CertifiedHours

Prevailing wage rates · Texas · Wage determination

Prevailing wage rates: Armstrong, Carson, Crosby and 8 more counties, Texas

Heavy construction · TX20260002 modification 1, published May 18, 2026

The short answer

This sheet sets 34 classifications for heavy work in Armstrong, Carson, Crosby and 8 more counties, Texas. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.30 an hour (laborer (flagger)) to $20.96 (electrician). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUTX2011-002 · Survey of contractors in TX, August 2, 2011
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI)$12.49$0.00$12.49Survey
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)$11.33$0.00$11.33Survey
TRUCK DRIVER (SINGLE AXLE)$12.74$0.00$12.74Survey
TRUCK DRIVER (LOWBOY-FLOAT)$14.46$0.00$14.46Survey
STEEL WORKER (REINFORCING)$13.50$0.00$13.50Survey
SERVICER$13.98$0.00$13.98Survey
POWER EQUIPMENT OPERATOR: SCRAPER$10.61$0.00$10.61Survey
POWER EQUIPMENT OPERATOR: MECHANIC$20.14$0.00$20.14Survey
POWER EQUIPMENT OPERATOR: (SPREADER BOX)$12.60$0.00$12.60Survey
POWER EQUIPMENT OPERATOR: (ROLLER, OTHER)$10.36$0.00$10.36Survey
POWER EQUIPMENT OPERATOR: (ROLLER, ASPHALT)$10.95$0.00$10.95Survey
POWER EQUIPMENT OPERATOR: (RECLAIMER/PULVERIZER)$12.85$0.00$12.85Survey
POWER EQUIPMENT OPERATOR: (PAVEMENT MARKING MACHINE)$16.42$0.00$16.42Survey
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, FINE)$17.49$0.00$17.49Survey
POWER EQUIPMENT OPERATOR: (MOTOR GRADER, ROUGH)$16.15$0.00$16.15Survey
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)$15.54$0.00$15.54Survey
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE)$14.18$0.00$14.18Survey
POWER EQUIPMENT OPERATOR: (FRONT END LOADER, 3CY OR LESS)$12.28$0.00$12.28Survey
POWER EQUIPMENT OPERATOR: (FRONT END LOADER OPERATOR, OVER 3 CY)$12.77$0.00$12.77Survey
POWER EQUIPMENT OPERATOR: (EXCAVATOR, 50,000 LBS OR LESS)$13.46$0.00$13.46Survey
POWER EQUIPMENT OPERATOR: (CRAWLER TRACTOR OPERATOR)$13.96$0.00$13.96Survey
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS)$16.82$0.00$16.82Survey
POWER EQUIPMENT OPERATOR: (BROOM AND SWEEPER)$11.21$0.00$11.21Survey
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)$13.40$0.00$13.40Survey
POWER EQUIPMENT OPERATOR: (ASPHALT DISTRIBUTER)$14.87$0.00$14.87Survey
LABORER: ASPHALT RAKER$12.28$0.00$12.28Survey
LABORER (WORK ZONE BARRICADE SERVICER)$10.30$0.00$10.30Survey
LABORER (LABORER, UTILITY)$11.80$0.00$11.80Survey
LABORER (LABORER, COMMON)$10.30$0.00$10.30Survey
LABORER (FLAGGER)$9.30$0.00$9.30Survey
FORM BUILDER/FORM SETTER (STRUCTURES)$13.52$0.00$13.52Survey
FORM BUILDER/FORM SETTER (PAVING & CURB)$12.36$0.00$12.36Survey
ELECTRICIAN$20.96$0.00$20.96Survey
CEMENT MASON/CONCRETE FINISHER (PAVING & STRUCTURES)$13.55$0.00$13.55Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on TX20260002?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Prevailing wage rates: Armstrong, Carson, Crosby and 8 more counties, Texas (Heavy) · TX20260002 Mod 1 · CertifiedHours