Prevailing wage rates · Texas · Wage determination

Prevailing wage rates: Montgomery County, Texas

Building construction · TX20260262 modification 1, published May 18, 2026

The short answer

This sheet sets 56 classifications for building work in Montgomery County, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.49 an hour (laborer: landscape and irrigation) to $92.03 (elevator mechanic). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0022-009 · Asbestos Workers and Heat & Frost Insulators agreement, July 1, 2024
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION)$30.20$12.38$42.58Agreement
BOIL0074-003 · Boilermakers agreement, January 1, 2025
BOILERMAKER$33.17$24.92$58.09Agreement
ELEC0716-005 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS)$38.50$10.71$49.21Agreement
ELEV0031-003 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC

FOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY

$53.59$38.44$92.03Agreement
ENGI0450-002 · Operating Engineers agreement, April 1, 2024
POWER EQUIPMENT OPERATOR (CRANES)$39.47$10.39$49.86Agreement
IRON0084-011 · Ironworkers agreement, June 1, 2024
IRONWORKER: ORNAMENTAL$28.26$8.13$36.39Agreement
PLAS0783-001 · Plasterers and Cement Masons agreement, April 1, 2023
PLASTERER$31.34$10.30$41.64Agreement
PLUM0068-002 · Plumbers and Pipefitters agreement, October 1, 2024
PLUMBER$39.98$11.61$51.59Agreement
PLUM0211-002 · Plumbers and Pipefitters agreement, October 1, 2025
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$42.09$12.96$55.05Agreement
SHEE0054-003 · Sheet Metal Workers agreement, April 1, 2020
SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION)$29.70$13.85$43.55Agreement
SUTX2014-038 · Survey of contractors in TX, July 21, 2014
WATERPROOFER$14.39$0.00$14.39Survey
TRUCK DRIVER: WATER TRUCK$12.00$4.11$16.11Survey
TRUCK DRIVER: SEMI-TRAILER TRUCK$12.50$0.00$12.50Survey
TRUCK DRIVER: FLATBED TRUCK$19.65$8.57$28.22Survey
TRUCK DRIVER: DUMP TRUCK$12.39$1.18$13.57Survey
TRUCK DRIVER: 1/SINGLE AXLE TRUCK$14.95$5.23$20.18Survey
TILE SETTER$16.17$0.00$16.17Survey
TILE FINISHER$12.00$0.00$12.00Survey
SPRINKLER FITTER (FIRE SPRINKLERS)$22.17$9.70$31.87Survey
SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY)$19.67$2.24$21.91Survey
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$20.17$4.77$24.94Survey
ROOFER$15.40$0.00$15.40Survey
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION$26.73$11.13$37.86Survey
PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING$16.77$4.51$21.28Survey
OPERATOR: ROLLER$16.00$0.00$16.00Survey
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$16.03$0.00$16.03Survey
OPERATOR: MECHANIC$17.52$3.33$20.85Survey
OPERATOR: LOADER$13.55$0.94$14.49Survey
OPERATOR: GRADER/BLADE$13.37$0.00$13.37Survey
OPERATOR: FORKLIFT$15.64$0.00$15.64Survey
OPERATOR: DRILL$16.22$0.34$16.56Survey
OPERATOR: BULLDOZER$20.77$0.00$20.77Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$13.93$0.00$13.93Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$16.17$0.00$16.17Survey
LATHER$19.73$0.00$19.73Survey
LABORER: LANDSCAPE AND IRRIGATION$9.49$0.00$9.49Survey
LABORER: ROOF TEAROFF$11.28$0.00$11.28Survey
LABORER: PIPELAYER$12.94$0.00$12.94Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$10.50$0.00$10.50Survey
LABORER: MASON TENDER - BRICK$13.37$0.00$13.37Survey
LABORER: COMMON OR GENERAL$10.20$0.00$10.20Survey
IRONWORKER, STRUCTURAL$27.15$5.66$32.81Survey
IRONWORKER, REINFORCING$12.10$0.00$12.10Survey
GLAZIER$19.12$4.41$23.53Survey
FORM WORKER$13.13$0.00$13.13Survey
FLOOR LAYER: CARPET$20.00$0.00$20.00Survey
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$18.00$1.68$19.68Survey
ELECTRICIAN (ALARM INSTALLATION ONLY)$17.97$3.37$21.34Survey
DRYWALL HANGER AND METAL STUD INSTALLER$17.45$3.96$21.41Survey
DRYWALL FINISHER/TAPER$16.30$3.71$20.01Survey
CEMENT MASON/CONCRETE FINISHER$13.37$0.00$13.37Survey
CAULKER$15.36$0.00$15.36Survey
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION

$18.81$2.10$20.91Survey
CARPENTER (BATT INSTALLATION ONLY)$14.87$0.73$15.60Survey
BRICKLAYER$19.86$0.00$19.86Survey
ACOUSTICAL CEILING MECHANIC$16.41$3.98$20.39Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on TX20260262?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator