CertifiedHours

Prevailing wage rates · Oklahoma · Wage determination

Prevailing wage rates: Canadian, Cleveland, Grady and 3 more counties, Oklahoma

Highway construction · OK20260022 modification 1, published May 18, 2026

The short answer

This sheet sets 64 classifications for highway work in Canadian, Cleveland, Grady and 3 more counties, Oklahoma. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.63 an hour (laborer (landscape)) to $17.37 (traffic signal installer). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUOK2011-009 · Survey of contractors in OK, April 18, 2011
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES)$13.72$0.00$13.72Survey
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CLEVELAND COUNTY)$12.37$0.00$12.37Survey
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CANADIAN COUNTY)$12.00$0.00$12.00Survey
TRUCK DRIVER: DUMP TRUCK (REMAINING COUNTIES)$12.88$0.00$12.88Survey
TRUCK DRIVER: DUMP TRUCK (CLEVELAND COUNTY)$12.32$0.00$12.32Survey
TRUCK DRIVER (WATER TRUCK)$12.00$0.00$12.00Survey
TRUCK DRIVER (PICKUP TRUCK)$12.48$0.00$12.48Survey
TRUCK DRIVER (OFF THE ROAD TRUCK)$13.75$0.00$13.75Survey
TRUCK DRIVER (LOWBOY/FLOAT)$13.90$0.00$13.90Survey
TRUCK DRIVER (FLATBED TRUCK)$14.69$0.00$14.69Survey
TRAFFIC SIGNAL INSTALLER$17.37$0.00$17.37Survey
POWER EQUIPMENT OPERATOR: SCRAPER (REMAINING COUNTIES)$13.19$0.00$13.19Survey
POWER EQUIPMENT OPERATOR: SCRAPER (CLEVELAND COUNTY)$13.06$0.00$13.06Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: SCRAPER (CANADIAN COUNTY).$ 12.00 0.00 POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (REMAINING COUNTIES)

$12.73$0.00$12.73Survey
POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (MCCLAIN COUNTY)$12.94$0.00$12.94Survey
POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (CLEVELAND COUNTY)$12.86$0.00$12.86Survey
POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT) (CANADIAN COUNTY)$11.67$0.00$11.67Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES)$12.85$0.00$12.85Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (CLEVELAND COUNTY)$12.76$0.00$12.76Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE (REMAINING COUNTIES)$14.98$0.00$14.98Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE (CLEVELAND COUNTY)$14.46$0.00$14.46Survey
POWER EQUIPMENT OPERATOR: GRADER/BLADE (CANADIAN COUNTY)$12.00$0.00$12.00Survey
POWER EQUIPMENT OPERATOR: CONCRETE SAW (REMAINING COUNTIES)$11.70$0.00$11.70Survey
POWER EQUIPMENT OPERATOR: CONCRETE SAW (CLEVELAND COUNTY)$11.64$0.00$11.64Survey
POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES)$14.24$0.00$14.24Survey
POWER EQUIPMENT OPERATOR: BULLDOZER (MCCLAIN COUNTY)$13.36$0.00$13.36Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES)$13.64$0.00$13.64Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CLEVELAND COUNTY)$12.91$0.00$12.91Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (REMAINING COUNTIES)$14.08$0.00$14.08Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (MCCLAIN COUNTY)$14.04$0.00$14.04Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (CLEVELAND COUNTY)$14.57$0.00$14.57Survey
POWER EQUIPMENT OPERATOR: ASPHALT PAVING MACHINE (CANADIAN COUNTY)$13.32$0.00$13.32Survey
POWER EQUIPMENT OPERATOR: (TRENCHER)$13.63$0.00$13.63Survey
POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE)$16.50$0.00$16.50Survey
POWER EQUIPMENT OPERATOR: (STRIPING MACHINE)$12.56$0.00$12.56Survey
POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION))$12.27$0.00$12.27Survey
POWER EQUIPMENT OPERATOR: (OILER)$14.06$0.00$14.06Survey
POWER EQUIPMENT OPERATOR: (MIXER)$14.43$0.00$14.43Survey
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)$14.93$0.00$14.93Survey
POWER EQUIPMENT OPERATOR: (MECHANIC)$15.60$0.00$15.60Survey
POWER EQUIPMENT OPERATOR: (EXCAVATOR)$15.10$0.00$15.10Survey
POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK)$13.81$0.00$13.81Survey
POWER EQUIPMENT OPERATOR: (CRANE)$16.99$0.00$16.99Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 13.61 0.00 POWER EQUIPMENT OPERATOR: (BROOM)

$11.97$0.00$11.97Survey
POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER)$12.71$0.00$12.71Survey
POWER EQUIPMENT OPERATOR: (ASPHALT PLANT)$14.70$0.00$14.70Survey
POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED)$12.44$0.00$12.44Survey
LABORER, COMMON OR GENERAL (MCCLAIN COUNTY)$10.37$0.00$10.37Survey
LABORER, COMMON OR GENERAL (LINCOLN COUNTY)$10.17$0.00$10.17Survey
LABORER, COMMON OR GENERAL (GRADY AND LOGAN COUNTIES)$10.55$0.00$10.55Survey
LABORER, COMMON OR GENERAL (CLEVELAND COUNTY)$10.62$0.00$10.62Survey
LABORER, COMMON OR GENERAL (CANADIAN COUNTY)$10.05$0.00$10.05Survey
LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS))$11.12$0.00$11.12Survey
LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS))$12.89$0.00$12.89Survey
LABORER (PIPELAYER)$12.50$0.00$12.50Survey
LABORER (LANDSCAPE)$9.63$0.00$9.63Survey
LABORER (ASPHALT RAKER AND SHOVELER)$11.31$0.00$11.31Survey
IRONWORKER: REINFORCING$13.63$0.00$13.63Survey
IRONWORKER, STRUCTURAL$14.21$0.00$14.21Survey
CEMENT MASON/CONCRETE FINISHER (MCCLAIN)$11.93$0.00$11.93Survey
CEMENT MASON/CONCRETE FINISHER (GRADY, LINCOLN, LOGAN)$12.47$0.00$12.47Survey
CEMENT MASON/CONCRETE FINISHER (CLEVELAND)$12.55$0.00$12.55Survey
CEMENT MASON/CONCRETE FINISHER (CANADIAN)$12.44$0.00$12.44Survey
CARPENTER (INCLUDES FORM WORK)$13.32$0.00$13.32Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on OK20260022?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator