CertifiedHours

Prevailing wage rates · Washington · Wage determination

Prevailing wage rates: Island County, Washington

Building construction · WA20260028 modification 1, published May 18, 2026

The short answer

This sheet sets 30 classifications for building work in Island County, Washington. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $21.98 an hour (painter: spray) to $102.69 (sprinkler fitter (fire sprinklers)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0007-003 · Asbestos Workers and Heat & Frost Insulators agreement, June 1, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION)$75.37$18.82$94.19Agreement
BRWA0001-013 · Bricklayers agreement, June 1, 2025
TILE SETTER$49.70$18.62$68.32Agreement
TILE FINISHER$40.98$18.17$59.15Agreement
BRWA0001-015 · Bricklayers agreement, June 1, 2025
BRICKLAYER$55.34$20.05$75.39Agreement
CARP0096-001 · Carpenters agreement, June 1, 2025
MILLWRIGHT$55.39$22.38$77.77Agreement
CARP0425-003 · Carpenters agreement, June 1, 2025
CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK)$63.98$19.13$83.11Agreement
ELEC0191-013 · Electrical Workers (IBEW) agreement, June 1, 2022
ELECTRICIAN (ISLAND, SAN JUAN, SKAGIT, SNOHOMISH AND WHATCOM COUNTIES)$53.20$27.51$80.71Agreement
ENGI0302-023 · Operating Engineers agreement, June 1, 2025
POWER EQUIPMENT OPERATOR: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS

$55.43$27.57$83.00Agreement
POWER EQUIPMENT OPERATOR: GROUP 3…
Full text

POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS

$59.23$27.57$86.80Agreement
POWER EQUIPMENT OPERATOR: GROUP 2…
Full text

POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC

$59.88$27.57$87.45Agreement
POWER EQUIPMENT OPERATOR: GROUP 1AAA…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS)

$63.35$27.57$90.92Agreement
POWER EQUIPMENT OPERATOR: GROUP 1AA…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS

$62.47$27.57$90.04Agreement
POWER EQUIPMENT OPERATOR: GROUP 1A…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS

$61.56$27.57$89.13Agreement
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10

$60.67$27.57$88.24Agreement
IRON0086-011 · Ironworkers agreement, July 7, 2025
Group definitions, zones and premiums for IRON0086-011
IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL).$ 57.94 34.52
LABO0292-004 · Laborers agreement, June 1, 2025
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES)…
Full text

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL

$52.31$17.01$69.32Agreement
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES)…
Full text

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL

$51.52$16.99$68.51Agreement
Group definitions, zones and premiums for LABO0292-004
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER
LABORER: ZONE 1: GROUP 4 PIPE LAYER
PAIN0188-001 · Painters and Allied Trades agreement, July 1, 2025
GLAZIER$61.14$23.76$84.90Agreement
PAIN0300-004 · Painters and Allied Trades agreement, July 1, 2025
PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING)$41.24$14.70$55.94Agreement
PAIN0364-001 · Painters and Allied Trades agreement, July 1, 2025
DRYWALL FINISHER/TAPER$53.59$23.65$77.24Agreement
PAIN1238-002 · Painters and Allied Trades agreement, July 1, 2025
SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET)$42.01$20.20$62.21Agreement
PLAS0528-004 · Plasterers and Cement Masons agreement, June 1, 2024
CEMENT MASON/CONCRETE FINISHER$54.16$21.27$75.43Agreement
PLUM0026-014 · Plumbers and Pipefitters agreement, June 1, 2025
PIPEFITTER$60.72$34.15$94.87Agreement
ROOF0054-010 · Roofers agreement, June 1, 2023
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS)$44.50$16.45$60.95Agreement
SFWA0699-002 · SFWA, July 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$68.89$33.80$102.69SFWA
SHEE0066-032 · Sheet Metal Workers agreement, June 1, 2025
SHEETMETAL WORKER (HVAC DUCT WORK ONLY)$66.05$29.41$95.46Agreement
SUWA2002-008 · Survey of contractors in WA, June 18, 2009
TRUCK DRIVER: DUMP TRUCK$23.50$6.87$30.37Survey
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.83 0.00 PLUMBER$35.00$0.00$35.00Survey
PAINTER: SPRAY$17.80$4.18$21.98Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.94$0.00$27.94Survey
LABORER: COMMON OR GENERAL$17.75$4.23$21.98Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on WA20260028?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator