH 44 TONS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADER- UNDER 6 YARDS; DRILLING MACHINE; GRADER-FINISHING

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$59.56$27.32$86.88Agreement, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS)

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$62.99$27.32$90.31Agreement, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); TOWER CRANE OVER 175 FT IN HEIGHT, BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE: OVER 90 METRIC TONS

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$62.12$27.32$89.44Agreement, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 100 TONS AND OVER; TOWER CRANE UP TO 175 FT IN HEIGHT BASE TO BOOM; EXCAVATOR/TRACKHOE, BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS; LOADERS-8 YARDS AND OVER

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$61.22$27.32$88.54Agreement, 2025
POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); CRANE-OVERHEAD, BRIDGE TYPE, 45 TONS THRU 99 TONS; DERRICKS ON BUILDING WORK; EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADERS- 6 YARDS TO, BUT NOT INCLUDING, 8 YARDS

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS ""D"" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS ""C"" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS ""B"" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS ""A"" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR

$60.32$27.32$87.64Agreement, 2025
IRON0086-012 · Ironworkers agreement, July 7, 2025
IRONWORKER (REINFORCING & STRUCTURAL)$57.94$34.52$92.46Agreement, 2025
LABO0252-003 · Laborers agreement, June 1, 2025
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL

$52.31$17.01$69.32Agreement, 2025
LABORER: ZONE 1: GROUP 4 CHIPPING GUNS (OVER 30 LBS); PIPE LAYER

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL

$51.52$16.99$68.51Agreement, 2025
LABORER: ZONE 1: GROUP 3 CHIPPING GUNS (UNDER 30 LBS); GENERAL OR COMMON LABORER

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL

$50.38$16.96$67.34Agreement, 2025
LABORER: ZONE 1: GROUP 2 FLAGGER

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL

$40.88$16.72$57.60Agreement, 2025
PAIN0300-005 · Painters and Allied Trades agreement, July 1, 2025
PAINTER (BRUSH, ROLLER AND SPRAY)$41.24$14.70$55.94Agreement, 2025
PLAS0528-004 · Plasterers and Cement Masons agreement, June 1, 2024
CEMENT MASON/CONCRETE FINISHER$54.16$21.27$75.43Agreement, 2024
SUWA2009-042 · Survey of contractors in WA, August 7, 2009
TRUCK DRIVER: 10 YARD TRUCK$24.61$8.34$32.95Survey, 2009
TRUCK DRIVER: WATER TRUCK$24.36$8.30$32.66Survey, 2009
TRUCK DRIVER: DUMP TRUCK$22.82$5.86$28.68Survey, 2009
PIPEFITTER$33.30$6.51$39.81Survey, 2009
OPERATOR: ROLLER$25.25$8.20$33.45Survey, 2009
OPERATOR: MECHANIC$25.00$0.00$25.00Survey, 2009
OPERATOR: BULLDOZER$29.26$0.00$29.26Survey, 2009
LABORER: LANDSCAPE$14.67$0.00$14.67Survey, 2009
FENCE ERECTOR$15.00$0.00$15.00Survey, 2009

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WA20260051?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and WA20260051 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 26 classifications in 9 rate groups
  • 8 from agreements, 1 from surveys
  • Counties: Lewis