Prevailing wage rates · Oklahoma · Wage determination
Prevailing wage rates: Oklahoma County, Oklahoma
Highway construction · OK20260015 modification 1, published May 18, 2026
The short answer
This sheet sets 40 classifications for highway work in Oklahoma County, Oklahoma. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $9.63 an hour (laborer (landscape)) to $17.37 (traffic signal installer). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SUOK2011-002 · Survey of contractors in OK, April 18, 2011 | ||||
| TRUCK DRIVER (WATER TRUCK) | $12.00 | $0.00 | $12.00 | Survey |
| TRUCK DRIVER (TANDEM AXLE/SEMI TRAILER) | $14.64 | $0.00 | $14.64 | Survey |
| TRUCK DRIVER (PICKUP TRUCK) | $12.48 | $0.00 | $12.48 | Survey |
| TRUCK DRIVER (OFF THE ROAD TRUCK) | $14.39 | $0.00 | $14.39 | Survey |
| TRUCK DRIVER (LOWBOY/FLOAT) | $13.90 | $0.00 | $13.90 | Survey |
| TRUCK DRIVER (FLATBED TRUCK) | $14.69 | $0.00 | $14.69 | Survey |
| TRUCK DRIVER (DUMP TRUCK) | $13.08 | $0.00 | $13.08 | Survey |
| TRAFFIC SIGNAL INSTALLER | $17.37 | $0.00 | $17.37 | Survey |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $13.66 | $0.00 | $13.66 | Survey |
| POWER EQUIPMENT OPERATOR: (TRACTOR/BOX BLADE) | $16.50 | $0.00 | $16.50 | Survey |
| POWER EQUIPMENT OPERATOR: (STRIPING MACHINE) | $12.56 | $0.00 | $12.56 | Survey |
| POWER EQUIPMENT OPERATOR: (SCRAPER) | $13.55 | $0.00 | $13.55 | Survey |
| POWER EQUIPMENT OPERATOR: (ROLLER (DIRT COMPACTION)) | $12.36 | $0.00 | $12.36 | Survey |
| POWER EQUIPMENT OPERATOR: (ROLLER (ASPHALT)) | $13.02 | $0.00 | $13.02 | Survey |
| POWER EQUIPMENT OPERATOR: (OILER) | $14.06 | $0.00 | $14.06 | Survey |
| POWER EQUIPMENT OPERATOR: (MIXER) | $14.43 | $0.00 | $14.43 | Survey |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $14.62 | $0.00 | $14.62 | Survey |
| POWER EQUIPMENT OPERATOR: (MECHANIC) | $15.61 | $0.00 | $15.61 | Survey |
| POWER EQUIPMENT OPERATOR: (LOADER (FRONT END)) | $12.95 | $0.00 | $12.95 | Survey |
| POWER EQUIPMENT OPERATOR: (GRADER/BLADE) | $16.36 | $0.00 | $16.36 | Survey |
| POWER EQUIPMENT OPERATOR: (EXCAVATOR) | $15.85 | $0.00 | $15.85 | Survey |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR TRUCK) | $13.81 | $0.00 | $13.81 | Survey |
| POWER EQUIPMENT OPERATOR: (CRANE) | $17.03 | $0.00 | $17.03 | Survey |
| POWER EQUIPMENT OPERATOR: (CONCRETE SAW) | $11.69 | $0.00 | $11.69 | Survey |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: (CONCRETE PAVING MACHINE).$ 13.61 0.00 POWER EQUIPMENT OPERATOR: (BULLDOZER) | $15.09 | $0.00 | $15.09 | Survey |
| POWER EQUIPMENT OPERATOR: (BROOM) | $11.97 | $0.00 | $11.97 | Survey |
| POWER EQUIPMENT OPERATOR: (BOBCAT/SKID LOADER) | $12.79 | $0.00 | $12.79 | Survey |
| POWER EQUIPMENT OPERATOR: (BACKHOE/TRACKHOE) | $13.78 | $0.00 | $13.78 | Survey |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE) | $14.34 | $0.00 | $14.34 | Survey |
| POWER EQUIPMENT OPERATOR: (ASPHALT PAVER SCREED) | $12.44 | $0.00 | $12.44 | Survey |
| LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER, SETTING UP AND MOVING CONES/BARRELS)) | $11.69 | $0.00 | $11.69 | Survey |
| LABORER (POWER TOOL OPERATOR (INCLUDES CHIPPING GUNS AND HANDHELD CONCRETE SAWS)) | $12.89 | $0.00 | $12.89 | Survey |
| LABORER (PIPELAYER) | $12.84 | $0.00 | $12.84 | Survey |
| LABORER (LANDSCAPE) | $9.63 | $0.00 | $9.63 | Survey |
| LABORER (COMMON OR GENERAL) | $10.64 | $0.00 | $10.64 | Survey |
| LABORER (ASPHALT RAKER AND SHOVELER) | $11.31 | $0.00 | $11.31 | Survey |
| IRONWORKER: REINFORCING | $13.00 | $0.00 | $13.00 | Survey |
| IRONWORKER, STRUCTURAL | $14.21 | $0.00 | $14.21 | Survey |
| CEMENT MASON/CONCRETE FINISHER | $12.50 | $0.00 | $12.50 | Survey |
| CARPENTER (INCLUDES FORM WORK) | $12.78 | $0.00 | $12.78 | Survey |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on OK20260015?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator