Prevailing wage rates · Utah · Wage determination
Prevailing wage rates: Morgan County, Utah
Residential construction · UT20260033 modification 1, published May 18, 2026
The short answer
This sheet sets 49 classifications for residential work in Morgan County, Utah. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.19 an hour (laborer: landscape) to $47.34 (truck driver: lowboy). Your contract may lock an earlier modification.
Scope
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ENGI0003-052 · Operating Engineers agreement, July 1, 2013 | ||||
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | $15.65 | $37.15 | Agreement |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | $15.65 | $39.02 | Agreement |
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 | Agreement |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | $15.65 | $41.02 | Agreement |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | $15.65 | $41.54 | Agreement |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | $15.65 | $43.20 | Agreement |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | $15.65 | $38.06 | Agreement |
| LABO0295-027 · Laborers agreement, July 1, 2012 | ||||
| LABORER: COMMON OR GENERAL, CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR | $18.28 | $6.35 | $24.63 | Agreement |
| PLUM0140-015 · Plumbers and Pipefitters agreement, August 1, 2019 | ||||
| PLUMBER | $30.60 | $10.85 | $41.45 | Agreement |
| SUUT2008-048 · Survey of contractors in UT, August 28, 2008 | ||||
| SPRINKLER FITTER | $15.00 | $0.00 | $15.00 | Survey |
| SHEET METAL WORKER | $16.00 | $0.00 | $16.00 | Survey |
| ROOFER | $17.14 | $0.00 | $17.14 | Survey |
| PAINTER: BRUSH, ROLLER AND SPRAY | $17.50 | $0.86 | $18.36 | Survey |
| OPERATOR: TRACKHOE | $16.14 | $0.00 | $16.14 | Survey |
| LABORER: MASON TENDER (BRICK AND HOD) | $12.00 | $0.00 | $12.00 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.87 | $0.00 | $12.87 | Survey |
| LABORER: LANDSCAPE | $10.00 | $0.19 | $10.19 | Survey |
| LABORER: ASPHALT SHOVELER | $12.95 | $0.00 | $12.95 | Survey |
| ELECTRICIAN | $15.65 | $1.98 | $17.63 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $1.40 | $15.40 | Survey |
| CARPENTER, INCLUDES VINYL SIDING INSTALLATION | $13.80 | $0.00 | $13.80 | Survey |
| BRICKLAYER | $17.41 | $0.00 | $17.41 | Survey |
| TEAM0222-018 · Teamsters agreement, July 1, 2024 | ||||
| TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.) | $29.37 | $14.65 | $44.02 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL) | $28.60 | $14.65 | $43.25 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL) | $28.33 | $14.65 | $42.98 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL. AND OVER) | $31.20 | $14.65 | $45.85 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL. TO LESS THAN 25,000 GAL) | $31.04 | $14.65 | $45.69 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL) | $29.53 | $14.65 | $44.18 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL. TO LESS THAN 20,000 GAL) | $30.66 | $14.65 | $45.31 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL. TO LESS THAN 15,000 GAL) | $30.59 | $14.65 | $45.24 | Agreement |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL) | $27.85 | $14.65 | $42.50 | Agreement |
| TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS) | $29.72 | $14.65 | $44.37 | Agreement |
TRUCK DRIVER: TRANSIT MIX…Full textTRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS).$ 29.62 14.65 TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 | Agreement |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 | Agreement |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 | Agreement |
TRUCK DRIVER: FLAT RACK…Full textTRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK).$ 29.18 14.65 TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS) | $29.26 | $14.65 | $43.91 | Agreement |
TRUCK DRIVER: FLAT RACK…Full textTRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER) | $29.69 | $14.65 | $44.34 | Agreement |
TRUCK DRIVER: FLAT RACK…Full textTRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS) | $29.53 | $14.65 | $44.18 | Agreement |
TRUCK DRIVER: FLAT RACK…Full textTRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS) | $29.42 | $14.65 | $44.07 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.) | $29.37 | $14.65 | $44.02 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.) | $30.56 | $14.65 | $45.21 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU. YDS. TO LESS THAN 14 CU. YDS.) | $29.53 | $14.65 | $44.18 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.) | $30.34 | $14.65 | $44.99 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.) | $30.12 | $14.65 | $44.77 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.) | $29.91 | $14.65 | $44.56 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.) | $29.67 | $14.65 | $44.32 | Agreement |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.) | $30.69 | $14.65 | $45.34 | Agreement |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 | Agreement |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 | Agreement |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on UT20260033?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator