Prevailing wage rates: Greene County, Virginia

Highway construction · VA20260124 modification 1, published May 18, 2026

The short answer

This sheet sets 34 classifications for highway work in Greene County, Virginia. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.22 an hour (traffic control: flagger) to $50.98 (electrician, includes traffic signalization). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ELEC0080-011 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION$36.85$14.13$50.98Agreement
SUVA2016-060 · Survey of contractors in VA, July 2, 2018
TRUCK DRIVER: MULTI AXLE$18.17$0.00$18.17Survey
TRUCK DRIVER: HEAVY OVER 7 CY$17.74$0.00$17.74Survey
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE$18.25$0.00$18.25Survey
TRUCK DRIVER: 1/SINGLE AXLE TRUCK$17.34$0.00$17.34Survey
TRUCK DRIVER : HEAVY 7CY & UNDER$15.36$0.00$15.36Survey
TRAFFIC CONTROL: FLAGGER$10.22$0.00$10.22Survey
PAVEMENT MARKING TRUCK DRIVER$18.83$0.00$18.83Survey
OPERATOR: BULLDOZER, INCLUDING UTILITY$19.26$0.00$19.26Survey
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR$16.51$0.00$16.51Survey
OPERATOR: SCREED$22.13$4.89$27.02Survey
OPERATOR: ROLLER$17.49$0.00$17.49Survey
OPERATOR: PILEDRIVER$21.83$4.08$25.91Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$18.00$0.00$18.00Survey
OPERATOR: MILLING MACHINE$23.12$3.60$26.72Survey
OPERATOR: MECHANIC$20.60$0.00$20.60Survey
OPERATOR: LOADER$18.39$0.00$18.39Survey
OPERATOR: HYDROSEEDER$16.64$0.00$16.64Survey
OPERATOR: GRADER/BLADE$26.13$0.00$26.13Survey
OPERATOR: GRADALL$18.65$0.00$18.65Survey
OPERATOR: DRILL$24.66$0.00$24.66Survey
OPERATOR: CRANE$25.82$0.00$25.82Survey
OPERATOR: BROOM/SWEEPER$14.32$0.25$14.57Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$19.16$4.45$23.61Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$20.05$0.00$20.05Survey
LABORER: POWER TOOL OPERATOR$15.69$0.00$15.69Survey
LABORER: PIPELAYER$15.11$0.00$15.11Survey
LABORER: GRADE CHECKER$15.07$0.00$15.07Survey
LABORER: COMMON OR GENERAL$13.59$0.00$13.59Survey
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$15.92$0.00$15.92Survey
IRONWORKER, STRUCTURAL$27.38$0.00$27.38Survey
IRONWORKER, REINFORCING$22.71$0.00$22.71Survey
CEMENT MASON/CONCRETE FINISHER$19.94$0.00$19.94Survey
CARPENTER, INCLUDES FORM WORK$17.20$0.00$17.20Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on VA20260124?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator