Prevailing wage rates · Pennsylvania · Wage determination
Prevailing wage rates: Adams, Berks, Bradford and 26 more counties, Pennsylvania
Heavy construction · PA20260018 modification 6, published September 17, 2026
The short answer
This sheet sets 112 classifications for heavy work in Adams, Berks, Bradford and 26 more counties, Pennsylvania. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $33.14 an hour (laborer: building) to $107.63 (electrician). Your contract may lock an earlier modification.
Scope
Sewage and Water Treatment Plant Projects
What changed this year
First published January 2, 2026, this sheet is now on modification 6, and its rates have changed in 5 modifications. Of the 78 rates we can follow line by line from the first publication to today, 13 are higher and 3 are lower.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
September 17, 2026 · modification 6
14 rates raised, 10 rates lowered; 13 classifications added, 13 classifications removed
- Operating engineers: 7 raised and 7 lowered, by between $3.53 and $8.86 an hour
- Teamsters: 2 raised and 2 lowered, by between $0.56 an hour
- Laborers: 1 raised and 1 lowered, by between $0.77 an hour
- Millwright: 2 rates raised by $4.06 to $5.21 an hour
- Carpenter: 1 rate raised by $1.45 an hour
- Piledriverman: 1 rate raised by $1.45 an hour
Every line that changed (24)
| Classification | Was | Now | Change |
|---|---|---|---|
| MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMEN… | $50.22 + $35.03 | $52.22 + $38.24 | +$5.21 (+6.1%) |
| CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKA… | $36.87 + $20.49 | $37.63 + $21.18 | +$1.45 (+2.5%) |
| PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, L… | $36.87 + $20.49 | $37.63 + $21.18 | +$1.45 (+2.5%) |
| MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND… | $43.00 + $23.44 | $45.20 + $25.30 | +$4.06 (+6.1%) |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.10 + $27.62 | $42.57 + $29.24 | +$7.09 (+11.0%) |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.97 + $27.89 | $44.82 + $29.90 | +$8.86 (+13.5%) |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $39.57 + $28.34 | $42.29 + $29.15 | +$3.53 (+5.2%) |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $42.29 + $29.15 | $39.57 + $28.34 | −$3.53 (−4.9%) |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $44.82 + $29.90 | $37.97 + $27.89 | −$8.86 (−11.9%) |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $42.57 + $29.24 | $37.10 + $27.62 | −$7.09 (−9.9%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $38.26 + $28.46 | $43.73 + $30.08 | +$7.09 (+10.6%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $39.13 + $28.73 | $45.98 + $30.74 | +$8.86 (+13.1%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $39.59 + $28.85 | $43.45 + $29.99 | +$5.00 (+7.3%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $40.73 + $29.18 | $45.70 + $30.66 | +$6.45 (+9.2%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $45.70 + $30.66 | $40.73 + $29.18 | −$6.45 (−8.4%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $43.45 + $29.99 | $39.59 + $28.85 | −$5.00 (−6.8%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $45.98 + $30.74 | $39.13 + $28.73 | −$8.86 (−11.5%) |
| (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBA… | $43.73 + $30.08 | $38.26 + $28.46 | −$7.09 (−9.6%) |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $31.43 + $19.99 | $30.66 + $19.99 | −$0.77 (−1.5%) |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.66 + $19.99 | $31.43 + $19.99 | +$0.77 (+1.5%) |
| (BRADFORD AND TIOGA COUNTIES) | $26.52 + $15.91 | $25.96 + $15.91 | −$0.56 (−1.3%) |
| (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LE… | $42.43 + $0.00 | $41.87 + $0.00 | −$0.56 (−1.3%) |
| (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LE… | $41.87 + $0.00 | $42.43 + $0.00 | +$0.56 (+1.3%) |
| (BRADFORD AND TIOGA COUNTIES) | $25.96 + $15.91 | $26.52 + $15.91 | +$0.56 (+1.3%) |
Classifications added or removed
- Added: IRONWORKER (ADAMS, BERKS… $37.26 + $32.63
- Added: LABORER: BUILDING (BRADFORD… $20.22 + $12.93
- Added: PAINTER: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) $28.02 + $18.33
- Added: PAINTER: STRUCTURAL STEEL… $29.02 + $18.33
- Added: PAINTER: BRUSH AND ROLLER… $29.02 + $21.14
- Added: PAINTER: SPRAY (BRADFORD… $30.02 + $21.14
- Added: PAINTER: STRUCTURAL STEEL… $30.02 + $21.14
- Added: PAINTER: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) $30.56 + $23.72
- Added: PAINTER: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) $36.01 + $23.72
- Added: PAINTER: SPRAY (JUNIATA COUNTY) $30.56 + $23.72
- Added: PAINTER: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) $33.72 + $16.30
- Added: PAINTER: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) $27.97 + $16.30
- Added: ROOFER: COMPOSITION (REMAINING COUNTIES) $39.50 + $31.80
- Removed: IRONWORKERS (ADAMS…
- Removed: LABORERS: BUILDER (BRADFORD…
- Removed: PAINTERS: STRUCTURAL STEEL…
- Removed: PAINTERS: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES)
- Removed: PAINTERS: STRUCTURAL STEEL…
- Removed: PAINTERS: SPRAY (BRADFORD…
- Removed: PAINTERS: BRUSH AND ROLLER…
- Removed: PAINTERS: SPRAY (JUNIATA COUNTY)
- Removed: PAINTERS: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY)
- Removed: PAINTERS: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY)
- Removed: PAINTERS: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES)
- Removed: PAINTERS: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES)
- Removed: ROOFERS: COMPOSITION (REMAINING COUNTIES)
Earlier modifications
May 20, 2026 · modification 53 classifications added, 3 classifications removed
Classifications added or removed
- Added: ELECTRICIAN (BERKS… $40.00 + $27.42
- Added: ELECTRICIAN (BERKS… $50.00 + $25.93
- Added: ELECTRICIAN (NORTHUMBERLAND… $38.50 + $26.46
- Removed: ELECTRICIAN (BERKS…
- Removed: ELECTRICIAN (BERKS…
- Removed: ELECTRICIAN (NORTHUMBERLAND AND UNION COUNTIES)
May 18, 2026 · modification 4Classification names reworded; 1 fringe formula changed among the 94 lines we could match
- Roofers: 1 fringe formula changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (1)
Classification Was Now Change ROOFERS:: COMPOSITION (REMAINING COUNTIES) $39.50 + 31.80+A $39.50 + $31.80 changed January 30, 2026 · modification 31 rate raised
- Electrician: 1 rate raised by $6.75 an hour
Every line that changed (1)
Classification Was Now Change ELECTRICIAN $45.15 + $24.03 $50.00 + $25.93 +$6.75 (+9.8%) January 16, 2026 · modification 21 rate raised
- Plumber and steamfitter: 1 rate raised by $3.20 an hour
Every line that changed (1)
Classification Was Now Change Plumber and Steamfitter $49.39 + $26.17 $51.69 + $27.07 +$3.20 (+4.2%) January 9, 2026 · modification 16 rates raised
- Electrician: 2 rates raised by $3.38 to $10.06 an hour
- Electrician bradford county: 1 rate raised by $3.38 an hour
- Electrician lycoming county: 1 rate raised by $7.14 an hour
- Electrician northumberland and union counties: 1 rate raised by $7.14 an hour
- Electrician sullivan county: 1 rate raised by $5.24 an hour
Every line that changed (6)
Classification Was Now Change ELECTRICIAN $38.36 + $24.07 $47.08 + $25.41 +$10.06 (+16.1%) ELECTRICIAN $37.43 + $26.17 $40.47 + $26.51 +$3.38 (+5.3%) ELECTRICIAN Bradford County $37.43 + $26.17 $40.47 + $26.51 +$3.38 (+5.3%) ELECTRICIAN Sullivan County $34.87 + $24.85 $38.50 + $26.46 +$5.24 (+8.8%) ELECTRICIAN LYCOMING COUNTY $34.24 + $23.58 $38.50 + $26.46 +$7.14 (+12.3%) ELECTRICIAN NORTHUMBERLAND AND UNION COUNTIES $34.24 + $23.58 $38.50 + $26.46 +$7.14 (+12.3%)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 6 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| BOIL0013-004 · Boilermakers agreement, January 1, 2025 | |||||
| BOILERMAKER | $55.00 | $35.48 | $90.48 | no change | Agreement, 2025 |
| BRPA0005-002 · Bricklayers agreement, April 29, 2018 | |||||
| BRICKLAYER (CARBON AND LEHIGH COUNTIES) | $32.14 | $17.81 | $49.95 | no change | Agreement, 2018 |
| BRPA0005-004 · Bricklayers agreement, May 1, 2020 | |||||
| MARBLE & TILE SETTER (MONROE AND NORTHAMPTON COUNTIES) | $31.18 | $18.35 | $49.53 | no change | Agreement, 2020 |
| BRPA0005-014 · Bricklayers agreement, May 1, 2022 | |||||
MARBLE & TILE SETTER…Full textMARBLE & TILE SETTER (ADAMS, BRADFORD, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LYCOMING, MONTOUR, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) | $32.85 | $17.56 | $50.41 | no change | Agreement, 2022 |
| BRPA0005-015 · Bricklayers agreement, May 3, 2020 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, LEBANON, PERRY, UNION, AND YORK COUNTIES) | $33.99 | $16.87 | $50.86 | no change | Agreement, 2020 |
| BRPA0005-019 · Bricklayers agreement, May 1, 2022 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING COUNTIES) | $37.07 | $18.82 | $55.89 | no change | Agreement, 2022 |
| BRPA0005-020 · Bricklayers agreement, May 1, 2022 | |||||
| MARBLE & TILE SETTER (LACKAWANNA, LUZERNE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $35.13 | $16.52 | $51.65 | no change | Agreement, 2022 |
| BRPA0005-026 · Bricklayers agreement, May 1, 2022 | |||||
| BRICKLAYER (BERKS COUNTY) | $37.83 | $16.98 | $54.81 | no change | Agreement, 2022 |
| BRPA0005-027 · Bricklayers agreement, May 1, 2022 | |||||
| MARBLE & TILE SETTER (BERKS COUNTY) | $33.61 | $16.80 | $50.41 | no change | Agreement, 2022 |
| BRPA0005-036 · Bricklayers agreement, May 1, 2022 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (COLUMBIA, MONTOUR, NORTHUMBERLAND, JUNIATA, MIFFLIN, SCHUYLKILL, SNYDER AND SULLIVAN COUNTIES) | $32.66 | $21.58 | $54.24 | no change | Agreement, 2022 |
| BRPA0005-053 · Bricklayers agreement, May 3, 2020 | |||||
| BRICKLAYER (BRADFORD, TIOGA, LYCOMING AND UNION COUNTIES) | $34.17 | $17.20 | $51.37 | no change | Agreement, 2020 |
| BRPA0005-054 · Bricklayers agreement, May 1, 2020 | |||||
| TERRAZZO FINISHER | $32.26 | $18.48 | $50.74 | no change | Agreement, 2020 |
| TERRAZZO WORKER/SETTER | $32.91 | $20.11 | $53.02 | no change | Agreement, 2020 |
| BRPA0005-073 · Bricklayers agreement, May 1, 2022 | |||||
| MARBLE & TILE SETTER (CARBON AND LEHIGH COUNTIES) | $31.12 | $21.11 | $52.23 | no change | Agreement, 2022 |
| BRPA0005-074 · Bricklayers agreement, May 1, 2022 | |||||
| BRICKLAYER (MONROE AND NORTHAMPTON COUNTIES) | $37.07 | $18.82 | $55.89 | no change | Agreement, 2022 |
| CARP0076-008 · Carpenters agreement, May 1, 2011 | |||||
| CARPENTER & SOFT FLOOR LAYER (MONTOUR, NORTHUMBERLAND, SNYDER AND UNION COUNTIES) | $27.03 | $11.43 | $38.46 | no change | Agreement, 2011 |
| CARP0076-009 · Carpenters agreement, May 1, 2011 | |||||
CARPENTER & SOFT FLOOR LAYER…Full textCARPENTER & SOFT FLOOR LAYER (COLUMBIA, SCHUYLKILL, AND LOWER PART OF LUZERNE COUNTY; IN CARBON COUNTY BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TOWNSHIPS AND THAT PART OF PENN FOREST TOWNSHIP, NORTH OF ROUTE 903) | $27.03 | $11.43 | $38.46 | no change | Agreement, 2011 |
| CARP0179-007 · Carpenters agreement, May 1, 2018 | |||||
| PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES) | $43.45 | $34.47 | $77.92 | no change | Agreement, 2018 |
| CARP0191-001 · Carpenters agreement, May 1, 2011 | |||||
| CARPENTER (YORK COUNTY) | $27.03 | $11.43 | $38.46 | no change | Agreement, 2011 |
| CARP0219-007 · Carpenters agreement, May 1, 2026 | |||||
MILLWRIGHT (CARBON…Full textMILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES) | $52.22 | $38.24 | $90.46 | +$5.21 (+6.1%) | Agreement, 2026 |
| CARP0261-004 · Carpenters agreement, May 23, 2011 | |||||
CARPENTER & SOFT FLOOR LAYER…Full textCARPENTER & SOFT FLOOR LAYER (LACKAWANNA, MONROE, PIKE, SUSQUEHANNA, WAYNE, AND WYOMING (EAST OF SUSQUEHANNA RIVER) COUNTIES) | $25.60 | $12.85 | $38.45 | no change | Agreement, 2011 |
| CARP0274-005 · Carpenters agreement, May 1, 2026 | |||||
CARPENTER (ADAMS, BERKS…Full textCARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $37.63 | $21.18 | $58.81 | +$1.45 (+2.5%) | Agreement, 2026 |
PILEDRIVERMAN (ADAMS…Full textPILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $37.63 | $21.18 | $58.81 | +$1.45 (+2.5%) | Agreement, 2026 |
| CARP0287-007 · Carpenters agreement, May 1, 2008 | |||||
CARPENTER & SOFT FLOOR LAYER…Full textCARPENTER & SOFT FLOOR LAYER (ADAMS, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LANCASTER, AND YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG AIRPORT)) | $24.77 | $8.69 | $33.46 | no change | Agreement, 2008 |
| CARP0443-001 · Carpenters agreement, June 1, 2026 | |||||
MILLWRIGHT (ADAMS, BRADFORD…Full textMILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903), COLUMBIA, CUMBERLAND, DAUPHIN, JUANIATA, LACKAWANNA, LANCASTER, LEBANON, LUZERNE (LOWER PART OF), LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY,PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES) | $45.20 | $25.30 | $70.50 | +$4.06 (+6.1%) | Agreement, 2026 |
| CARP0492-003 · Carpenters agreement, June 1, 2015 | |||||
| CARPENTER & SOFT FLOOR LAYER (BERKS) | $28.16 | $15.02 | $43.18 | no change | Agreement, 2015 |
| CARP0492-004 · Carpenters agreement, May 1, 2015 | |||||
| MILLWRIGHT (BERKS COUNTY) | $34.00 | $17.05 | $51.05 | no change | Agreement, 2015 |
| CARP0514-003 · Carpenters agreement, June 1, 2017 | |||||
CARPENTER & SOFT FLOOR LAYER…Full textCARPENTER & SOFT FLOOR LAYER (LUZERNE (EXCEPT BLACK CREEK, BUTLER, DENNISON, FOSTER, FREELAND, HANLE, HAZLETON, HOLLENBACK, NESPECK, THE LOWER PART OF SALEM, AND SUGARLOAF), SULLIVAN, RED ROCK AIR BASE), AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COUNTIES) | $28.88 | $15.65 | $44.53 | no change | Agreement, 2017 |
| CARP0514-006 · Carpenters agreement, June 1, 2017 | |||||
CARPENTER & SOFT FLOOR LAYER…Full textCARPENTER & SOFT FLOOR LAYER (BRADFORD, LYCOMING, SULLIVAN (EXCEPT RED ROCK AIR FORCE BASE), AND TIOGA COUNTIES) | $28.88 | $15.65 | $44.53 | no change | Agreement, 2017 |
| CARP0600-003 · Carpenters agreement, May 1, 2015 | |||||
| CARPENTER (LEHIGH, MONROE (EXCEPT TOBYHANNA ARMY DEPOT), AND NORTHAMPTON COUNTIES) | $32.14 | $24.09 | $56.23 | no change | Agreement, 2015 |
| CARP1823-004 · Carpenters agreement, May 1, 2015 | |||||
| FLOOR LAYER: CARPET | $31.47 | $24.69 | $56.16 | no change | Agreement, 2015 |
| ELEC0081-006 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (BRADFORD…Full textELECTRICIAN (BRADFORD (AREA EAST OF THE SUSQUEHANNA RIVER); LACKAWANNA; LUZERNE (AREA EAST OF A LINE FOLLOWING THE SUSQUEHANNA RIVER SOUTH TO THE CITY OF PITTSON, EAST AND SOUTH ON THE LIMITS OF PITTSON BUT EXCLUDING IT, TO U.S. HIGHWAY 11, EAST ON 11 TO DUPONT BUROUGH AND HIGHWAY 215, AND SOUTHEAST ON 215. ALSO THE PORTION OF LUZERNE COUNTY SOUTH AND EAST OF A LINE FOLLOWING THORNHURST ROAD, SOUTHWEST TO STATE HIGHWAY 115 AND SOUTHEAST ON 115 TO MONROE COUNTY LINE); MONROE (BARRETT, COOLBAU | $47.97 | $23.29 | $71.26 | — | Agreement, 2025 |
| ELEC0102-006 · Electrical Workers (IBEW) agreement, June 2, 2025 | |||||
ELECTRICIAN (MONROE…Full textELECTRICIAN (MONROE (REMAINDER OF COUNTY), NORTHAMPTON (REMAINDER) AND PIKE (DELAWARE, LEHMAN, AND PORTER) COUNTIES) | $65.43 | $42.20 | $107.63 | — | Agreement, 2025 |
| ELEC0143-006 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (BERKS…Full textELECTRICIAN (BERKS (BETHEL, MARION, AND TULPEHOCKEN TOWNSHIPS); CUMBERLAND; DAUPHIN; JUNIATA; LANCASTER (THAT PORTION NORTHWEST OF A LINE EXTENDING FROM THE SUSQUHANNA RIVER TO THE INTERSECTION OF STATE HIGHWAYS 441 AND 241 ALONG 241 TO THE BOROUGH OF ELIZABETHTOWN, AROUND THE LIMITS OF ELIZABETHTOWN ON THE WEST AND NORTH SIDE, INCLUDING THE MASONIC HOMES IN ELIZABETHTOWN, CONTINIUING ALONG STATE HIGHWAY 241 TO LEBANON COUNTY AND THAT PORTION NORTH OF THE PENNSYLVANIA TURNPIKE, INCLUDING ALL BUILDINGS ON THE TURNPIKE FROM LEBANON COUNTY LINE TO WEST COCALICO TOWNSHIP); LEBANON; PERRY; SCHUYKILL (PINE GROVE AND TREMONT TOWNSHIPS); AND SNYDER (SOUTH OF U.S. HIGHWAY 522) YORK COUNTY (FRANKLIN, CARROL, MONOGHAM AND FAIRVIEW TWPS.) | $40.00 | $27.42 | $67.42 | — | Agreement, 2025 |
| ELEC0163-004 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (BRADFORD AND WYOMING…Full textELECTRICIAN (BRADFORD AND WYOMING (WEST OF THE SUSQUEHANNA RIVER) COLUMBIA COUNTY (BERWICK BOROUGH ONLY IN BRIAR CREEK TOWNSHIP),LACKAWANNA COUNTY: (THAT PORTION OF LEHIGH, WEST OF HIGHWAY 215 (DUPONT THORNHURST ROAD) AND NORTH OF THE THORNHURST STODDARTSVILLE ROAD; LUZERNE COUNTY: FAIRMONT, ROSS, LAKE, DALLA, NESCOPECK, DENISON, HOLLENBACH, BLACK CREEK, SUGARLOAF, HAZEL, BUTLER, FOSTER, FRANKLIN, EXETER, KINGSTON, JACKSON, LEHMAN, PLYMOUTH, HUNLOCK, UNION, HUNTINGTON, SALEM, CONYNGHAM, NEWPORT, SLOCUM, DORRANCE, HANOVER, RICE, WRIGHT, FAIRVIEW, WHITE HAVEN, WILKES BARRE AND PLAINS TOWNSHIPS IN THEIR ENTIRETY; THAT PORTION OF PITTSTON, JENKINS AND BEAR CREEK TOWNSHIPS, SOUTH AND WEST OF A LINE FOLLOWING U.S. HIGHWAY 11 FROM THE CITY OF PITTSTON TO STATE HIGHWAY 315 TO THE DUPONT THORNHURST ROAD, AND SOUTH ON THAT ROAD TO LACKAWANNA COUNTY; ALL OF BUCK TOWNSHIP, EXCEPT THAT PORTION SOUTH AND EAST OF A LINE FOLLOWING THE THORNHURST STODDARTSVILLE ROAD FROM LACKAWANNA COUNTY TO STATE HIGHWAY 115 AND CONTINUING ON 115 TO MONROE COUNTY. ALSO INCLUDED ARE THE CITIES OF WILKES BARRE, NATICOKE, HAZLETON AND PITTSTON, BUT THE BOROUGH OF DURYEA AND AVOCA ARE EXCLUDED; MONROE COUNTY: THAT PORTION OF TOBYHANNA AND TUNKANNOCK TOWNSHIPS WEST OF STATE HIGHWAY 115; SULLIVAN COUNTY: THAT PORTION EAST OF A LINE DRAWN SOUTH ON U.S. HIGHWYA 220 FROM THE BRADFORD SULLIVAN COUNTY LINE TO THE NORDMONT EMMENS ROAD, AND SOUTH OF THIS ROAD TO THE COLUMBIA COUNTY LINE. DUNSHORE BOROUGH IS INCLUDED, BUT LAPORTE BOROUGH IS EXCLUDED | $47.08 | $25.41 | $72.49 | +$10.06 (+16.1%) | Agreement, 2025 |
| ELEC0229-001 · Electrical Workers (IBEW) agreement, July 21, 2025 | |||||
ELECTRICIAN (ADAMS AND YORK…Full textELECTRICIAN (ADAMS AND YORK (EXCEPT CARROLL, FAIRVIEW, FRANKLIN, AND MONAGHAN TOWNSHIPS) COUNTIES) | $40.31 | $23.93 | $64.24 | no change | Agreement, 2025 |
| ELEC0375-007 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (BERKS…Full textELECTRICIAN (BERKS (HEREFORD, LONGSWAMP, AND WASHINGTON TOWNSHIPS; AND THE PORTION OF MAXATOWNEY TOWNSHIP EAST OF SACONY CREEK);(NORTHAMPTON (ALLEN, HANOVER, LEHIGH TOWNSHIPS BOROUGHS OF BATH, FREEMANSBURG, HELLERTOWN AND THE CITY OF BETHLEHEM, THE PORTION OF MOORE TOWNSHIP OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. CITY OF BETHLEHEM; THE PORTION OF MOORE TOWNSHIP SOUTH OF STATE HIGHWAY 946 AND WEST OF STATE HIGHWAY 987. EAST ALLEN TOWNSHIP EXCEPT THE PART NORTH OF BATH BOROUGH AND EAST OF STATE HIGHWAY 987 AND LOWER SAUCON TOWNSHIP WEST OF A LINE FOLLOWING THE HECKTOWN-BUTZTOWN ROAD. SOUTH FROM LOWER NAZARETH TOWNSHIP THROUGH BUTRZTOWN AND CONTINUING TO MIDDLETON, ALONG ALTERNATE U.S. HIGHWAY 22 TO THE EASTERN BOUNDARY OF THE BOROUGH OF FREEMANSBURG, ALONG THIS BOUNDARY IN A SOUTHERLY DIRECTION TO THE BETHLEHEM CITY LINE BETWEEN BETHLEHEM AND LOWER AUCON TOWNSHIP TO THE NORTHERN BOUNDARY OF HELLERTON AND LOWER SAUCON TOWNSHIP TO STATE HIGHWAY 412 TO BUCKS COUNTY), LEHIGH & CARBON COUNTIES | $50.00 | $25.93 | $75.93 | — | Agreement, 2025 |
| ELEC0607-005 · Electrical Workers (IBEW) agreement, September 1, 2025 | |||||
ELECTRICIAN (COLUMBIA…Full textELECTRICIAN (COLUMBIA (EXCEPT BERWICK BOROUGH); MONTOUR; NORTHUMBERLAND (REMAINDER); SCHUYLKILL (REMAINDER); SNYDER (NORTH OF HWY 522); AND UNION (EAST BUFFALO, LEWISBURG, AND UNION TWPS.) COUNTIES) | $41.00 | $31.06 | $72.06 | no change | Agreement, 2025 |
| ELEC0743-006 · Electrical Workers (IBEW) agreement, September 1, 2025 | |||||
| ELECTRICIAN (BERKS COUNTY (REMAINDER)) | $46.02 | $27.98 | $74.00 | no change | Agreement, 2025 |
| ELEC0743-009 · Electrical Workers (IBEW) agreement, September 1, 2025 | |||||
| ELECTRICIAN (REMAINDER OF LANCASTER COUNTY) | $46.02 | $27.98 | $74.00 | no change | Agreement, 2025 |
| ELEC0812-002 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
| ELECTRICIAN (TIOGA COUNTY) | $40.47 | $26.51 | $66.98 | +$3.38 (+5.3%) | Agreement, 2025 |
| ELEC0812-006 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (BRADFORD COUNTY…Full textELECTRICIAN (BRADFORD COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED ""55"" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-COLUMBIA COUNTY LINE, LAPORTE BOROUGH IN THIS JURISDICTION) COUNTIES | $40.47 | $26.51 | $66.98 | +$3.38 (+5.3%) | Agreement, 2025 |
ELECTRICIAN (SULLIVAN COUNTY…Full textELECTRICIAN (SULLIVAN COUNTY (BRADFORD (ARMENIA AND CANTON TOWNSHIPS); AND SULLIVAN (THE PORTION WEST OF THE LINE DRAWN SOUTH OF U.S. HIGHWAY #220, FROM BRADFORD-SULLIVAN COUNTY LINE TO THE DUSHORE BOROUGH, THEN WEST, SOUTH AND EAST AROUND THE WESTERN LIMITS OF DUSHORE AND WEST AROUND THE EASTERN LIMITS OF LAPORTS BACK TO HIGHWAY #220; HENCE SOUTH ON HIGHWAY #220 TO NORDMONT-EMMANS ROAD, (MARKED ""55"" ON THE 1931 DEPARTMENT OF HIGHWAY MAY OF SULLIVAN COUNTY;) THEN IN A SOUTHERLY DIRECTION TO THE SULLIVAN-COLUMBIA COUNTY LINE, LAPORTE BOROUGH IN THIS JURISDICTION) COUNTIES | $38.50 | $26.46 | $64.96 | +$5.24 (+8.8%) | Agreement, 2025 |
| ELEC0812-007 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
| ELECTRICIAN (LYCOMING COUNTY) | $38.50 | $26.46 | $64.96 | +$7.14 (+12.3%) | Agreement, 2025 |
ELECTRICIAN (NORTHUMBERLAND…Full textELECTRICIAN (NORTHUMBERLAND (DELAWARE, LEWIS, AND TURBOT TOWNSHIPS, AND THE BOROUGH OF MILTON) AND UNION (EXCEPT EAST BUFFALO AND UNION TOWNSHIPS AND LEWISBURG BOROUGH) COUNTIES) | $38.50 | $26.46 | $64.96 | — | Agreement, 2025 |
| ENGI0542-013 · Operating Engineers agreement, May 1, 2023 | |||||
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.57 | $29.24 | $71.81 | — | Agreement, 2023 |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $44.82 | $29.90 | $74.72 | — | Agreement, 2023 |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.29 | $29.15 | $71.44 | — | Agreement, 2023 |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $44.54 | $29.82 | $74.36 | — | Agreement, 2023 |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.57 | $28.34 | $67.91 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, TIREMAN (FOR POWER EQUIPMENT), GROUT PUMP 4"" AND UP, POWER BROOM, POWER SWEEPER, SEEDING SPREADER (SELF-PROPELLED) MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $38.42 | $28.02 | $66.44 | — | Agreement, 2023 |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $37.97 | $27.89 | $65.86 | — | Agreement, 2023 |
| (LACKAWANNA, LUZERNE, MONROE, PIKE, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: WASHINGTON 'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY; THANKSGIVING DAY AND CHRISTMAS DAY. ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $37.10 | $27.62 | $64.72 | — | Agreement, 2023 |
Group definitions, zones and premiums for ENGI0542-013POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, LULLTYPE FORKLIFT WITH BOOM ATTACHMENT, CONCRETE BOOM. TRUCK, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLEWAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WIINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 ALL TYPES OF CRANES (EXCEPT CRANES DOING HOOK WORK) BACKHOES, CABLEWAYS, DRAGLINES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, DIRECTIONALL DRILL MACHINES 8"" AND UP, SKID STEER, HYDRAULIC PIPE PUSHER 8"" AND UP, HYDRO AX, ENVIRONMENTAL RECYCLING MACHINE AND GRINDER TYPE MACHINES, LULL TYPE LIFTS MASONRY TENDERS, SHEAR ATTACHED TO MACHINES, GREASE TRUCK, CONCREATE PLACER MACHINE, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 TON AND OVER FACTORY RATING; CONCRETE PUMPS 97 FEET OR BOOM LENGTH OR LESS (150 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, DIRECTIONAL DRILL MACHINE 7"" OR LESS, HYDRAULIC PIPE PUSHER 7"" OR LESS, SKID-STEER FORKLIFT, MACHINES WITH CONCRETE MIXER ATTACHMENT, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, MISCELLANEOUS EQUIPMENT OPERATOR. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 FIREMAN POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS) | |||||
| ENGI0542-014 · Operating Engineers agreement, May 1, 2024 | |||||
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.73 | $30.08 | $73.81 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.98 | $30.74 | $76.72 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.45 | $29.99 | $73.44 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.70 | $30.66 | $76.36 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.73 | $29.18 | $69.91 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.59 | $28.85 | $68.44 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.13 | $28.73 | $67.86 | — | Agreement, 2024 |
(ADAMS, BERKS, BRADFORD…Full text(ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, SULLIVAN, TIOGA, UNION, AND YORK COUNTIES) FOOTNOTE: A - PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY ***TOXIC/HAZARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $38.26 | $28.46 | $66.72 | — | Agreement, 2024 |
Group definitions, zones and premiums for ENGI0542-014POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, MACHINES SIMILAR TO THE ABOVE, ALL TYPES OF CRANES, CABLEWAYS, AND DRAGLINES. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLEWAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2 BACKHOES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, MACHINES SIMILAR TO THE ABOVE. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 AND OVER FACTORY RATING; CONCRETE PUMPS 92 FEET OF BOOM LENGTH OR LESS (150 YARD POUR OR LESS); MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, CORE DRILL OPERATORS, FORKLIFT TRUCKS UNDER 20FT. LIFT, FINE GRADE MACHINES, MACHINES SIMILAR TO THE ABOVE. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, TIREMAN (FOR POWER EQUIPMENT), MACHINES SIMILAR TO THE ABOVE. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 5 FIREMAN. POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS) | |||||
| IRON0404-006 · Ironworkers agreement, July 1, 2024 | |||||
IRONWORKER (ADAMS, BERKS…Full textIRONWORKER (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES) | $37.26 | $32.63 | $69.89 | — | Agreement, 2024 |
| IRON0404-017 · Ironworkers agreement, July 1, 2024 | |||||
IRONWORKER (BRADFORD…Full textIRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.26 | $32.63 | $69.89 | no change | Agreement, 2024 |
| LABO0130-004 · Laborers agreement, May 1, 2024 | |||||
LABORER: BUILDING (LACKAWANNA…Full textLABORER: BUILDING (LACKAWANNA, PIKE, SUSQUEHANNA, WAYNE AND WYOMING (NORTHERN PART) COUNTIES) | $24.35 | $21.43 | $45.78 | no change | Agreement, 2024 |
| LABO0130-013 · Laborers agreement, May 1, 2024 | |||||
| LABORER: BUILDING (LUZERNE (NORTHERN PART), SULLIVAN AND WYOMING (SOUTHERN PART) COUNTIES) | $24.35 | $21.43 | $45.78 | no change | Agreement, 2024 |
| LABO0130-014 · Laborers agreement, May 1, 2024 | |||||
| LABORER: BUILDING (LUZERNE (SOUTHERN PART), COLUMBIA COUNTIES) | $24.35 | $21.43 | $45.78 | no change | Agreement, 2024 |
| LABO0158-002 · Laborers agreement, May 1, 2025 | |||||
| LABORER: HEAVY CONSTRUCTION: GROUP 1 FLAG PERSON | $26.61 | $19.99 | $46.60 | no change | Agreement, 2025 |
LABORER: HEAVY CONSTRUCTION: GROUP 2…Full textLABORER: HEAVY CONSTRUCTION: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER | $33.23 | $19.99 | $53.22 | no change | Agreement, 2025 |
LABORER: HEAVY CONSTRUCTION: GROUP 3…Full textLABORER: HEAVY CONSTRUCTION: GROUP 3 CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, ASPHALT TAMPER, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER | $30.22 | $19.99 | $50.21 | no change | Agreement, 2025 |
LABORER: HEAVY CONSTRUCTION: GROUP 4…Full textLABORER: HEAVY CONSTRUCTION: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, WALK BEHIND ROLLERS AND CONCRETE RUBBERS, BLASTER | $30.57 | $19.99 | $50.56 | no change | Agreement, 2025 |
LABORER: HEAVY CONSTRUCTION: GROUP 5…Full textLABORER: HEAVY CONSTRUCTION: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER. | $31.24 | $19.99 | $51.23 | no change | Agreement, 2025 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.66 | $19.99 | $50.65 | −$0.77 (−1.5%) | Agreement, 2025 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.95 | $19.99 | $50.94 | no change | Agreement, 2025 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $31.43 | $19.99 | $51.42 | +$0.77 (+1.5%) | Agreement, 2025 |
Group definitions, zones and premiums for LABO0158-002LABORER: HEAVY CONSTRUCTION: GROUP 6 OUTSIDE LABERS IN CONJUCTION WITH TUNNELS AND ROCK SHAFTS LABORER: HEAVY CONSTRUCTION: GROUP 7 CHUCK TENDERS, MUCKERS, NIPPERS, MINERS, INSIDE LABORERS LABORER: HEAVY CONSTRUCTION: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS | |||||
| LABO1174-004 · Laborers agreement, May 1, 2017 | |||||
| LABORER: BUILDING (CARBON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $25.39 | $22.29 | $47.68 | no change | Agreement, 2017 |
| LABO1174-016 · Laborers agreement, May 1, 2017 | |||||
| LABORER: BUILDING (BERKS, LEBANON AND SCHUYLKILL COUNTIES) | $21.57 | $15.04 | $36.61 | no change | Agreement, 2017 |
| LABO1180-004 · Laborers agreement, May 1, 2016 | |||||
LABORER: BUILDING (CUMBERLAND…Full textLABORER: BUILDING (CUMBERLAND, DAUPHIN, JUNIATA, NORTHUMBERLAND (SOUTH OF THE SUSQUEHANNA RIVER), PERRY, AND SNYDER COUNTIES) | $20.21 | $12.93 | $33.14 | no change | Agreement, 2016 |
| LABO1180-012 · Laborers agreement, May 1, 2016 | |||||
LABORER: BUILDING (BRADFORD…Full textLABORER: BUILDING (BRADFORD, LYCOMING, MONTOUR, NORTHUMBERLAND (NORTHERN PART), TIOGA, AND UNION COUNTIES) | $20.22 | $12.93 | $33.15 | — | Agreement, 2016 |
| LABO1180-019 · Laborers agreement, May 1, 2022 | |||||
| LABORER: BUILDING (ADAMS, LANCASTER AND YORK COUNTIES) | $23.01 | $17.18 | $40.19 | no change | Agreement, 2022 |
| PAIN0021-005 · Painters and Allied Trades agreement, May 1, 2018 | |||||
| PAINTER: BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $28.02 | $18.33 | $46.35 | — | Agreement, 2018 |
PAINTER: STRUCTURAL STEEL…Full textPAINTER: STRUCTURAL STEEL (BERKS, CARBON, LEBANON, LEHIGH, MONROE, AND NORTHAMPTON COUNTIES) | $29.02 | $18.33 | $47.35 | — | Agreement, 2018 |
| PAIN0021-023 · Painters and Allied Trades agreement, May 1, 2021 | |||||
PAINTER: BRUSH AND ROLLER…Full textPAINTER: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $29.02 | $21.14 | $50.16 | — | Agreement, 2021 |
PAINTER: SPRAY (BRADFORD…Full textPAINTER: SPRAY (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $30.02 | $21.14 | $51.16 | — | Agreement, 2021 |
PAINTER: STRUCTURAL STEEL…Full textPAINTER: STRUCTURAL STEEL (BRADFORD, COLUMBIA, LACKWANNA,LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA,TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $30.02 | $21.14 | $51.16 | — | Agreement, 2021 |
| PAIN0057-020 · Painters and Allied Trades agreement, June 1, 2023 | |||||
| PAINTER: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 | — | Agreement, 2023 |
| PAINTER: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) | $36.01 | $23.72 | $59.73 | — | Agreement, 2023 |
| PAINTER: SPRAY (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 | — | Agreement, 2023 |
| PAIN0411-003 · Painters and Allied Trades agreement, May 1, 2021 | |||||
| PAINTER: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) | $33.72 | $16.30 | $50.02 | — | Agreement, 2021 |
| PAINTER: INDUSTRIAL (ADAMS, CUMBERLAND, DAUPHIN,LANCASTER, PERRY, YORK COUNTIES) | $27.97 | $16.30 | $44.27 | — | Agreement, 2021 |
| PLAS0592-003 · Plasterers and Cement Masons agreement, June 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (PIKE AND MONROE (EXCEPT TOBYHANNA) COUNTIES) | $37.13 | $14.30 | $51.43 | no change | Agreement, 2023 |
| PLASTERER (PIKE AND MONROE (EXCEPT TOBYHANNA) COUNTIES) | $37.81 | $13.70 | $51.51 | no change | Agreement, 2023 |
| PLAS0592-006 · Plasterers and Cement Masons agreement, June 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY) | $37.13 | $14.30 | $51.43 | no change | Agreement, 2023 |
| PLASTERER (COLUMBIA COUNTY) | $37.81 | $13.70 | $51.51 | no change | Agreement, 2023 |
| PLAS0592-018 · Plasterers and Cement Masons agreement, May 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES) | $34.05 | $21.25 | $55.30 | no change | Agreement, 2023 |
| PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES) | $31.33 | $20.75 | $52.08 | no change | Agreement, 2023 |
| PLAS0592-026 · Plasterers and Cement Masons agreement, May 1, 2023 | |||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE)) | $35.18 | $24.25 | $59.43 | no change | Agreement, 2023 |
| CEMENT MASON/CONCRETE FINISHER (REMAINDER OF BERKS COUNTY) | $34.15 | $20.50 | $54.65 | no change | Agreement, 2023 |
| PLASTERER (BERKS COUNTY) | $31.33 | $20.75 | $52.08 | no change | Agreement, 2023 |
| PLUM0420-004 · Plumbers and Pipefitters agreement, May 1, 2024 | |||||
| STEAMFITTER (BERKS, LEHIGH, AND NORTHAMPTON COUNTIES) | $59.65 | $42.78 | $102.43 | no change | Agreement, 2024 |
| PLUM0520-008 · Plumbers and Pipefitters agreement, May 1, 2023 | |||||
PLUMBER AND STEAMFITTER…Full textPLUMBER AND STEAMFITTER (COLUMBIA (REMAINDER OF COUNTY), CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON (WEST OF ROUTE 501), MONTOUR, NORTHUMBERLAND, PERRY, SNYDER, YORK, BRADFORD COUNTY (WESTERN HALF), SULLIVAN, TIOGA AND UNION COUNTIES) | $41.36 | $29.45 | $70.81 | no change | Agreement, 2023 |
| PLUM0524-006 · Plumbers and Pipefitters agreement, December 1, 2025 | |||||
PLUMBER AND STEAMFITTER…Full textPLUMBER AND STEAMFITTER (CARBON, COLUMBIA (BERWICK TOWNSHIP), BRADFORD (EASTERN PART), LUZERNE, LACKAWANNA, MONROE, SCHUYLKILL, SUSQUEHANNA, WAYNE, WYOMING, AND PIKE COUNTIES) | $51.69 | $27.07 | $78.76 | +$3.20 (+4.2%) | Agreement, 2025 |
| PLUM0690-007 · Plumbers and Pipefitters agreement, May 1, 2025 | |||||
| PLUMBER (BERKS, LEHIGH, LEBANON (EAST OF ROUTE 501), AND NORTHAMPTON COUNTIES) | $56.28 | $35.51 | $91.79 | no change | Agreement, 2025 |
| ROOF0030-008 · Roofers agreement, May 1, 2020 | |||||
| ROOFER: COMPOSITION (REMAINING COUNTIES) FOOTNOTE: (COMPOSITION ROOFER ONLY); A. PAID HOLIDAY: ELECTION DAY | $39.50 | $31.80 | $71.30 | — | Agreement, 2020 |
| ROOF0030-010 · Roofers agreement, May 1, 2024 | |||||
ROOFER (BRADFORD, LACKAWANNA…Full textROOFER (BRADFORD, LACKAWANNA, LUZERNE (NORTH OF INTERSTATE 80 WITH THE EXCEPTION OF WHITE HAVEN TWP.) MONROE (TOBYHANNA ARMY DEPOT ONLY), PIKE, SULLIVAN, TIOGA, WAYNE, AND WYOMING COUNTIES) | $34.25 | $21.89 | $56.14 | no change | Agreement, 2024 |
| SHEE0019-009 · Sheet Metal Workers agreement, June 1, 2025 | |||||
SHEET METAL WORKER…Full textSHEET METAL WORKER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES). FOOTNOTES: PAID HOLIDAY: ELECTION DAY | $45.02 | $44.09 | $89.11 | no change | Agreement, 2025 |
| SHEE0044-003 · Sheet Metal Workers agreement, May 1, 2024 | |||||
SHEET METAL WORKER…Full textSHEET METAL WORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMNING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $36.13 | $30.32 | $66.45 | no change | Agreement, 2024 |
| TEAM0229-004 · Teamsters agreement, May 1, 2025 | |||||
| (BRADFORD AND TIOGA COUNTIES) | $25.96 | $15.91 | $41.87 | −$0.56 (−1.3%) | Agreement, 2025 |
(ADAMS, BERKS, CARBON…Full text(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.87 | $0.00 | $41.87 | −$0.56 (−1.3%) | Agreement, 2025 |
(ADAMS, BERKS, CARBON…Full text(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.94 | $0.00 | $41.94 | no change | Agreement, 2025 |
| (BRADFORD AND TIOGA COUNTIES) | $26.03 | $15.91 | $41.94 | no change | Agreement, 2025 |
(ADAMS, BERKS, CARBON…Full text(ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $42.43 | $0.00 | $42.43 | +$0.56 (+1.3%) | Agreement, 2025 |
| (BRADFORD AND TIOGA COUNTIES) | $26.52 | $15.91 | $42.43 | +$0.56 (+1.3%) | Agreement, 2025 |
Group definitions, zones and premiums for TEAM0229-004TRUCK DRIVER: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE, DUMPSTER) TRUCK DRIVER: GROUP 1 STAKE BODY TRUCK (SINGLE AXLE, DUMPSTER) TRUCK DRIVER: GROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, READY-MIX AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS (WHEN USED FOR TRANSPORTATION), STAKE BODY TRUCK (TANDEM) TRUCK DRIVER: GROUP 2 DUMP TRUCKS, TANDEM AND BATCH TRUCKS, SEMI-TRAILERS, AGITATOR MIXER TRUCKS, READY-MIX AND DUMPCRETE TYPE VEHICLES, ASPHALT DISTRIBUTORS (WHEN USED FOR TRANSPORTATION), STAKE BODY TRUCK (TANDEM) TRUCK DRIVER: GROUP 3 EUCLID TYPE OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOW-BED TRAILERS TRUCK DRIVER: GROUP 3 EUCLID TYPE OFF-HIGHWAY EQUIPMENT - BACK OR BELLY DUMP TRUCKS AND DOUBLE-HITCHED EQUIPMENT, STRADDLE (ROSS) CARRIER, LOW-BED TRAILERS | |||||
Modification history
| Modification 3 | January 30, 2026 |
| Modification 4 | May 18, 2026 |
| Modification 5 | May 20, 2026 |
| Modification 6 | September 17, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on PA20260018?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 6 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and PA20260018 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 112 classifications in 71 rate groups
- 71 from agreements, 0 from surveys
- Counties: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster, Lebanon, Lehigh, Luzerne, Lycoming, Monroe, Montour, Northampton, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming, York