Prevailing wage rates: Baker, Crook, Gilliam and 4 more counties, Oregon

Residential construction · OR20260009 modification 2, published May 18, 2026

The short answer

This sheet sets 23 classifications for residential work in Baker, Crook, Gilliam and 4 more counties, Oregon. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $7.25 an hour (carpenter, excludes form work) to $66.44 (cement mason/concrete finisher). Your contract may lock an earlier modification.

Scope

RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 1 modification. Of the 23 rates we can follow line by line from the first publication to today, 1 is higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

May 18, 2026 · modification 2

Classification names reworded; no change among the 23 lines we could match

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Earlier modifications

  • January 23, 2026 · modification 11 rate raised
    • Electrician: 1 rate raised by $1.95 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    ELECTRICIAN$32.43 + $17.23$33.41 + $18.20+$1.95 (+3.9%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
CARP0503-006 · Carpenters agreement, July 1, 2024
CARPENTERS: (FORM WORK ONLY-SINGLE UNIT)$33.48$14.03$47.51no changeAgreement, 2024
CARPENTERS: (FORM WORK ONLY-MULTI UNIT)$36.27$14.03$50.30no changeAgreement, 2024
ELEC0048-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN (HOOD RIVER COUNTY)$41.67$19.08$60.75no changeAgreement, 2025
ELEC0112-002 · Electrical Workers (IBEW) agreement, September 1, 2024
ELECTRICIAN (BAKER, GILLIAM AND GRANT COUNTIES)$31.05$12.04$43.09no changeAgreement, 2024
ELEC0280-005 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN (CROOK AND JEFFERSON COUNTIES)$40.93$20.39$61.32no changeAgreement, 2025
ELEC0659-010 · Electrical Workers (IBEW) agreement, January 1, 2026
ELECTRICIAN (HARNEY COUNTY)$33.41$18.20$51.61+$1.95 (+3.9%)Agreement, 2026
ENGI0701-017 · Operating Engineers agreement, January 1, 2024
POWER EQUIPMENT OPERATOR GROUP 6…
Full text

POWER EQUIPMENT OPERATOR GROUP 6 LOADERS: (LESS THAN 1 CU YD.); GRADE CHECKER; ROLLER (NON-ASPHALT)

$45.81$16.90$62.71no changeAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5 ROLLER OPERATOR; BULLDOZERS: BULLDOZER OPERATOR, 20,000 LBS. OR LESS OR 100 HORSE OR LESS; HYDRAULIC HOES EXCAVATORS/TRACKHOE: HYDRAULIC BACKHOE OPERATOR, WHEEL TYPE (FORD, JOHN DEERE, CASE TYPE); HYDRAULIC BACKHOE OPERATOR TRACK TYPE UP TO AND INCLUDING 20,000 LBS.; LOADERS: LOADERS, RUBBER- TIRED TYPE, LESS THAN 25,000 LBS; CONCRETE PUMPER; CONCRETE PAVER

$49.03$16.90$65.93no changeAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4 BULLDOZERS: BULLDOZER OPERATOR OVER 20,000 LBS AND MORE THAN 100 HORSE UP TO 70,000 LBS; HYDRAULIC HOES EXCAVATOR/TRACKHOE: ROBOTIC HYDRAULIC BACKHOE OPERATOR, TRACK AND WHEEL TYPE UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; EXCAVATOR OPERATOR OVER 20,000 LBS THROUGH 80,000 LBS.; LOADERS: LOADERS OPERATOR, FRONT END AND OVERHEAD, 25,000 LBS AND LESS THAN 60,000 LBS; RUBBER-TIRED DOZERS; ASPHALT PAVER; SCREED OPERATOR; BLADE OPERATOR; RUBBER-TIRED SCRAPER, SINGLE ENGINE, SINGLE SCRAPER.

$50.27$16.90$67.17no changeAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 3…
Full text

POWER EQUIPMENT OPERATOR GROUP 3 BULLDOZERS: BULLDOZER OPERATOR, OVER 70,000 LBS. UP TO AND INCLUDING 120,000 LBS.; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 80,000 LBS. THROUGH 130,000 LBS.; LOADERS: LOADER OPERATOR 60,000 AND LESS THAN 120,000; RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS.

$53.60$16.90$70.50no changeAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2 BULLDOZERS: BULLDOZER OPERATOR OVER 120,000 LBS AND ABOVE; BULLDOZER OPERATOR, TWIN ENGINE; BULLDOZER OPERATOR,TANDEM, QUADNINE, D10, D11, AND SIMILAR TYPE; LOADERS: LOADER OPERATOR, 120,000 LBS. AND ABOVE; HYDRAULIC HOES-EXCAVATOR: EXCAVATOR OVER 130,000 LBS; BLADE OPERATOR-ROBOTIC; RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINE

$54.75$16.90$71.65no changeAgreement, 2024
LABO0737-005 · Laborers agreement, June 1, 2024
LABORERS: (MASON TENDER-CEMENT/CONCRETE)$43.79$17.05$60.84no changeAgreement, 2024
LABO0737-009 · Laborers agreement, June 1, 2024
LABORERS: (GENERAL LABORER)$39.00$17.30$56.30no changeAgreement, 2024
PLAS0555-003 · Plasterers and Cement Masons agreement, June 1, 2025
CEMENT MASON/CONCRETE FINISHER$46.13$20.31$66.44no changeAgreement, 2025
SUOR2009-007 · Survey of contractors in OR, October 16, 2009
ROOFER$14.41$0.00$14.41no changeSurvey, 2009
CARPENTER, EXCLUDES FORM WORK$7.25$0.00$7.25no changeSurvey, 2009
TEAM0037-008 · Teamsters agreement, June 1, 2025
TRUCK DRIVERS: GROUP 7…
Full text

TRUCK DRIVERS: GROUP 7 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 80 CU. YDS. AND INCLUDING 100 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS

$36.82$18.30$55.12no changeAgreement, 2025
TRUCK DRIVERS: GROUP 6…
Full text

TRUCK DRIVERS: GROUP 6 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 60 CU. YDS. AND INCLUDING 80 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS

$36.57$18.30$54.87no changeAgreement, 2025
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 50 CU. YDS. AND INCLUDING 60 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS

$36.35$18.30$54.65no changeAgreement, 2025
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 30 CU. YDS. AND INCLUDING 50 CU. YDS. AND INCLUDES ARTICULATED DUMP TRUCKS

$36.08$18.30$54.38no changeAgreement, 2025
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: OVER 10 CU. YDS. AND INCLUDING 30 CU. YDS., INCLUDES ARTICULATED DUMP TRUCKS

$35.74$18.30$54.04no changeAgreement, 2025
TRUCK DRIVERS: GROUP 2 DUMP TRCUKS/ARTICULATED DUMPS 6 CU TO 10 CU.;$35.57$18.30$53.87no changeAgreement, 2025
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 DUMP TRUCKS, SIDE, END AND BOTTOM DUMPS: UP TO AND INCLUDING 10 CU. YDS

$35.41$18.30$53.71no changeAgreement, 2025

Modification history

Modification 1January 23, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on OR20260009?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and OR20260009 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 23 classifications in 11 rate groups
  • 10 from agreements, 1 from surveys
  • Counties: Baker, Crook, Gilliam, Grant, Harney, Hood River, Jefferson