Prevailing wage rates: Powhatan County, Virginia
Highway construction · VA20260183 modification 1, published May 18, 2026
The short answer
This sheet sets 33 classifications for highway work in Powhatan County, Virginia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.89 an hour (traffic control: flagger) to $50.98 (electrician, includes traffic signalization). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ELEC0080-011 · Electrical Workers (IBEW) agreement, June 1, 2025 | ||||
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 | Agreement |
| SUVA2016-068 · Survey of contractors in VA, July 2, 2018 | ||||
| TRUCK DRIVER: SINGLE & MULTI AXLE | $18.23 | $0.00 | $18.23 | Survey |
| TRUCK DRIVER: HEAVY OVER 7 CY | $16.98 | $0.00 | $16.98 | Survey |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 | Survey |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 | $15.53 | Survey |
| TRAFFIC CONTROL: FLAGGER | $12.89 | $0.00 | $12.89 | Survey |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $18.22 | $2.69 | $20.91 | Survey |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $19.09 | $1.81 | $20.90 | Survey |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 | Survey |
| OPERATOR: ROLLER (FINISHING) | $19.05 | $1.29 | $20.34 | Survey |
| OPERATOR: ROLLER | $21.69 | $0.00 | $21.69 | Survey |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 | Survey |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.32 | $0.00 | $20.32 | Survey |
| OPERATOR: MILLING MACHINE | $23.12 | $3.60 | $26.72 | Survey |
| OPERATOR: MECHANIC | $21.43 | $0.00 | $21.43 | Survey |
| OPERATOR: LOADER | $17.17 | $0.00 | $17.17 | Survey |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 | Survey |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 | $23.21 | Survey |
| OPERATOR: GRADALL | $19.26 | $0.00 | $19.26 | Survey |
| OPERATOR: DRILL | $24.66 | $0.00 | $24.66 | Survey |
| OPERATOR: CRANE | $24.42 | $4.69 | $29.11 | Survey |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 | $19.41 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 | $23.61 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.31 | $2.91 | $21.22 | Survey |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 | Survey |
| LABORER: PIPELAYER | $17.76 | $0.00 | $17.76 | Survey |
| LABORER: GRADE CHECKER | $14.88 | $0.00 | $14.88 | Survey |
| LABORER: COMMON OR GENERAL | $14.33 | $0.00 | $14.33 | Survey |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $19.21 | $2.82 | $22.03 | Survey |
| IRONWORKER, STRUCTURAL | $27.38 | $0.00 | $27.38 | Survey |
| IRONWORKER, REINFORCING | $20.80 | $0.00 | $20.80 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $16.03 | $0.00 | $16.03 | Survey |
| CARPENTER, INCLUDES FORM WORK | $19.22 | $0.00 | $19.22 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on VA20260183?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.