Prevailing wage rates: Campbell County, South Dakota

Building construction · SD20260009 modification 1, published May 18, 2026

The short answer

This sheet sets 19 classifications for building work in Campbell County, South Dakota. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.32 an hour (laborer: common or general) to $94.74 (elevator mechanic). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0034-007 · Asbestos Workers and Heat & Frost Insulators agreement, June 9, 2025
ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$55.34$34.03$89.37Agreement
BRSD0004-003 · Bricklayers agreement, August 1, 2022
BRICKLAYER$33.58$4.60$38.18Agreement
ELEV0033-004 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC

FOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY

$56.30$38.44$94.74Agreement
ENGI0049-009 · Operating Engineers agreement, September 1, 2024
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES)) LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00

$34.08$18.71$52.79Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR ((1) TOWER CRANE): LONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00

$34.38$18.71$53.09Agreement
IRON0021-018 · Ironworkers agreement, May 1, 2024
IRONWORKER, STRUCTURAL$30.80$15.48$46.28Agreement
PLAS0538-001 · Plasterers and Cement Masons agreement, October 1, 2024
CEMENT MASON/CONCRETE FINISHER$33.01$15.08$48.09Agreement
PLUM0300-014 · Plumbers and Pipefitters agreement, May 1, 2024
PLUMBER$34.90$15.70$50.60Agreement
SFSD0669-003 · SFSD, July 1, 2025
SPRINKLER FITTER (FIRE SPRINKLERS)$38.47$24.68$63.15SFSD
SHEE0010-022 · Sheet Metal Workers agreement, June 1, 2022
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$30.93$17.22$48.15Agreement
SUSD2012-006 · Survey of contractors in SD, August 21, 2014
ROOFER$14.52$2.09$16.61Survey
PAINTER: BRUSH, ROLLER, AND SPRAY$19.22$0.00$19.22Survey
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$16.14$0.00$16.14Survey
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$19.34$0.00$19.34Survey
LABORER: MASON TENDER - BRICK$14.19$0.00$14.19Survey
LABORER: COMMON OR GENERAL$12.32$0.00$12.32Survey
ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING$24.27$8.06$32.33Survey
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)$18.50$4.92$23.42Survey
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION.$ 18.41 2.17 ACOUSTICAL CEILING…
Full text

CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION.$ 18.41 2.17 ACOUSTICAL CEILING MECHANIC

$16.68$0.00$16.68Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on SD20260009?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.