Prevailing wage rates · Ohio · Wage determination
Prevailing wage rates: Adams, Allen, Ashland and 85 more counties, Ohio
Heavy, Highway construction · OH20260001 modification 5, published September 17, 2026
The short answer
This sheet sets 290 classifications for heavy, highway work in Adams, Allen, Ashland and 85 more counties, Ohio. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $19.15 an hour (sound & communication technician) to $83.56 (plumber, pipefitter). Your contract may lock an earlier modification.
Scope
Heavy Construction
Highway Construction
What changed this year
First published January 2, 2026, this sheet is now on modification 5, and its rates have changed in 2 modifications. Of the 215 rates we can follow line by line from the first publication to today, 1 is higher.
If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.
Latest change
September 17, 2026 · modification 5
30 classifications added, 30 classifications removed
Classifications added or removed
- Added: POWER EQUIPMENT OPERATOR: GROUP 1… $44.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 2… $44.02 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 3… $42.98 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 4… $41.80 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 5… $36.34 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 6… $45.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 7… $45.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1… $44.63 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2… $44.30 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3… $38.47 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4… $34.52 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5… $31.13 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1… $40.91 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2… $40.61 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3… $35.27 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4… $31.65 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5… $28.53 + $24.30
- Added: IRONWORKER: ALL OTHER WORK… $29.77 + $21.30
- Added: IRONWORKER: FENCE ERECTOR… $29.77 + $21.30
- Added: IRONWORKER: FLAT ROAD MESH… $26.40 + $24.62
- Added: IRONWORKER: TUNNES & CAISSONS UNDER PRESSURE… $35.50 + $29.20
- Added: IRONWORKER (ALLEN (SOUTHERN HALF)… $37.39 + $25.35
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 2… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 3… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 4… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 5… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 6… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 7… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 8… $34.66 + $23.88
- Added: PAINTER: NEW COMMERCIAL WORK: GROUP 9… $34.66 + $23.88
- Removed: POWER EQUIPMENT OPERATOR GROUP 7…
- Removed: POWER EQUIPMENT OPERATOR GROUP 6…
- Removed: POWER EQUIPMENT OPERATOR GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR GROUP 1…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1…
- Removed: IRONWORKER: FENCE ERECTOR…
- Removed: IRONWORKER: ALL OTHER WORK…
- Removed: IRONWORKER: FLAT ROAD MESH…
- Removed: IRONWORKER: TUNNES & CAISSONS UNDER PRESSURE…
- Removed: IRONWORKER (ALLEN (SOUTHERN HALF)…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 9…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 8…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 7…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 6…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 5…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 4…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 3…
- Removed: PAINTER: NEW COMMERCIAL WORK: GROUP 2…
Earlier modifications
July 30, 2026 · modification 419 classifications added, 19 classifications removed
Classifications added or removed
- Added: POWER EQUIPMENT OPERATOR GROUP 7… $45.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR GROUP 6… $45.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR GROUP 5… $36.34 + $16.41
- Added: POWER EQUIPMENT OPERATOR GROUP 4… $41.80 + $16.41
- Added: POWER EQUIPMENT OPERATOR GROUP 3… $42.98 + $16.41
- Added: POWER EQUIPMENT OPERATOR GROUP 2… $44.02 + $16.41
- Added: POWER EQUIPMENT OPERATOR GROUP 1… $44.14 + $16.41
- Added: LABORER GROUP 4… $36.47 + $14.45
- Added: LABORER GROUP 4… $38.13 + $14.45
- Added: LABORER GROUP 4… $36.90 + $14.45
- Added: LABORER GROUP 3… $36.02 + $14.45
- Added: LABORER GROUP 3… $37.68 + $14.45
- Added: LABORER GROUP 3… $36.45 + $14.45
- Added: LABORER GROUP 2… $35.69 + $14.45
- Added: LABORER GROUP 2… $37.35 + $14.45
- Added: LABORER GROUP 2… $36.12 + $14.45
- Added: LABORER GROUP 1… $35.52 + $14.45
- Added: LABORER GROUP 1… $37.18 + $14.45
- Added: LABORER GROUP 1… $35.95 + $14.45
- Removed: POWER EQUIPMENT OPERATOR: GROUP 1…
- Removed: POWER EQUIPMENT OPERATOR: GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR: GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR: GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR: GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR: GROUP 6…
- Removed: POWER EQUIPMENT OPERATOR: GROUP 7…
- Removed: LABORER GROUP 1…
- Removed: LABORER GROUP 1…
- Removed: LABORER GROUP 1…
- Removed: LABORER GROUP 2…
- Removed: LABORER GROUP 2…
- Removed: LABORER GROUP 2…
- Removed: LABORER GROUP 3…
- Removed: LABORER GROUP 3…
- Removed: LABORER GROUP 3…
- Removed: LABORER GROUP 4…
- Removed: LABORER GROUP 4…
- Removed: LABORER GROUP 4…
June 25, 2026 · modification 37 classifications added, 7 classifications removed
Classifications added or removed
- Added: POWER EQUIPMENT OPERATOR: GROUP 1… $44.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 2… $44.02 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 3… $42.98 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 4… $41.80 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 5… $36.34 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 6… $45.14 + $16.41
- Added: POWER EQUIPMENT OPERATOR: GROUP 7… $45.14 + $16.41
- Removed: POWER EQUIPMENT OPERATOR GROUP 7…
- Removed: POWER EQUIPMENT OPERATOR GROUP 6…
- Removed: POWER EQUIPMENT OPERATOR GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR GROUP 1…
May 20, 2026 · modification 21 rate raised, 1 rate lowered; 27 classifications added, 25 classifications removed
- Ironworker: 1 raised and 1 lowered, by between $0.05 and $13.63 an hour
Every line that changed (2)
Classification Was Now Change IRONWORKER: FENCE ERECTOR (CRAWFORD (AREA BETWEEN LINES DRAWN FROM WHERE HWY #598 &… $26.40 + $24.62 $29.77 + $21.30 +$0.05 (+0.1%) IRONWORKER: ALL OTHER WORK (CRAWFORD (AREA BETWEEN LINES DRAWN FROM WHERE HWY #598 &… $35.50 + $29.20 $29.77 + $21.30 −$13.63 (−21.1%) Classifications added or removed
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5… $28.53 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4… $31.65 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3… $35.27 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2… $40.61 + $24.30
- Added: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1… $40.91 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5… $31.13 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4… $34.52 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3… $38.47 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2… $44.30 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1… $44.63 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 5… $25.94 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 4… $28.77 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 3… $32.06 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 2… $36.92 + $24.30
- Added: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 1… $37.19 + $24.30
- Added: IRONWORKER: STRUCTURAL… $36.83 + $29.01
- Added: IRONWORKER: FLAT ROAD MESH… $26.40 + $24.62
- Added: IRONWORKER: TUNNES & CAISSONS UNDER PRESSURE… $35.50 + $29.20
- Added: LABORER: SEWAGE PLANTS… $38.56 + $14.45
- Added: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SPRAY… $25.80 + $10.20
- Added: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SANDBLASTING & HOPPER TENDER… $26.05 + $10.20
- Added: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRUSH & ROLLER… $25.30 + $10.20
- Added: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGES WHEN HIGHEST… $26.30 + $10.20
- Added: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGE EQUIPMENT TENDER… $21.95 + $10.20
- Added: PAINTER: BRIDGES; BLASTERS; AND RIGGERS (KNOX, LICKING, MUSKINGUM, AND PERRY) $34.60 + $7.25
- Added: PAINTER: GROUP 2- BRIDGES (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) $40.27 + $18.36
- Added: PAINTERS: GROUP 7… $33.18 + $18.15
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1…
- Removed: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 5…
- Removed: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 4…
- Removed: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 3…
- Removed: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 2…
- Removed: POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 1…
- Removed: IRONWORKER: STRUCTURAL…
- Removed: LABORER (CUYAHOGA AND GEAUGA COUNTIES ONLY…
- Removed: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SPRAY
- Removed: PAINTER HEAVY &…
- Removed: PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRUSH & ROLLER
- Removed: PAINTER HEAVY &…
- Removed: PAINTER HEAVY &…
- Removed: PAINTER: BRIDGES; BLASTERS; ANDRIGGERS (KNOX, LICKING, MUSKINGUM, AND PERRY)
- Removed: PAINTER: GROUP 2BRIDGES (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES)
- Removed: PAINTERS: GROUP 7SYNTHETIC…
May 18, 2026 · modification 1Classification names reworded; 1 rate raised, 25 fringe formulas changed among the 262 lines we could match
- Line construction: 24 fringe formulas changed
- Plumber: 1 rate raised by $10.40 an hour
- Sign painter & erector: 1 fringe formula changed
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Every line that changed (26)
Classification Was Now Change LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, C… $54.96 + 27%+8.25 $54.96 + $23.09 changed LINE CONSTRUCTION: LINEMEN/CABLE SPLICER: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS… $43.89 + 27%+8.00 $43.89 + $19.85 changed LINE CONSTRUCTION: GROUNDMAN: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEA… $38.47 + 27%+8.25 $38.47 + $18.64 changed LINE CONSTRUCTION: GROUNDMAN: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA,… $31.10 + 27%+8.00 $31.10 + $16.40 changed LINE CONSTRUCTION: EQUIPMENT OPERATOR: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYA… $49.46 + 27%+8.25 $49.46 + $21.60 changed LINE CONSTRUCTION: EQUIPMENT OPERATOR: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (A… $39.97 + 27%+8.00 $39.97 + $18.79 changed LINE CONSTRUCTION: LINEMAN & CABLE SPLICERS (STATEWIDE) $46.02 + 4%+17.20 $46.02 + $19.04 changed LINE CONSTRUCTION: GROUNDMAN (STATEWIDE) $29.07 + 4%+13.81 $29.07 + $14.97 changed LINE CONSTRUCTION: EQUIPMENT OPERATOR (STATEWIDE) $40.44 + 4%+16.09 $40.44 + $17.71 changed LINE CONSTRUCTION: LINEMAN (ALLEN, HARDIN, VAN WERT & WYANDOT (CRAWFORD, JACKSON, MARSEI… $47.07 + 28%+7.85 $47.07 + $21.03 changed LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (ALLEN, HARDIN, VAN WERT & WYANDOT (CRAWFORD,… $20.59 + 28%+7.85 $20.59 + $13.62 changed LINE CONSTRUCTION: EQUIPMENT OPERATOR (ALLEN, HARDIN, VAN WERT & WYANDOT (CRAWFORD, JACK… $32.95 + 28%+7.85 $32.95 + $17.08 changed LINE CONSTRUCTION: TRAFFIC SIGNAL & LIGHTING TECHNICIAN (DEFIANCE, FULTON, HANCOCK, HENR… $42.18 + 8.10+28% $42.18 + $19.91 changed LINE CONSTRUCTION: OPERATOR - CLASS 2 (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, O… $32.81 + 8.10+28% $32.81 + $17.29 changed LINE CONSTRUCTION: OPERATOR - CLASS 1 (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, O… $37.50 + 8.10+28% $37.50 + $18.60 changed LINE CONSTRUCTION: LINEMAN (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAUL… $46.87 + 8.10+28% $46.87 + $21.22 changed LINE CONSTRUCTION: HELI-ARC WELDING (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTT… $47.17 + 8.10+28% $47.17 + $21.31 changed LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCA… $20.51 + 8.10+28% $20.51 + $13.84 changed LINE CONSTRUCTION: CABLE SPLICER (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA… $53.90 + 8.10+28% $53.90 + $23.19 changed LINE CONSTRUCTION: OPERATOR - CLASS 2 (ERIE COUNTY) $32.81 + 28%+8.10 $32.81 + $17.29 changed LINE CONSTRUCTION: OPERATOR - CLASS 1 (ERIE COUNTY) $37.50 + 28%+8.10 $37.50 + $18.60 changed LINE CONSTRUCTION: LINEMAN (ERIE COUNTY) $46.87 + 28%+8.10 $46.87 + $21.22 changed LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (ERIE COUNTY) $20.51 + 28%+8.10 $20.51 + $13.84 changed LINE CONSTRUCTION: CABLE SPLICER (ERIE COUNTY) $53.90 + 28%+8.10 $53.90 + $23.19 changed SIGN PAINTER & ERECTOR $20.61 + 3.50+a+b+c $20.61 + $3.50 changed PLUMBER, PIPEFITTER, STEAMFITTER (DELAWARE, FAIRFIELD, FRANKLIN, HOCKING, LICKING, MADIS… $43.25 + $26.94 $53.00 + $27.59 +$10.40 (+14.8%)
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 5 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Since Jan 2 | Source |
|---|---|---|---|---|---|
| BROH0001-001 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (DEFIANCE, FULTON (EXCLUDING FULTON, AMBOY & SWAN CREEK TOWNSHIPS), HENRY (EXCLUDING MONROE, BARTLOW, LIBERTY, WASHINGTON, RICHFIELD, MARION, DAMASCUS & TOWNSHIPS & THAT PART OF HARRISON TOWNSHIP OUTSIDE CORPORATE LIMITS OF CITY OF NAPOLEON), PAULDING, PUTNAM AND WILLIAMS COUNTIES) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0001-004 · Bricklayers agreement, June 1, 2023 | |||||
| CEMENT MASON/CONCRETE FINISHER | $32.40 | $19.30 | $51.70 | no change | Agreement, 2023 |
| BROH0003-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (FULTON (TOWNSHIPS OF AMBOY, SWAN CREEK & FULTON), HENRY (TOWNSHIPS OF WASHINGTON, DAMASCUS, RICHFIELD, BARTLOW, LIBERTY, HARRISON, MONROE, & MARION), LUCAS AND WOOD (TOWNSHIPS OF PERRYSBURG, ROSS, LAKE, TROY, FREEDOM, MONTGOMERY, WEBSTER, CENTER, PORTAGE, MIDDLETON, PLAIN, LIBERTY, HENRY, WASHINGTON, WESTON, MILTON, JACKSON & GRAND RAPIDS) COUNTIES) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0005-003 · Bricklayers agreement, June 1, 2020 | |||||
BRICKLAYER: BRICKLAYERS…Full textBRICKLAYER: BRICKLAYERS; CAULKERS; CLEANERS; POINTERS; & STONEMASONS (CUYAHOGA, LORAIN & MEDINA (HINCKLEY, GRANGER, BRUNSWICK, LIVERPOOL, MONTVILLE, YORK, HOMER, HARRISVILLE, CHATHAM, LITCHFIELD & SPENCER TOWNSHIPS AND THE CITY OF MEDINA)) | $36.64 | $17.13 | $53.77 | no change | Agreement, 2020 |
BRICKLAYER: SANDBLASTERS…Full textBRICKLAYER: SANDBLASTERS (CUYAHOGA, LORAIN & MEDINA (HINCKLEY, GRANGER, BRUNSWICK, LIVERPOOL, MONTVILLE, YORK, HOMER, HARRISVILLE, CHATHAM, LITCHFIELD & SPENCER TOWNSHIPS AND THE CITY OF MEDINA)) | $36.39 | $17.13 | $53.52 | no change | Agreement, 2020 |
BRICKLAYER: SEWER BRICKLAYERS & STACK BUILDERS…Full textBRICKLAYER: SEWER BRICKLAYERS & STACK BUILDERS (CUYAHOGA, LORAIN & MEDINA (HINCKLEY, GRANGER, BRUNSWICK, LIVERPOOL, MONTVILLE, YORK, HOMER, HARRISVILLE, CHATHAM, LITCHFIELD & SPENCER TOWNSHIPS AND THE CITY OF MEDINA)) | $36.64 | $17.13 | $53.77 | no change | Agreement, 2020 |
BRICKLAYER: SWING SCAFFOLDS…Full textBRICKLAYER: SWING SCAFFOLDS (CUYAHOGA, LORAIN & MEDINA (HINCKLEY, GRANGER, BRUNSWICK, LIVERPOOL, MONTVILLE, YORK, HOMER, HARRISVILLE, CHATHAM, LITCHFIELD & SPENCER TOWNSHIPS AND THE CITY OF MEDINA)) | $37.14 | $17.13 | $54.27 | no change | Agreement, 2020 |
| BROH0006-005 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (CARROLL, COLUMBIANA (KNOX, BUTLER, WEST & HANOVER TOWNSHIPS), STARK & TUSCARAWAS) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0007-002 · Bricklayers agreement, June 1, 2024 | |||||
| BRICKLAYER, STONEMASON (LAWRENCE) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0007-005 · Bricklayers agreement, June 1, 2023 | |||||
| BRICKLAYER (PORTAGE & SUMMIT) | $32.40 | $19.30 | $51.70 | no change | Agreement, 2023 |
| BROH0007-010 · Bricklayers agreement, June 1, 2024 | |||||
| MASON - STONE (PORTAGE & SUMMIT) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0008-001 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER (COLUMBIANA…Full textBRICKLAYER (COLUMBIANA (SALEM, PERRY, FAIRFIELD, CENTER, ELK RUN, MIDDLETON, & UNITY TOWNSHIPS AND THE CITY OF NEW WATERFORD), MAHONING & TRUMBULL) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0009-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (BELMONT & MONROE COUNTIES AND THE TOWNSHIPS OF WARREN & MT. PLEASANT AND THE VILLAGE OF DILLONVALE IN JEFFERSON COUNTY) | $33.39 | $20.06 | $53.45 | — | Agreement, 2024 |
REFRACTORY (BELMONT & MONROE COUNTIES AND THE TOWNSHIPS OF WARREN & MT. PLEASANT AND THE…Full textREFRACTORY (BELMONT & MONROE COUNTIES AND THE TOWNSHIPS OF WARREN & MT. PLEASANT AND THE VILLAGE OF DILLONVALE IN JEFFERSON COUNTY) | $31.45 | $19.01 | $50.46 | — | Agreement, 2024 |
| BROH0010-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (COLUMBIANA (ST. CLAIR, MADISON, WAYNE, FRANKLIN, WASHINGTON, YELLOW CREEK & LIVERPOOL TOWNSHIPS) & JEFFERSON (BRUSH CREEK & SALINE TOWNSHIPS)) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0014-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (HARRISON & JEFFERSON (EXCEPT MT. PLEASANT, WARREN, BRUSH CREEK, SALINE & SALINEVILLE TOWNSHIPS & THE VILLAGE OF DILLONVALE)) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0016-002 · Bricklayers agreement, June 1, 2023 | |||||
| BRICKLAYER, STONEMASON (ASHTABULA, GEAUGA, AND LAKE COUNTIES) | $32.40 | $19.30 | $51.70 | no change | Agreement, 2023 |
| BROH0018-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (GASPER, DIXON, ISRAEL, LANIER, SOMERS & GRATIS TOWNSHIPS) & WARREN COUNTIES:) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0022-004 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN, MIAMI, MONTGOMERY, PREBLE (JACKSON, MONROE, HARRISON, TWIN, JEFFERSON & WASHINGTON TOWNSHIPS) AND SHELBY COUNTIES) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0032-001 · Bricklayers agreement, June 1, 2024 | |||||
| BRICKLAYER, STONEMASON (GALLIA & MEIGS) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0035-002 · Bricklayers agreement, June 1, 2024 | |||||
| BRICKLAYER, STONEMASON (ALLEN, AUGLAIZE, MERCER AND VAN WERT COUNTIES) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0039-002 · Bricklayers agreement, June 1, 2024 | |||||
| BRICKLAYER, STONEMASON (ADAMS & SCIOTO) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0040-003 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND, WAYNE AND WYANDOT (EXCEPT CRAWFORD, RIDGE, RICHLAND & TYMOCHTEE TOWNSHIPS) COUNTIES) FOOTNOTE: LAYOUT MAN AND SAWMAN RATE: $1.00 PER HOUR ABOVE JOURNEYMAN RATE. FREE STANDING STACK WORK GROUND LEVEL TO TOP OF STACK; SANDBLASTING AND LAYING OF CARBON MASONRY MATERIAL IN SWING STAGE AND/OR SCAFFOLD; RAMMING AND SPADING OF PLASTICS AND GUNNITING: $1.50 PER HOUR ABOVE JOURNEYMAN RATE. ""HOT"" WORK: $2.50 ABOVE JOURNEYMAN RATE | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0044-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (COSHOCTON, FAIRFIELD, GUERNSEY, HOCKING, KNOX, KICKING, MORGAN, MUSKINGUM, NOBLE (BEAVER, BUFFALO, SENECA & WAYNE TOWNSHIPS) & PERRY COUNTIES:) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0045-002 · Bricklayers agreement, June 1, 2023 | |||||
| BRICKLAYER, STONEMASON (FAYETTE, JACKSON, PIKE, ROSS AND VINTON COUNTIES) | $35.39 | $17.47 | $52.86 | no change | Agreement, 2023 |
| BROH0046-002 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (PERRY & BLOOM TOWNSHIPS) AND WYANDOT (TYMOCHTEE, CRAWFORD, RIDGE & RICHLAND TOWNSHIPS) COUNTIES & THE ISLANDS OF LAKE ERIE NORTH OF SANDUSKY) FOOTNOTE: LAYOUT MAN AND SAWMAN RATE: $1.00 PER HOUR ABOVE JOURNEYMAN RATE. FREE STANDING STACK WORK GROUND LEVEL TO TOP OF STACK; SANDBLASTING AND LAYING OF CARBON MASONRY MATERIAL IN SWING STAGE AND/OR SCAFFOLD; RAMMING AND SPADING OF PLASTICS AND GUNNITING: $1.50 PER HOUR ABOVE JOURNEYMAN RATE. ""HOT"" WORK: $2.50 ABOVE JOURNEYMAN RATE | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0052-001 · Bricklayers agreement, June 1, 2024 | |||||
| BRICKLAYER, STONEMASON (ATHENS COUNTY) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0052-003 · Bricklayers agreement, June 1, 2024 | |||||
BRICKLAYER, STONEMASON…Full textBRICKLAYER, STONEMASON (NOBLE (BROOKFIELD, NOBLE, CENTER, SHARON, OLIVE, ENOCH, STOCK, JACKSON, JEFFERSON & ELK TOWNSHIPS) AND WASHINGTON COUNTIES) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| BROH0055-003 · Bricklayers agreement, June 1, 2024 | |||||
| BRICKLAYER, STONEMASON (DELAWARE, FRANKLIN, MADISON, PICKAWAY AND UNION COUNTIES) | $33.39 | $20.06 | $53.45 | no change | Agreement, 2024 |
| CARP0002-024 · Carpenters agreement, May 1, 2025 | |||||
CARPENTER & PILEDRIVERMEN…Full textCARPENTER & PILEDRIVERMEN (BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE, GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN) | $35.94 | $23.59 | $59.53 | — | Agreement, 2025 |
DIVER (BROWN, BUTLER…Full textDIVER (BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE, GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN) | $40.58 | $9.69 | $50.27 | — | Agreement, 2025 |
| CARP0171-001 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (MAHONING & TRUMBULL) | $33.19 | $25.02 | $58.21 | no change | Agreement, 2025 |
| CARP0171-002 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE) | $32.50 | $26.19 | $58.69 | no change | Agreement, 2025 |
| CARP0200-002 · Carpenters agreement, May 1, 2025 | |||||
CARPENTER (ADAMS, ATHENS…Full textCARPENTER (ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA, GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING, MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON AND WASHINGTON COUNTIES) | $35.94 | $23.59 | $59.53 | — | Agreement, 2025 |
DIVER (ADAMS, ATHENS…Full textDIVER (ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA, GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING, MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON AND WASHINGTON COUNTIES) | $39.41 | $10.40 | $49.81 | — | Agreement, 2025 |
PILEDRIVERMAN (ADAMS…Full textPILEDRIVERMAN (ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA, GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING, MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON AND WASHINGTON COUNTIES) | $35.94 | $23.59 | $59.53 | — | Agreement, 2025 |
| CARP0285-001 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (CARROLL, STARK, TUSCARAWAS AND WAYNE) | $34.07 | $24.28 | $58.35 | no change | Agreement, 2025 |
| CARP0285-002 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (COSHOCTON, HOLMES, KNOX & MORROW) | $33.38 | $24.69 | $58.07 | no change | Agreement, 2025 |
| CARP0285-008 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (MEDINA, PORTAGE & SUMMIT) | $37.18 | $25.07 | $62.25 | no change | Agreement, 2025 |
| CARP0351-005 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (LUCAS & WOOD) | $35.44 | $27.56 | $63.00 | no change | Agreement, 2025 |
| CARP0351-006 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (DEFIANCE, FULTON, HANCOCK, HENRY, PAULDING & WILLIAMS COUNTIES) | $32.05 | $26.13 | $58.18 | no change | Agreement, 2025 |
| CARP0372-002 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT) | $31.80 | $26.33 | $58.13 | no change | Agreement, 2025 |
| CARP0435-005 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (ASHTABULA, CUYAHOGA, GEAUGA & LAKE) | $38.57 | $24.64 | $63.21 | no change | Agreement, 2025 |
| CARP0735-001 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (ASHLAND, HURON & RICHLAND) | $34.67 | $23.57 | $58.24 | no change | Agreement, 2025 |
| CARP0735-002 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (LORAIN) | $38.42 | $24.01 | $62.43 | no change | Agreement, 2025 |
| CARP0735-004 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (ERIE) | $36.71 | $24.14 | $60.85 | no change | Agreement, 2025 |
| CARP0744-001 · Carpenters agreement, May 1, 2025 | |||||
| CARPENTER (CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT) | $33.74 | $27.05 | $60.79 | no change | Agreement, 2025 |
| CARP1090-002 · Carpenters agreement, May 1, 2025 | |||||
PILEDRIVERMEN & DIVER'S TENDER…Full textPILEDRIVERMEN & DIVER'S TENDER (ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT) DIVERS - $250.00 PER DAY | $35.94 | $28.39 | $64.33 | no change | Agreement, 2025 |
| CARP1090-003 · Carpenters agreement, May 1, 2025 | |||||
| DIVER, WET (BELMONT, HARRISON, & MONROE) | $58.52 | $24.91 | $83.43 | no change | Agreement, 2025 |
| PILEDRIVERMEN; DIVER, DRY (BELMONT, HARRISON, & MONROE) | $39.01 | $24.91 | $63.92 | no change | Agreement, 2025 |
| CARP1090-004 · Carpenters agreement, May 1, 2025 | |||||
| DIVER, WET (CARROLL, STARK, TUSCARAWAS & WAYNE) | $49.82 | $25.40 | $75.22 | no change | Agreement, 2025 |
| PILEDRIVERMEN; DIVER, DRY (CARROLL, STARK, TUSCARAWAS & WAYNE) | $33.21 | $25.40 | $58.61 | no change | Agreement, 2025 |
| CARP1090-005 · Carpenters agreement, May 1, 2025 | |||||
DIVER, WET (ASHLAND…Full textDIVER, WET (ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE, LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT) | $54.51 | $27.50 | $82.01 | no change | Agreement, 2025 |
PILEDRIVERMEN; DIVER…Full textPILEDRIVERMEN; DIVER, DRY (ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE, LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT) | $36.34 | $27.50 | $63.84 | no change | Agreement, 2025 |
| CARP1090-006 · Carpenters agreement, May 1, 2025 | |||||
| DIVER, WET (COSHOCTON, HOLMES, KNOX & MORROW) | $54.36 | $22.54 | $76.90 | no change | Agreement, 2025 |
| PILEDRIVERMEN; DIVER, DRY (COSHOCTON, HOLMES, KNOX & MORROW) | $36.24 | $22.54 | $58.78 | no change | Agreement, 2025 |
| CARP1090-007 · Carpenters agreement, May 1, 2025 | |||||
| DIVER, WET (MAHONING & TRUMBULL) | $50.85 | $24.82 | $75.67 | no change | Agreement, 2025 |
| PILEDRIVERMEN; DIVER, DRY (MAHONING & TRUMBULL) | $33.90 | $24.82 | $58.72 | no change | Agreement, 2025 |
| CARP1090-008 · Carpenters agreement, May 1, 2025 | |||||
| PILEDRIVERMAN (COLUMBIANA & JEFFERSON) | $39.01 | $24.91 | $63.92 | no change | Agreement, 2025 |
| CARP1090-009 · Carpenters agreement, May 1, 2025 | |||||
PILEDRIVERMEN & DIVER'S TENDER…Full textPILEDRIVERMEN & DIVER'S TENDER (CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD) DIVERS - $250.00 PER DAY | $37.98 | $28.63 | $66.61 | no change | Agreement, 2025 |
| ELEC0008-002 · Electrical Workers (IBEW) agreement, May 27, 2024 | |||||
CABLE SPLICER (DEFIANCE…Full textCABLE SPLICER (DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD) | $38.98 | $18.96 | $57.94 | — | Agreement, 2024 |
ELECTRICIAN (DEFIANCE…Full textELECTRICIAN (DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD) | $48.40 | $25.24 | $73.64 | — | Agreement, 2024 |
| ELEC0032-003 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (ALLEN…Full textELECTRICIAN (ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT & WYANDOT (CRAWFORD, JACKSON, MARSEILLES, MIFFLIN, RIDGELAND, RIDGE & SALEM TOWNSHIPS)) | $39.17 | $23.60 | $62.77 | no change | Agreement, 2025 |
| ELEC0038-002 · Electrical Workers (IBEW) agreement, April 28, 2025 | |||||
| ELECTRICIAN, EXCLUDING SOUND & COMMUNICATIONS WORK. FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $46.63 | $24.92 | $71.55 | no change | Agreement, 2025 |
| ELEC0038-008 · Electrical Workers (IBEW) agreement, April 28, 2025 | |||||
SOUND & COMMUNICATION TECHNICIAN…Full textSOUND & COMMUNICATION TECHNICIAN: COMMUNICATIONS TECHNICIAN (CUYAHOGA, GEAUGA (BAINBRIDGE, CHESTER & RUSSELL TOWNSHIPS) & LORAIN (COLUMBIA TOWNSHIP)) FOOTNOTES: ; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $34.30 | $14.95 | $49.25 | no change | Agreement, 2025 |
SOUND & COMMUNICATION TECHNICIAN…Full textSOUND & COMMUNICATION TECHNICIAN: INSTALLER TECHNICIAN (CUYAHOGA, GEAUGA (BAINBRIDGE, CHESTER & RUSSELL TOWNSHIPS) & LORAIN (COLUMBIA TOWNSHIP)) FOOTNOTES: ; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $33.05 | $14.91 | $47.96 | no change | Agreement, 2025 |
| ELEC0064-003 · Electrical Workers (IBEW) agreement, November 30, 2025 | |||||
ELECTRICIAN (COLUMBIANA…Full textELECTRICIAN (COLUMBIANA (BUTLER, FAIRFIELD, PERRY, SALEM & UNITY TOWNSHIPS) MAHONING (AUSTINTOWN, BEAVER, BERLIN, BOARDMAN, CANFIELD, ELLSWORTH, COITSVILLE, GOSHEN, GREEN, JACKSON, POLAND, SPRINGFIELD & YOUNGSTOWN TOWNSHIPS), & TRUMBULL (HUBBARD & LIBERTY TOWNSHIPS)) | $41.49 | $21.81 | $63.30 | no change | Agreement, 2025 |
| ELEC0071-005 · Electrical Workers (IBEW) agreement, January 6, 2025 | |||||
LINE CONSTRUCTION: EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: EQUIPMENT OPERATOR: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $39.97 | $18.79 | $58.76 | changed | Agreement, 2025 |
LINE CONSTRUCTION: EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: EQUIPMENT OPERATOR: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $49.46 | $21.60 | $71.06 | changed | Agreement, 2025 |
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $31.10 | $16.40 | $47.50 | changed | Agreement, 2025 |
LINE CONSTRUCTION: GROUNDMAN…Full textLINE CONSTRUCTION: GROUNDMAN: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $38.47 | $18.64 | $57.11 | changed | Agreement, 2025 |
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER…Full textLINE CONSTRUCTION: LINEMEN/CABLE SPLICER: DOT/TRAFFIC SIGNAL & HIGHWAY LIGHTING PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $43.89 | $19.85 | $63.74 | changed | Agreement, 2025 |
LINE CONSTRUCTION: LINEMEN/CABLE SPLICER…Full textLINE CONSTRUCTION: LINEMEN/CABLE SPLICER: MUNICIPAL POWER/TRANSIT PROJECTS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN) | $54.96 | $23.09 | $78.05 | changed | Agreement, 2025 |
| ELEC0071-010 · Electrical Workers (IBEW) agreement, January 6, 2025 | |||||
| LINE CONSTRUCTION: EQUIPMENT OPERATOR (STATEWIDE) | $40.44 | $17.71 | $58.15 | changed | Agreement, 2025 |
| LINE CONSTRUCTION: GROUNDMAN (STATEWIDE) | $29.07 | $14.97 | $44.04 | changed | Agreement, 2025 |
| LINE CONSTRUCTION: LINEMAN & CABLE SPLICERS (STATEWIDE) | $46.02 | $19.04 | $65.06 | changed | Agreement, 2025 |
| ELEC0082-002 · Electrical Workers (IBEW) agreement, December 2, 2024 | |||||
ELECTRICIAN (CLINTON…Full textELECTRICIAN (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (WAYNE, CLEAR CREEK & FRANKLIN TOWNSHIPS)) | $38.00 | $22.49 | $60.49 | no change | Agreement, 2024 |
| ELEC0082-006 · Electrical Workers (IBEW) agreement, November 25, 2024 | |||||
SOUND & COMMUNICATION TECHNICIAN…Full textSOUND & COMMUNICATION TECHNICIAN: CABLE PULLER (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (WAYNE, CLEAR CREEK & FRANKLIN TOWNSHIPS)) | $13.85 | $5.30 | $19.15 | no change | Agreement, 2024 |
SOUND & COMMUNICATION TECHNICIAN…Full textSOUND & COMMUNICATION TECHNICIAN: INSTALLER/TECHNICIAN (CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN (WAYNE, CLEAR CREEK & FRANKLIN TOWNSHIPS)) | $27.70 | $15.71 | $43.41 | no change | Agreement, 2024 |
| ELEC0129-003 · Electrical Workers (IBEW) agreement, February 24, 2025 | |||||
ELECTRICIAN (LORAIN…Full textELECTRICIAN (LORAIN (EXCEPT COLUMBIA TOWNSHIP) & MEDINA (LITCHFIELD & LIVERPOOL TOWNSHIPS)) | $42.95 | $18.81 | $61.76 | no change | Agreement, 2025 |
| ELEC0129-004 · Electrical Workers (IBEW) agreement, February 24, 2025 | |||||
ELECTRICIAN (ERIE & HURON…Full textELECTRICIAN (ERIE & HURON (LYME, RIDGEFIELD, NORWALK, TOWNSEND, WAKEMAN, SHERMAN, PERU, BRONSON, HARTLAND, CLARKSFIELD, NORWICH, GREENFIELD, FAIRFIELD, FITCHVILLE & NEW LONDON TOWNSHIPS)) | $42.95 | $18.81 | $61.76 | no change | Agreement, 2025 |
| ELEC0141-003 · Electrical Workers (IBEW) agreement, June 2, 2025 | |||||
| CABLE SPLICER (BELMONT COUNTY) | $42.94 | $27.74 | $70.68 | — | Agreement, 2025 |
| ELECTRICIAN (BELMONT COUNTY) | $39.25 | $31.23 | $70.48 | — | Agreement, 2025 |
| ELEC0212-003 · Electrical Workers (IBEW) agreement, November 26, 2018 | |||||
| SOUND & COMMUNICATION TECHNICIAN (BROWN, CLERMONT & HAMILTON) | $24.35 | $10.99 | $35.34 | no change | Agreement, 2018 |
| ELEC0212-005 · Electrical Workers (IBEW) agreement, June 2, 2025 | |||||
| ELECTRICIAN (BROWN, CLERMONT, AND HAMILTON COUNTIES) | $38.05 | $22.97 | $61.02 | no change | Agreement, 2025 |
| ELEC0245-001 · Electrical Workers (IBEW) agreement, August 26, 2024 | |||||
LINE CONSTRUCTION: EQUIPMENT OPERATOR…Full textLINE CONSTRUCTION: EQUIPMENT OPERATOR (ALLEN, HARDIN, VAN WERT & WYANDOT (CRAWFORD, JACKSON, MARSEILLES, MIFFLIN, RICHLAND, RIDGE & SALEM TOWNSHIPS)) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR TO CHRISTMAS OR NEW YEAR'S DAY | $32.95 | $17.08 | $50.03 | changed | Agreement, 2024 |
LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (ALLEN, HARDIN, VAN WERT & WYANDOT (CRAWFORD, JACKSON, MARSEILLES, MIFFLIN, RICHLAND, RIDGE & SALEM TOWNSHIPS)) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR TO CHRISTMAS OR NEW YEAR'S DAY | $20.59 | $13.62 | $34.21 | changed | Agreement, 2024 |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN (ALLEN, HARDIN, VAN WERT & WYANDOT (CRAWFORD, JACKSON, MARSEILLES, MIFFLIN, RICHLAND, RIDGE & SALEM TOWNSHIPS)) FOOTNOTE: A. HALF DAY'S PAID HOLIDAY: THE LAST 4 HOURS OF THE WORKDAY PRIOR TO CHRISTMAS OR NEW YEAR'S DAY | $47.07 | $21.03 | $68.10 | changed | Agreement, 2024 |
| ELEC0245-003 · Electrical Workers (IBEW) agreement, January 1, 2025 | |||||
LINE CONSTRUCTION: CABLE SPLICER…Full textLINE CONSTRUCTION: CABLE SPLICER (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $53.90 | $23.19 | $77.09 | changed | Agreement, 2025 |
LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER…Full textLINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $20.51 | $13.84 | $34.35 | changed | Agreement, 2025 |
LINE CONSTRUCTION: HELI-ARC WELDING…Full textLINE CONSTRUCTION: HELI-ARC WELDING (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $47.17 | $21.31 | $68.48 | changed | Agreement, 2025 |
LINE CONSTRUCTION: LINEMAN…Full textLINE CONSTRUCTION: LINEMAN (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $46.87 | $21.22 | $68.09 | changed | Agreement, 2025 |
LINE CONSTRUCTION: OPERATOR - CLASS 1…Full textLINE CONSTRUCTION: OPERATOR - CLASS 1 (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $37.50 | $18.60 | $56.10 | changed | Agreement, 2025 |
LINE CONSTRUCTION: OPERATOR - CLASS 2…Full textLINE CONSTRUCTION: OPERATOR - CLASS 2 (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $32.81 | $17.29 | $50.10 | changed | Agreement, 2025 |
LINE CONSTRUCTION: TRAFFIC SIGNAL & LIGHTING TECHNICIAN…Full textLINE CONSTRUCTION: TRAFFIC SIGNAL & LIGHTING TECHNICIAN (DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS, AND WOOD COUNTIES) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $42.18 | $19.91 | $62.09 | changed | Agreement, 2025 |
| ELEC0245-004 · Electrical Workers (IBEW) agreement, January 1, 2025 | |||||
| LINE CONSTRUCTION: CABLE SPLICER (ERIE COUNTY) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $53.90 | $23.19 | $77.09 | changed | Agreement, 2025 |
| LINE CONSTRUCTION: GROUNDMAN/TRUCK DRIVER (ERIE COUNTY) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $20.51 | $13.84 | $34.35 | changed | Agreement, 2025 |
| LINE CONSTRUCTION: LINEMAN (ERIE COUNTY) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $46.87 | $21.22 | $68.09 | changed | Agreement, 2025 |
| LINE CONSTRUCTION: OPERATOR - CLASS 1 (ERIE COUNTY) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $37.50 | $18.60 | $56.10 | changed | Agreement, 2025 |
| LINE CONSTRUCTION: OPERATOR - CLASS 2 (ERIE COUNTY) FOOTNOTE: A. 6 OBSERVED HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY. EMPLOYEES WHO WORK ON A HOLIDAY SHALL BE PAID AT A RATE OF DOUBLE THEIR APPLICABLE CLASSIFIED STRAIGHT-TIME RATES FOR THE WORK PERFORMED ON SUCH HOLIDAY | $32.81 | $17.29 | $50.10 | changed | Agreement, 2025 |
| ELEC0246-001 · Electrical Workers (IBEW) agreement, October 28, 2024 | |||||
ELECTRICIAN (CARROLL…Full textELECTRICIAN (CARROLL, COLUMBIANA, HARRISON AND JEFFERSON COUNTIES IN OHIO; BROOKE AND HANCOCK COUNTIES IN WEST VIRGINIA.) FOOTNOTE: A. 1 1/2 PAID HOLIDAYS: THE LAST SCHEDULED WORKDAY PRIOR TO CHRISTMAS & 4 HOURS ON GOOD FRIDAY | $44.00 | $37.68 | $81.68 | — | Agreement, 2024 |
| ELEC0306-005 · Electrical Workers (IBEW) agreement, May 27, 2024 | |||||
CABLE SPLICER (MEDINA…Full textCABLE SPLICER (MEDINA (BRUNSWICK, CHATHAM, GRANGER, GUILFORD, HARRISVILLE, HINCKLEY, HOMER, LAFAYETTE, MEDINA, MONTVILLE, SHARON, SPENCER, WADSWORTH, WESTFIELD & YORK TOWNSHIPS), PORTAGE (ATWATER, AURORA, BRIMFIELD, DEERFIELD, FRANKLIN, MANTUA, RANDOLPH, RAVENNA, ROOTSTOWN, SHALERSVILLE, STREETSBORO & SUFFIELD TOWNSHIPS), SUMMIT & WAYNE (BAUGHMAN, CANAAN, CHESTER, CHIPPEWA, CONGRESS, GREEN, MILTON, & WAYNE TOWNSHIPS)) | $46.81 | $20.95 | $67.76 | no change | Agreement, 2024 |
ELECTRICIAN (MEDINA…Full textELECTRICIAN (MEDINA (BRUNSWICK, CHATHAM, GRANGER, GUILFORD, HARRISVILLE, HINCKLEY, HOMER, LAFAYETTE, MEDINA, MONTVILLE, SHARON, SPENCER, WADSWORTH, WESTFIELD & YORK TOWNSHIPS), PORTAGE (ATWATER, AURORA, BRIMFIELD, DEERFIELD, FRANKLIN, MANTUA, RANDOLPH, RAVENNA, ROOTSTOWN, SHALERSVILLE, STREETSBORO & SUFFIELD TOWNSHIPS), SUMMIT & WAYNE (BAUGHMAN, CANAAN, CHESTER, CHIPPEWA, CONGRESS, GREEN, MILTON, & WAYNE TOWNSHIPS)) | $42.55 | $20.95 | $63.50 | no change | Agreement, 2024 |
| ELEC0317-002 · Electrical Workers (IBEW) agreement, June 2, 2025 | |||||
| CABLE SPLICER (GALLIA & LAWRENCE) | $32.68 | $18.13 | $50.81 | — | Agreement, 2025 |
| ELECTRICIAN (GALLIA & LAWRENCE) | $41.15 | $29.35 | $70.50 | — | Agreement, 2025 |
| ELEC0540-005 · Electrical Workers (IBEW) agreement, June 30, 2025 | |||||
