This sheet sets 117 classifications for heavy work in Allegheny, Armstrong, Beaver and 30 more counties, Pennsylvania. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $37.52 an hour (laborer: building construction) to $90.48 (boilermaker (centre, franklin, potter, clinton, fulton, huntindon and mifflin counties)). Your contract may lock an earlier modification.

Scope

Sewage and Water Treatment Plant Projects

What changed this year

First published January 2, 2026, this sheet is now on modification 7, and its rates have changed in 7 modifications. Of the 92 rates we can follow line by line from the first publication to today, 26 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

September 18, 2026 · modification 7

1 rate raised

  • Sheet metal worker: 1 rate raised by $12.39 an hour
Every line that changed (1)
ClassificationWasNowChange
SHEET METAL WORKER (REMAINING COUNTIES)$39.50 + $30.79$46.75 + $35.93+$12.39 (+17.6%)

Earlier modifications

  • September 17, 2026 · modification 61 rate raised, 1 rate lowered
    • Millwright: 1 rate raised by $4.06 an hour
    • Sheet metal worker: 1 rate lowered by $12.39 an hour
    Every line that changed (2)
    ClassificationWasNowChange
    MILLWRIGHT$43.00 + $23.44$45.20 + $25.30+$4.06 (+6.1%)
    SHEET METAL WORKER (REMAINING COUNTIES)$46.75 + $35.93$39.50 + $30.79−$12.39 (−15.0%)
  • August 20, 2026 · modification 5Classification names reworded; 1 rate raised among the 103 lines we could match
    • Sheet metal worker: 1 rate raised by $12.39 an hour

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

    Every line that changed (1)
    ClassificationWasNowChange
    SHEET METAL WORKER (REMAINING COUNTIES)$39.50 + $30.79$46.75 + $35.93+$12.39 (+17.6%)
  • May 18, 2026 · modification 4Classification names reworded; 1 fringe formula changed among the 106 lines we could match
    • Roofers: 1 fringe formula changed

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

    Every line that changed (1)
    ClassificationWasNowChange
    ROOFERS: COMPOSITION (CENTRE, FRANKLIN, FULTON AND MIFFLIN COUNTIES)$39.50 + 31.80+A$39.50 + $31.80changed
  • January 30, 2026 · modification 321 rates raised
    • Laborer: 6 rates raised by $2.00 an hour
    • Laborers: 6 rates raised by $2.00 an hour
    • Carpenter: 4 rates raised by $2.00 an hour
    • Piledriverman piledriverman: 2 rates raised by $2.00 an hour
    • Cement mason/concrete finisher: 1 rate raised by $2.00 an hour
    • Diver: 1 rate raised by $2.63 an hour
    • Tender: 1 rate raised by $2.00 an hour
    Every line that changed (21)
    ClassificationWasNowChange
    PILEDRIVERMAN Piledriverman (welder)$43.38 + $22.67$44.63 + $23.42+$2.00 (+3.0%)
    PILEDRIVERMAN Piledriverman$41.88 + $22.67$43.13 + $23.42+$2.00 (+3.1%)
    Diver$62.82 + $22.67$64.70 + $23.42+$2.63 (+3.1%)
    Tender$41.88 + $22.67$43.13 + $23.42+$2.00 (+3.1%)
    CARPENTER (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, ERIE, FAYETTE, GREENE, LAWRENCE, MERCER…$42.85 + $22.09$44.10 + $22.84+$2.00 (+3.1%)
    CARPENTER (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, ERIE, FAYETTE, GREENE, LAWRENCE, MERCER…$41.35 + $22.09$42.60 + $22.84+$2.00 (+3.2%)
    CARPENTER (BEDFORD, BLAIR, CAMBRIA, CAMERON, CENTRE, CLARION, CLINTON, CLEARFIELD, CRAWF…$42.60 + $22.09$43.85 + $22.84+$2.00 (+3.1%)
    CARPENTER (BEDFORD, BLAIR, CAMBRIA, CAMERON, CENTRE, CLARION, CLINTON, CLEARFIELD, CRAWF…$41.10 + $22.09$42.35 + $22.84+$2.00 (+3.2%)
    LABORER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGD…$33.60 + $26.00$34.60 + $27.00+$2.00 (+3.4%)
    LABORER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGD…$33.76 + $26.00$34.76 + $27.00+$2.00 (+3.3%)
    LABORER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGD…$34.25 + $26.00$35.25 + $27.00+$2.00 (+3.3%)
    LABORER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGD…$34.70 + $26.00$35.70 + $27.00+$2.00 (+3.3%)
    LABORER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGD…$35.11 + $26.00$36.11 + $27.00+$2.00 (+3.3%)
    LABORER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGD…$31.95 + $26.00$32.95 + $27.00+$2.00 (+3.5%)
    Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, EL…$33.70 + $26.00$34.70 + $27.00+$2.00 (+3.4%)
    Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, EL…$33.86 + $26.00$34.86 + $27.00+$2.00 (+3.3%)
    Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, EL…$34.25 + $26.00$35.25 + $27.00+$2.00 (+3.3%)
    Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, EL…$34.70 + $26.00$35.70 + $27.00+$2.00 (+3.3%)
    Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, EL…$35.11 + $26.00$36.11 + $27.00+$2.00 (+3.3%)
    Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, EL…$31.95 + $26.00$32.95 + $27.00+$2.00 (+3.5%)
    CEMENT MASON/CONCRETE FINISHER$35.94 + $27.50$37.44 + $28.00+$2.00 (+3.2%)
  • January 23, 2026 · modification 26 rates raised
    • Truck driver: 2 rates raised by $2.00 an hour
    • Truck drivers: 2 rates raised by $2.00 an hour
    • Electrician: 1 rate raised by $5.80 an hour
    • Roofer: 1 rate raised by $2.00 an hour
    Every line that changed (6)
    ClassificationWasNowChange
    ELECTRICIAN$47.30 + $28.12$51.45 + $29.77+$5.80 (+7.7%)
    ROOFER$39.91 + $20.76$41.21 + $21.46+$2.00 (+3.3%)
    TRUCK DRIVER (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARFIELD, C…$36.43 + $23.21$37.93 + $23.71+$2.00 (+3.4%)
    TRUCK DRIVER (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARFIELD, C…$36.89 + $23.52$38.39 + $24.02+$2.00 (+3.3%)
    Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTI…$36.29 + $23.13$37.79 + $23.63+$2.00 (+3.4%)
    Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTI…$36.75 + $23.43$38.25 + $23.93+$2.00 (+3.3%)
  • January 9, 2026 · modification 15 rates raised
    • Electrician: 5 rates raised by $3.26 to $3.38 an hour
    Every line that changed (5)
    ClassificationWasNowChange
    ELECTRICIAN$50.86 + $31.78$49.11 + $36.79+$3.26 (+3.9%)
    ELECTRICIAN$50.86 + $31.78$49.11 + $36.79+$3.26 (+3.9%)
    ELECTRICIAN$37.43 + $26.17$40.47 + $26.51+$3.38 (+5.3%)
    ELECTRICIAN$38.44 + $26.20$41.48 + $26.54+$3.38 (+5.2%)
    ELECTRICIAN$37.43 + $26.17$40.47 + $26.51+$3.38 (+5.3%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 7 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
BOIL0013-007 · Boilermakers agreement, January 1, 2025
BOILERMAKER (CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND MIFFLIN COUNTIES)$55.00$35.48$90.48no changeAgreement, 2025
BOIL0154-004 · Boilermakers agreement, January 1, 2025
BOILERMAKER (ALLEGHENY…
Full text

BOILERMAKER (ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA, CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES)

$48.28$33.17$81.45no changeAgreement, 2025
BOIL0744-003 · Boilermakers agreement, July 1, 2008
BOILERMAKER (ERIE COUNTY)$35.34$18.48$53.82no changeAgreement, 2008
BRPA0005-033 · Bricklayers agreement, May 1, 2022
BRICKLAYER, STONEMASON (MIFFLIN COUNTY)$32.66$21.58$54.24no changeAgreement, 2022
BRPA0005-046 · Bricklayers agreement, May 3, 2020
BRICKLAYER, STONEMASON (FRANKLIN COUNTY)$33.99$16.87$50.86no changeAgreement, 2020
BRPA0005-052 · Bricklayers agreement, May 1, 2014
BRICKLAYER, STONEMASON (CENTRE (REMAINDER) AND CLINTON COUNTIES)$31.35$13.85$45.20no changeAgreement, 2014
BRPA0009-004 · Bricklayers agreement, December 1, 2022
BRICKLAYER, STONEMASON & MARBLE SETTER…
Full text

BRICKLAYER, STONEMASON & MARBLE SETTER (BEDFORD, BLAIR,CAMBRIA, CENTRE COUNTY (HALFMOON, HOUSTON, PATTON, RUSH,TAYLOR AND WORTH TOWNSHIPS),FULTON, HUNTINGDON, AND SOMERSET COUNTIES)

$34.14$22.00$56.14no changeAgreement, 2022
BRPA0009-006 · Bricklayers agreement, December 1, 2022
BRICKLAYER, STONEMASON…
Full text

BRICKLAYER, STONEMASON (CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION (EXCEPT BRADY, MADISON, PERRY, PORTER, REDBANK, AND TOBY TOWNSHIPS) COUNTIES)

$34.14$22.77$56.91no changeAgreement, 2022
MARBLE MASON (CLEARFIELD…
Full text

MARBLE MASON (CLEARFIELD, FOREST, JEFFERSON, VENANGO, AND CLARION (EXCEPT BRADY, MADISON, PERRY, PORTER, REDBANK, AND TOBY TOWNSHIPS) COUNTIES)

$34.14$22.77$56.91no changeAgreement, 2022
BRPA0009-012 · Bricklayers agreement, December 1, 2022
BRICKLAYER, STONEMASON (BUTTER, LAWRENCE & MERCER COUNTIES)$34.73$24.14$58.87no changeAgreement, 2022
BRPA0009-018 · Bricklayers agreement, December 1, 2022
BRICKLAYER, STONEMASON (CAMERON COUNTY)$31.62$22.81$54.43no changeAgreement, 2022
MARBLE MASON (CAMERON COUNTY)$31.62$22.81$54.43no changeAgreement, 2022
BRPA0009-023 · Bricklayers agreement, December 1, 2022
BRICKLAYER (BEAVER COUNTY)$35.28$24.49$59.77no changeAgreement, 2022
BRPA0009-024 · Bricklayers agreement, December 1, 2022
BRICKLAYER (WASHINGTON…
Full text

BRICKLAYER (WASHINGTON (CROSS CREEK, HANOVER, JEFFERSON, MT PLEASANT, NOTTINGHAM, PETERS, ROBINSON, SMITH, UNION TWPS) COUNTY)

$36.99$24.67$61.66no changeAgreement, 2022
BRPA0009-025 · Bricklayers agreement, December 1, 2022
BRICKLAYER (BUTLER, LAWRENCE, AND MERCER COUNTIES)$34.73$24.14$58.87no changeAgreement, 2022
BRPA0009-028 · Bricklayers agreement, December 1, 2022
MASON - STONE (ALLEGHENY AND WASHINGTON…
Full text

MASON - STONE (ALLEGHENY AND WASHINGTON (CROSS CREEK, HANOVER, JEFFERSON, MT PLEASANT, NOTTINGHAM, PETERS, ROBINSON, SMITH AND UNION TWPS) COUNTIES)

$38.56$23.36$61.92no changeAgreement, 2022
TILE SETTER (ALLEGHENY, BEAVER, GREENE, AND WASHINGTON)$35.64$21.63$57.27no changeAgreement, 2022
BRPA0009-032 · Bricklayers agreement, June 1, 2017
BRICKLAYER (FAYETTE…
Full text

BRICKLAYER (FAYETTE (JEFFERSON & WASHINGTON TWPS), GREENE (EXCEPT CUMBERLAND, DUNKIRK, GREENE, MONONGAHELIA TWPS), INDIANA, AND WESTMORELAND (ROSTRAVER TWP) COUNTIES)

$31.00$20.66$51.66no changeAgreement, 2017
BRPA0009-033 · Bricklayers agreement, December 1, 2022
BRICKLAYER (ARMSTRONG…
Full text

BRICKLAYER (ARMSTRONG, CLARION (BRADY, MADISON, PERRY, TOBE, PORTER, REDBANK TWPS), FAYETTE (EXCEPT JEFFERSON & WASHINGTON TWPS), GREENE (CUMBERLAND, DUNKIRK, GREENE, MONONGAHELIA TWPS), INDIANA, AND WESTMORELAND (EXCEPT ROSTRAVE TWP) COUNTIES)

$36.55$24.46$61.01no changeAgreement, 2022
BRPA0009-035 · Bricklayers agreement, May 1, 2022
MARBLE MASON (ERIE AND CRAWFORD COUNTIES)$31.39$22.97$54.36—Agreement, 2022
BRPA0009-035 · Bricklayers agreement, December 1, 2022
TERRAZZO WORKER/SETTER (ERIE AND CRAWFORD COUNTIES)$35.49$20.32$55.81—Agreement, 2022
TILE SETTER (ERIE AND CRAWFORD COUNTIES)$35.64$21.63$57.27—Agreement, 2022
BRPA0009-040 · Bricklayers agreement, November 1, 2019
BRICKLAYER (CRAWFORD AND ERIE COUNTIES)$28.64$21.86$50.50no changeAgreement, 2019
CARP0251-011 · Carpenters agreement, May 1, 2018
FLOOR LAYER: CARPET (ERIE COUNTY)$29.74$15.23$44.97no changeAgreement, 2018
CARP0251-012 · Carpenters agreement, June 1, 2018
FLOOR LAYER: CARPET…
Full text

FLOOR LAYER: CARPET (BEDFORD, BLAIR, CAMBRIA, CAMERON, CENTRE, CLARION, CLEARFIELD, CLINTON, CRAWFORD, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, INDIANA, JEFFERSON, MIFFLIN, POTTER AND SOMERSET COUNTIES)

$28.51$15.23$43.74no changeAgreement, 2018
CARP0251-013 · Carpenters agreement, June 1, 2018
FLOOR LAYER: CARPET (MCKEAN, VENANGO, AND WARREN COUNTIES)$28.11$13.88$41.99no changeAgreement, 2018
CARP0251-014 · Carpenters agreement, June 1, 2018
FLOOR LAYER: CARPET…
Full text

FLOOR LAYER: CARPET (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, FAYETTE, WASHINGTON, WESTMORELAND, LAWRENCE, MERCER AND GREENE COUNTIES)

$33.75$17.03$50.78no changeAgreement, 2018
CARP0274-001 · Carpenters agreement, January 1, 2026
PILEDRIVERMAN (PILEDRIVERMAN (WELDER))$44.63$23.42$68.05+$2.00 (+3.0%)Agreement, 2026
PILEDRIVERMAN (PILEDRIVERMAN)$43.13$23.42$66.55+$2.00 (+3.1%)Agreement, 2026
CARP0274-002 · Carpenters agreement, January 1, 2026
DIVER$64.70$23.42$88.12+$2.63 (+3.1%)Agreement, 2026
TENDER$43.13$23.42$66.55+$2.00 (+3.1%)Agreement, 2026
CARP0443-004 · Carpenters agreement, June 1, 2026
MILLWRIGHT$45.20$25.30$70.50+$4.06 (+6.1%)Agreement, 2026
CARP2274-001 · Carpenters agreement, January 1, 2026
CARPENTER (ALLEGHENY…
Full text

