This sheet sets 112 classifications for heavy work in Adams, Berks, Bradford and 26 more counties, Pennsylvania. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $33.14 an hour (laborer: building) to $107.63 (electrician). Your contract may lock an earlier modification.

Scope

Sewage and Water Treatment Plant Projects

What changed this year

First published January 2, 2026, this sheet is now on modification 6, and its rates have changed in 5 modifications. Of the 78 rates we can follow line by line from the first publication to today, 13 are higher and 3 are lower.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

September 17, 2026 · modification 6

14 rates raised, 10 rates lowered; 13 classifications added, 13 classifications removed

  • Operating engineers: 7 raised and 7 lowered, by between $3.53 and $8.86 an hour
  • Teamsters: 2 raised and 2 lowered, by between $0.56 an hour
  • Laborers: 1 raised and 1 lowered, by between $0.77 an hour
  • Millwright: 2 rates raised by $4.06 to $5.21 an hour
  • Carpenter: 1 rate raised by $1.45 an hour
  • Piledriverman: 1 rate raised by $1.45 an hour
Every line that changed (24)
ClassificationWasNowChange
MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMEN…$50.22 + $35.03$52.22 + $38.24+$5.21 (+6.1%)
CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKA…$36.87 + $20.49$37.63 + $21.18+$1.45 (+2.5%)
PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, L…$36.87 + $20.49$37.63 + $21.18+$1.45 (+2.5%)
MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND…$43.00 + $23.44$45.20 + $25.30+$4.06 (+6.1%)
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$37.10 + $27.62$42.57 + $29.24+$7.09 (+11.0%)
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$37.97 + $27.89$44.82 + $29.90+$8.86 (+13.5%)
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$39.57 + $28.34$42.29 + $29.15+$3.53 (+5.2%)
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$42.29 + $29.15$39.57 + $28.34−$3.53 (−4.9%)
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$44.82 + $29.90$37.97 + $27.89−$8.86 (−11.9%)
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$42.57 + $29.24$37.10 + $27.62−$7.09 (−9.9%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$38.26 + $28.46$43.73 + $30.08+$7.09 (+10.6%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$39.13 + $28.73$45.98 + $30.74+$8.86 (+13.1%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$39.59 + $28.85$43.45 + $29.99+$5.00 (+7.3%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$40.73 + $29.18$45.70 + $30.66+$6.45 (+9.2%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$45.70 + $30.66$40.73 + $29.18−$6.45 (−8.4%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$43.45 + $29.99$39.59 + $28.85−$5.00 (−6.8%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$45.98 + $30.74$39.13 + $28.73−$8.86 (−11.5%)
(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA…$43.73 + $30.08$38.26 + $28.46−$7.09 (−9.6%)
(FREE AIR TUNNELS AND ROCK SHAFTS)$31.43 + $19.99$30.66 + $19.99−$0.77 (−1.5%)
(FREE AIR TUNNELS AND ROCK SHAFTS)$30.66 + $19.99$31.43 + $19.99+$0.77 (+1.5%)
(BRADFORD AND TIOGA COUNTIES)$26.52 + $15.91$25.96 + $15.91−$0.56 (−1.3%)
(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LE…$42.43 + $0.00$41.87 + $0.00−$0.56 (−1.3%)
(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LE…$41.87 + $0.00$42.43 + $0.00+$0.56 (+1.3%)
(BRADFORD AND TIOGA COUNTIES)$25.96 + $15.91$26.52 + $15.91+$0.56 (+1.3%)
Classifications added or removed
  • Added: IRONWORKER (ADAMS, BERKS… $37.26 + $32.63
  • Added: LABORER: BUILDING (BRADFORD… $20.22 + $12.93
  • Added: PAINTER: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) $28.02 + $18.33
  • Added: PAINTER: STRUCTURAL STEEL… $29.02 + $18.33
  • Added: PAINTER: BRUSH AND ROLLER… $29.02 + $21.14
  • Added: PAINTER: SPRAY (BRADFORD… $30.02 + $21.14
  • Added: PAINTER: STRUCTURAL STEEL… $30.02 + $21.14
  • Added: PAINTER: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) $30.56 + $23.72
  • Added: PAINTER: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) $36.01 + $23.72
  • Added: PAINTER: SPRAY (JUNIATA COUNTY) $30.56 + $23.72
  • Added: PAINTER: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) $33.72 + $16.30
  • Added: PAINTER: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) $27.97 + $16.30
  • Added: ROOFER: COMPOSITION (REMAINING COUNTIES) $39.50 + $31.80
  • Removed: IRONWORKERS (ADAMS…
  • Removed: LABORERS: BUILDER (BRADFORD…
  • Removed: PAINTERS: STRUCTURAL STEEL…
  • Removed: PAINTERS: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES)
  • Removed: PAINTERS: STRUCTURAL STEEL…
  • Removed: PAINTERS: SPRAY (BRADFORD…
  • Removed: PAINTERS: BRUSH AND ROLLER…
  • Removed: PAINTERS: SPRAY (JUNIATA COUNTY)
  • Removed: PAINTERS: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY)
  • Removed: PAINTERS: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY)
  • Removed: PAINTERS: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES)
  • Removed: PAINTERS: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES)
  • Removed: ROOFERS: COMPOSITION (REMAINING COUNTIES)

Earlier modifications

  • May 20, 2026 · modification 53 classifications added, 3 classifications removed
    Classifications added or removed
    • Added: ELECTRICIAN (BERKS… $40.00 + $27.42
    • Added: ELECTRICIAN (BERKS… $50.00 + $25.93
    • Added: ELECTRICIAN (NORTHUMBERLAND… $38.50 + $26.46
    • Removed: ELECTRICIAN (BERKS…
    • Removed: ELECTRICIAN (BERKS…
    • Removed: ELECTRICIAN (NORTHUMBERLAND AND UNION COUNTIES)
  • May 18, 2026 · modification 4Classification names reworded; 1 fringe formula changed among the 94 lines we could match
    • Roofers: 1 fringe formula changed

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

    Every line that changed (1)
    ClassificationWasNowChange
    ROOFERS:: COMPOSITION (REMAINING COUNTIES)$39.50 + 31.80+A$39.50 + $31.80changed
  • January 30, 2026 · modification 31 rate raised
    • Electrician: 1 rate raised by $6.75 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    ELECTRICIAN$45.15 + $24.03$50.00 + $25.93+$6.75 (+9.8%)
  • January 16, 2026 · modification 21 rate raised
    • Plumber and steamfitter: 1 rate raised by $3.20 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    Plumber and Steamfitter$49.39 + $26.17$51.69 + $27.07+$3.20 (+4.2%)
  • January 9, 2026 · modification 16 rates raised
    • Electrician: 2 rates raised by $3.38 to $10.06 an hour
    • Electrician bradford county: 1 rate raised by $3.38 an hour
    • Electrician lycoming county: 1 rate raised by $7.14 an hour
    • Electrician northumberland and union counties: 1 rate raised by $7.14 an hour
    • Electrician sullivan county: 1 rate raised by $5.24 an hour
    Every line that changed (6)
    ClassificationWasNowChange
    ELECTRICIAN$38.36 + $24.07$47.08 + $25.41+$10.06 (+16.1%)
    ELECTRICIAN$37.43 + $26.17$40.47 + $26.51+$3.38 (+5.3%)
    ELECTRICIAN Bradford County$37.43 + $26.17$40.47 + $26.51+$3.38 (+5.3%)
    ELECTRICIAN Sullivan County$34.87 + $24.85$38.50 + $26.46+$5.24 (+8.8%)
    ELECTRICIAN LYCOMING COUNTY$34.24 + $23.58$38.50 + $26.46+$7.14 (+12.3%)
    ELECTRICIAN NORTHUMBERLAND AND UNION COUNTIES$34.24 + $23.58$38.50 + $26.46+$7.14 (+12.3%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 6 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
BOIL0013-004 · Boilermakers agreement, January 1, 2025
BOILERMAKER$55.00$35.48$90.48no changeAgreement, 2025
BRPA0005-002 · Bricklayers agreement, April 29, 2018
BRICKLAYER (CARBON AND LEHIGH COUNTIES)$32.14$17.81$49.95no changeAgreement, 2018
BRPA0005-004 · Bricklayers agreement, May 1, 2020
MARBLE & TILE SETTER (MONROE AND NORTHAMPTON COUNTIES)$31.18$18.35$49.53no changeAgreement, 2020
BRPA0005-014 · Bricklayers agreement, May 1, 2022
MARBLE & TILE SETTER…
Full text

MARBLE & TILE SETTER (ADAMS, BRADFORD, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LYCOMING, MONTOUR, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

$32.85$17.56$50.41no changeAgreement, 2022
BRPA0005-015 · Bricklayers agreement, May 3, 2020
BRICKLAYER, STONEMASON…
Full text

BRICKLAYER, STONEMASON (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, LEBANON, PERRY, UNION, AND YORK COUNTIES)

$33.99$16.87$50.86no changeAgreement, 2020
BRPA0005-019 · Bricklayers agreement, May 1, 2022
BRICKLAYER, STONEMASON…
Full text

BRICKLAYER, STONEMASON (LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING COUNTIES)

$37.07$18.82$55.89no changeAgreement, 2022
BRPA0005-020 · Bricklayers agreement, May 1, 2022
MARBLE & TILE SETTER (LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)$35.13$16.52$51.65no changeAgreement, 2022
BRPA0005-026 · Bricklayers agreement, May 1, 2022
BRICKLAYER (BERKS COUNTY)$37.83$16.98$54.81no changeAgreement, 2022
BRPA0005-027 · Bricklayers agreement, May 1, 2022
MARBLE & TILE SETTER (BERKS COUNTY)$33.61$16.80$50.41no changeAgreement, 2022
BRPA0005-036 · Bricklayers agreement, May 1, 2022
BRICKLAYER, STONEMASON…
Full text

BRICKLAYER, STONEMASON (COLUMBIA, MONTOUR, NORTHUMBERLAND, JUNIATA, MIFFLIN, SCHUYLKILL, SNYDER AND SULLIVAN COUNTIES)

$32.66$21.58$54.24no changeAgreement, 2022
BRPA0005-053 · Bricklayers agreement, May 3, 2020
BRICKLAYER (BRADFORD, TIOGA, LYCOMING AND UNION COUNTIES)$34.17$17.20$51.37no changeAgreement, 2020
BRPA0005-054 · Bricklayers agreement, May 1, 2020
TERRAZZO FINISHER$32.26$18.48$50.74no changeAgreement, 2020
TERRAZZO WORKER/SETTER$32.91$20.11$53.02no changeAgreement, 2020
BRPA0005-073 · Bricklayers agreement, May 1, 2022
MARBLE & TILE SETTER (CARBON AND LEHIGH COUNTIES)$31.12$21.11$52.23no changeAgreement, 2022
BRPA0005-074 · Bricklayers agreement, May 1, 2022
BRICKLAYER (MONROE AND NORTHAMPTON COUNTIES)$37.07$18.82$55.89no changeAgreement, 2022
CARP0076-008 · Carpenters agreement, May 1, 2011
CARPENTER & SOFT FLOOR LAYER (MONTOUR, NORTHUMBERLAND, SNYDER AND UNION COUNTIES)$27.03$11.43$38.46no changeAgreement, 2011
CARP0076-009 · Carpenters agreement, May 1, 2011
CARPENTER & SOFT FLOOR LAYER…
Full text

CARPENTER & SOFT FLOOR LAYER (COLUMBIA, SCHUYLKILL, AND LOWER PART OF LUZERNE COUNTY; IN CARBON COUNTY BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TOWNSHIPS AND THAT PART OF PENN FOREST TOWNSHIP, NORTH OF ROUTE 903)

$27.03$11.43$38.46no changeAgreement, 2011
CARP0179-007 · Carpenters agreement, May 1, 2018
PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES)$43.45$34.47$77.92no changeAgreement, 2018
CARP0191-001 · Carpenters agreement, May 1, 2011
CARPENTER (YORK COUNTY)$27.03$11.43$38.46no changeAgreement, 2011
CARP0219-007 · Carpenters agreement, May 1, 2026
MILLWRIGHT (CARBON…
Full text

MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES)

$52.22$38.24$90.46+$5.21 (+6.1%)Agreement, 2026
CARP0261-004 · Carpenters agreement, May 23, 2011
CARPENTER & SOFT FLOOR LAYER…
Full text

CARPENTER & SOFT FLOOR LAYER (LACKAWANNA, MONROE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING (EAST OF SUSQUEHANNA RIVER) COUNTIES)

$25.60$12.85$38.45no changeAgreement, 2011
CARP0274-005 · Carpenters agreement, May 1, 2026
CARPENTER (ADAMS, BERKS…
Full text

CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK)

$37.63$21.18$58.81+$1.45 (+2.5%)Agreement, 2026
PILEDRIVERMAN (ADAMS…
Full text

PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK)

$37.63$21.18$58.81+$1.45 (+2.5%)Agreement, 2026
CARP0287-007 · Carpenters agreement, May 1, 2008
CARPENTER & SOFT FLOOR LAYER…
Full text

CARPENTER & SOFT FLOOR LAYER (ADAMS, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LANCASTER, AND YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG AIRPORT))

$24.77$8.69$33.46no changeAgreement, 2008
CARP0443-001 · Carpenters agreement, June 1, 2026
MILLWRIGHT (ADAMS, BRADFORD…
Full text

MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903), COLUMBIA, CUMBERLAND, DAUPHIN, JUANIATA, LACKAWANNA, LANCASTER, LEBANON, LUZERNE (LOWER PART OF), LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY,PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES)

$45.20$25.30$70.50+$4.06 (+6.1%)Agreement, 2026
CARP0492-003 · Carpenters agreement, June 1, 2015
CARPENTER & SOFT FLOOR LAYER (BERKS)$28.16$15.02$43.18no changeAgreement, 2015
CARP0492-004 · Carpenters agreement, May 1, 2015
MILLWRIGHT (BERKS COUNTY)$34.00$17.05$51.05no changeAgreement, 2015
CARP0514-003 · Carpenters agreement, June 1, 2017
CARPENTER & SOFT FLOOR LAYER…
Full text

CARPENTER & SOFT FLOOR LAYER (LUZERNE (EXCEPT BLACK CREEK, BUTLER, DENNISON, FOSTER, FREELAND, HANLE, HAZLETON, HOLLENBACK, NESPECK, THE LOWER PART OF SALEM, AND SUGARLOAF), SULLIVAN, RED ROCK AIR BASE), AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COUNTIES)

$28.88$15.65$44.53no changeAgreement, 2017
CARP0514-006 · Carpenters agreement, June 1, 2017
CARPENTER & SOFT FLOOR LAYER…
Full text

CARPENTER & SOFT FLOOR LAYER (BRADFORD, LYCOMING, SULLIVAN (EXCEPT RED ROCK AIR FORCE BASE), AND TIOGA COUNTIES)

$28.88$15.65$44.53no changeAgreement, 2017
CARP0600-003 · Carpenters agreement, May 1, 2015
CARPENTER (LEHIGH, MONROE (EXCEPT TOBYHANNA ARMY DEPOT), AND NORTHAMPTON COUNTIES)$32.14$24.09$56.23no changeAgreement, 2015
CARP1823-004 · Carpenters agreement, May 1, 2015
FLOOR LAYER: CARPET$31.47$24.69$56.16no changeAgreement, 2015
ELEC0081-006 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (BRADFORD…
Full text

ELECTRICIAN (BRADFORD (AREA EAST OF THE SUSQUEHANNA RIVER); LACKAWANNA; LUZERNE (AREA EAST OF A LINE FOLLOWING THE SUSQUEHANNA RIVER SOUTH TO THE CITY OF PITTSON, EAST AND SOUTH ON THE LIMITS OF PITTSON BUT EXCLUDING IT, TO U.S. HIGHWAY 11, EAST ON 11 TO DUPONT BUROUGH AND HIGHWAY 215, AND SOUTHEAST ON 215. ALSO THE PORTION OF LUZERNE COUNTY SOUTH AND EAST OF A LINE FOLLOWING THORNHURST ROAD, SOUTHWEST TO STATE HIGHWAY 115 AND SOUTHEAST ON 115 TO MONROE COUNTY LINE); MONROE (BARRETT, COOLBAU

$47.97$23.29$71.26—Agreement, 2025
ELEC0102-006 · Electrical Workers (IBEW) agreement, June 2, 2025
ELECTRICIAN (MONROE…
Full text

ELECTRICIAN (MONROE (REMAINDER OF COUNTY), NORTHAMPTON (REMAINDER) AND PIKE (DELAWARE, LEHMAN, AND PORTER) COUNTIES)

$65.43$42.20$107.63—Agreement, 2025
ELEC0143-006 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (BERKS…
Full text

ELECTRICIAN (BERKS (BETHEL, MARION, AND TULPEHOCKEN TOWNSHIPS); CUMBERLAND; DAUPHIN; JUNIATA; LANCASTER (THAT PORTION NORTHWEST OF A LINE EXTENDING FROM THE SUSQUHANNA RIVER TO THE INTERSECTION OF STATE HIGHWAYS 441 AND 241 ALONG 241 TO THE BOROUGH OF ELIZABETHTOWN, AROUND THE LIMITS OF ELIZABETHTOWN ON THE WEST AND NORTH SIDE, INCLUDING THE MASONIC HOMES IN ELIZABETHTOWN, CONTINIUING ALONG STATE HIGHWAY 241 TO LEBANON COUNTY AND THAT PORTION NORTH OF THE PENNSYLVANIA TURNPIKE, INCLUDING ALL BUILDINGS ON THE TURNPIKE FROM LEBANON COUNTY LINE TO WEST COCALICO TOWNSHIP); LEBANON; PERRY; SCHUYKILL (PINE GROVE AND TREMONT TOWNSHIPS); AND SNYDER (SOUTH OF U.S. HIGHWAY 522) YORK COUNTY (FRANKLIN, CARROL, MONOGHAM AND FAIRVIEW TWPS.)

$40.00$27.42$67.42—Agreement, 2025
ELEC0163-004 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (BRADFORD AND WYOMING…
Full text

ELECTRICIAN (BRADFORD AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COLUMBIA COUNTY (BERWICK BOROUGH ONLY IN BRIAR CREEK TOWNSHIP),LACKAWANNA COUNTY: (THAT PORTION OF LEHIGH, WEST OF HIGHWAY 215 (DUPONT THORNHURST ROAD) AND NORTH OF THE THORNHURST STODDARTSVILLE ROAD; LUZERNE COUNTY: FAIRMONT, ROSS, LAKE, DALLA, NESCOPECK, DENISON, HOLLENBACH, BLACK CREEK, SUGARLOAF, HAZEL, BUTLER, FOSTER, FRANKLIN, EXETER, KINGSTON, JACKSON, LEHMAN, PLYMOUTH, HUNLOCK, UNION, HUNTINGTON, SALEM, CONYNGHAM, NEWPORT, SLOCUM, DORRANCE, HANOVER, RICE, WRIGHT, FAIRVIEW, WHITE HAVEN, WILKES BARRE AND PLAINS TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF PITTSTON, JENKINS AND BEAR CREEK TOWNSHIPS, SOUTH AND WEST OF A LINE FOLLOWING U.S. HIGHWAY 11 FROM THE CITY OF PITTSTON TO STATE HIGHWAY 315 TO THE DUPONT THORNHURST ROAD, AND SOUTH ON THAT ROAD TO LACKAWANNA COUNTY; ALL OF BUCK TOWNSHIP, EXCEPT THAT PORTION SOUTH AND EAST OF A LINE FOLLOWING THE THORNHURST STODDARTSVILLE ROAD FROM LACKAWANNA COUNTY TO STATE HIGHWAY 115 AND CONTINUING ON 115 TO MONROE COUNTY. ALSO INCLUDED ARE THE CITIES OF WILKES BARRE, NATICOKE, HAZLETON AND PITTSTON, BUT THE BOROUGH OF DURYEA AND AVOCA ARE EXCLUDED; MONROE COUNTY: THAT PORTION OF TOBYHANNA AND TUNKANNOCK TOWNSHIPS WEST OF STATE HIGHWAY 115; SULLIVAN COUNTY: THAT PORTION EAST OF A LINE DRAWN SOUTH ON U.S. HIGHWYA 220 FROM THE BRADFORD SULLIVAN COUNTY LINE TO THE NORDMONT EMMENS ROAD, AND SOUTH OF THIS ROAD TO THE COLUMBIA COUNTY LINE. DUNSHORE BOROUGH IS INCLUDED, BUT LAPORTE BOROUGH IS EXCLUDED

$47.08$25.41$72.49+$10.06 (+16.1%)Agreement, 2025
ELEC0229-001 · Electrical Workers (IBEW) agreement, July 21, 2025
ELECTRICIAN (ADAMS AND YORK…
Full text

ELECTRICIAN (ADAMS AND YORK (EXCEPT CARROLL, FAIRVIEW, FRANKLIN, AND MONAGHAN TOWNSHIPS) COUNTIES)

$40.31$23.93$64.24no changeAgreement, 2025
ELEC0375-007 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (BERKS…
Full text

ELECTRICIAN (BERKS (HEREFORD, LONGSWAMP, AND WASHINGTON TOWNSHIPS; AND THE PORTION OF MAXATOWNEY TOWNSHIP EAST OF SACONY CREEK);(NORTHAMPTON (ALLEN, HANOVER, LEHIGH TOWNSHIPS BOROUGHS OF BATH, FREEMANSBURG, HELLERTOWN AND THE CITY OF BETHLEHEM, THE PORTION OF MOORE TOWNSHIP OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. CITY OF BETHLEHEM; THE PORTION OF MOORE TOWNSHIP SOUTH OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. EAST ALLEN TOWNSHIP EXCEPT THE PART NORTH OF BATH BOROUGH AND EAST OF STATE HIGHWAY 987 AND LOWER SAUCON TOWNSHIP WEST OF A LINE FOLLOWING THE HECKTOWN-BUTZTOWN ROAD. SOUTH FROM LOWER NAZARETH TOWNSHIP THROUGH BUTRZTOWN AND CONTINUING TO MIDDLETON, ALONG ALTERNATE U.S. HIGHWAY 22 TO THE EASTERN BOUNDARY OF THE BOROUGH OF FREEMANSBURG, ALONG THIS BOUNDARY IN A SOUTHERLY DIRECTION TO THE BETHLEHEM CITY LINE BETWEEN BETHLEHEM AND LOWER AUCON TOWNSHIP TO THE NORTHERN BOUNDARY OF HELLERTON AND LOWER SAUCON TOWNSHIP TO STATE HIGHWAY 412 TO BUCKS COUNTY), LEHIGH & CARBON COUNTIES

$50.00$25.93$75.93—Agreement, 2025
ELEC0607-005 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (COLUMBIA…
Full text

ELECTRICIAN (COLUMBIA (EXCEPT BERWICK BOROUGH); MONTOUR; NORTHUMBERLAND (REMAINDER); SCHUYLKILL (REMAINDER); SNYDER (NORTH OF HWY 522); AND UNION (EAST BUFFALO, LEWISBURG, AND UNION TWPS.) COUNTIES)

$41.00$31.06$72.06no changeAgreement, 2025
ELEC0743-006 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (BERKS COUNTY (REMAINDER))$46.02$27.98$74.00no changeAgreement, 2025
ELEC0743-009 · Electrical Workers (IBEW) agreement, September 1, 2025
ELECTRICIAN (REMAINDER OF LANCASTER COUNTY)$46.02$27.98$74.00no changeAgreement, 2025
ELEC0812-002 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (TIOGA COUNTY)$40.47$26.51$66.98+$3.38 (+5.3%)Agreement, 2025
ELEC0812-006 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (BRADFORD COUNTY…
Full text

ELECTRICIAN (BRADFORD COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED ""55"" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-COLUMBIA COUNTY LINE, LAPORTE BOROUGH IN THIS JURISDICTION) COUNTIES

$40.47$26.51$66.98+$3.38 (+5.3%)Agreement, 2025
ELECTRICIAN (SULLIVAN COUNTY…
Full text

ELECTRICIAN (SULLIVAN COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED ""55"" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-COLUMBIA COUNTY LINE, LAPORTE BOROUGH IN THIS JURISDICTION) COUNTIES

$38.50$26.46$64.96+$5.24 (+8.8%)Agreement, 2025
ELEC0812-007 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (LYCOMING COUNTY)$38.50$26.46$64.96+$7.14 (+12.3%)Agreement, 2025
ELECTRICIAN (NORTHUMBERLAND…
Full text

ELECTRICIAN (NORTHUMBERLAND (DELAWARE, LEWIS, AND TURBOT TOWNSHIPS, AND THE BOROUGH OF MILTON) AND UNION (EXCEPT EAST BUFFALO AND UNION TOWNSHIPS AND LEWISBURG BOROUGH) COUNTIES)

$38.50$26.46$64.96—Agreement, 2025
ENGI0542-013 · Operating Engineers agreement, May 1, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$42.57$29.24$71.81—Agreement, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$44.82$29.90$74.72—Agreement, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$42.29$29.15$71.44—Agreement, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$44.54$29.82$74.36—Agreement, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$39.57$28.34$67.91—Agreement, 2023
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4…
Full text

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, TIREMAN (FOR POWER EQUIPMENT), GROUT PUMP 4"" AND UP, POWER BROOM, POWER SWEEPER, SEEDING SPREADER (SELF-PROPELLED) MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$38.42$28.02$66.44—Agreement, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$37.97$27.89$65.86—Agreement, 2023
(LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$37.10$27.62$64.72—Agreement, 2023
Group definitions, zones and premiums for ENGI0542-013
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, LULLTYPE FORKLIFT WITH BOOM ATTACHMENT, CONCRETE BOOM. TRUCK, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLEWAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WIINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 ALL TYPES OF CRANES (EXCEPT CRANES DOING HOOK WORK) BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, DIRECTIONALL DRILL MACHINES 8"" AND UP, SKID STEER, HYDRAULIC PIPE PUSHER 8"" AND UP, HYDRO AX, ENVIRONMENTAL RECYCLING MACHINE AND GRINDER TYPE MACHINES, LULL TYPE LIFTS MASONRY TENDERS, SHEAR ATTACHED TO MACHINES, GREASE TRUCK, CONCREATE PLACER MACHINE, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS 97 FEET OR BOOM LENGTH OR LESS (150 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, DIRECTIONAL DRILL MACHINE 7"" OR LESS, HYDRAULIC PIPE PUSHER 7"" OR LESS, SKID-STEER FORKLIFT, MACHINES WITH CONCRETE MIXER ATTACHMENT, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, MISCELLANEOUS EQUIPMENT OPERATOR.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 FIREMAN
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS)
ENGI0542-014 · Operating Engineers agreement, May 1, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$43.73$30.08$73.81—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$45.98$30.74$76.72—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$43.45$29.99$73.44—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$45.70$30.66$76.36—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$40.73$29.18$69.91—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$39.59$28.85$68.44—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$39.13$28.73$67.86—Agreement, 2024
(ADAMS, BERKS, BRADFORD…
Full text

(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES)

FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS

$38.26$28.46$66.72—Agreement, 2024
Group definitions, zones and premiums for ENGI0542-014
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, MACHINES SIMILAR TO THE ABOVE, ALL TYPES OF CRANES, CABLEWAYS, AND DRAGLINES.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLEWAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 BACKHOES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, MACHINES SIMILAR TO THE ABOVE.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 AND OVER FACTORY RATING; CONCRETE PUMPS 92 FEET OF BOOM LENGTH OR LESS (150 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, MACHINES SIMILAR TO THE ABOVE.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, TIREMAN (FOR POWER EQUIPMENT), MACHINES SIMILAR TO THE ABOVE.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 FIREMAN.
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS)
IRON0404-006 · Ironworkers agreement, July 1, 2024
IRONWORKER (ADAMS, BERKS…
Full text

IRONWORKER (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES)

$37.26$32.63$69.89—Agreement, 2024
IRON0404-017 · Ironworkers agreement, July 1, 2024
IRONWORKER (BRADFORD…
Full text

IRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES)

$37.26$32.63$69.89no changeAgreement, 2024
LABO0130-004 · Laborers agreement, May 1, 2024
LABORER: BUILDING (LACKAWANNA…
Full text

LABORER: BUILDING (LACKAWANNA, PIKE, SUSQUEHANNA, WAYNE AND WYOMING (NORTHERN PART) COUNTIES)

$24.35$21.43$45.78no changeAgreement, 2024
LABO0130-013 · Laborers agreement, May 1, 2024
LABORER: BUILDING (LUZERNE (NORTHERN PART), SULLIVAN AND WYOMING (SOUTHERN PART) COUNTIES)$24.35$21.43$45.78no changeAgreement, 2024
LABO0130-014 · Laborers agreement, May 1, 2024
LABORER: BUILDING (LUZERNE (SOUTHERN PART), COLUMBIA COUNTIES)$24.35$21.43$45.78no changeAgreement, 2024
LABO0158-002 · Laborers agreement, May 1, 2025
LABORER: HEAVY CONSTRUCTION: GROUP 1 FLAG PERSON$26.61$19.99$46.60no changeAgreement, 2025
LABORER: HEAVY CONSTRUCTION: GROUP 2…
Full text

LABORER: HEAVY CONSTRUCTION: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER

$33.23$19.99$53.22no changeAgreement, 2025
LABORER: HEAVY CONSTRUCTION: GROUP 3…
Full text

LABORER: HEAVY CONSTRUCTION: GROUP 3 CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, ASPHALT TAMPER, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER

$30.22$19.99$50.21no changeAgreement, 2025
LABORER: HEAVY CONSTRUCTION: GROUP 4…
Full text

LABORER: HEAVY CONSTRUCTION: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, WALK BEHIND ROLLERS AND CONCRETE RUBBERS, BLASTER

$30.57$19.99$50.56no changeAgreement, 2025
LABORER: HEAVY CONSTRUCTION: GROUP 5…
Full text

LABORER: HEAVY CONSTRUCTION: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER.

$31.24$19.99$51.23no changeAgreement, 2025
(FREE AIR TUNNELS AND ROCK SHAFTS)$30.66$19.99$50.65−$0.77 (−1.5%)Agreement, 2025
(FREE AIR TUNNELS AND ROCK SHAFTS)$30.95$19.99$50.94no changeAgreement, 2025
(FREE AIR TUNNELS AND ROCK SHAFTS)$31.43$19.99$51.42+$0.77 (+1.5%)Agreement, 2025
Group definitions, zones and premiums for LABO0158-002
LABORER: HEAVY CONSTRUCTION: GROUP 6 OUTSIDE LABERS IN CONJUCTION WITH TUNNELS AND ROCK SHAFTS
LABORER: HEAVY CONSTRUCTION: GROUP 7 CHUCK TENDERS, MUCKERS, NIPPERS, MINERS, INSIDE LABORERS
LABORER: HEAVY CONSTRUCTION: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS
LABO1174-004 · Laborers agreement, May 1, 2017
LABORER: BUILDING (CARBON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES)$25.39$22.29$47.68no changeAgreement, 2017
LABO1174-016 · Laborers agreement, May 1, 2017
LABORER: BUILDING (BERKS, LEBANON AND SCHUYLKILL COUNTIES)$21.57$15.04$36.61no changeAgreement, 2017
LABO1180-004 · Laborers agreement, May 1, 2016
LABORER: BUILDING (CUMBERLAND…
Full text

LABORER: BUILDING (CUMBERLAND, DAUPHIN, JUNIATA, NORTHUMBERLAND (SOUTH OF THE SUSQUEHANNA RIVER), PERRY, AND SNYDER COUNTIES)

$20.21$12.93$33.14no changeAgreement, 2016
LABO1180-012 · Laborers agreement, May 1, 2016
LABORER: BUILDING (BRADFORD…
Full text

LABORER: BUILDING (BRADFORD, LYCOMING, MONTOUR, NORTHUMBERLAND (NORTHERN PART), TIOGA, AND UNION COUNTIES)

$20.22$12.93$33.15—Agreement, 2016
LABO1180-019 · Laborers agreement, May 1, 2022
LABORER: BUILDING (ADAMS, LANCASTER AND YORK COUNTIES)$23.01$17.18$40.19no changeAgreement, 2022
PAIN0021-005 · Painters and Allied Trades agreement, May 1, 2018
PAINTER: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES)$28.02$18.33$46.35—Agreement, 2018
PAINTER: STRUCTURAL STEEL…
Full text

PAINTER: STRUCTURAL STEEL (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES)

$29.02$18.33$47.35—Agreement, 2018
PAIN0021-023 · Painters and Allied Trades agreement, May 1, 2021
PAINTER: BRUSH AND ROLLER…
Full text

PAINTER: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)

$29.02$21.14$50.16—Agreement, 2021
PAINTER: SPRAY (BRADFORD…
Full text

PAINTER: SPRAY (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)

$30.02$21.14$51.16—Agreement, 2021
PAINTER: STRUCTURAL STEEL…
Full text

PAINTER: STRUCTURAL STEEL (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)

$30.02$21.14$51.16—Agreement, 2021
PAIN0057-020 · Painters and Allied Trades agreement, June 1, 2023
PAINTER: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY)$30.56$23.72$54.28—Agreement, 2023
PAINTER: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY)$36.01$23.72$59.73—Agreement, 2023
PAINTER: SPRAY (JUNIATA COUNTY)$30.56$23.72$54.28—Agreement, 2023
PAIN0411-003 · Painters and Allied Trades agreement, May 1, 2021
PAINTER: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES)$33.72$16.30$50.02—Agreement, 2021
PAINTER: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES)$27.97$16.30$44.27—Agreement, 2021
PLAS0592-003 · Plasterers and Cement Masons agreement, June 1, 2023
CEMENT MASON/CONCRETE FINISHER (PIKE AND MONROE (EXCEPT TOBYHANNA) COUNTIES)$37.13$14.30$51.43no changeAgreement, 2023
PLASTERER (PIKE AND MONROE (EXCEPT TOBYHANNA) COUNTIES)$37.81$13.70$51.51no changeAgreement, 2023
PLAS0592-006 · Plasterers and Cement Masons agreement, June 1, 2023
CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY)$37.13$14.30$51.43no changeAgreement, 2023
PLASTERER (COLUMBIA COUNTY)$37.81$13.70$51.51no changeAgreement, 2023
PLAS0592-018 · Plasterers and Cement Masons agreement, May 1, 2023
CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES)$34.05$21.25$55.30no changeAgreement, 2023
PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES)$31.33$20.75$52.08no changeAgreement, 2023
PLAS0592-026 · Plasterers and Cement Masons agreement, May 1, 2023
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE))

$35.18$24.25$59.43no changeAgreement, 2023
CEMENT MASON/CONCRETE FINISHER (REMAINDER OF BERKS COUNTY)$34.15$20.50$54.65no changeAgreement, 2023
PLASTERER (BERKS COUNTY)$31.33$20.75$52.08no changeAgreement, 2023
PLUM0420-004 · Plumbers and Pipefitters agreement, May 1, 2024
STEAMFITTER (BERKS, LEHIGH, AND NORTHAMPTON COUNTIES)$59.65$42.78$102.43no changeAgreement, 2024
PLUM0520-008 · Plumbers and Pipefitters agreement, May 1, 2023
PLUMBER AND STEAMFITTER…
Full text

PLUMBER AND STEAMFITTER (COLUMBIA (REMAINDER OF COUNTY), CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON (WEST OF ROUTE 501), MONTOUR, NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY (WESTERN HALF), SULLIVAN, TIOGA AND UNION COUNTIES)

$41.36$29.45$70.81no changeAgreement, 2023
PLUM0524-006 · Plumbers and Pipefitters agreement, December 1, 2025
PLUMBER AND STEAMFITTER…
Full text

PLUMBER AND STEAMFITTER (CARBON, COLUMBIA (BERWICK TOWNSHIP), BRADFORD (EASTERN PART), LUZERNE, LACKAWANNA, MONROE, SCHUYLKILL, SUSQUEHANNA, WAYNE, WYOMING, AND PIKE COUNTIES)

$51.69$27.07$78.76+$3.20 (+4.2%)Agreement, 2025
PLUM0690-007 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER (BERKS, LEHIGH, LEBANON (EAST OF ROUTE 501), AND NORTHAMPTON COUNTIES)$56.28$35.51$91.79no changeAgreement, 2025
ROOF0030-008 · Roofers agreement, May 1, 2020
ROOFER: COMPOSITION (REMAINING COUNTIES)

FOOTNOTE: (COMPOSITION ROOFER ONLY); A. PAID HOLIDAY: ELECTION DAY

$39.50$31.80$71.30—Agreement, 2020
ROOF0030-010 · Roofers agreement, May 1, 2024
ROOFER (BRADFORD, LACKAWANNA…
Full text

ROOFER (BRADFORD, LACKAWANNA, LUZERNE (NORTH OF INTERSTATE 80 WITH THE EXCEPTION OF WHITE HAVEN TWP.) MONROE (TOBYHANNA ARMY DEPOT ONLY), PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES)

$34.25$21.89$56.14no changeAgreement, 2024
SHEE0019-009 · Sheet Metal Workers agreement, June 1, 2025
SHEET METAL WORKER…
Full text

SHEET METAL WORKER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES).

FOOTNOTES: PAID HOLIDAY: ELECTION DAY

$45.02$44.09$89.11no changeAgreement, 2025
SHEE0044-003 · Sheet Metal Workers agreement, May 1, 2024
SHEET METAL WORKER…
Full text

SHEET METAL WORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMNING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES)

$36.13$30.32$66.45no changeAgreement, 2024
TEAM0229-004 · Teamsters agreement, May 1, 2025
(BRADFORD AND TIOGA COUNTIES)$25.96$15.91$41.87−$0.56 (−1.3%)Agreement, 2025
(ADAMS, BERKS, CARBON…
Full text

(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES)

$41.87$0.00$41.87−$0.56 (−1.3%)Agreement, 2025
(ADAMS, BERKS, CARBON…
Full text

(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES)

$41.94$0.00$41.94no changeAgreement, 2025
(BRADFORD AND TIOGA COUNTIES)$26.03$15.91$41.94no changeAgreement, 2025
(ADAMS, BERKS, CARBON…
Full text

(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES)

$42.43$0.00$42.43+$0.56 (+1.3%)Agreement, 2025
(BRADFORD AND TIOGA COUNTIES)$26.52$15.91$42.43+$0.56 (+1.3%)Agreement, 2025
Group definitions, zones and premiums for TEAM0229-004
TRUCK DRIVER: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE, DUMPSTER)
TRUCK DRIVER: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE, DUMPSTER)
TRUCK DRIVER: GROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, READY-MIX AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS (WHEN USED FOR TRANSPORTATION), STAKE BODY TRUCK (TANDEM)
TRUCK DRIVER: GROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, READY-MIX AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS (WHEN USED FOR TRANSPORTATION), STAKE BODY TRUCK (TANDEM)
TRUCK DRIVER: GROUP 3 EUCLID TYPE OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOW-BED TRAILERS
TRUCK DRIVER: GROUP 3 EUCLID TYPE OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOW-BED TRAILERS

Modification history

Modification 3January 30, 2026
Modification 4May 18, 2026
Modification 5May 20, 2026
Modification 6September 17, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on PA20260018?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 6 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and PA20260018 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 112 classifications in 71 rate groups
  • 71 from agreements, 0 from surveys
  • Counties: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster, Lebanon, Lehigh, Luzerne, Lycoming, Monroe, Montour, Northampton, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming, York