Prevailing wage rates · Ohio · Wage determination
Prevailing wage rates: Hamilton County, Ohio
Building construction · OH20260082 modification 1, published May 18, 2026
The short answer
This sheet sets 40 classifications for building work in Hamilton County, Ohio. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $24.47 an hour (laborer: landscape & irrigation) to $95.85 (elevator mechanic). Your contract may lock an earlier modification.
Rates by classification
Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| ASBE0008-010 · Asbestos Workers and Heat & Frost Insulators agreement, March 1, 2025 | ||||
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 | $58.27 | Agreement |
| BROH0018-008 · Bricklayers agreement, September 1, 2023 | ||||
| TILE SETTER | $32.41 | $16.36 | $48.77 | Agreement |
| TILE FINISHER | $27.87 | $16.31 | $44.18 | Agreement |
| BRICKLAYER | $35.00 | $17.13 | $52.13 | Agreement |
| BROH0018-008 · Bricklayers agreement, June 1, 2024 | ||||
| TILE SETTER | $32.41 | $16.36 | $48.77 | Agreement |
| TILE FINISHER | $27.87 | $16.31 | $44.18 | Agreement |
| BRICKLAYER | $35.00 | $17.13 | $52.13 | Agreement |
| CARP0002-008 · Carpenters agreement, June 1, 2024 | ||||
| CARPENTER (ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 | $51.36 | Agreement |
| CARP0002-014 · Carpenters agreement, June 1, 2024 | ||||
CARPENTER (INCLUDING DRYWALL HANGING…Full textCARPENTER (INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION AND FORM WORK; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $32.26 | $19.10 | $51.36 | Agreement |
| ELEC0212-010 · Electrical Workers (IBEW) agreement, June 2, 2025 | ||||
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $38.05 | $22.97 | $61.02 | Agreement |
| ELEV0011-002 · Elevator Constructors agreement, January 1, 2025 | ||||
| ELEVATOR MECHANIC PAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 | $95.85 | Agreement |
| ENGI0018-036 · Operating Engineers agreement, May 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR (BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE) | $44.14 | $16.41 | $60.55 | Agreement |
| ENGI0018-037 · Operating Engineers agreement, May 1, 2024 | ||||
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 | $60.55 | Agreement |
| ENGI0066-045 · Operating Engineers agreement, June 1, 2017 | ||||
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $32.42 | $19.66 | $52.08 | Agreement |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $28.87 | $19.66 | $48.53 | Agreement |
| POWER EQUIPMENT OPERATOR (MECHANIC) | $32.92 | $19.66 | $52.58 | Agreement |
| IRON0044-003 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER, REINFORCING | $38.27 | $23.90 | $62.17 | Agreement |
| IRON0044-019 · Ironworkers agreement, June 1, 2025 | ||||
| IRONWORKER: ORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 | $61.67 | Agreement |
| LABO0265-017 · Laborers agreement, June 1, 2025 | ||||
| LABORER: COMMON OR GENERAL | $27.30 | $18.75 | $46.05 | Agreement |
| LABO0265-019 · Laborers agreement, June 1, 2025 | ||||
| LABORER: MASON TENDER - BRICK | $26.60 | $18.75 | $45.35 | Agreement |
| PAIN0123-001 · Painters and Allied Trades agreement, May 1, 2024 | ||||
| PAINTER: BRUSH AND ROLLER | $28.29 | $13.75 | $42.04 | Agreement |
| PAIN0387-002 · Painters and Allied Trades agreement, November 1, 2023 | ||||
| GLAZIER | $31.95 | $18.20 | $50.15 | Agreement |
| PLAS0132-018 · Plasterers and Cement Masons agreement, June 1, 2025 | ||||
| CEMENT MASON/CONCRETE FINISHER | $33.50 | $16.05 | $49.55 | Agreement |
| PLAS0132-019 · Plasterers and Cement Masons agreement, July 1, 2025 | ||||
| PLASTERER | $31.35 | $17.65 | $49.00 | Agreement |
| PLUM0392-005 · Plumbers and Pipefitters agreement, June 1, 2025 | ||||
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 | Agreement |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 | $70.70 | Agreement |
| ROOF0042-007 · Roofers agreement, August 1, 2025 | ||||
| ROOFER | $34.38 | $19.94 | $54.32 | Agreement |
| SFOH0669-009 · SFOH, April 1, 2025 | ||||
| SPRINKLER FITTER (FIRE SPRINKLERS) | $48.28 | $28.08 | $76.36 | SFOH |
| SHEE0024-029 · Sheet Metal Workers agreement, June 1, 2023 | ||||
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION ONLY) | $34.32 | $23.77 | $58.09 | Agreement |
| SUOH2012-084 · Survey of contractors in OH, August 29, 2014 | ||||
| TRUCK DRIVER: DUMP (ALL TYPES) | $24.32 | $11.73 | $36.05 | Survey |
| PAINTER: SPRAY | $22.78 | $12.40 | $35.18 | Survey |
| OPERATOR: ROLLER | $29.85 | $12.00 | $41.85 | Survey |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 | $43.57 | Survey |
| OPERATOR: LOADER | $29.66 | $12.61 | $42.27 | Survey |
| LABORER: PIPELAYER | $23.18 | $8.95 | $32.13 | Survey |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 | $33.67 | Survey |
| LABORER: LANDSCAPE & IRRIGATION | $23.60 | $0.87 | $24.47 | Survey |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 | $35.18 | Survey |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $22.28 | $8.63 | $30.91 | Survey |
| UAVGOH0021 · Union average, January 1, 2019 | ||||
| OPERATOR: OILER | $27.56 | $16.37 | $43.93 | Union average |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on OH20260082?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.