The short answer
This sheet sets 64 classifications for heavy, highway work in Adams, Berks, Bradford and 26 more counties, Pennsylvania. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $41.35 an hour (painters: brush and roller) to $99.49 (line construction: linemen). Your contract may lock an earlier modification.
Scope
Excluding Sewer Grouting Projects and Excluding Sewage and Water Treatment Plant Projects
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0013-003 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $55.00 | $35.48 | $90.48 | Agreement |
| CARP0167-007 · Carpenters agreement, May 1, 2025 | ||||
| CARPENTER (LEHIGH AND NORTHAMPTON COUNTIES) | $40.04 | $28.09 | $68.13 | Agreement |
| CARP0219-007 · Carpenters agreement, May 1, 2024 | ||||
MILLWRIGHT (CARBON…Full textMILLWRIGHT (CARBON (TOWNSHIPS: EAST PENN, LOWER TOWAMENSING, MAHONING, FRANKLIN, TOWAMENSING, PENN FOREST. EVERYTHING SOUTH OF ROUTE 903 AND EAST TO THE KIDDER TOWNSHIP LINE. BOROUGHS: HAUTO, NESQUEHONING, LANSFORD, SUMMIT HILL, JIM THORPE, WEISSPORT, BOWNMANSTOWN, PALMERTON, LEHIGHTON, AND PARRYVILLE) , LEHIGH AND NORTHAMPTON COUNTIES) | $50.22 | $35.03 | $85.25 | Agreement |
| CARP0274-005 · Carpenters agreement, May 1, 2025 | ||||
PILEDRIVERMAN (ADAMS…Full textPILEDRIVERMAN (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $36.87 | $20.49 | $57.36 | Agreement |
CARPENTER (ADAMS, BERKS…Full textCARPENTER (ADAMS, BERKS, BRADFORD, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANNA, LANCASTER,LEBANON, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING AND YORK) | $36.87 | $20.49 | $57.36 | Agreement |
| CARP0443-002 · Carpenters agreement, June 1, 2024 | ||||
MILLWRIGHT (ADAMS, BRADFORD…Full textMILLWRIGHT (ADAMS, BRADFORD, CARBON (BANKS, LAUSANNE, LEHIGH, PACKER, KIDDER TWPS., AND PART OF PENN FOREST TOWNSHIP NORTH OF ROUTE 903) COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LEBANON, LUZERNE (LOWER PART OF) MONROE, MONTOUR, NORTHUMBERLAND, PERRY, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING, YORK (NEW CUMBERLAND ARMY DEPOT AND HARRISBURG STATE AIRPORT) COUNTIES) | $43.00 | $23.44 | $66.44 | Agreement |
| CARP0443-010 · Carpenters agreement, June 1, 2024 | ||||
| MILLWRIGHT (BERKS AND LANCASTER COUNTIES) | $43.00 | $23.44 | $66.44 | Agreement |
| CARP0474-005 · Carpenters agreement, May 1, 2025 | ||||
| PILEDRIVERMAN (LEHIGH AND NORTHAMPTON COUNTIES) | $48.25 | $44.92 | $93.17 | Agreement |
| ELEC0126-001 · Electrical Workers (IBEW) agreement, June 3, 2024 | ||||
LINE CONSTRUCTION: WINCH TRUCK OPERATOR…Full textLINE CONSTRUCTION: WINCH TRUCK OPERATOR (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $37.24 | $24.25 | $61.49 | Agreement |
LINE CONSTRUCTION: TRUCK DRIVER…Full textLINE CONSTRUCTION: TRUCK DRIVER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $34.58 | $23.34 | $57.92 | Agreement |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $53.20 | $29.72 | $82.92 | Agreement |
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $31.92 | $22.43 | $54.35 | Agreement |
LINE CONSTRUCTION: CABLE SPLICER…Full textLINE CONSTRUCTION: CABLE SPLICER (ADAMS, BERKS, CUMBERLAND, DAUPHIN, JUNIATA, LANCASTER, LEBANON, LEHIGH, NORTHAMPTON, PERRY AND YORK COUNTIES) | $53.20 | $29.72 | $82.92 | Agreement |
| ELEC1319-001 · Electrical Workers (IBEW) agreement, September 1, 2025 | ||||
LINE CONSTRUCTION: TRUCK DRIVER…Full textLINE CONSTRUCTION: TRUCK DRIVER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $44.24 | $16.21 | $60.45 | Agreement |
LINE CONSTRUCTION: LINEMEN…Full textLINE CONSTRUCTION: LINEMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $68.06 | $31.43 | $99.49 | Agreement |
LINE CONSTRUCTION: GROUNDMEN…Full textLINE CONSTRUCTION: GROUNDMEN (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $42.20 | $16.02 | $58.22 | Agreement |
LINE CONSTRUCTION: EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: EQUIPMENT OPERATOR (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, AND WYOMING COUNTIES) | $68.06 | $31.43 | $99.49 | Agreement |
| ENGI0542-004 · Operating Engineers agreement, May 1, 2025 | ||||
POWER EQUIPMENT OPERATORS…Full textPOWER EQUIPMENT OPERATORS: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 4 FIREMAN AND GREASE TRUCK BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.26 | $29.54 | $69.80 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6A ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) 100 FEET 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.05 | $30.96 | $76.01 | Agreement |
| ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.80 | $30.30 | $73.10 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 5 OILERS AND DECK HANDS BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.73 | $29.41 | $69.14 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 3 WELDING MACHINE, WELL POINTS, COMPRESSORS, PUMP HEATERS, FARM TRACTORS, FORM LINE GRADERS, DITCH WITCH TYPE TRENCHER, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, MISCELLANEOUS EQUIPMENT OPERATOR, SEAMAN PULVERIZING MIXER, POWER BROOM, SEEDING SPREADER, TIREMAN - (FOR POWER EQUIPMENT ) CONVEYORS, LOADERS OTHER THAN EUC TYPE, CONVEYORS, DRILLER SECOND CLASS, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFT UNDER 20 FT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.70 | $29.68 | $70.38 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 2 SPREADERS, ASPHALT PLANT ENGINEERS, ROLLERS (HIGH GRADE FINISHING), MACHINE SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, AND FORKLIFTS 20FT AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $41.39 | $29.89 | $71.28 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; SINGLE PERSON OPERATION TRUCK CRANES 15 TON AND OVER FACTORY RATING; CHERRY PICKER TYPE MACHINERY AND EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $44.81 | $30.92 | $75.73 | Agreement |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 1 PILE DRIVERS, ALL TYPES OF CRANES, ALL TYPES OF BACKHOES, DRAGLINES, KEYSTONES, ALL TYPES OF SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, PAVER (BLACKTOP AND CONCRETE), GRADALLS, ALL FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPES BACKHOES, BOAT CAPTAINS, BATCH PLANT WITH MIXER, DRILL SELF CONTAINED (DRILL-MASTER TYPE), CMI AUTOGRADE, MILLING MACHINE, VEMEER SAW, CONVEYOR LOADER (EUCLID TYPE) SCRAPER AND TOURNAPULLS, BULLDOZERS AND TRACTORS, CONCRETE PUMPS, MOTOR PATROLS, MECHANIC WELDERS, LOG SKIDDER, SIDE BOOM, BOBCAT TYPE (WITH ATTACHMENTS), BORING MACHINES INCLUDING DIRECTIONAL BORING MACHINES, CHIPPER WITH BOOM, HYDRO AX, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $42.56 | $30.24 | $72.80 | Agreement |
Group definitions, zones and premiums for ENGI0542-004POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION AND WATER LINES CONSTRUCTION (OFF PLANT SITE): GROUP 6 ALL MACHINES WITH BOOMS (INCLUDING JIBS, MASTS, LEADS, ETC.) L00 FT. AND OVER. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. AND OVER, TWENTY FIVE CENTS ($0.25) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON MACHINES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS,ETC.), 200 FT. AND OVER, TWO (2) OPERATING ENGINEERS SHALL BE REQUIRED. | ||||
| ENGI0542-022 · Operating Engineers agreement, May 1, 2025 | ||||
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $37.80 | $28.82 | $66.62 | Agreement |
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $38.67 | $29.09 | $67.76 | Agreement |
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $39.12 | $29.22 | $68.34 | Agreement |
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $40.26 | $29.55 | $69.81 | Agreement |
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.43 | $31.08 | $76.51 | Agreement |
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.18 | $30.41 | $73.59 | Agreement |
POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A…Full textPOWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1A MACHINES DOING HOOK WORK; MACHINES HANDLING MACHINERY; ALL TYPES OF CRANES 15 TON AND OVER FACTORY RATING; CABLE WAYS; DRAGLINES 15 TON AND OVER FACTORY RATING; HIGH RAIL/BURRO CRANE 15 TON AND OVER FACTORY RATING; RAIL LOADER (WINCH BOOM TYPE) 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. FOOTNOTE: A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $45.71 | $31.16 | $76.87 | Agreement |
| FOOTNOTE: A PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY. BOOM LENGTH PAY: ON ALL MACHINES WITH BOOMS, JIBS, MASTS AND LEADS 100 FT. FROM GROUND UP, FIFTY ($0.50) PER HOUR ADDITIONAL WILL BE PAID FOR EACH INCREMENT OF 25 FT. OVER 100 FT. ON CRANES WITH BOOMS (INCLUDING JIBS, MASTS AND LEADS, ETC.) 200 FT. AND OVER, TWO (2) OPERATORS SHALL BE REQUIRED, NO OILERS WILL BE REQUIRED, WITH SEVENTY FIVE ($0.75) IN INCREMENTS OF 25 FT. ***TOXIC/HAZXARDOUS WASTE REMOVAL*** ADD 20% TO BASIC HOURLY RATE FOR ALL CLASSIFICATIONS | $43.46 | $30.50 | $73.96 | Agreement |
Group definitions, zones and premiums for ENGI0542-022POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 6 OILERS AND DECK HANDS (PERSONNEL BOATS). POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 5 FIREMAN. POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 4 WELDING MACHINES, WELL POINTS, COMPRESSORS, PUMPS, HEATERS, FARM TRACTORS, FORM LINE GRADERS, ROAD FINISHING MACHINES, CONCRETE BREAKING MACHINES, ROLLERS, SEAMAN PULVERZING MIXER, POWER BOOM, SEEDING SPREADER, CHIPPER WITHOUT BOOM, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 3 CONVEYORS, BUILDING HOIST (SINGLE DRUM), HIGH OR LOW PRESSURE BOILERS, DRILL OPERATORS, WELL DRILLERS, ASPHALT PLANT ENGINEERS, DITCH WITCH TYPE TRENCHER, SECOND CLASS DRILLER, FORKLIFT TRUCK UNDER 20FT. LIFT, STUMP GRINDER, TIREMAN (FOR POWER EQUIPMENT), MACHINES SIMILAR TO ABOVE INCLUDING REMOTE CONTROL EQUIPMENT. POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 2A CRAWLER BACKHOES AND CRAWLER GRADALLS OVER ONE CUBIC YARD FACTORY RATING; HYDRAULIC BACKHOES OVER ONE CUBIC YARD FACTORY RATING; EQUIPMENT 15 TON AND OVER FACTORY RATING; MACHINES SIMILAR TO ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT; EQUIPMENT IN THIS WAGE GROUP THAT DOES NOT REQUIRE AN OILER. POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 2 BACKHOES, KEYSTONES, SHOVELS, DERRICKS, TRENCH SHOVELS, TRENCHING MACHINES, HOIST WITH TWO TOWERS, PAVERS 21E AND OVER, OVERHEAD CRANES, BUILDING HOISTS (DOUBLE DRUM) GRADALLS, MUCKING MACHINES IN TUNNELS, FRONT END LOADERS, TANDEM SCRAPERS, PIPPIN TYPE BACKHOES, BOAT CAPTAINS, BATCH PLANT OPERATORS CONCRETE DRILLS, SELF-CONTAINED ROTARY DRILLS, FORK LIFTS, 20FT, LIFT AND OVER, SCRAPERS, TOURNAPULLS, SPREADERS, BULLDOZERS AND TRACTORS, ROLLERS (HIGH GRADE FINISHING), MECHANIC-WELDER, MOTOR PATROLS, CONCRETE PUMPS, GREASE TRUCK, BOB CAT TYPE (ALL ATTACHMENTS), BORING MACHINES INCLUDING DIRECTIONAL BORING MACHINES, HYDRO AX, SIDE BOOM, VERMEER SAW, CHIPPER WITH BOOM, MACHINES SIMILAR TO THE ABOVE INCLUDING REMOTE CONTROL EQUIPMENT POWER EQUIPMENT OPERATOR: HEAVY CONSTRUCTION: GROUP 1 MACHINES DOING HOOK WORK, ANY MACHINE HANDLING MACHINERY, CABLE SPINNING MACHINES, HELICOPTERS, MACHINES SIMILAR TO THE ABOVE, INCLUDING REMOTE CONTROL EQUIPMENT, ALL TYPES OF CRANES, CABLEWAYS, AND DRAGLINES. | ||||
| IRON0404-006 · Ironworkers agreement, July 1, 2024 | ||||
Group definitions, zones and premiums for IRON0404-006IRONWORKERS (ADAMS, BERKS, CUMBERLAND, DAUPHIN,JUANITA, LANCASTER, LEBANON, LEHIGH, LYCOMING, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, SCHUYLKILL, SNYDER, UNION AND YORK COUNTIES).$ 37.26 32.63 | ||||
| IRON0404-017 · Ironworkers agreement, July 1, 2024 | ||||
IRONWORKER (BRADFORD…Full textIRONWORKER (BRADFORD, CARBON, COLUMBIA, LACKAWANNA, LUZERNE, MONROE, PIKE, SULLIVAN, TIOGA, SUSQUEHANNA, WAYNE AND WYOMING COUNTIES) | $37.26 | $32.63 | $69.89 | Agreement |
| LABO0158-001 · Laborers agreement, May 1, 2025 | ||||
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.95 | $19.99 | $50.94 | Agreement |
| (FREE AIR TUNNELS AND ROCK SHAFTS) | $30.66 | $19.99 | $50.65 | Agreement |
LABORER: GROUP 5…Full textLABORER: GROUP 5 FORM SETTER, REINFORCED STEEL PLACER, BONDING ALIGNING AND SECURING AND BURNING AND WELDING IN CONJUNCTION WTH REBAR, AND CONCRETE SURFACER. | $31.24 | $19.99 | $51.23 | Agreement |
LABORER: GROUP 4…Full textLABORER: GROUP 4 CAISSON-OPEN AIR BELOW 8 FEET, COFFERDAM OPEN AIR BELOW 8 FEET WHERE EXCAVATIONS FOR CIRCULAR CAISSONS AND COFFERDAMS 8 FT AND BELOW LEVEL OF NATURAL GRADE ADJACENT TO STARTING POINT, FORM SETTERS (ROAD) WAGON DRILL DIAMOND POINT DRILL, GUNITE NOZZLE OPERATORS, CONCRETE RUBBERS, BLASTER | $30.57 | $19.99 | $50.56 | Agreement |
LABORER: GROUP 3…Full textLABORER: GROUP 3 ASPHALT TAMPER, CONCRETE PITMAN, PUDDLERS, HIGHWAY GUIDE RAIL RIGHT OF WAY AND PROPERTY FENCE SLAB REINFORCEMENT PLACERS, LABORERS, LANDSCAPER, SEEDERS, PLANTERS, MAGAZINE TENDERS, LASER BEAM MEN FOR PIPE LAYING AND PAVING MACHINES,, RAILROAD TRACKMAN, SIGNALMAN, ASPHALT RAKERS, LUTE OR SCREED MAN, PNEUMATIC AND ELECTRIC TOOL OPERATORS, JACKMAMMERS, PAVING BREAKERS, CONCRETE SAWS, WHACKER VIBRATOR, CHAINSAW, HIGHWAY CONCRETE BLOCK LAYERS, SHEET HAMMER, PIPE LAYERS, WALK BEHIND ROLLERS, WALK BEHIND TRENCHER | $30.22 | $19.99 | $50.21 | Agreement |
| LABORER: GROUP 2 HAZARDOUS/TOXIC/ASBESTOS WASTE HANDLER, LEAD PAINT HANDLER | $33.23 | $19.99 | $53.22 | Agreement |
| LABORER: GROUP 1 FLAG PERSON | $26.61 | $19.99 | $46.60 | Agreement |
Group definitions, zones and premiums for LABO0158-001LABORER: GROUP 8 MINERS, DRILLERS, BLASTERS, PNEUMATIC SHIELD OPERATORS, LINING, SPOTTING AND TIMBER WORKMEN, REBAR STEEL PLACER, BONDING AND SECURING, WELDERS, AND CONCRETE SURFACERS (FREE AIR TUNNELS AND ROCK SHAFTS).$ 31.43 19.99 LABORER: GROUP 7 CHUCK TENDERS, MUCKERS, NIPPERS, MINERS, INSIDE LABORERS LABORER: GROUP 6 OUTSIDE LABERS IN CONJUCTION WITH TUNNELS AND ROCK SHAFTS | ||||
| PAIN0021-026 · Painters and Allied Trades agreement, May 1, 2021 | ||||
PAINTERS: SPRAY, SANDBLAST…Full textPAINTERS: SPRAY, SANDBLAST (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $27.97 | $16.30 | $44.27 | Agreement |
| PAINTERS: BRUSH (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $25.84 | $16.30 | $42.14 | Agreement |
| PAINTERS: BRIDGE (ADAMS, CUMBERLAND, DAUPHIN, LANCASTER, PERRY, AND YORK COUNTIES) | $33.72 | $16.30 | $50.02 | Agreement |
| PAIN0057-021 · Painters and Allied Trades agreement, June 1, 2023 | ||||
| PAINTERS: SPRAY (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 | Agreement |
| PAINTERS: INDUSTRIAL BRUSH & ROLLER (JUNIATA COUNTY) | $36.01 | $23.72 | $59.73 | Agreement |
| PAINTERS: COMMERCIAL BRUSH & ROLLER (JUNIATA COUNTY) | $30.56 | $23.72 | $54.28 | Agreement |
| PAINTERS: BRIDGE, TOWERS (JUNIATA COUNTY) | $38.33 | $23.72 | $62.05 | Agreement |
| PAIN1021-001 · Painters and Allied Trades agreement, May 1, 2012 | ||||
PAINTERS: SPRAY AND SANDBLAST…Full textPAINTERS: SPRAY AND SANDBLAST (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $27.55 | $14.80 | $42.35 | Agreement |
PAINTERS: BRUSH AND ROLLER…Full textPAINTERS: BRUSH AND ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $26.55 | $14.80 | $41.35 | Agreement |
| PAINTERS: BRIDGE; SPRAY (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $31.85 | $14.80 | $46.65 | Agreement |
PAINTERS: BRIDGE; BRUSH…Full textPAINTERS: BRIDGE; BRUSH, ROLLER (BERKS, CARBON, LEBANON, LEHIGH, NORTHAMPTON, AND MONROE COUNTIES) | $30.85 | $14.80 | $45.65 | Agreement |
| PAIN1021-002 · Painters and Allied Trades agreement, May 1, 2009 | ||||
Group definitions, zones and premiums for PAIN1021-002PAINTERS: SPRAY, SANDBLAST (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES).$ 23.75 12.05 PAINTERS: BRUSH AND ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES).$ 22.75 12.05 PAINTERS: BRIDGE; SPRAY (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES).$ 26.60 12.05 PAINTERS: BRIDGE; BRUSH, ROLLER (BRADFORD, COLUMBIA, LACKWANNA, LUZERNE, LYCOMING, MONTOUR, NORTHUMBERLAND, PIKE, SCHUYLKILL, SNYDER, SULLIVAN, SUSQUEHANNA, TIOGA, UNION, WAYNE, WYOMING COUNTIES).$ 25.60 12.05 | ||||
| PLAS0592-004 · Plasterers and Cement Masons agreement, June 1, 2023 | ||||
| CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY; (EXCEPT TOBYHANNA DEPOT)) | $37.13 | $14.30 | $51.43 | Agreement |
| PLAS0592-005 · Plasterers and Cement Masons agreement, June 1, 2023 | ||||
| CEMENT MASON/CONCRETE FINISHER (COLUMBIA COUNTY) | $37.13 | $14.30 | $51.43 | Agreement |
| PLAS0592-017 · Plasterers and Cement Masons agreement, May 1, 2023 | ||||
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (BERKS (NORTHEASTERN PART LYING NORTH OF A LINE STARTING FROM THE SOUTHERN BOUNDARY LINE OF LEHIGH COUNTY CONTINUING THROUGH HUFFS CHURCH, FREDERICKSVILLE, DRYVILLE, LYON STATION, KUTZTOWN, KRUMSVILLE, AND STONEY RUN IN BERKS COUNTY TO THE LEHIGH COUNTY LINE), CARBON, LEHIGH, NORTHAMPTON (NORTHWEST PART INCLUDING THE TOWNS OF WALNUTPORT, BATH, AND NORTHAMPTON) COUNTIES) | $35.18 | $24.25 | $59.43 | Agreement |
| PLAS0592-018 · Plasterers and Cement Masons agreement, May 1, 2023 | ||||
| PLASTERER (ADAMS, BERKS (PORTIONS OF), LANCASTER, AND LEBANON COUNTIES) | $31.33 | $20.75 | $52.08 | Agreement |
| CEMENT MASON/CONCRETE FINISHER (ADAMS, LANCASTER AND YORK COUNTIES) | $34.05 | $21.25 | $55.30 | Agreement |
| PLAS9592-002 · Plasterers and Cement Masons agreement, June 1, 2023 | ||||
| CEMENT MASON/CONCRETE FINISHER (MONROE COUNTY (TOBYHANNA ARMY DEPOT)) | $37.13 | $14.30 | $51.43 | Agreement |
| TEAM0229-003 · Teamsters agreement, May 1, 2025 | ||||
(BRADFORD AND TIOGA COUNTIES) WATER TANK…Full text(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $26.03 | $15.91 | $41.94 | Agreement |
TRUCK DRIVER: GROUP 3…Full textTRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE. (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $42.43 | $0.00 | $42.43 | Agreement |
(BRADFORD AND TIOGA COUNTIES) WATER TANK…Full text(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $26.52 | $15.91 | $42.43 | Agreement |
TRUCK DRIVER: GROUP 2…Full textTRUCK DRIVER: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.94 | $0.00 | $41.94 | Agreement |
TRUCK DRIVER: GROUP 1…Full textTRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) (ADAMS, BERKS, CARBON, COLUMBIA, CUMBERLAND, DAUPHIN, JUNIATA, LACKAWANA, LANCASTER, LEBANON, LEHIGH, LUZERNE, LYCOMING, MONROE, MONTOUR, NORTHAMPTON, NORTHUMBERLAND, PERRY, PIKE, SCHUYKILL, SNYDER, SULLIVAN, SUSQUEHANNA, UNION, WAYNE, WYOMING, AND YORK COUNTIES) | $41.87 | $0.00 | $41.87 | Agreement |
(BRADFORD AND TIOGA COUNTIES) WATER TANK…Full text(BRADFORD AND TIOGA COUNTIES) WATER TANK, SPRINKLER TRUCKS, WINCH TRUCKS AND FUEL TRUCKS SHALL BE GOVERNED BY THE APPROPRIATE CLASSIFICATION AS LISTED ABOVE | $25.96 | $15.91 | $41.87 | Agreement |
Group definitions, zones and premiums for TEAM0229-003TRUCK DRIVERS: GROUP 2 DUMP TRUCK (OVER 10 YDS), ASPHALT DISTRIBUTORS, TRANSIT MIX (UNDER 5 YDS), TRANSIT MIX (OVER 5 YDS.), FLAT OR STAKE BODY (TANDEM), FUEL TRUCK A-FRAME/WINCH TRUCKS, DRY BATCH TRUCK, TRUCK MOUNTED SWEEPER AND VAC TRUCKS, BUSES, DUMPSTER (TANDEM) TRUCK DRIVER: GROUP 3 EUCLID-TYPE, OFF HIGHWAY EQUIPMENT-BACK OR DOUBLE BOTTOM DUMP TRUCKS (OVER 20 TONS), STRADDLE TRUCKS, PUSHER, ARTICULATE DUMPED TRUCKS, LOW BOY TRAILERS, SEMI TRAILERS TRUCK DRIVER: GROUP 1 FLAT BED TRUCK (SINGLE-AXLE), DUMP TRUCKS (UNDER 10 YDS SINGLE AXLE), STAKE BODY TRCK (SINGLE AXLE), DUMPSTER (SINGLE AXLE) | ||||
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on PA20260006?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator