Prevailing wage rates · Oklahoma · Wage determination
Prevailing wage rates: Johnston County, Oklahoma
Building construction · OK20260040 modification 1, published May 18, 2026
The short answer
This sheet sets 29 classifications for building work in Johnston County, Oklahoma. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $11.00 an hour (laborer: common or general) to $58.11 (boilermaker). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| BOIL0592-001 · Boilermakers agreement, January 1, 2025 | ||||
| BOILERMAKER | $33.70 | $24.41 | $58.11 | Agreement |
| ELEC1141-007 · Electrical Workers (IBEW) agreement, May 26, 2025 | ||||
| ELECTRICIAN | $41.40 | $13.14 | $54.54 | Agreement |
| ELEC1141-028 · Electrical Workers (IBEW) agreement, May 26, 2025 | ||||
ELECTRICIAN (LOW VOLTAGE WIRING…Full textELECTRICIAN (LOW VOLTAGE WIRING, ALARM INSTALLATION, AND SOUND AND COMMUNICATIONS SYSTEMS INSTALLATION ONLY) | $24.26 | $9.76 | $34.02 | Agreement |
| ENGI0627-019 · Operating Engineers agreement, June 1, 2025 | ||||
POWER EQUIPMENT OPERATOR: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: GROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 | $53.12 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: GROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 | $54.45 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: GROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 | $55.19 | Agreement |
| POWER EQUIPMENT OPERATOR: GROUP 10 OILER | $27.25 | $19.05 | $46.30 | Agreement |
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 | $57.14 | Agreement |
| IRON0048-009 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER, STRUCTURAL | $32.10 | $17.38 | $49.48 | Agreement |
| PLUM0344-006 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 | Agreement |
| PLUM0344-021 · Plumbers and Pipefitters agreement, July 1, 2025 | ||||
PIPEFITTER (INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE…Full textPIPEFITTER (INCLUDING INSTALLATION OF HVAC ELECTRICAL/TEMPERATURE CONTROLS AND HVAC PIPE INSTALLATION) | $41.00 | $16.03 | $57.03 | Agreement |
| SHEE0124-014 · Sheet Metal Workers agreement, July 1, 2021 | ||||
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $33.38 | $16.36 | $49.74 | Agreement |
| SUOK2012-020 · Survey of contractors in OK, June 18, 2012 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $21.52 | $6.00 | $27.52 | Survey |
| ROOFER | $15.00 | $0.29 | $15.29 | Survey |
| PAINTER: BRUSH, ROLLER AND SPRAY | $12.32 | $0.00 | $12.32 | Survey |
| OPERATOR: FORKLIFT | $18.02 | $0.00 | $18.02 | Survey |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $16.83 | $0.00 | $16.83 | Survey |
| LABORER: PIPELAYER | $11.65 | $0.00 | $11.65 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 | $13.04 | Survey |
| LABORER: MASON TENDER - BRICK | $12.00 | $0.00 | $12.00 | Survey |
| LABORER: COMMON OR GENERAL | $11.00 | $0.00 | $11.00 | Survey |
| GLAZIER | $15.27 | $1.46 | $16.73 | Survey |
| FORM WORKER | $16.79 | $3.12 | $19.91 | Survey |
| FLOOR LAYER (HARDWOOD AND CARPET) | $18.74 | $1.10 | $19.84 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $14.50 | $0.00 | $14.50 | Survey |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $16.82 | $2.82 | $19.64 | Survey |
| CARPENTER (DRYWALL HANGING ONLY) | $14.96 | $0.00 | $14.96 | Survey |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $16.24 | $0.00 | $16.24 | Survey |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on OK20260040?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator