Prevailing wage rates · Oklahoma · Wage determination
Prevailing wage rates: Atoka, Bryan, Carter and 16 more counties, Oklahoma
Highway construction · OK20260020 modification 1, published May 18, 2026
The short answer
This sheet sets 87 classifications for highway work in Atoka, Bryan, Carter and 16 more counties, Oklahoma. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.70 an hour (guardrail installer (includes guardrail/post driver work)) to $17.37 (power equipment operator: (mechanic)). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 1, but none of its modifications has changed a rate.
Latest change
May 18, 2026 · modification 1
Classification names reworded; no change among the 87 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SUOK2011-007 · Survey of contractors in OK, April 18, 2011 | ||||
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (SEMINOLE COUNTY) | $16.12 | $0.00 | $16.12 | Survey, 2011 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES) | $14.76 | $0.00 | $14.76 | Survey, 2011 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (PITTSBURG COUNTY) | $15.68 | $0.00 | $15.68 | Survey, 2011 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (LOVE COUNTY) | $14.06 | $0.00 | $14.06 | Survey, 2011 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CHOCTAW COUNTY) | $14.43 | $0.00 | $14.43 | Survey, 2011 |
| TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (CARTER COUNTY) | $16.61 | $0.00 | $16.61 | Survey, 2011 |
| TRUCK DRIVER (WATER TRUCK) | $12.00 | $0.00 | $12.00 | Survey, 2011 |
| TRUCK DRIVER (STRAIGHT TRUCK) | $15.92 | $0.00 | $15.92 | Survey, 2011 |
| TRUCK DRIVER (SINGLE AXLE TRUCK (INCLUDES PILOT CAR)) | $13.15 | $0.00 | $13.15 | Survey, 2011 |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | $12.63 | $0.00 | $12.63 | Survey, 2011 |
| TRUCK DRIVER (LOWBOY/FLOAT) | $14.99 | $0.00 | $14.99 | Survey, 2011 |
| TRUCK DRIVER (FLATBED TRUCK) | $16.18 | $0.00 | $16.18 | Survey, 2011 |
| TRUCK DRIVER (DUMP TRUCK) | $14.42 | $0.00 | $14.42 | Survey, 2011 |
| TRUCK DRIVER (CONCRETE TRUCK) | $14.22 | $0.00 | $14.22 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SEMINOLE COUNTY) | $13.39 | $0.00 | $13.39 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (REMAINING COUNTIES) | $13.10 | $0.00 | $13.10 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (REMAINING COUNTIES) | $15.02 | $0.00 | $15.02 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: CONCRETE SAW (PITTSBURG COUNTY) | $16.42 | $0.00 | $16.42 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (REMAINING COUNTIES) | $14.34 | $0.00 | $14.34 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (PITTSBURG) | $14.89 | $0.00 | $14.89 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (MCCURTAIN COUNTY) | $13.02 | $0.00 | $13.02 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (LOVE COUNTY) | $14.35 | $0.00 | $14.35 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER (CHOCTAW COUNTY) | $14.56 | $0.00 | $14.56 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES) | $14.05 | $0.00 | $14.05 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (PITTSBURG COUNTY) | $16.83 | $0.00 | $16.83 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (MCCURTAIN COUNTY) | $12.52 | $0.00 | $12.52 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (CHOCTAW COUNTY) | $13.46 | $0.00 | $13.46 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $14.66 | $0.00 | $14.66 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (TRANSFER MATERIAL MACHINE) | $12.38 | $0.75 | $13.13 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | $12.46 | $0.00 | $12.46 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | $12.13 | $0.00 | $12.13 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | $14.62 | $0.00 | $14.62 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ROTOMILL) | $17.33 | $0.00 | $17.33 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | $11.86 | $0.00 | $11.86 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | $12.61 | $0.00 | $12.61 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (OILER) | $16.06 | $0.00 | $16.06 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (MIXER) | $14.56 | $0.00 | $14.56 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.16 | $0.00 | $14.16 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | $17.37 | $0.00 | $17.37 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | $17.04 | $0.00 | $17.04 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $14.08 | $0.00 | $14.08 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | $13.25 | $0.00 | $13.25 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (CRANE) | $16.17 | $0.00 | $16.17 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE) | $14.42 | $0.00 | $14.42 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $11.02 | $0.00 | $11.02 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | $12.62 | $0.00 | $12.62 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PLANT) | $14.70 | $0.00 | $14.70 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $13.11 | $0.00 | $13.11 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | $13.99 | $0.00 | $13.99 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (SEMINOLE COUNTY) | $10.79 | $0.00 | $10.79 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (PUSHMATAHA COUNTY) | $10.80 | $0.00 | $10.80 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (POTTAWATOMIE COUNTY) | $10.60 | $0.00 | $10.60 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (PONTOTOC COUNTY) | $10.48 | $0.00 | $10.48 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (PITTSBURG COUNTY) | $11.05 | $0.00 | $11.05 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (MURRAY COUNTY) | $9.88 | $0.00 | $9.88 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (MCCURTAIN COUNTY) | $9.82 | $0.00 | $9.82 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (MARSHALL COUNTY) | $11.68 | $0.00 | $11.68 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (LOVE COUNTY) | $10.42 | $0.00 | $10.42 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (LATIMER COUNTY) | $10.25 | $0.00 | $10.25 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (JOHNSTON COUNTY) | $10.37 | $0.00 | $10.37 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (HUGHES COUNTY) | $10.01 | $0.00 | $10.01 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (GARVIN COUNTY) | $10.40 | $0.00 | $10.40 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (COAL COUNTY) | $10.55 | $0.00 | $10.55 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (CHOCTAW COUNTY) | $10.34 | $0.00 | $10.34 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (CARTER COUNTY) | $9.97 | $0.00 | $9.97 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (BRYAN AND HASKALL COUNTIES) | $10.49 | $0.00 | $10.49 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (ATOKA COUNTY) | $10.22 | $0.00 | $10.22 | Survey, 2011 |
| LABORER (VIBRATING PLATE) | $12.70 | $0.00 | $12.70 | Survey, 2011 |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | $11.15 | $0.00 | $11.15 | Survey, 2011 |
| LABORER (PIPELAYER) | $11.13 | $0.00 | $11.13 | Survey, 2011 |
| LABORER (ASPHALT RAKER AND SHOVELER) | $12.35 | $0.00 | $12.35 | Survey, 2011 |
| LABORER (AIR/POWER TOOL OPERATOR (INCLUDES HANDHELD CONCRETE SAWS AND CHIPPING GUNS)) | $12.79 | $0.00 | $12.79 | Survey, 2011 |
| IRONWORKER: REINFORCING | $13.63 | $0.00 | $13.63 | Survey, 2011 |
| GUARDRAIL INSTALLER (INCLUDES GUARDRAIL/POST DRIVER WORK) | $9.70 | $0.00 | $9.70 | Survey, 2011 |
| FORM WORKER | $12.19 | $0.00 | $12.19 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES) | $12.65 | $0.00 | $12.65 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (POTTAWATOMIE COUNTY) | $12.28 | $0.00 | $12.28 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (PITTSBURG COUNTY) | $13.70 | $0.00 | $13.70 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (LOVE COUNTY) | $12.95 | $0.00 | $12.95 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (CHOCTAW COUNTY) | $12.00 | $0.00 | $12.00 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (CARTER COUNTY) | $11.80 | $0.00 | $11.80 | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (REMAINING COUNTIES) | $12.53 | $0.00 | $12.53 | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (POTTAWATOMIE COUNTY) | $12.14 | $0.00 | $12.14 | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (PITTSBURG COUNTY) | $12.49 | $0.00 | $12.49 | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (LOVE COUNTY) | $12.45 | $0.00 | $12.45 | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (HUGHES COUNTY) | $11.75 | $0.00 | $11.75 | Survey, 2011 |
| CARPENTER, EXCLUDES FORM WORK (CHOCTAW COUNTY) | $12.87 | $0.00 | $12.87 | Survey, 2011 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on OK20260020?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and OK20260020 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 87 classifications in 1 rate groups
- 0 from agreements, 1 from surveys
- Counties: Atoka, Bryan, Carter, Choctaw, Coal, Garvin, Haskell, Hughes, Johnston, Latimer, Love, Marshall, McCurtain, Murray, Pittsburg, Pontotoc, Pottawatomie, Pushmataha, Seminole