CARPENTER (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, ERIE, FAYETTE, GREENE, LAWRENCE, MERCER, WASHINGTON, AND WESTMORELAND COUNTIES)

$42.60$22.84$65.44+$2.00 (+3.2%)Agreement, 2026
CARPENTER (BEDFORD…
Full text

CARPENTER (BEDFORD, BLAIR, CAMBRIA, CAMERON, CENTRE, CLARION, CLINTON, CLEARFIELD, CRAWFORD, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, MIFFLIN, POTTER, SOMERSET, VENANGO, AND WARREN COUNTIES)

$42.35$22.84$65.19+$2.00 (+3.2%)Agreement, 2026
CARPENTER (WELDER)…
Full text

CARPENTER (WELDER) (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, ERIE, FAYETTE, GREENE, LAWRENCE, MERCER, WASHINGTON, AND WESTMORELAND COUNTIES)

$44.10$22.84$66.94+$2.00 (+3.1%)Agreement, 2026
CARPENTER (WELDER)…
Full text

CARPENTER (WELDER) (BEDFORD, BLAIR, CAMBRIA, CAMERON, CENTRE, CLARION, CLINTON, CLEARFIELD, CRAWFORD, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, MIFFLIN, POTTER, SOMERSET, VENANGO, AND WARREN COUNTIES)

$43.85$22.84$66.69+$2.00 (+3.1%)Agreement, 2026
ELEC0005-006 · Electrical Workers (IBEW) agreement, December 26, 2025
ELECTRICIAN (ALLEGHENY…
Full text

ELECTRICIAN (ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON, CENTRE (REMAINDER), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES)

$49.11$36.79$85.90+$3.26 (+3.9%)Agreement, 2025
ELEC0005-010 · Electrical Workers (IBEW) agreement, December 26, 2025
ELECTRICIAN (BUTLER AND VENANGO COUNTIES)$49.11$36.79$85.90+$3.26 (+3.9%)Agreement, 2025
ELEC0056-004 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (ERIE, FOREST AND WARREN COUNTIES)$43.25$26.56$69.81no changeAgreement, 2025
ELEC0143-007 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (FRANKLIN AND MIFFLIN COUNTIES)$40.00$27.42$67.42no changeAgreement, 2025
ELEC0712-003 · Electrical Workers (IBEW) agreement, December 29, 2025
ELECTRICIAN (CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES)$51.45$29.77$81.22+$5.80 (+7.7%)Agreement, 2025
ELEC0812-008 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (CLINTON COUNTY)$40.47$26.51$66.98+$3.38 (+5.3%)Agreement, 2025
ELEC0812-009 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (POTTER COUNTY)$41.48$26.54$68.02+$3.38 (+5.2%)Agreement, 2025
ELEC0812-011 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (CENTRE COUNTY…
Full text

ELECTRICIAN (CENTRE COUNTY (BURNSIDE, CURTIN, LIBERTY, HOWARD, MARION, WALKER, MILES, HAINES TOWNSHIPS))

$40.47$26.51$66.98+$3.38 (+5.3%)Agreement, 2025
ENGI0066-009 · Operating Engineers agreement, January 1, 2024
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1-A BACKHOES-360 DEGREE SWING (ABOVE 120,000 LBS. GROSS WEIGHT); CRANES (OVER 100 TONS), CRANES-ROUGH TERRAIN (OVER 100 TON) (HEAVY) ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

$41.59$24.03$65.62no changeAgreement, 2024
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1-A BACKHOES-360 DEGREE SWING (ABOVE 120,000 LBS. GROSS WEIGHT); CRANES (OVER 100 TONS), CRANES-ROUGH TERRAIN (OVER 100 TON) (HEAVY) BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES:

$41.30$24.03$65.33no changeAgreement, 2024
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1-B BACKHOES-360 DEGREE SWING (ABOVE 70,000 LBS. TO 120,000 LBS. GROSS WEIGHT); CRANES (UP TO 100 TON), CRANES-ROUGH TERRAIN (65 TON-100 TON), TOWER CRANE (HEAVY) ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

$40.59$24.03$64.62no changeAgreement, 2024
POWER EQUIPMENT OPERATOR: GROUP 1…
Full text

POWER EQUIPMENT OPERATOR: GROUP 1-B BACKHOES-360 DEGREE SWING (ABOVE 70,000 LBS. TO 120,000 LBS. GROSS WEIGHT); CRANES (UP TO 100 TON), CRANES-ROUGH TERRAIN (65 TON-100 TON), TOWER CRANE (HEAVY) BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES:

$40.30$24.03$64.33no changeAgreement, 2024
(BEDFORD, CAMERON, CLINTON…
Full text

(BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES)

$38.30$24.03$62.33—Agreement, 2024
(ALLEGHENY, ARMSTRONG…
Full text

(ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES)

$38.59$24.03$62.62—Agreement, 2024
(BEDFORD, CAMERON, CLINTON…
Full text

(BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES)

$38.02$24.03$62.05—Agreement, 2024
(ALLEGHENY, ARMSTRONG…
Full text

(ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES)

$38.33$24.03$62.36—Agreement, 2024
(BEDFORD, CAMERON, CLINTON…
Full text

(BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES)

$34.38$24.03$58.41—Agreement, 2024
(ALLEGHENY, ARMSTRONG…
Full text

(ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES)

$34.68$24.03$58.71—Agreement, 2024
(ALLEGHENY, ARMSTRONG…
Full text

(ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES)

$34.22$24.03$58.25—Agreement, 2024
(BEDFORD, CAMERON, CLINTON…
Full text

(BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES)

$33.89$24.03$57.92—Agreement, 2024
(ALLEGHENY, ARMSTRONG…
Full text

(ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARION, CLEARFIELD, CRAWFORD, ERIE, ELK, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES)

$33.97$24.03$58.00—Agreement, 2024
(BEDFORD, CAMERON, CLINTON…
Full text

(BEDFORD, CAMERON, CLINTON, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN AND POTTER COUNTIES)

$33.68$24.03$57.71—Agreement, 2024
Group definitions, zones and premiums for ENGI0066-009
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 1 ASPHALT PAVING MACHINE (SPREADER); AUTOGRADER (C.M.I. AND SIMILAR); BACKFILLER; BACKHOE-360 SWING; CABLEWAY; CAISSON DRILL (SIMILAR TO HUGH WILLIAMS); CENTRAL MIX PLANT; COOLING PLANT; CONCRETE PAVING MIXER; CONCRETE PUMP (SELF-PROPELLED); CRANES; CRANES (BOOM OR MAST OVER 101 FT. WILL BE PAID ON THE BASIS OF AN ADDITIONAL $.25 PER EACH ADDITIONAL 50 FEET INCLUSIVE OF JIB); CRANES (TOWER-STATIONARY-CLIMBING TOWER CRANE); DERRICK; DERRICK BOAT; DOZER (D-6 AND OVER); DRAGLINE; DREDGE; DREDGE HYDRAULIC; ELEVATING GRADER; FRANKI PILE MACHINE; GRADALL (REMOTE CONTROL OR OTHERWISE); GRADER (POWER-FINE GRADE); HELICPOTER (1500 LB. LIFT); HELICOPTER (UNDER 1500 LB. LIFT); HILIFT (4 CY. AND OVER); HOIST 2 DRUMS OR MORE (IN ONE UNIT); HYDRAULIC BOOM TRUCK (WITH PIVOTAL CAB) (SINGLE MOTOR-PITMAN OR SIMILAR); KOCAL; LOCOMOTIVE (STD. GAUGE); METRO-CHIP HARVESTER OR SIMILAR; MILLING MACHINE (ROTO MILL OR SIMILAR); MIX MOBILE; MIX MOBILE (WITH SELF LOADING ATTACHMENT); MUCKING MACHINE (TUNNEL); ILE DRIVER MACHINE; PIPE EXTRUSTION MACHINE; PRESPLITTER DRILL (SELF CONTAINED); REFRIGERATION PLANT (SOIL STABILIZATION); ROUGH TERRAIN CRANE (25 TON AND OVER); ROUGH TERRAIN CRANE (UNDER 25 TON); SCRAPERS, SHOVEL-POWER; SLIP FORM PAVER (C.M.I. AND SIMILAR); TRENCHING MACHINE (30,000 LB. AND OVER); TRENCHING MACHINE (UNDER30,000 LB.); TUNNEL MACHINE (MARK XXI JARVA OR SIMILAR); VERMEER SAW; WHIRLEY.
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 1 ASPHALT PAVING MACHINE (SPREADER); AUTOGRADER (C.M.I. AND SIMILAR); BACKFILLER; BACKHOE-360 SWING; CABLEWAY; CAISSON DRILL (SIMILAR TO HUGH WILLIAMS); CENTRAL MIX PLANT; COOLING PLANT; CONCRETE PAVING MIXER; CONCRETE PUMP (SELF-PROPELLED); CRANES; CRANES (BOOM OR MAST OVER 101 FT. WILL BE PAID ON THE BASIS OF AN ADDITIONAL $.25 PER EACH ADDITIONAL 50 FEET INCLUSIVE OF JIB); CRANES (TOWER-STATIONARY-CLIMBING TOWER CRANE); DERRICK; DERRICK BOAT; DOZER (D-6 AND OVER); DRAGLINE; DREDGE; DREDGE HYDRAULIC; ELEVATING GRADER; FRANKI PILE MACHINE; GRADALL (REMOTE CONTROL OR OTHERWISE); GRADER (POWER-FINE GRADE); HELICPOTER (1500 LB. LIFT); HELICOPTER (UNDER 1500 LB. LIFT); HILIFT (4 CY. AND OVER); HOIST 2 DRUMS OR MORE (IN ONE UNIT); HYDRAULIC BOOM TRUCK (WITH PIVOTAL CAB) (SINGLE MOTOR-PITMAN OR SIMILAR); KOCAL; LOCOMOTIVE (STD. GAUGE); METRO-CHIP HARVESTER OR SIMILAR; MILLING MACHINE (ROTO MILL OR SIMILAR); MIX MOBILE; MIX MOBILE (WITH SELF LOADING ATTACHMENT); MUCKING MACHINE (TUNNEL); ILE DRIVER MACHINE; PIPE EXTRUSTION MACHINE; PRESPLITTER DRILL (SELF CONTAINED); REFRIGERATION PLANT (SOIL STABILIZATION); ROUGH TERRAIN CRANE (25 TON AND OVER); ROUGH TERRAIN CRANE (UNDER 25 TON); SCRAPERS, SHOVEL-POWER; SLIP FORM PAVER (C.M.I. AND SIMILAR); TRENCHING MACHINE (30,000 LB. AND OVER); TRENCHING MACHINE (UNDER30,000 LB.); TUNNEL MACHINE (MARK XXI JARVA OR SIMILAR); VERMEER SAW; WHIRLEY.
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 2 ASPHALT PLANT OPERATOR; AUGER (TRACTOR MTD.); AUGER (TRUCK MTD.); BACKHOE (REAR PIVOTAL SWING) (180 SWING); BELT LOADER (EUCLID OR SIMILAR); BORING MACHINE; CABLE PLACER OR LAYER; COMPACTOR WITH BLADE; CONCRETE BATCH PLANT (ELECTRONICALLY SYNCHRONIZED); CONCRETE BELT PLACER (C.M.I. AND SIMILAR); CONCRETE FINISHING MACHINE AND SPREADER; CONCRETE MIXER (OVER 1 CY.); CONCRETE PUMP (STATIONARY); CORE DRILL (TRUCK OR SKID MTD. - SIMILAR TO PENN DRILL); DIRECTIONAL DRILLS OVER 3,000 LBS. THRUST; DOZER (UNDER D-6); DITCH WITCH - SAW; FORCE FEED LOADER; FORK LIFT (LULL OR SIMILAR); GRADER - POWER; GREASE UNIT OPERATOR; GUARD RAIL POST DRIVER (TRUCK MOUNTED); GUARD RAIL POST DRIVER (SKID TYPE); HILIFT (UNDER 4 CY.); HYDRAULIC BOOM TRUCK (NON-PIVOTAL CAB); JOB WORK BOAT (POWERED); JUMBO OPERATOR; LOCOMOTIVE (NARROW GAUGE); MECHANIC; MINOR EQUIPMENT OPERATOR (ACCUMULATIVE FOUR UNITS); MUCKING MACHINE; MULTI-HEAD SAW (GROOVER); OVER-HEAD CRANE; ROLLER-POWER-ASPHALT; ROSS CARRIER; SIDE BOOM OR TRACTOR MOUNTED BOOM; SHUTTLE BUGGY (ASPHALT); STONE CRUSHER (SCREENING-WASHING PLANTS); STONE SPREADER (SELF-PROPELLED); TRUCK MOUNTED DRILL (DAVEY OR SIMILAR); WELDER AND REPAIRMAN; WELL POINT PUMP OPERATOR.
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 2 ASPHALT PLANT OPERATOR; AUGER (TRACTOR MTD.); AUGER (TRUCK MTD.); BACKHOE (REAR PIVOTAL SWING) (180 SWING); BELT LOADER (EUCLID OR SIMILAR); BORING MACHINE; CABLE PLACER OR LAYER; COMPACTOR WITH BLADE; CONCRETE BATCH PLANT (ELECTRONICALLY SYNCHRONIZED); CONCRETE BELT PLACER (C.M.I. AND SIMILAR); CONCRETE FINISHING MACHINE AND SPREADER; CONCRETE MIXER (OVER 1 CY.); CONCRETE PUMP (STATIONARY); CORE DRILL (TRUCK OR SKID MTD. - SIMILAR TO PENN DRILL); DIRECTIONAL DRILLS OVER 3,000 LBS. THRUST; DOZER (UNDER D-6); DITCH WITCH - SAW; FORCE FEED LOADER; FORK LIFT (LULL OR SIMILAR); GRADER - POWER; GREASE UNIT OPERATOR; GUARD RAIL POST DRIVER (TRUCK MOUNTED); GUARD RAIL POST DRIVER (SKID TYPE); HILIFT (UNDER 4 CY.); HYDRAULIC BOOM TRUCK (NON-PIVOTAL CAB); JOB WORK BOAT (POWERED); JUMBO OPERATOR; LOCOMOTIVE (NARROW GAUGE); MECHANIC; MINOR EQUIPMENT OPERATOR (ACCUMULATIVE FOUR UNITS); MUCKING MACHINE; MULTI-HEAD SAW (GROOVER); OVER-HEAD CRANE; ROLLER-POWER-ASPHALT; ROSS CARRIER; SIDE BOOM OR TRACTOR MOUNTED BOOM; SHUTTLE BUGGY (ASPHALT); STONE CRUSHER (SCREENING-WASHING PLANTS); STONE SPREADER (SELF-PROPELLED); TRUCK MOUNTED DRILL (DAVEY OR SIMILAR); WELDER AND REPAIRMAN; WELL POINT PUMP OPERATOR.
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 3 BROOM FINISHER (C.M.I. OR SIMILAR); COMPACTORS/ROLLERS (STATIC OR VIBRATORY (SELF-PROPELLED); CURB BUILDER; MINOR EQUIPMENT OPERTOR (TWO TO THREE UNITS); MULTI-HEAD TIE TAMPER; PAVEMENT BREAKER (SELF-PROPELLED OR RIDDEN); SOIL STABLIZER MACHINE; TIRE REPAIRMAN; TRACTOR (SNAKING AND HAULING); WELL DRILLER AND HORIZONTAL: WINCH OR ""A"" FRAME TRUCK (WHEN HOISTING AND LOWERING).
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 3 BROOM FINISHER (C.M.I. OR SIMILAR); COMPACTORS/ROLLERS (STATIC OR VIBRATORY (SELF-PROPELLED); CURB BUILDER; MINOR EQUIPMENT OPERTOR (TWO TO THREE UNITS); MULTI-HEAD TIE TAMPER; PAVEMENT BREAKER (SELF-PROPELLED OR RIDDEN); SOIL STABLIZER MACHINE; TIRE REPAIRMAN; TRACTOR (SNAKING AND HAULING); WELL DRILLER AND HORIZONTAL: WINCH OR ""A"" FRAME TRUCK (WHEN HOISTING AND LOWERING).
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 4 BALLAST REGULATOR; COMPRESSOR; CONCRETE MIXER (1 CY. & UNDER WITH SKIP); CONCRETE SAW (RIDDEN OR SELP-PROPELLED); CONVEYOR; ELEVATOR (MATERIAL HAULING ONLY); FORK-LIFT (RIDDEN OR SELF-PROPELLED); FORM LINE MACHINE; GENERATOR; GROUTE PUMP; HEATER (MACHINICAL); HOIST (SINGLE DRUM); LADAVATOR LIGHT PLANT; MULCHING MACHINE; PERSONNEL BOAT (POWERED), PULVERIZER, PUMPS, SEEDING MACHINE,SPRAY CURE MACHINE (POWERED DRIVEN); SUBGRADER; TIE PULLER; TUGGER; WELDING MACHINE (GAS OR DIESEL).
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 4 BALLAST REGULATOR; COMPRESSOR; CONCRETE MIXER (1 CY. & UNDER WITH SKIP); CONCRETE SAW (RIDDEN OR SELP-PROPELLED); CONVEYOR; ELEVATOR (MATERIAL HAULING ONLY); FORK-LIFT (RIDDEN OR SELF-PROPELLED); FORM LINE MACHINE; GENERATOR; GROUTE PUMP; HEATER (MACHINICAL); HOIST (SINGLE DRUM); LADAVATOR LIGHT PLANT; MULCHING MACHINE; PERSONNEL BOAT (POWERED), PULVERIZER, PUMPS, SEEDING MACHINE,SPRAY CURE MACHINE (POWERED DRIVEN); SUBGRADER; TIE PULLER; TUGGER; WELDING MACHINE (GAS OR DIESEL).
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 5 DECK HAND; FARM TRACTOR; FIREMAN ON BOILER; OILER; POWER BROOM; SIDE DELIVERY SHOULDER SPREADER.
POWER EQUIPMENT OPERATOR: HEAVY: GROUP 5 DECK HAND; FARM TRACTOR; FIREMAN ON BOILER; OILER; POWER BROOM; SIDE DELIVERY SHOULDER SPREADER.
IRON0003-001 · Ironworkers agreement, June 1, 2023
IRONWORKER (ALLEGHENY…
Full text

IRONWORKER (ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG, BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES)

$38.89$34.54$73.43no changeAgreement, 2023
IRON0003-007 · Ironworkers agreement, June 1, 2023
IRONWORKER (BLAIR, CAMERON…
Full text

IRONWORKER (BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON, MCKEAN, AND POTTER COUNTIES)

$32.29$32.41$64.70no changeAgreement, 2023
IRON0003-011 · Ironworkers agreement, June 1, 2023
IRONWORKER (CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES)$33.57$32.23$65.80no changeAgreement, 2023
IRON0207-002 · Ironworkers agreement, June 1, 2025
IRONWORKER (LAWRENCE, MERCER, AND VENANGO COUNTIES)$36.26$28.16$64.42no changeAgreement, 2025
IRON0404-008 · Ironworkers agreement, July 1, 2024
IRONWORKER, STRUCTURAL…
Full text

IRONWORKER, STRUCTURAL (FRANKLIN (REMAINDER), HUNTINGDON (REMAINDER), AND MIFFLIN COUNTIES)

$37.26$32.63$69.89no changeAgreement, 2024
IRON0549-002 · Ironworkers agreement, December 1, 2022
IRONWORKER (GREENE COUNTY)$35.19$25.66$60.85no changeAgreement, 2022
IRON0568-004 · Ironworkers agreement, May 1, 2025
IRONWORKER: STRUCTURAL…
Full text

IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, MACHINERY MOVER, RIGGER & MACHINERY ERECTOR, WELDER, FENCE ERECTOR (BEDFORD, FRANKLIN (SOUTHWEST 1/3), FULTON, HUNTINGDON (WESTERN 2/3), AND SOMERSET COUNTIES)

$31.65$24.50$56.15no changeAgreement, 2025
LABO0323-002 · Laborers agreement, January 1, 2021
LABORER: BUILDING CONSTRUCTION (VENANGO COUNTY)$22.82$19.25$42.07no changeAgreement, 2021
LABO0419-003 · Laborers agreement, January 1, 2020
LABORER: BUILDING CONSTRUCTION…
Full text

LABORER: BUILDING CONSTRUCTION (BEDFORD, CLEARFIELD, CLINTON, CENTRE, BLAIR, FRANKLIN, FULTON, HUNTINGDON, AND MIFFLIN COUNTIES)

$20.47$17.05$37.52no changeAgreement, 2020
LABO0603-003 · Laborers agreement, May 1, 2025
LABORER (ERIE COUNTY)$27.34$20.18$47.52no changeAgreement, 2025
LABO0613-001 · Laborers agreement, January 1, 2019
LABORER: BUILDING CONSTRUCTION…
Full text

LABORER: BUILDING CONSTRUCTION (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, FAYETTE, INDIANA, WASHINGTON, WESTMORELAND, LAWRENCE, MERCER, CLARION, JEFFERSON, AND GREENE COUNTIES)

$22.37$17.60$39.97no changeAgreement, 2019
LABO0910-001 · Laborers agreement, January 1, 2025
LABORER: BUILDING CONSTRUCTION (CAMERON, ELK, FOREST, MCKEAN, POTTER, AND WARREN COUNTIES)$25.98$19.53$45.51no changeAgreement, 2025
LABO0910-003 · Laborers agreement, January 1, 2024
LABORER: BUILDING CONSTRUCTION (CAMBRIA AND SOMERSET COUNTIES)$26.31$17.05$43.36no changeAgreement, 2024
LABO0964-002 · Laborers agreement, June 1, 2025
LABORER: BUILDING CONSTRUCTION (CRAWFORD COUNTY)$26.03$20.23$46.26no changeAgreement, 2025
LABO1058-001 · Laborers agreement, January 1, 2026
LABORER: GROUP 1…
Full text

LABORER: GROUP 1 ASPHALT CURB SEALER; ASPHALT TAMPER; BATCHERMAN (WEIGH) BLASTER,BOATMAN, BRAKEMAN, CHANGE HOUSE ATTENDANT, COFFER DAM, CONCRETE CURING PITMAN, PUDDLER, DRILL RUNNER'S HELPER (INCLUDES DRILL MOUNTED ON TRUCK, TRACK, OR SIMILAR AND DAVEY DRILL SPOTS, CLEAN UP, HELPS TO MAINTAIN), ELECTRIC BRUSH AND OR GRINDER, FENCE CONSTRUCTION (INCLUDING FENCE MACHINE OPERATOR) FORM STRIPPER AND MOVER, GABION (ERECTORS AND PLACERS) HYDRO JET BLASTER NOZZLEMAN; LANDSCAPE LABORER, MANUALLY MOVED EMULUSION SPRAYER, RADIO ACTUATED TRAFFIC CONTROL OPERATOR RIP RAP WORK, SCAFFOLDS AND RUNWAYS, SHEETERS AND SHORERS (INCLUDES LAGGING) STRUCTURAL CONCRETE TOP SURFACER, WALK BEHIND STREET SWEEPER, AND WOOD CHIPPER; WATER BOY (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGDON, JEFFERSON, MIFFLIN, AND POTTER COUNTIES)

$34.60$27.00$61.60+$2.00 (+3.4%)Agreement, 2026
LABORER: GROUP 1…
Full text

LABORER: GROUP 1 ASPHALT CURB SEALER; ASPHALT TAMPER; BATCHERMAN (WEIGH) BLASTER,BOATMAN, BRAKEMAN, CHANGE HOUSE ATTENDANT, COFFER DAM, CONCRETE CURING PITMAN, PUDDLER, DRILL RUNNER'S HELPER (INCLUDES DRILL MOUNTED ON TRUCK, TRACK, OR SIMILAR AND DAVEY DRILL SPOTS, CLEAN UP, HELPS TO MAINTAIN), ELECTRIC BRUSH AND OR GRINDER, FENCE CONSTRUCTION (INCLUDING FENCE MACHINE OPERATOR) FORM STRIPPER AND MOVER, GABION (ERECTORS AND PLACERS) HYDRO JET BLASTER NOZZLEMAN; LANDSCAPE LABORER, MANUALLY MOVED EMULUSION SPRAYER, RADIO ACTUATED TRAFFIC CONTROL OPERATOR RIP RAP WORK, SCAFFOLDS AND RUNWAYS, SHEETERS AND SHORERS (INCLUDES LAGGING) STRUCTURAL CONCRETE TOP SURFACER, WALK BEHIND STREET SWEEPER, AND WOOD CHIPPER; WATER BOY (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$34.70$27.00$61.70+$2.00 (+3.4%)Agreement, 2026
LABORER: GROUP 2…
Full text

LABORER: GROUP 2 AIR TOOL OPERATOR (ALL TYPES); ASPHALT, BATCH & CONCRETE PLANT OPERATOR (MANUALLY OPERATED) BURNER, CAISSON; MEN (OPEN AIR); CARRYABLE PUMPS; CHAIN SAW OPERATOR INCLUDING ATTACHMENTS, CRIBBING, (CONCRETE OR STEEL); CURB MACHINE OPERATOR (ASPHALT OR CONCRETE WALK BEHIND); DIAMOND HEAD CORE DRLLER, DRILL RUNNER'S HELPER (TUNNEL) FORK LIFT, (WALK BEHIND), FORM SETTER (ROAD FORMS LINE MAN) HIGHWAY SLAB REINFORCEMENT PLACERS (INCLUDING JOINT AND BASKET SETTERS) HYDRAULIC PIPE PUSHER; LINER PLATES (TILE OR VITRIFIED CLAY) MECHANICAL COMPACTING EQUIPMENT OPERATORS, MECHANICAL JOINT SEALER, DOPE POT AND TAR KETTLE, MORTAR MIXER (HAND OR MACHINE) MUCKERS, BRAKEMEN & ALL OTHER LABOR, (INCLUDES INSTALLATION OF UTILITY LINES) PIPE LAYERS /FUSION /HEATING IRON (REGARDLESS OF MATERIALS) PORTABLE SINGLE UNIT CONVEYOR, POST HOLE AUGER, (2 OR 4 CYCLE HAND OPERATED) POWER WHEELBARROWS AND BUGGIES, RAIL PORTER OR SIMILAR; SAND BLASTER;SIGNAL MAN,VIBRATOR OPERATOR, ALL RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING: ADZING MACHINE, BALLAST ROUTER, BOLTING MACHINE, POWER JACKS, RAIL DRILLS, RAILROAD BRAKEMAN,RAIL SAWS, SPIKE DRIVERS (MANUALLY OR HAND HELD TOOL) SPIKE PULLERS TAMPING MACHINE, THERMITWELD (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGDON, JEFFERSON, MIFFLIN, AND POTTER COUNTIES)

$34.76$27.00$61.76+$2.00 (+3.3%)Agreement, 2026
LABORER: GROUP 2…
Full text

LABORER: GROUP 2 AIR TOOL OPERATOR (ALL TYPES); ASPHALT, BATCH & CONCRETE PLANT OPERATOR (MANUALLY OPERATED) BURNER, CAISSON; MEN (OPEN AIR); CARRYABLE PUMPS; CHAIN SAW OPERATOR INCLUDING ATTACHMENTS, CRIBBING, (CONCRETE OR STEEL); CURB MACHINE OPERATOR (ASPHALT OR CONCRETE WALK BEHIND); DIAMOND HEAD CORE DRLLER, DRILL RUNNER'S HELPER (TUNNEL) FORK LIFT, (WALK BEHIND), FORM SETTER (ROAD FORMS LINE MAN) HIGHWAY SLAB REINFORCEMENT PLACERS (INCLUDING JOINT AND BASKET SETTERS) HYDRAULIC PIPE PUSHER; LINER PLATES (TILE OR VITRIFIED CLAY) MECHANICAL COMPACTING EQUIPMENT OPERATORS, MECHANICAL JOINT SEALER, DOPE POT AND TAR KETTLE, MORTAR MIXER (HAND OR MACHINE) MUCKERS, BRAKEMEN & ALL OTHER LABOR, (INCLUDES INSTALLATION OF UTILITY LINES) PIPE LAYERS /FUSION /HEATING IRON (REGARDLESS OF MATERIALS) PORTABLE SINGLE UNIT CONVEYOR, POST HOLE AUGER, (2 OR 4 CYCLE HAND OPERATED) POWER WHEELBARROWS AND BUGGIES, RAIL PORTER OR SIMILAR; SAND BLASTER;SIGNAL MAN,VIBRATOR OPERATOR, ALL RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING: ADZING MACHINE, BALLAST ROUTER, BOLTING MACHINE, POWER JACKS, RAIL DRILLS, RAILROAD BRAKEMAN,RAIL SAWS, SPIKE DRIVERS (MANUALLY OR HAND HELD TOOL) SPIKE PULLERS TAMPING MACHINE, THERMITWELD (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$34.86$27.00$61.86+$2.00 (+3.3%)Agreement, 2026
LABORER: GROUP 3…
Full text

LABORER: GROUP 3 ASPHALT LUTEMAN/RAKER,BLACKSMITH, BLASTER, BRICK, STONE AND BLOCK PAVERS AND BLOCK CUTTERS (WOOD, BELGIAN AND ASPHALT); CEMENT MORTAR LINING CAR PUSHER; CEMENT MORTAR MIXER (PIPE RELINING); CEMENT MORTAR PIPE RELINERS; CONCRETE SAW OPERATOR (WALK BEHIND); CURB CUTTERS AND SETTERS; ELEVATED ROADWAY DRAINAGE CONSTRUCTION; ERECTOR OF OVERHEAD SIGNS, FORM SETTER (ROAD FORMS-LEAD MAN); GROUT MACHINE OPERATOR; GUNITE OR DRY PACK GUN (NOZZLE AND MACHINE MAN); MANHOLE OR CATCH BASIN BUILDER (BRICK BLOCK CONCRETE OR ANY PREFABRICATION) MINERS AND DRILLERS (INCLUDING LINING, SUPPORTING AND FORM WORKMEN, SETTING OF SHIELDS, MISCELLANEOUS EQUIPMENT AND JUMBOS); MULTI-PLATE PIPE (ALIGNING AND SECURING); PLACING WIRE MESH ON GUNITE PROJECTS; WAGON DRILL OPERATORS (AIR TRACK OR SIMILAR); WALK BEHIND DITCHING MACHINE (TRENCHER OR SIMILAR);CROWN SCREED ADJUSTER AND WELDER (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGDON, JEFFERSON, MIFFLIN, AND POTTER COUNTIES)

$35.25$27.00$62.25—Agreement, 2026
LABORER: GROUP 3…
Full text

LABORER: GROUP 3 ASPHALT LUTEMAN/RAKER,BLACKSMITH, BLASTER, BRICK, STONE AND BLOCK PAVERS AND BLOCK CUTTERS (WOOD, BELGIAN AND ASPHALT); CEMENT MORTAR LINING CAR PUSHER; CEMENT MORTAR MIXER (PIPE RELINING); CEMENT MORTAR PIPE RELINERS; CONCRETE SAW OPERATOR (WALK BEHIND); CURB CUTTERS AND SETTERS; ELEVATED ROADWAY DRAINAGE CONSTRUCTION; ERECTOR OF OVERHEAD SIGNS, FORM SETTER (ROAD FORMS-LEAD MAN); GROUT MACHINE OPERATOR; GUNITE OR DRY PACK GUN (NOZZLE AND MACHINE MAN); MANHOLE OR CATCH BASIN BUILDER (BRICK BLOCK CONCRETE OR ANY PREFABRICATION) MINERS AND DRILLERS (INCLUDING LINING, SUPPORTING AND FORM WORKMEN, SETTING OF SHIELDS, MISCELLANEOUS EQUIPMENT AND JUMBOS); MULTI-PLATE PIPE (ALIGNING AND SECURING); PLACING WIRE MESH ON GUNITE PROJECTS; WAGON DRILL OPERATORS (AIR TRACK OR SIMILAR); WALK BEHIND DITCHING MACHINE (TRENCHER OR SIMILAR);CROWN SCREED ADJUSTER AND WELDER (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$35.25$27.00$62.25—Agreement, 2026
LABORER: GROUP 4…
Full text

LABORER: GROUP 4 REINFORCING STEEL PLACER (BENDING, ALIGNING, AND SECURING, CADWELD) (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$35.70$27.00$62.70—Agreement, 2026
LABORER: GROUP 4…
Full text

LABORER: GROUP 4 REINFORCING STEEL PLACER (BENDING, ALIGNING, AND SECURING, CADWELD) (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGDON, JEFFERSON, MIFFLIN, AND POTTER COUNTIES)

$35.70$27.00$62.70—Agreement, 2026
LABORER: GROUP 5…
Full text

LABORER: GROUP 5 HIGH BURNER, (ANY BURNING NOT DONE FROM DECK), WELDER (PIPELINE) (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$36.11$27.00$63.11—Agreement, 2026
LABORER: GROUP 5…
Full text

LABORER: GROUP 5 HIGH BURNER, (ANY BURNING NOT DONE FROM DECK), WELDER (PIPELINE) (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGDON, JEFFERSON, MIFFLIN, AND POTTER COUNTIES)

$36.11$27.00$63.11—Agreement, 2026
LABORER: GROUP 6…
Full text

LABORER: GROUP 6 UNIFORMED FLAGPERSON, WATCHMAN (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$32.95$27.00$59.95—Agreement, 2026
LABORER: GROUP 6…
Full text

LABORER: GROUP 6 UNIFORMED FLAGPERSON, WATCHMAN (BEDFORD, CAMERON, CENTRE, CLINTON, CRAWFORD, FOREST, FRANKLIN, FULTON, HUNTINGDON, JEFFERSON, MIFFLIN, AND POTTER COUNTIES)

$32.95$27.00$59.95—Agreement, 2026
PAIN0021-019 · Painters and Allied Trades agreement, May 1, 2021
PAINTER: BRUSH & ROLLER (CLINTON COUNTY)$29.02$21.14$50.16no changeAgreement, 2021
PAINTER: SPRAY (CLINTON COUNTY)$30.02$21.14$51.16no changeAgreement, 2021
PAIN0021-024 · Painters and Allied Trades agreement, May 1, 2021
PAINTER: BRUSH (FRANKLIN COUNTY)$25.84$16.30$42.14no changeAgreement, 2021
PAIN0057-014 · Painters and Allied Trades agreement, June 1, 2023
PAINTER: BRIDGE (ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES)$38.33$23.72$62.05no changeAgreement, 2023
PAINTER: BRUSH & ROLLER (ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES)$30.56$23.72$54.28—Agreement, 2023
PAINTER: SPRAY (ALLEGHENY, FAYETTE, GREENE, WASHINGTON COUNTIES)$30.56$23.72$54.28—Agreement, 2023
PAIN0057-015 · Painters and Allied Trades agreement, June 1, 2023
PAINTER: BRIDGE (ARMSTRONG…
Full text

PAINTER: BRIDGE (ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE, CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA, JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND WESTMORELAND COUNTIES)

$38.33$23.72$62.05no changeAgreement, 2023
PAINTER: BRUSH AND ROLLER…
Full text

PAINTER: BRUSH AND ROLLER (ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE, CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA, JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND WESTMORELAND COUNTIES)

$30.56$23.72$54.28—Agreement, 2023
PAINTER: SPRAY (ARMSTRONG…
Full text

PAINTER: SPRAY (ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE, CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA, JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND WESTMORELAND COUNTIES)

$30.56$23.72$54.28—Agreement, 2023
PAIN0057-016 · Painters and Allied Trades agreement, May 1, 2024
PAINTER: BRIDGE (ERIE…
Full text

PAINTER: BRIDGE (ERIE, MCKEAN AND WARREN (INCLUDING COLUMBUS AND FREEHOLD TOWNSHIPS) COUNTIES)

$28.87$24.89$53.76no changeAgreement, 2024
PAINTER: PAINTER (ERIE…
Full text

PAINTER: PAINTER (ERIE, MCKEAN AND WARREN (INCLUDING COLUMBUS AND FREEHOLD TOWNSHIPS) COUNTIES)

$27.12$24.89$52.01no changeAgreement, 2024
PAIN0057-026 · Painters and Allied Trades agreement, June 1, 2023
PAINTER: BRUSH AND ROLLER…
Full text

PAINTER: BRUSH AND ROLLER (CAMERON, CRAWFORD, FOREST, POTTER AND WARREN (EXCLUDING COLUMBUS AND FREEHOLD TWP) COUNTIES)

$30.56$23.72$54.28no changeAgreement, 2023
PLAS0526-002 · Plasterers and Cement Masons agreement, January 1, 2026
CEMENT MASON/CONCRETE FINISHER$37.44$28.00$65.44+$2.00 (+3.2%)Agreement, 2026
PLAS0526-018 · Plasterers and Cement Masons agreement, June 1, 2019
PLASTERER (ALLEGHENY…
Full text

PLASTERER (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, CAMERON, CLARION, CLEARFIELD,CRAWFORD, ELK, FAYETTE, FOREST, GREENE JEFFERSON,LAWRENCE, MCKEAN, MERCER, POTTER, VENAGO, WARREN, WASHINGTON, AND WESTMORELAND COUNTIES)

$29.78$17.10$46.88no changeAgreement, 2019
PLAS0526-019 · Plasterers and Cement Masons agreement, June 1, 2021
PLASTERER (BLAIR, BEDFORD CAMBRIA…
Full text

PLASTERER (BLAIR, BEDFORD CAMBRIA, CENTRE, CLINTON, HUNTINGDON, INDIANA, SOMERSET, AND MIFFLIN COUNTIES)

$29.20$12.86$42.06no changeAgreement, 2021
PLAS0526-020 · Plasterers and Cement Masons agreement, June 1, 2019
PLASTERER (ERIE COUNTY)$24.91$16.36$41.27no changeAgreement, 2019
PLAS0592-023 · Plasterers and Cement Masons agreement, May 1, 2023
PLASTERER (FRANKLIN AND FULTON COUNTIES)$31.33$20.75$52.08no changeAgreement, 2023
PLUM0027-001 · Plumbers and Pipefitters agreement, June 1, 2023
PLUMBER AND PIPEFITTER…
Full text

PLUMBER AND PIPEFITTER: BRIDGE DRAIN PIPE (ALLEGHENY, ARMSTRONG, BEAVER, BUTLER, CLARION, GREENE (EXCEPT EXTREME EASTERN PORTION), LAWRENCE, WASHINGTON (EXCEPT EXTREME EASTERN PORTION) AND WESTMORELAND (CITY OF ARNOLD AND CITY OF NEW KENSINGTON ONLY) COUNTIES)

$48.65$25.47$74.12no changeAgreement, 2023
PLUM0027-009 · Plumbers and Pipefitters agreement, June 1, 2023
PLUMBER AND PIPEFITTER…
Full text

PLUMBER AND PIPEFITTER: BRIDGE DRAIN PIPE (CRAWFORD, ERIE, FOREST, MCKEAN, MERCER, VENANGO AND WARREN COUNTIES)

$46.98$25.47$72.45no changeAgreement, 2023
PLUM0354-005 · Plumbers and Pipefitters agreement, June 1, 2012
PLUMBER AND PIPEFITTER…
Full text

PLUMBER AND PIPEFITTER: BRIDGE DRAIN PIPE (BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE, GREENE (EXTREME EASTERN PORTION), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (EXTREME EASTERN PORTION), AND WESTMORELAND COUNTIES)

$35.54$19.97$55.51no changeAgreement, 2012
ROOF0030-002 · Roofers agreement, May 1, 2020
ROOFER: COMPOSITION (CENTRE, FRANKLIN, FULTON AND MIFFLIN COUNTIES)

FOOTNOTE: (COMPOSITION ROOFER ONLY): A. PAID HOLIDAY: PRESENTIAL ELECTION DAY

$39.50$31.80$71.30changedAgreement, 2020
ROOF0030-006 · Roofers agreement, May 1, 2024
ROOFER (CLINTON COUNTY)$34.25$21.89$56.14no changeAgreement, 2024
ROOF0037-003 · Roofers agreement, December 1, 2025
ROOFER (ALLEGHENY, ARMSTRONG…
Full text

ROOFER (ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA, CAMERON, CLARION, CLEARFIELD, ELK, FAYETTE, FOREST, GREENE, HUNTINGDON, INDIANA, JEFFERSON, SOMERSET, WASHINGTON, AND WESTMORELAND COUNTIES)

$41.21$21.46$62.67+$2.00 (+3.3%)Agreement, 2025
ROOF0071-002 · Roofers agreement, April 1, 2024
ROOFER (LAWRENCE AND MERCER COUNTIES)$29.81$18.76$48.57no changeAgreement, 2024
ROOF0210-003 · Roofers agreement, May 1, 2025
ROOFER (ERIE, CRAWFORD, MCKEAN, POTTER, VENANGO AND WARREN COUNTIES)$36.70$18.09$54.79no changeAgreement, 2025
SHEE0012-004 · Sheet Metal Workers agreement, July 1, 2026
SHEET METAL WORKER (REMAINING COUNTIES)$46.75$35.93$82.68+$12.39 (+17.6%)Agreement, 2026
SHEE0019-012 · Sheet Metal Workers agreement, June 1, 2025
SHEET METAL WORKER…
Full text

SHEET METAL WORKER (CENTRE, BLAIR, BEDFORD, FRANKLIN, FULTON, HUNTINGDON AND MIFFLIN COUNTIES)

FOOTNOTE: ; PAID HOLIDAY; ELECTION DAY

$45.02$44.09$89.11no changeAgreement, 2025
SHEE0033-001 · Sheet Metal Workers agreement, July 1, 2015
SHEET METAL WORKER (MERCER COUNTY)$29.51$22.14$51.65no changeAgreement, 2015
SHEE0044-004 · Sheet Metal Workers agreement, May 1, 2024
SHEET METAL WORKER (CLINTON AND POTTER COUNTIES)$36.13$30.32$66.45no changeAgreement, 2024
TEAM0040-006 · Teamsters agreement, January 1, 2026
TRUCK DRIVER: GROUP 1…
Full text

TRUCK DRIVER: GROUP 1 SINGLE AXLE (2 AXLES INCLUDING STEERING AXLE); INCLUDES PARTSMAN AND WAREHOUEMAN. TANDEM - TRI-AXLE - SEMI-TRACTOR TRAILER (COMBINATION) (3 AXLES OR MORE INCLUDING STEERING AXLE) (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARFIELD, CRAWFORD, ERIE, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND)

FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MATERIAL/WORK LEVEL A & B RECEIVE ADDITIONAL $2.50 PER HOUR ABOVE CLASSIFICATION RATE B. HAZARDOUS/TOXIC WASTE MATERIALS/WORK LEVEL C & D RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION

$37.93$23.71$61.64+$2.00 (+3.4%)Agreement, 2026
TRUCK DRIVER: GROUP 1…
Full text

TRUCK DRIVER: GROUP 1 SINGLE AXLE (2 AXLES INCLUDING STEERING AXLE); INCLUDES PARTSMAN AND WAREHOUEMAN. TANDEM - TRI-AXLE - SEMI-TRACTOR TRAILER (COMBINATION) (3 AXLES OR MORE INCLUDING STEERING AXLE) BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES

FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MATERIAL/WORK LEVEL A & B RECEIVE ADDITIONAL $2.50 PER HOUR ABOVE CLASSIFICATION RATE B. HAZARDOUS/TOXIC WASTE MATERIALS/WORK LEVEL C & D RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION

$37.79$23.63$61.42+$2.00 (+3.4%)Agreement, 2026
TRUCK DRIVER: GROUP 2…
Full text

TRUCK DRIVER: GROUP 2 SPECIALTY VEHICLES; HEAVY EQUIPMENT WHOSE CAPACITY EXCEEDS THAT FOR WHICH STATE LICENSES ARE ISSUED SPECIFICALLY REFERS TO UNITS IN EXCESS OF EIGHT (8) FEET WIDTH (SUCH AS EUCLIDS, ATLEY WAGON, PAYLODER, TOURNAWAGONS, AND SIMILAR EQUIPMENT WHEN NOT SELF LOADED); TAR AND ASPHALT DISTRIBUTORS TRUCKS, HEAVY DUTY TRAILER, SUCH AS LOW BOY, HIGH BOY (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CENTRE, CLARFIELD, CRAWFORD, ERIE, FAYETTE, GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND)

FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MATERIAL/WORK LEVEL A & B RECEIVE ADDITIONAL $2.50 PER HOUR ABOVE CLASSIFICATION RATE B. HAZARDOUS/TOXIC WASTE MATERIALS/WORK LEVEL C & D RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION

$38.39$24.02$62.41+$2.00 (+3.3%)Agreement, 2026
TRUCK DRIVER: GROUP 2…
Full text

TRUCK DRIVER: GROUP 2 SPECIALTY VEHICLES; HEAVY EQUIPMENT WHOSE CAPACITY EXCEEDS THAT FOR WHICH STATE LICENSES ARE ISSUED SPECIFICALLY REFERS TO UNITS IN EXCESS OF EIGHT (8) FEET WIDTH (SUCH AS EUCLIDS, ATLEY WAGON, PAYLODER, TOURNAWAGONS, AND SIMILAR EQUIPMENT WHEN NOT SELF LOADED); TAR AND ASPHALT DISTRIBUTORS TRUCKS, HEAVY DUTY TRAILER, SUCH AS LOW BOY, HIGH BOY BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES

FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MATERIAL/WORK LEVEL A & B RECEIVE ADDITIONAL $2.50 PER HOUR ABOVE CLASSIFICATION RATE B. HAZARDOUS/TOXIC WASTE MATERIALS/WORK LEVEL C & D RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION

$38.25$23.93$62.18+$2.00 (+3.3%)Agreement, 2026

Modification history

Modification 3January 30, 2026
Modification 4May 18, 2026
Modification 5August 20, 2026
Modification 6September 17, 2026
Modification 7September 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on PA20260020?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 7 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and PA20260020 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 117 classifications in 75 rate groups
  • 75 from agreements, 0 from surveys
  • Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington, Westmoreland