Prevailing wage rates: Creek, Okmulgee, Osage and 4 more counties, Oklahoma

Highway construction · OK20260017 modification 1, published May 18, 2026

The short answer

This sheet sets 51 classifications for highway work in Creek, Okmulgee, Osage and 4 more counties, Oklahoma. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $8.67 an hour (laborer (landscape)) to $18.04 (traffic signal installer). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUOK2011-004 · Survey of contractors in OK, April 18, 2011
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (TULSA COUNTY)$18.01$0.00$18.01Survey
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (ROGERS COUNTY)$14.01$0.31$14.32Survey
TRUCK DRIVER: TANDEM AXLE/SEMI TRAILER (REMAINING COUNTIES)$16.36$0.00$16.36Survey
TRUCK DRIVER (WATER TRUCK)$12.00$0.00$12.00Survey
TRUCK DRIVER (PICKUP TRUCK)$12.32$0.00$12.32Survey
TRUCK DRIVER (OFF THE ROAD TRUCK)$13.40$0.00$13.40Survey
TRUCK DRIVER (LOWBOY/FLOAT)$13.80$0.00$13.80Survey
TRUCK DRIVER (FLATBED TRUCK)$14.69$0.00$14.69Survey
TRUCK DRIVER (DUMP TRUCK)$13.97$0.00$13.97Survey
TRAFFIC SIGNAL INSTALLER$18.04$0.00$18.04Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (TULSA COUNTY)$15.19$0.00$15.19Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (ROGERS COUNTY)$15.11$0.00$15.11Survey
POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (REMAINING COUNTIES)$15.16$0.00$15.16Survey
POWER EQUIPMENT OPERATOR: (TRENCHER)$13.87$0.00$13.87Survey
POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE)$13.67$0.00$13.67Survey
POWER EQUIPMENT OPERATOR: (STRIPING MACHINE)$11.94$0.00$11.94Survey
POWER EQUIPMENT OPERATOR: (SCRAPER)$13.34$0.00$13.34Survey
POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION))$11.71$0.00$11.71Survey
POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT))$12.79$0.00$12.79Survey
POWER EQUIPMENT OPERATOR: (OILER)$15.28$0.00$15.28Survey
POWER EQUIPMENT OPERATOR: (MIXER)$14.43$0.00$14.43Survey
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)$14.56$0.00$14.56Survey
POWER EQUIPMENT OPERATOR: (MECHANIC)$17.46$0.00$17.46Survey
POWER EQUIPMENT OPERATOR: (LOADER (FRONT END))$13.81$0.00$13.81Survey
POWER EQUIPMENT OPERATOR: (GRADER/BLADE)$16.68$0.00$16.68Survey
POWER EQUIPMENT OPERATOR: (EXCAVATOR)$14.99$0.00$14.99Survey
POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK)$13.34$0.00$13.34Survey
POWER EQUIPMENT OPERATOR: (CRANE)$17.45$0.00$17.45Survey
POWER EQUIPMENT OPERATOR: (CONCRETE SAW)$11.94$0.00$11.94Survey
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 14.11 0.00 POWER EQUIPMENT OPERATOR: (BULLDOZER)

$14.28$0.00$14.28Survey
POWER EQUIPMENT OPERATOR: (BROOM)$11.97$0.00$11.97Survey
POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER)$12.24$0.00$12.24Survey
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)$13.95$2.75$16.70Survey
POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED)$12.96$0.00$12.96Survey
LABORER, TRAFFIC CONTROL…
Full text

LABORER, TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (TULSA COUNTY)

$10.94$0.00$10.94Survey
LABORER, TRAFFIC CONTROL…
Full text

LABORER, TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS) (REMAINING COUNTIES)

$11.05$0.00$11.05Survey
LABORER, COMMON OR GENERAL (WAGONER)$10.32$0.00$10.32Survey
LABORER, COMMON OR GENERAL (TULSA COUNTY)$10.84$0.00$10.84Survey
LABORER, COMMON OR GENERAL (ROGERS COUNTY)$10.14$0.00$10.14Survey
LABORER, COMMON OR GENERAL (REMAINING COUNTIES)$10.70$0.00$10.70Survey
LABORER, COMMON OR GENERAL (CREEK COUNTY)$10.95$0.00$10.95Survey
LABORER, ASPHALT RAKER AND SHOVELER…
Full text

LABORER, ASPHALT RAKER AND SHOVELER (ROGERS COUNTY).$ 11.76 1.57 LABORER, ASPHALT RAKER AND SHOVELER (REMAINING COUNTIES)

$12.40$1.57$13.97Survey
LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS))$12.89$0.00$12.89Survey
LABORER (PIPELAYER)$12.35$0.00$12.35Survey
LABORER (LANDSCAPE)$8.67$0.00$8.67Survey
IRONWORKER: REINFORCING$15.38$0.00$15.38Survey
IRONWORKER, STRUCTURAL$14.21$0.00$14.21Survey
CEMENT MASON/CONCRETE FINISHER (TULSA COUNTY)$13.44$0.00$13.44Survey
CEMENT MASON/CONCRETE FINISHER…
Full text

CEMENT MASON/CONCRETE FINISHER (REMAINING COUNTIES).$ 13.36 0.00 CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (TULSA COUNTY)

$12.80$0.00$12.80Survey
CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (ROGERS COUNTY)$14.82$0.00$14.82Survey
CARPENTER, INCLUDES FORM WORK, AND CURB LINE FORMSETTING (REMAINING COUNTIES)$13.24$0.00$13.24Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on OK20260017?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator