Prevailing wage rates · Pennsylvania · Wage determination
Prevailing wage rates: Adams, Berks, Bradford and 26 more counties, Pennsylvania
Heavy, Highway construction · PA20260006 modification 2, published September 17, 2026
The short answer
This sheet sets 70 classifications for heavy, highway work in Adams, Berks, Bradford and 26 more counties, Pennsylvania. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $34.80 an hour (painter: brush and roller) to $93.17 (piledriverman (lehigh and northampton counties)). Your contract may lock an earlier modification.
Scope
Excluding Sewer Grouting Projects and Excluding Sewage and Water Treatment Plant Projects
What changed this year
First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications. Of the 54 rates we can follow line by line from the first publication to today, 5 are higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
September 17, 2026 · modification 2
Classification names reworded; 5 rates raised among the 62 lines we could match
- Millwright: 3 rates raised by $4.06 to $5.21 an hour
- Carpenter: 1 rate raised by $1.45 an hour
- Piledriverman: 1 rate raised by $1.45 an hour
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (5)
| Classification | Was | Now | Change |
|---|---|---|---|
| MILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMEN… | $50.22 + $35.03 | $52.22 + $38.24 | +$5.21 (+6.1%) |
| CARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKA… | $36.87 + $20.49 | $37.63 + $21.18 | +$1.45 (+2.5%) |
| PILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, L… | $36.87 + $20.49 | $37.63 + $21.18 | +$1.45 (+2.5%) |
| MILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND… | $43.00 + $23.44 | $45.20 + $25.30 | +$4.06 (+6.1%) |
| MILLWRIGHT (BERKS AND LANCASTER COUNTIES) | $43.00 + $23.44 | $45.20 + $25.30 | +$4.06 (+6.1%) |
Earlier modifications
May 18, 2026 · modification 1Classification names reworded; 5 fringe formulas changed among the 62 lines we could match
- Line construction: 5 fringe formulas changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (5)
Classification Was Now Change LINE CONSTRUCTION: WINCH TRUCK OPERATOR (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LAN… $37.24 + 34.25%+11.50 $37.24 + $24.25 changed LINE CONSTRUCTION: TRUCK DRIVER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER,… $34.58 + 34.25%+11.50 $34.58 + $23.34 changed LINE CONSTRUCTION: LINEMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBAN… $53.20 + 34.25%+11.50 $53.20 + $29.72 changed LINE CONSTRUCTION: GROUNDMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEB… $31.92 + 34.25%+11.50 $31.92 + $22.43 changed LINE CONSTRUCTION: CABLE SPLICER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER,… $53.20 + 34.25%+11.50 $53.20 + $29.72 changed
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| BOIL0013-003 · Boilermakers agreement, January 1, 2025 | |||||
| BOILERMAKER | $55.00 | $35.48 | $90.48 | no change | Agreement, 2025 |
| CARP0167-007 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (LEHIGH AND NORTHAMPTON COUNTIES) | $40.04 | $28.09 | $68.13 | no change | Agreement, 2025 |
| CARP0219-007 · Carpenters agreement, May 1, 2026 | |||||
MILLWRIGHT (CARBON…Full textMILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES) | $52.22 | $38.24 | $90.46 | +$5.21 (+6.1%) | Agreement, 2026 |
| CARP0274-005 · Carpenters agreement, May 1, 2026 | |||||
CARPENTER (ADAMS, BERKS…Full textCARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $37.63 | $21.18 | $58.81 | +$1.45 (+2.5%) | Agreement, 2026 |
PILEDRIVERMAN (ADAMS…Full textPILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $37.63 | $21.18 | $58.81 | +$1.45 (+2.5%) | Agreement, 2026 |
| CARP0443-002 · Carpenters agreement, June 1, 2026 | |||||
MILLWRIGHT (ADAMS, BRADFORD…Full textMILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903) COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LUZERNE (LOWER PART OF) MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES) | $45.20 | $25.30 | $70.50 | +$4.06 (+6.1%) | Agreement, 2026 |
| CARP0443-010 · Carpenters agreement, June 1, 2026 | |||||
| MILLWRIGHT (BERKS AND LANCASTER COUNTIES) | $45.20 | $25.30 | $70.50 | +$4.06 (+6.1%) | Agreement, 2026 |
| CARP0474-005 · Carpenters agreement, May 1, 2025 | |||||
| PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES) | $48.25 | $44.92 | $93.17 | no change | Agreement, 2025 |
| ELEC0126-001 · Electrical Workers (IBEW) agreement, June 3, 2024 | |||||
LINE CONSTRUCTION: CABLE SPLICER…Full textLINE CONSTRUCTION: CABLE SPLICER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $53.20 | $29.72 | $82.92 | changed | Agreement, 2024 |
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $31.92 | $22.43 | $54.35 | changed | Agreement, 2024 |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $53.20 | $29.72 | $82.92 | changed | Agreement, 2024 |
LINE CONSTRUCTION: TRUCK DRIVER…Full textLINE CONSTRUCTION: TRUCK DRIVER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $34.58 | $23.34 | $57.92 | changed | Agreement, 2024 |
LINE CONSTRUCTION: WINCH TRUCK OPERATOR…Full textLINE CONSTRUCTION: WINCH TRUCK OPERATOR (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $37.24 | $24.25 | $61.49 | changed | Agreement, 2024 |
| ELEC1319-001 · Electrical Workers (IBEW) agreement, September 1, 2025 | |||||
LINE CONSTRUCTION: EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: EQUIPMENT OPERATOR (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $68.06 | $31.43 | $99.49 | no change | Agreement, 2025 |
LINE CONSTRUCTION: GROUNDMEN…Full textLINE CONSTRUCTION: GROUNDMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $42.20 | $16.02 | $58.22 | no change | Agreement, 2025 |
LINE CONSTRUCTION: LINEMEN…Full textLINE CONSTRUCTION: LINEMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $68.06 | $31.43 | $99.49 | no change | Agreement, 2025 |
LINE CONSTRUCTION: TRUCK DRIVER…Full textLINE CONSTRUCTION: TRUCK DRIVER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $44.24 | $16.21 | $60.45 | no change | Agreement, 2025 |
| ENGI0542-004 · Operating Engineers agreement, May 1, 2025 | |||||
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1 PILE DRIVERS, ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, PAVER (BLACKTOP AND CONCRETE), GRADALLS, ALL FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPES BACKHOES, BOAT CAPTAINS, BATCH PLANT WITH MIXER, DRILL SELF CONTAINED (DRILL-MASTER TYPE), CMI AUTOGRADE, MILLING MACHINE, VEMEER SAW, CONVEYOR LOADER (EUCLID TYPE) SCRAPER AND TOURNAPULLS, BULLDOZERS AND TRACTORS, CONCRETE PUMPS, MOTOR PATROLS, MECHANIC WELDERS, LOG SKIDDER, SIDE BOOM, BOBCAT TYPE (WITH ATTACHMENTS), BORING MACHINES INCLUDING DIRECTIONAL BORING MACHINES, CHIPPER WITH BOOM, HYDRO AX, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.56 | $30.24 | $72.80 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $44.81 | $30.92 | $75.73 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 2 SPREADERS, ASPHALT PLANT ENGINEERS, ROLLERS (HIGH GRADE FINISHING), MACHINE SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFTS 20FT AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $41.39 | $29.89 | $71.28 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 3 WELDING MACHINE, WELL POINTS, COMPRESSORS, PUMP HEATERS, FARM TRACTORS, FORM LINE GRADERS, DITCH WITCH TYPE TRENCHER, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, MISCELLANEOUS EQUIPMENT OPERATOR, SEAMAN PULVERIZING MIXER, POWER BROOM, SEEDING SPREADER, TIREMAN - (FOR POWER EQUIPMENT ) CONVEYORS, LOADERS OTHER THAN EUC TYPE, CONVEYORS, DRILLER SECOND CLASS, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFT UNDER 20 FT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.70 | $29.68 | $70.38 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 5 OILERS AND DECK HANDS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.73 | $29.41 | $69.14 | no change | Agreement, 2025 |
| ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.80 | $30.30 | $73.10 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6A ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) 100 FEET 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.05 | $30.96 | $76.01 | no change | Agreement, 2025 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 4 FIREMAN AND GREASE TRUCK BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.26 | $29.54 | $69.80 | no change | Agreement, 2025 |
Group definitions, zones and premiums for ENGI0542-004POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6 ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) L00 FT. AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | |||||
| ENGI0542-022 · Operating Engineers agreement, May 1, 2025 | |||||
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, ALL TYPES OF CRANES, CABLEWAYS, AND DRAGLINES. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.46 | $30.50 | $73.96 | — | Agreement, 2025 |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLE WAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.71 | $31.16 | $76.87 | — | Agreement, 2025 |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 2 BACKHOES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, BOB CAT TYPE (ALL ATTACHMENTS), BORING MACHINES INCLUDING DIRECTIONAL BORING MACHINES, HYDRO AX, SIDE BOOM, VERMEER SAW, CHIPPER WITH BOOM, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.18 | $30.41 | $73.59 | — | Agreement, 2025 |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 2A…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.43 | $31.08 | $76.51 | — | Agreement, 2025 |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, DRILL OPERATORS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, SECOND CLASS DRILLER, FORKLIFT TRUCK UNDER 20FT. LIFT, STUMP GRINDER, TIREMAN (FOR POWER EQUIPMENT), MACHINES SIMILAR TO ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.26 | $29.55 | $69.81 | — | Agreement, 2025 |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, CHIPPER WITHOUT BOOM, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.12 | $29.22 | $68.34 | — | Agreement, 2025 |
| POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 5 FIREMAN. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $38.67 | $29.09 | $67.76 | — | Agreement, 2025 |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 6…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS). FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $37.80 | $28.82 | $66.62 | — | Agreement, 2025 |
| IRON0404-006 · Ironworkers agreement, July 1, 2024 | |||||
IRONWORKER (ADAMS, BERKS…Full textIRONWORKER (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES) | $37.26 | $32.63 | $69.89 | no change | Agreement, 2024 |
| IRON0404-017 · Ironworkers agreement, July 1, 2024 | |||||
IRONWORKER (BRADFORD…Full textIRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.26 | $32.63 | $69.89 | no change | Agreement, 2024 |
| LABO0158-001 · Laborers agreement, May 1, 2025 | |||||
| LABORER: GROUP 1 FLAG PERSON | $26.61 | $19.99 | $46.60 | no change | Agreement, 2025 |
| LABORER: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER | $33.23 | $19.99 | $53.22 | no change | Agreement, 2025 |
LABORER: GROUP 3…Full textLABORER: GROUP 3 ASPHALT TAMPER, CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER | $30.22 | $19.99 | $50.21 | no change | Agreement, 2025 |
LABORER: GROUP 4…Full textLABORER: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, CONCRETE RUBBERS, BLASTER | $30.57 | $19.99 | $50.56 | no change | Agreement, 2025 |
LABORER: GROUP 5…Full textLABORER: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER. | $31.24 | $19.99 | $51.23 | no change | Agreement, 2025 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.66 | $19.99 | $50.65 | — | Agreement, 2025 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.95 | $19.99 | $50.94 | — | Agreement, 2025 |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $31.43 | $19.99 | $51.42 | — | Agreement, 2025 |
Group definitions, zones and premiums for LABO0158-001LABORER: GROUP 6 OUTSIDE LABERS IN CONJUCTION WITH TUNNELS AND ROCK SHAFTS LABORER: GROUP 7 CHUCK TENDERS, MUCKERS, NIPPERS, MINERS, INSIDE LABORERS LABORER: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS | |||||
| PAIN0021-026 · Painters and Allied Trades agreement, May 1, 2021 | |||||
| PAINTER: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $33.72 | $16.30 | $50.02 | no change | Agreement, 2021 |
| PAINTER: BRUSH (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $25.84 | $16.30 | $42.14 | no change | Agreement, 2021 |
PAINTER: SPRAY, SANDBLAST…Full textPAINTER: SPRAY, SANDBLAST (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $27.97 | $16.30 | $44.27 | no change | Agreement, 2021 |
| PAIN0057-021 · Painters and Allied Trades agreement, June 1, 2023 | |||||
| PAINTER: BRIDGE, TOWERS (JUNIATA COUNTY) | $38.33 | $23.72 | $62.05 | no change | Agreement, 2023 |
| PAINTER: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 | — | Agreement, 2023 |
| PAINTER: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) | $36.01 | $23.72 | $59.73 | no change | Agreement, 2023 |
| PAINTER: SPRAY (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 | — | Agreement, 2023 |
| PAIN1021-001 · Painters and Allied Trades agreement, May 1, 2012 | |||||
PAINTER: BRIDGE; BRUSH…Full textPAINTER: BRIDGE; BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $30.85 | $14.80 | $45.65 | no change | Agreement, 2012 |
| PAINTER: BRIDGE; SPRAY (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $31.85 | $14.80 | $46.65 | no change | Agreement, 2012 |
PAINTER: BRUSH AND ROLLER…Full textPAINTER: BRUSH AND ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $26.55 | $14.80 | $41.35 | no change | Agreement, 2012 |
PAINTER: SPRAY AND SANDBLAST…Full textPAINTER: SPRAY AND SANDBLAST (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $27.55 | $14.80 | $42.35 | no change | Agreement, 2012 |
| PAIN1021-002 · Painters and Allied Trades agreement, May 1, 2009 | |||||
PAINTER: BRIDGE; BRUSH…Full textPAINTER: BRIDGE; BRUSH, ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $25.60 | $12.05 | $37.65 | no change | Agreement, 2009 |
PAINTER: BRIDGE; SPRAY…Full textPAINTER: BRIDGE; SPRAY (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $26.60 | $12.05 | $38.65 | no change | Agreement, 2009 |
PAINTER: BRUSH AND ROLLER…Full textPAINTER: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $22.75 | $12.05 | $34.80 | no change | Agreement, 2009 |
PAINTER: SPRAY, SANDBLAST…Full textPAINTER: SPRAY, SANDBLAST (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES) | $23.75 | $12.05 | $35.80 | no change | Agreement, 2009 |
| PLAS0592-004 · Plasterers and Cement Masons agreement, June 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY; (EXCEPT TOBYHANNA DEPOT)) | $37.13 | $14.30 | $51.43 | no change | Agreement, 2023 |
| PLAS0592-005 · Plasterers and Cement Masons agreement, June 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY) | $37.13 | $14.30 | $51.43 | no change | Agreement, 2023 |
| PLAS0592-017 · Plasterers and Cement Masons agreement, May 1, 2023 | |||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE), CARBON, LEHIGH, NORTHAMPTON (NORTHWEST PART INCLUDING THE TOWNS OF WALNUTPORT, BATH, AND NORTHAMPTON) COUNTIES) | $35.18 | $24.25 | $59.43 | no change | Agreement, 2023 |
| PLAS0592-018 · Plasterers and Cement Masons agreement, May 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES) | $34.05 | $21.25 | $55.30 | no change | Agreement, 2023 |
| PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES) | $31.33 | $20.75 | $52.08 | no change | Agreement, 2023 |
| PLAS9592-002 · Plasterers and Cement Masons agreement, June 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY (TOBYHANNA ARMY DEPOT)) | $37.13 | $14.30 | $51.43 | no change | Agreement, 2023 |
| TEAM0229-003 · Teamsters agreement, May 1, 2025 | |||||
(BRADFORD AND TIOGA COUNTIES) WATER TANK…Full text(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $25.96 | $15.91 | $41.87 | — | Agreement, 2025 |
TRUCK DRIVER: GROUP 1…Full textTRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.87 | $0.00 | $41.87 | no change | Agreement, 2025 |
TRUCK DRIVER: GROUP 2…Full textTRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.94 | $0.00 | $41.94 | no change | Agreement, 2025 |
(BRADFORD AND TIOGA COUNTIES) WATER TANK…Full text(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $26.52 | $15.91 | $42.43 | — | Agreement, 2025 |
TRUCK DRIVER: GROUP 3…Full textTRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE. (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $42.43 | $0.00 | $42.43 | no change | Agreement, 2025 |
(BRADFORD AND TIOGA COUNTIES) WATER TANK…Full text(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $26.03 | $15.91 | $41.94 | — | Agreement, 2025 |
Group definitions, zones and premiums for TEAM0229-003TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) TRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS TRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) | |||||
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | September 17, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on PA20260006?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 2 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and PA20260006 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 70 classifications in 24 rate groups
- 24 from agreements, 0 from surveys
- Counties: Adams, Berks, Bradford, Carbon, Columbia, Cumberland, Dauphin, Juniata, Lackawanna, Lancaster, Lebanon, Lehigh, Luzerne, Lycoming, Monroe, Montour, Northampton, Northumberland, Perry, Pike, Schuylkill, Snyder, Sullivan, Susquehanna, Tioga, Union, Wayne, Wyoming, York