This sheet sets 49 classifications for highway work in Atascosa, Bandera, Bastrop and 17 more counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $15.52 an hour (flagger) to $30.54 (electrician). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SATX2025-004 · SATX, November 15, 2023 | ||||
| WORK ZONE BARRICADE SERVICER | $17.75 | $0.00 | $17.75 | SATX |
| WELDER | $23.38 | $0.00 | $23.38 | SATX |
TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 21.71 0.00 TRUCK DRIVER…Full textTRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER.$ 21.71 0.00 TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK | $20.91 | $0.00 | $20.91 | SATX |
| TRUCK DRIVER, SINGLE AXLE | $19.70 | $0.00 | $19.70 | SATX |
| TRUCK DRIVER LOWBOY FLOAT | $25.96 | $0.00 | $25.96 | SATX |
| TRAFFIC SIGNAL/LIGHT POLE WORKER | $21.99 | $0.00 | $21.99 | SATX |
| SPREADER BOX OPERATOR | $19.31 | $0.00 | $19.31 | SATX |
| SIGN ERECTOR | $17.52 | $0.00 | $17.52 | SATX |
| SERVICER | $23.75 | $0.00 | $23.75 | SATX |
| SCRAPER OPERATOR | $17.52 | $0.00 | $17.52 | SATX |
| ROLLER OPERATOR, OTHER | $17.52 | $0.00 | $17.52 | SATX |
| ROLLER OPERATOR, ASPHALT | $20.24 | $0.00 | $20.24 | SATX |
| REINFORCING STEEL WORKER | $22.46 | $0.00 | $22.46 | SATX |
| RECLAIMER/PULVERIZER OPERATOR | $19.05 | $0.00 | $19.05 | SATX |
| PIPELAYER | $19.23 | $0.00 | $19.23 | SATX |
| PAVEMENT MARKING MACHINE OPERATOR | $22.00 | $0.00 | $22.00 | SATX |
| PAINTER, STRUCTURES | $23.76 | $0.00 | $23.76 | SATX |
| OFF ROAD HAULER | $17.52 | $0.00 | $17.52 | SATX |
| MOTOR GRADER OPERATOR, ROUGH | $22.95 | $0.00 | $22.95 | SATX |
| MOTOR GRADER OPERATOR, FINE GRADE | $26.56 | $0.00 | $26.56 | SATX |
| MILLING MACHINE OPERATOR | $21.73 | $0.00 | $21.73 | SATX |
| MECHANIC | $26.15 | $0.00 | $26.15 | SATX |
| LOADER/BACKHOE OPERATOR | $20.32 | $0.00 | $20.32 | SATX |
| LABORER, UTILITY | $19.05 | $0.00 | $19.05 | SATX |
| LABORER, COMMON | $17.52 | $0.00 | $17.52 | SATX |
| FRONT END LOADER OPERATOR, OVER 3 CY | $20.20 | $0.00 | $20.20 | SATX |
| FRONT END LOADER OPERATOR, 3 CY OR LESS | $20.33 | $0.00 | $20.33 | SATX |
| FOUNDATION DRILL OPERATOR, TRUCK MOUNTED | $24.28 | $0.00 | $24.28 | SATX |
| FORM SETTER, PAVING & CURB | $19.18 | $0.00 | $19.18 | SATX |
| FORM BUILDER/SETTER, STRUCTURES | $20.63 | $0.00 | $20.63 | SATX |
| FLAGGER | $15.52 | $0.00 | $15.52 | SATX |
| EXCAVATOR OPERATOR, OVER 50,000 POUNDS | $22.90 | $0.00 | $22.90 | SATX |
| EXCAVATOR OPERATOR, 50,000 POUNDS OR LESS | $22.93 | $0.00 | $22.93 | SATX |
| ELECTRICIAN | $30.54 | $0.00 | $30.54 | SATX |
| DIRECTIONAL DRILLING OPERATOR | $25.19 | $0.00 | $25.19 | SATX |
| DIRECTIONAL DRILLING LOCATOR | $21.39 | $0.00 | $21.39 | SATX |
| CRAWLER TRACTOR OPERATOR | $20.92 | $0.00 | $20.92 | SATX |
| CRANE OPERATOR, LATTICE BOOM OVER 80 TONS | $28.87 | $0.00 | $28.87 | SATX |
| CRANE OPERATOR, LATTICE BOOM 80 TONS OR LESS | $26.47 | $0.00 | $26.47 | SATX |
| CRANE OPERATOR, HYDRAULIC 80 TONS OR LESS | $29.24 | $0.00 | $29.24 | SATX |
| CONCRETE SAW OPERATOR | $25.97 | $0.00 | $25.97 | SATX |
| CONCRETE PAVEMENT FINISHING MACHINE OPERATOR | $22.81 | $0.00 | $22.81 | SATX |
| CONCRETE FINISHER, PAVING AND STRUCTURES | $20.61 | $0.00 | $20.61 | SATX |
| BROOM OR SWEEPER OPERATOR | $18.09 | $0.00 | $18.09 | SATX |
| BOOM TRUCK OPERATOR | $27.82 | $0.00 | $27.82 | SATX |
| ASPHALT RAKER | $19.40 | $0.00 | $19.40 | SATX |
| ASPHALT PAVING MACHINE OPERATOR | $22.12 | $0.00 | $22.12 | SATX |
| ASPHALT DISTRIBUTOR OPERATOR | $24.07 | $0.00 | $24.07 | SATX |
| AGRICULTURAL TRACTOR OPERATOR | $19.14 | $0.00 | $19.14 | SATX |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on TX20260291?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator