Prevailing wage rates · Texas · Wage determination
Prevailing wage rates: Robertson County, Texas
Building construction · TX20260267 modification 1, published May 18, 2026
The short answer
This sheet sets 40 classifications for building work in Robertson County, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.93 an hour (laborer: mason tender - cement/concrete) to $92.03 (elevator mechanic). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0074-003 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $33.17 | $24.92 | $58.09 | Agreement |
| ELEV0031-003 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY | $53.59 | $38.44 | $92.03 | Agreement |
| ENGI0178-005 · Operating Engineers agreement, June 1, 2020 | ||||
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 | $45.45 | Agreement |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | $32.85 | $13.10 | $45.95 | Agreement |
| IRON0084-011 · Ironworkers agreement, June 1, 2024 | ||||
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 | $36.39 | Agreement |
| PLUM0068-002 · Plumbers and Pipefitters agreement, October 1, 2024 | ||||
| PLUMBER | $39.98 | $11.61 | $51.59 | Agreement |
| PLUM0211-002 · Plumbers and Pipefitters agreement, October 1, 2025 | ||||
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $42.09 | $12.96 | $55.05 | Agreement |
| PLUM0286-011 · Plumbers and Pipefitters agreement, September 1, 2025 | ||||
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $37.15 | $16.92 | $54.07 | Agreement |
| SHEE0054-002 · Sheet Metal Workers agreement, April 1, 2020 | ||||
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $29.70 | $13.85 | $43.55 | Agreement |
| SUTX2014-044 · Survey of contractors in TX, July 21, 2014 | ||||
| TRUCK DRIVER: WATER TRUCK | $12.00 | $4.11 | $16.11 | Survey |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 | $0.00 | $12.50 | Survey |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 | Survey |
| TRUCK DRIVER: DUMP TRUCK | $11.97 | $1.23 | $13.20 | Survey |
| TILE SETTER | $14.74 | $0.00 | $14.74 | Survey |
| TILE FINISHER | $11.22 | $0.00 | $11.22 | Survey |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 14.62 0.00 ROOFER | $13.75 | $0.00 | $13.75 | Survey |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $13.14 | $0.00 | $13.14 | Survey |
| OPERATOR: ROLLER | $13.11 | $0.00 | $13.11 | Survey |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 | Survey |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 | Survey |
| OPERATOR: LOADER | $14.01 | $0.44 | $14.45 | Survey |
| OPERATOR: GRADER/BLADE | $14.34 | $1.68 | $16.02 | Survey |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 | Survey |
| OPERATOR: DRILL | $16.22 | $0.34 | $16.56 | Survey |
| OPERATOR: BULLDOZER | $18.29 | $1.31 | $19.60 | Survey |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.33 | $0.00 | $14.33 | Survey |
| LABORER: ROOF TEAROFF | $11.28 | $0.00 | $11.28 | Survey |
| LABORER: PIPELAYER | $12.49 | $2.13 | $14.62 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.93 | $0.00 | $9.93 | Survey |
| LABORER: MASON TENDER - BRICK | $10.96 | $0.00 | $10.96 | Survey |
| LABORER: COMMON OR GENERAL | $12.00 | $0.00 | $12.00 | Survey |
| IRONWORKER, STRUCTURAL | $20.74 | $5.25 | $25.99 | Survey |
| IRONWORKER, REINFORCING | $13.35 | $0.00 | $13.35 | Survey |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $19.77 | $7.13 | $26.90 | Survey |
| FORM WORKER | $11.83 | $0.00 | $11.83 | Survey |
| ELECTRICIAN | $22.96 | $4.83 | $27.79 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $14.68 | $0.00 | $14.68 | Survey |
| CARPENTER, EXCLUDES FORM WORK | $15.50 | $0.00 | $15.50 | Survey |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on TX20260267?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.