Prevailing wage rates: Beaver, Emery, Grand and 3 more counties, Utah

Heavy construction · UT20260017 modification 1, published May 18, 2026

The short answer

This sheet sets 24 classifications for heavy work in Beaver, Emery, Grand and 3 more counties, Utah. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.00 an hour (laborer: pipelayer (excluding natural gas pipeline construction)) to $61.08 (truck driver zone 2: group 1). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ENGI0003-046 · Operating Engineers agreement, July 1, 2020
OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR$30.78$16.09$46.87Agreement
ENGI0003-054 · Operating Engineers agreement, July 1, 2013
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$22.03$11.88$33.91Agreement
OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE…
Full text

OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY

$35.68$17.57$53.25Agreement
LABO0295-018 · Laborers agreement, July 1, 2014
LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50Agreement
LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY$21.65$8.65$30.30Agreement
LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50Agreement
LABORER COMMON OR GENERAL…
Full text

LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY

$20.59$8.65$29.24Agreement
LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50Agreement
SUUT2008-033 · Survey of contractors in UT, August 19, 2008
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$12.00$0.00$12.00Survey
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$13.63$0.00$13.63Survey
OPERATOR: ROLLER (DIRT AND GRADE COMPACTION)$10.89$0.00$10.89Survey
OPERATOR: LOADER (FRONT END)$11.38$0.00$11.38Survey
OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION$13.61$0.00$13.61Survey
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$9.00$0.00$9.00Survey
LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$10.92$0.00$10.92Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$9.00$0.36$9.36Survey
CEMENT MASON/CONCRETE FINISHER$14.00$0.56$14.56Survey
CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK)$14.75$3.03$17.78Survey
TEAM0222-003 · Teamsters agreement, July 1, 2025
TRUCK DRIVER ZONE 2: GROUP 3$41.57$14.90$56.47Agreement
TRUCK DRIVER ZONE 2: GROUP 2$45.57$14.90$60.47Agreement
TRUCK DRIVER ZONE 2: GROUP 1$46.18$14.90$61.08Agreement
TRUCK DRIVER ZONE 1: GROUP 3$40.66$15.75$56.41Agreement
TRUCK DRIVER ZONE 1: GROUP 2$41.06$15.75$56.81Agreement
TRUCK DRIVER ZONE 1: GROUP 1$41.71$14.75$56.46Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on UT20260017?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator