Prevailing wage rates · Pennsylvania · Wage determination
Prevailing wage rates: Beaver County, Pennsylvania
Building construction · PA20260075 modification 5, published August 20, 2026
The short answer
This sheet sets 40 classifications for building work in Beaver County, Pennsylvania. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $18.10 an hour (laborer: landscape) to $85.90 (electrician (hvac/temperature controls installation only)). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0002-005 · Asbestos Workers and Heat & Frost Insulators agreement, August 1, 2024 | ||||
ASBESTOS WORKER/HEAT & FROST INSULATOR…Full textASBESTOS WORKER/HEAT & FROST INSULATOR (MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION AND INDUSTRIAL WORK (INCLUDING DUCT AND PIPE)) | $46.50 | $29.43 | $75.93 | Agreement |
| BOIL0154-007 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $48.28 | $33.17 | $81.45 | Agreement |
| BRPA0009-011 · Bricklayers agreement, December 1, 2022 | ||||
| TILE FINISHER | $28.76 | $17.16 | $45.92 | Agreement |
| TILE SETTER | $35.64 | $21.63 | $57.27 | Agreement |
| BRPA0009-055 · Bricklayers agreement, December 1, 2022 | ||||
BRICKLAYER: INCLUDING POINTING…Full textBRICKLAYER: INCLUDING POINTING, CAULKING, CLEANING, AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $35.28 | $24.49 | $59.77 | Agreement |
| MASON - STONE ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $35.28 | $24.49 | $59.77 | Agreement |
| CARP0142-014 · Carpenters agreement, June 1, 2023 | ||||
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION…Full textCARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-HARDWOOD FLOORS, CARPET, FORM WORK, AND SCAFFOLD BUILDING) | $38.92 | $20.06 | $58.98 | Agreement |
| CARP0274-003 · Carpenters agreement, January 1, 2026 | ||||
| PILEDRIVERMAN | $43.13 | $23.42 | $66.55 | Agreement |
| CARP0443-004 · Carpenters agreement, June 1, 2024 | ||||
| MILLWRIGHT | $43.00 | $23.44 | $66.44 | Agreement |
| ELEC0005-019 · Electrical Workers (IBEW) agreement, December 26, 2025 | ||||
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $49.11 | $36.79 | $85.90 | Agreement |
| ELEC0712-010 · Electrical Workers (IBEW) agreement, December 29, 2025 | ||||
ELECTRICIAN (INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING AND INSTALLATION OF SOUND…Full textELECTRICIAN (INCLUDES ALARM INSTALLATION AND LOW VOLTAGE WIRING AND INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS; EXCLUDES HVAC TEMPERATURE CONTROL INSTALLATION) | $51.45 | $29.77 | $81.22 | Agreement |
| ENGI0066-040 · Operating Engineers agreement, June 1, 2024 | ||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, BULLDOZER, COMPACTOR, CRANE*, DRILL RIG CAISSONS, DRILL, GRADALL, GRADER/BLADE, MAN LIFT/OUTSIDE ELEVATOR, MECHANIC, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), SCRAPER, FORKLIFT (LULL) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $41.69 | $24.05 | $65.74 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BROOM/SWEEPER, COMPRESSOR, CONCRETE PUMP, HIGHLIFT, HOIST, PUMP, ROLLER, TUGBOAT, FORKLIFT (RIDDEN OR SELF-PROPELLED) | $35.62 | $24.05 | $59.67 | Agreement |
| POWER EQUIPMENT OPERATOR: LOADER | $41.69 | $24.05 | $65.74 | Agreement |
| POWER EQUIPMENT OPERATOR: OILER | $32.83 | $24.05 | $56.88 | Agreement |
| IRON0003-025 · Ironworkers agreement, June 1, 2023 | ||||
IRONWORKER (ORNAMENTAL…Full textIRONWORKER (ORNAMENTAL, REINFORCING, RIGGER AND STRUCTURAL; METAL BUILDINGS: METAL SIDING/WALL PANELS INSTALLATION) | $38.89 | $34.54 | $73.43 | Agreement |
| LABO0125-005 · Laborers agreement, June 1, 2022 | ||||
| LABORER (MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 | $42.29 | Agreement |
| LABO0833-001 · Laborers agreement, January 1, 2026 | ||||
| LABORER (ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS)) | $27.97 | $20.39 | $48.36 | Agreement |
| LABORER (MASON TENDER- BRICK) | $30.97 | $20.39 | $51.36 | Agreement |
| LABORER: COMMON OR GENERAL | $27.82 | $20.39 | $48.21 | Agreement |
| PAIN0057-033 · Painters and Allied Trades agreement, June 1, 2023 | ||||
| PAINTER (BRUSH, ROLLER, AND SPRAY, EXCLUDING WORK ON INDUSTRIAL SITES) | $30.56 | $23.72 | $54.28 | Agreement |
| PAINTER: DRYWALL FINISHING/TAPING | $32.39 | $23.26 | $55.65 | Agreement |
| PAIN0057-034 · Painters and Allied Trades agreement, June 1, 2023 | ||||
| PAINTER (INDUSTRIAL: BRUSH AND ROLLER ONLY) | $36.01 | $23.72 | $59.73 | Agreement |
| PAINTER (INDUSTRIAL: SPRAY AND SANDBLASTER ONLY) | $36.01 | $23.72 | $59.73 | Agreement |
| PAIN0751-006 · Painters and Allied Trades agreement, September 1, 2023 | ||||
| GLAZIER | $35.65 | $29.73 | $65.38 | Agreement |
| PLAS0526-015 · Plasterers and Cement Masons agreement, June 1, 2021 | ||||
| CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 | $53.66 | Agreement |
| PLAS0526-026 · Plasterers and Cement Masons agreement, June 1, 2021 | ||||
| PLASTERER | $30.69 | $18.99 | $49.68 | Agreement |
| PLUM0027-003 · Plumbers and Pipefitters agreement, June 1, 2023 | ||||
| PLUMBER | $48.65 | $25.47 | $74.12 | Agreement |
| PLUM0449-004 · Plumbers and Pipefitters agreement, June 1, 2024 | ||||
| PIPEFITTER (INDUSTRIAL) | $52.50 | $30.17 | $82.67 | Agreement |
| PLUM0449-005 · Plumbers and Pipefitters agreement, June 1, 2024 | ||||
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $48.15 | $29.17 | $77.32 | Agreement |
| ROOF0037-005 · Roofers agreement, December 1, 2025 | ||||
| ROOFER (EXCLUDES METAL ROOF INSTALLATION AND WATERPROOFING) | $41.21 | $21.46 | $62.67 | Agreement |
| SFPA0669-004 · SFPA, January 1, 2026 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $49.75 | $30.26 | $80.01 | SFPA |
| SHEE0012-011 · Sheet Metal Workers agreement, July 1, 2026 | ||||
| SHEET METAL WORKER (INCLUDES HVAC DUCT AND METAL ROOF INSTALLATION) | $46.75 | $35.93 | $82.68 | Agreement |
| SUPA2011-033 · Survey of contractors in PA, August 20, 2014 | ||||
| FLOOR LAYER: VINYL FLOORING | $28.11 | $7.03 | $35.14 | Survey |
| LABORER: ASPHALT RAKER | $20.92 | $9.09 | $30.01 | Survey |
| LABORER: LANDSCAPE | $18.10 | $0.00 | $18.10 | Survey |
| LABORER: LUTEMAN | $21.13 | $8.23 | $29.36 | Survey |
| ROOFER: WATERPROOFING ONLY | $25.07 | $7.33 | $32.40 | Survey |
| TRUCK DRIVER: DUMP TRUCK | $23.36 | $7.60 | $30.96 | Survey |
| UAVGPA0035 · Union average, January 1, 2025 | ||||
| INDUSTRIAL: PIPEFITTER | $43.62 | $20.23 | $63.85 | Union average |
Modification history
| Modification 3 | January 30, 2026 |
| Modification 4 | May 18, 2026 |
| Modification 5 | August 20, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on PA20260075?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 5 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator