This sheet sets 21 classifications for heavy work in Iron County, Utah. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.00 an hour (laborer: pipelayer (excluding natural gas pipeline construction)) to $62.40 (truck driver: group 1). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 2, but none of its modifications has changed a rate.
Latest change
May 20, 2026 · modification 2
2 classifications added, 2 classifications removed
Classifications added or removed
- Added: TRUCK DRIVER: GROUP 2… $46.02 + $15.75
- Added: TRUCK DRIVER: GROUP 1… $46.65 + $15.75
- Removed: TRUCK DRIVER: NATURAL GAS PIPELINE CONSTRUCTION ONLY: GROUP 2 STRINGER TRUCK
- Removed: PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE
Earlier modifications
May 18, 2026 · modification 1Classification names reworded; no change among the 21 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ENGI0003-046 · Operating Engineers agreement, July 1, 2020 | ||||
OPERATOR: POWER EQUIPMENT…Full textOPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR. (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $30.78 | $16.09 | $46.87 | Agreement, 2020 |
| ENGI0003-054 · Operating Engineers agreement, July 1, 2013 | ||||
| OPERATOR: POWER EQUIPMENT OILER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $22.03 | $11.88 | $33.91 | Agreement, 2013 |
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE…Full textOPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $35.68 | $17.57 | $53.25 | Agreement, 2013 |
| LABO0295-018 · Laborers agreement, July 1, 2014 | ||||
| LABORER: SANDBLASTER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 | $29.50 | Agreement, 2014 |
| LABORER: POWDERMAN (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $21.65 | $8.65 | $30.30 | Agreement, 2014 |
| LABORER: FORMWORKER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 | $29.50 | Agreement, 2014 |
LABORER: COMMON OR GENERAL…Full textLABORER: COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.59 | $8.65 | $29.24 | Agreement, 2014 |
| LABORER: CHAIN SAW AND POWER DRILL (NATURAL GAS PIPELINE CONSTRUCTION ONLY) | $20.85 | $8.65 | $29.50 | Agreement, 2014 |
| SUUT2008-025 · Survey of contractors in UT, August 19, 2008 | ||||
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 | $0.00 | $12.00 | Survey, 2008 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 | $0.00 | $13.63 | Survey, 2008 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 | $0.00 | $10.89 | Survey, 2008 |
| OPERATOR: LOADER (FRONT END) | $11.38 | $0.00 | $11.38 | Survey, 2008 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 | $0.00 | $13.61 | Survey, 2008 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 | Survey, 2008 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 | $0.00 | $9.00 | Survey, 2008 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 | $0.36 | $9.36 | Survey, 2008 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 | Survey, 2008 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | Survey, 2008 |
| TEAM0222-020 · Teamsters agreement, July 1, 2025 | ||||
TRUCK DRIVER: GROUP 2…Full textTRUCK DRIVER: GROUP 2- A-FRAME, CHALLENGE (FOR TRANSPORTATION PURPOSES), FORKLIFT, FUEL TRUCK, GIN POLE, RUBBER-TIRED TRACTOR, TANDEM FLOAT (4 & 5 AXLE), TRACK TRUCK/ALL-TRACK DUMPER EQUIPMENT, VACUUM TRUCK, WINCH TRUCK. (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS: STRINGER TRUCK | $46.02 | $15.75 | $61.77 | Agreement, 2025 |
TRUCK DRIVER: GROUP 1…Full textTRUCK DRIVER: GROUP 1- ARTICULATD END DUMP, LOW BOY, ROLLAGON OR SIMILAR TYPE EQUIPMENT, TRUCK MECHANIC. (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS: LOW BOY AND TRUCK MECHANIC | $46.65 | $15.75 | $62.40 | Agreement, 2025 |
TRUCK DRIVER: GROUP 3…Full textTRUCK DRIVER: GROUP 3- AMBULANCE , BUS, DUMP TRUCK (2 AND 3 AXLE), FLATBED TRUCK (2 AND 3 AXLE), GREASE TRUCK, HOT PASS TRUCK (3 AXLE), JEEP, PICK-UP, SINGLE AXLE FLOAT (3 AXLE), SKID TRUCK (2 AND 3 AXLE), STATION WAGON, STRINGER BEAD & HOT PASS (2 AXLE), SWAMP BUGGY/ MARSH BUGGY, OR SIMILAR TYPE EQUIPMENT, TEAM DRIVER, WATER TRUCK (2 AND 3 AXLE) (NATURAL GAS PIPELINE CONSTRUCTION ONLY) PREMIUM PAY: ADD $2.25 TO THE ABOVE RATE FOR THE FOLLOWING CLASSIFICATIONS | $41.90 | $15.75 | $57.65 | Agreement, 2025 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | May 20, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on UT20260019?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and UT20260019 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 21 classifications in 5 rate groups
- 4 from agreements, 1 from surveys
- Counties: Iron