ELECTRICIAN (CARROLL…Full textELECTRICIAN (CARROLL (NORTHERN HALF, INCLUDING FOX, HARRISON, ROSE & WASHINGTON TOWNHSHIPS), COLUMBIANA (KNOX TOWNSHIP), HOLMES, MAHONING (SMITH TOWNSHIP), STARK, TUSCARAWAS (NORTH OF AUBURN, CLAY, RUSH & YORK TOWNSHIPS), AND WAYNE (SOUTH OF BAUGHMAN, CHESTER, GREEN & WAYNE TOWNSHIPS) COUNTIES) | $39.86 | $29.19 | $69.05 | no change | Agreement, 2025 |
| ELEC0573-003 · Electrical Workers (IBEW) agreement, June 1, 2025 | |||||
ELECTRICIAN (ASHTABULA…Full textELECTRICIAN (ASHTABULA (COLEBROOK, WAYNE, WILLIAMSFIELD, ORWELL & WINDSOR TOWNSHIPS), GEAUGA (AUBURN, MIDDLEFIELD, PARKMAN & TROY TOWNSHIPS), MAHONING (MILTON TOWNSHIP), PORTAGE (CHARLESTOWN, EDINBURG, FREEDOM, HIRAM, NELSON, PALMYRA, PARIS & WINDHAM TOWNSHIPS), AND TRUMBULL (EXCEPT LIBERTY & HUBBARD TOWNSHIPS)) | $42.20 | $23.37 | $65.57 | no change | Agreement, 2025 |
| ELEC0575-001 · Electrical Workers (IBEW) agreement, May 29, 2023 | |||||
ELECTRICIAN (ADAMS…Full textELECTRICIAN (ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (BLOOMFIELD, FRANKLIN, HAMILTON, JEFFERSON, LICK, MADISON, SCIOTO, COAL, JACKSON, LIBERTY, MILTON & WASHINGTON TOWNSHIPS), PICKAWAY (DEER CREEK, PERRY, PICKAWAY, SALT CREEK & WAYNE TOWNSHIPS), PIKE (BEAVER, BENTON, JACKSON, MIFFLIN, PEBBLE, PEEPEE, PERRY, SEAL, CAMP CREEK, NEWTON, SCIOTO, SUNFISH, UNION & MARION TOWNSHIPS), ROSS, SCIOTO & VINTON (CLINTON, EAGLE, ELK, HARRISON, JACKSON, RICHLAND & SWAN TOWNSHIPS)) | $37.00 | $22.26 | $59.26 | no change | Agreement, 2023 |
| ELEC0648-001 · Electrical Workers (IBEW) agreement, September 1, 2025 | |||||
CABLE SPLICER (BUTLER AND WARREN COUNTIES…Full textCABLE SPLICER (BUTLER AND WARREN COUNTIES (DEERFIELD, HAMILTON, HARLAN, MASSIE, SALEM, TURTLE CREEK, UNION & WASHINGTON TOWNSHIPS)) | $30.50 | $18.23 | $48.73 | — | Agreement, 2025 |
ELECTRICIAN (BUTLER AND WARREN COUNTIES…Full textELECTRICIAN (BUTLER AND WARREN COUNTIES (DEERFIELD, HAMILTON, HARLAN, MASSIE, SALEM, TURTLE CREEK, UNION & WASHINGTON TOWNSHIPS)) | $38.00 | $24.16 | $62.16 | — | Agreement, 2025 |
| ELEC0673-004 · Electrical Workers (IBEW) agreement, May 26, 2025 | |||||
CABLE SPLICER (ASHTABULA…Full textCABLE SPLICER (ASHTABULA (EXCLUDING ORWELL, COLEBROOK, WILLIAMSFIELD, WAYNE & WINDSOR TOWNSHIPS), GEAUGA (BURTON, CHARDON, CLARIDON, HAMBDEN, HUNTSBURG, MONTVILLE, MUNSON, NEWBURY & THOMPSON TOWNSHIPS) AND LAKE COUNTIES) | $33.81 | $21.47 | $55.28 | — | Agreement, 2025 |
ELECTRICIAN (ASHTABULA…Full textELECTRICIAN (ASHTABULA (EXCLUDING ORWELL, COLEBROOK, WILLIAMSFIELD, WAYNE & WINDSOR TOWNSHIPS), GEAUGA (BURTON, CHARDON, CLARIDON, HAMBDEN, HUNTSBURG, MONTVILLE, MUNSON, NEWBURY & THOMPSON TOWNSHIPS) AND LAKE COUNTIES) | $41.17 | $24.58 | $65.75 | — | Agreement, 2025 |
| ELEC0683-002 · Electrical Workers (IBEW) agreement, June 2, 2025 | |||||
CABLE SPLICER (CHAMPAIGN…Full textCABLE SPLICER (CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY (CIRCLEVILLE, DARBY, HARRISON, JACKSON, MADISON, MONROE, MUHLENBERG, SCIOTO, WALNUT & WASHINGTON TOWNSHIPS), AND UNION COUNTIES) | $44.00 | $26.40 | $70.40 | no change | Agreement, 2025 |
ELECTRICIAN (CHAMPAIGN…Full textELECTRICIAN (CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON, PICKAWAY (CIRCLEVILLE, DARBY, HARRISON, JACKSON, MADISON, MONROE, MUHLENBERG, SCIOTO, WALNUT & WASHINGTON TOWNSHIPS), AND UNION COUNTIES) | $43.00 | $26.37 | $69.37 | no change | Agreement, 2025 |
| ELEC0688-003 · Electrical Workers (IBEW) agreement, May 30, 2022 | |||||
ELECTRICIAN (ASHLAND…Full textELECTRICIAN (ASHLAND, CRAWFORD, HURON (RICHMOND, NEW HAVEN, RIPLEY & GREENWICH TOWNSHIPS), KNOX (LIBERTY, CLINTON, UNION, HOWARD, MONROE, MIDDLEBERRY, MORRIS, WAYNE, BERLIN, PIKE, BROWN & JEFFERSON TOWNSHIPS), MARION, MORROW, RICHLAND AND WYANDOT (SYCAMORE, CRANE, EDEN, PITT, ANTRIM & TYMOCHTEE TOWNSHIPS) COUNTIES) | $32.30 | $21.83 | $54.13 | no change | Agreement, 2022 |
| ELEC0972-002 · Electrical Workers (IBEW) agreement, June 1, 2024 | |||||
CABLE SPLICER (ATHENS…Full textCABLE SPLICER (ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (BROWN, KNOX, MADISON, VINTON & WILKESVILLE TOWNSHIPS), AND WASHINGTON COUNITES) | $40.25 | $33.33 | $73.58 | no change | Agreement, 2024 |
ELECTRICIAN (ATHENS…Full textELECTRICIAN (ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (BROWN, KNOX, MADISON, VINTON & WILKESVILLE TOWNSHIPS), AND WASHINGTON COUNITES) | $40.00 | $33.32 | $73.32 | no change | Agreement, 2024 |
| ELEC1105-001 · Electrical Workers (IBEW) agreement, May 27, 2024 | |||||
ELECTRICIAN (COSHOCTON…Full textELECTRICIAN (COSHOCTON, GUERNSEY, KNOX (JACKSON, CLAY, MORGAN, MILLER, MILFORD, HILLIAR, BUTLER, HARRISON, PLEASANT & COLLEGE TOWNSHIPS), LICKING, MUSKINGUM, PERRY, AND TUSCARAWAS (AUBURN, YORK, CLAY, JEFFERSON, RUSH, OXFORD, WASHINGTON, SALEM, PERRY & BUCKS TOWNSHIPS) COUNTIES) | $39.60 | $24.41 | $64.01 | no change | Agreement, 2024 |
| ENGI0018-003 · Operating Engineers agreement, May 1, 2024 | |||||
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1- AIR COMPRESSOR ON STEEL ERECTION; BARRIER MOVING MACHINE; BOILER OPERATOR ON COMPRESSOR OR GENERATOR WHEN MOUNTED ON A RIG; CABLEWAY; COMBINATION CONCRETE MIXER & TOWER; CONCRETE PLANT (OVER 4 YD. CAPACITY); CONCRETE PUMP; CRANE (ALL TYPES, INCLUDING BOOM TRUCK, CHERRY PICKER); CRANE-COMPACT, TRACK OR RUBBER OVER 4,000 LBS. CAPACITY; CRANES-SELF ERECTING, STATIONARY, TRACK OR TRUCK (ALL CONFIGURATIONS); DERRICK; DRAGLINE; DREDGE (DIPPER, CLAM OR SUCTION); ELEVATING GRADER OR EUCLID LOADER; FLOATING EQUIPMENT (ALL TYPES); GRADALL; HELICOPTER CREW (OPERATOR-HOIST OR WINCH); HOE (ALL TYPES); HOISTING ENGINE ON SHAFT OR TUNNEL WORK; HYDRAULIC GANTRY (LIFTING SYSTEM); INDUSTRIAL-TYPE TRACTOR; JET ENGINE DRYER (D8 OR D9) DIESEL TRACTOR; LOCOMOTIVE (STANDARD GAUGE); MAINTENANCE OPERATOR CLASS A; MIXER, PAVING (SINGLE OR DOUBLE DRUM); MUCKING MACHINE; MULTIPLE SCRAPER; PILEDRIVING MACHINE (ALL TYPES); POWER SHOVEL; PRENTICE LOADER; QUAD 9 (DOUBLE PUSHER); RAIL TAMPER (WITH AUTO LIFTING & ALIGNING DEVICE); REFRIGERATING MACHINE (FREEZER OPERATION); ROTARY DRILL, ON CAISSON WORK; ROUGH TERRAIN FORK LIFT WITH WINCH/HOIST; SIDE-BOOM; SLIP-FORM PAVER; TOWER DERRICK; TREE SHREDDER; TRENCH MACHINE (OVER 24"" WIDE); TRUCK MOUNTED CONCRETE PUMP; TUG BOAT; TUNNEL MACHINE AND/OR MINING MACHINE; WHEEL EXCAVATOR; AND ASPHALT PLANT ENGINEER (CLEVELAND DISTRICT ONLY). (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $45.63 | $16.41 | $62.04 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: GROUP 2- ASPHALT PAVER; AUTOMATIC SUBGRADER MACHINE, SELF-PROPELLED (CMI TYPE); BOBCAT TYPE AND/OR SKID STEER LOADER WITH HOE ATTACHMENT GREATER THAN 7,000 LBS.; BORING MACHINE MORE THAN 48""; BULLDOZER; ENDLOADER; HORIZONTAL DIRECTIONAL DRILL (OVER 50,000 FT LBS THRUST); HYDRO MILLING MACHINE; KOLMAN-TYPE LOADER (PRODUCTION TYPE-DIRT); LEAD GREASEMAN; LIGHTING & TRAFFIC SIGNAL INSTALLATION EQUIPMENT (INCLUDES ALL GROUPS OR CLASSIFICATIONS); MATERIAL TRANSFER EQUIPMENT (SHUTTLE BUGGY) ASPHALT; PETTIBONE-RAIL EQUIPMENT; POWER GRADER; POWER SCRAPER; PUSH CAT; ROTOMILL (ALL), GRINDERS & PLANERS OF ALL TYPES; TRENCH MACHINE (24"" WIDE & UNDER); VERMEER TYPE CONCRETE SAW; AND MAINTENANCE OPERATORS (PORTAGE AND SUMMIT COUNTIES ONLY). (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $45.53 | $16.41 | $61.94 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: GROUP 3- A-FRAME; AIR COMPRESSOR ON TUNNEL WORK (LOW PRESSURE); ASPHALT PLANT ENGINEER (PORTAGE AND SUMMIT COUNTIES ONLY); BOBCAT-TYPE AND/OR SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; HIGHWAY DRILLS (ALL TYPES); LOCOMOTIVE (NARROW GAUGE); MATERIAL HOIST/ELEVATOR; MIXER, CONCRETE (MORE THAN ONE BAG CAPACITY); MIXER, ONE BAG CAPACITY (SIDE LOADER); POWER BOILER (OVER 15 LBS. PRESSURE) PUMP OPERATOR INSTALLING & OPERATING WELL POINTS; PUMP (4"" & OVER DISCHARGE); ROLLER, ASPHALT; ROTOVATOR (LIME SOIL STABILIZER); SWITCH & TIE TAMPERS (WITHOUT LIFTING & ALIGNING DEVICE); UTILITY OPERATOR (SMALL EQUIPMENT); WELDING MACHINES; AND RAILROAD TIE INSERTER/REMOVER; ARTICULATING/STRAIGHT BED END DUMPS IF ASSIGNED (MINUS $4.00 PER HOUR. (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $44.49 | $16.41 | $60.90 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: GROUP 4- BACKFILLER; BALLAST RE-LOCATOR; BARS, JOINT & MESH INSTALLING MACHINE; BATCH PLANT; BORING MACHINE OPERATOR (48"" OR LESS); BULL FLOATS; BURLAP & CURING MACHINE; CONCRETE PLANT (CAPACITY 4 YD. & UNDER); CONCRETE SAW (MULTIPLE); CONVEYOR (HIGHWAY); CRUSHER; DECKHAND; FARM-TYPE TRACTOR WITH ATTACHMENTS (HIGHWAY); FINISHING MACHINE; FIREPERSON, FLOATING EQUIPMENT (ALL TYPES); FORKLIFT; FORM TRENCHER; HYDRO HAMMER EXPECT MASONARY; HYDRO SEEDER; PAVEMENT BREAKER; PLANT MIXER; POST DRIVER; POST HOLE DIGGER (POWER AUGER); POWER BRUSH BURNER; POWER FORM HANDLING EQUIPMENT; ROAD WIDENING TRENCHER; ROLLER (BRICK, GRADE & MACADAM); SELF-PROPELLED POWER SPREADER; SELF-PROPELLED POWER SUBGRADER; STEAM FIREPERSON; TRACTOR (PULLING SHEEPFOOT, ROLLER OR GRADER); AND VIBRATORY COMPACTOR WITH INTEGRAL POWER. (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $43.27 | $16.41 | $59.68 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 5…Full textPOWER EQUIPMENT OPERATOR: GROUP 5- COMPRESSOR (PORTABLE, SEWER, HEAVY & HIGHWAY); DRUM FIREPERSON (ASPHALT PLANT); GENERATOR; MASONRY FORK LIFT; INBOARD-OUTBOARD MOTOR BOAT LAUNCH; OIL HEATER (ASPHALT PLANT); OILER/HELPER; POWER DRIVEN HEATER; POWER SWEEPER & SCRUBBER; PUMP (UNDER 4"" DISCHARGE); SIGNALPERSON; TIRE REPAIRPERSON; VAC/ALLS; CRANES - COMPACT, TRACK OR RUBBER UNDER 4,000 POUND CAPACITY; FUELING AND GREASING; AND CHAINMEN. (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $37.98 | $16.41 | $54.39 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 6…Full textPOWER EQUIPMENT OPERATOR: GROUP 6- MASTER MECHANIC & BOOM FROM 150 TO 180. (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $46.63 | $16.41 | $63.04 | no change | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 7…Full textPOWER EQUIPMENT OPERATOR: GROUP 7- BOOM FROM 180 AND OVER. (ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA, PORTAGE, AND SUMMIT COUNTIES) | $46.63 | $16.41 | $63.04 | no change | Agreement, 2024 |
| ENGI0018-004 · Operating Engineers agreement, May 1, 2024 | |||||
POWER EQUIPMENT OPERATOR: GROUP 1…Full textPOWER EQUIPMENT OPERATOR: GROUP 1- AIR COMPRESSOR ON STEEL ERECTION; BARRIER MOVING MACHINE; BOILER OPERATOR ON COMPRESSOR OR GENERATOR WHEN MOUNTED ON A RIG; CABLEWAY; COMBINATION CONCRETE MIXER & TOWER; CONCRETE PLANT (OVER 4 YD. CAPACITY); CONCRETE PUMP; CRANE (ALL TYPES, INCLUDING BOOM TRUCK, CHERRY PICKER); CRANE-COMPACT, TRACK OR RUBBER OVER 4,000 LBS. CAPACITY; CRANES-SELF-ERECTING, STATIONARY, TRACK OR TRUCK (ALL CONFIGURATIONS); DERRICK; DRAGLINE; DREDGE (DIPPER, CLAM OR SUCTION); ELEVATING GRADER OR EUCLID LOADER; FLOATING EQUIPMENT (ALL TYPES); GRADALL; HELICOPTER CREW (OPERATOR-HOIST OR WINCH); HOE (ALL TYPES); HOISTING ENGINE ON SHAFT OR TUNNEL WORK; HYDRAULIC GANTRY (LIFTING SYSTEM); INDUSTRIAL-TYPE TRACTOR; JET ENGINE DRYER (D8 OR D9) DIESEL TRACTOR; LOCOMOTIVE (STANDARD GAUGE); MAINTENANCE OPERATOR CLASS A; MIXER, PAVING 9SINGLE OR DOUBLE DRUM); MUCKING MACHINE; MULTIPLE SCRAPER; PILEDRIVING MACHINE (ALL TYPES); POWER SHOVEL; PRENTICE LOADER; QUAD 9 (DOUBLE PUSHER); RAIL TAMPER (WITH AUTO LIFTING & ALIGNING DEVICE); REFRIGERATING MACHINE (FREEZER OPERATORON); ROTARY DRILL, ON CAISSON WORK; ROUGH TERRAIN FORK LIFT WITH WINCH/HOIST; SIDE-BOOM; SLIP-FORM PAVER; TOWER DERRICK; TREE SHREDDER; TRENCH MACHINE (OVER 24' WIDE); TRUCK MOUNTED CONCRETE PUMP; TUG BOAT; TUNNEL MACHINE AND/OR MINING MACHINE; AND WHEEL EXCAVATOR. (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $44.14 | $16.41 | $60.55 | — | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 2…Full textPOWER EQUIPMENT OPERATOR: GROUP 2- ASPHALT PAVER; AUTOMATIC SUBGRADER MACHINE, SELF-PROPELLED (CMI TYPE); BOBCAT TYPE AND/OR SKID STEER LOADER WITH HOE ATTACHMENT GREATER THAN 7,000 LBS.; BORING MACHINE MRE THAN 48""; BULLDOZER; ENDLOADER; HYDRO MILLING MACHINE; HORIZONTAL DIRECTIONAL DRILL (OVER 50,000 FT. LBS. THURUST); KOLMAN-TYPE LOADER (PRODUCTION TYPE-DIRT); LEAD GREASEMAN; LIGHTING & TRAFFIC SIGNAL INSTALLATION EQUIPMENT (INCLUDES ALL GROUPS OR CLASSIFICATIONS); MATERIAL TRANSFER EQUIPMENT (SHUTTLE BUGGY); ASHPHALT; PETTIBONE-RAIL EQUIPMENT; POWER GRADER; POWER SCRAPER; PUSH CAT; ROTOMILL (ALL), GRINDERS & PLANERS OF ALL TYPES; TRENCH MACHINE (24' WIDE & UNDER); AND VERMEER TYPE CONCRETE SAW. (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $44.02 | $16.41 | $60.43 | — | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 3…Full textPOWER EQUIPMENT OPERATOR: GROUP 3- A-FRAME; AIR COMPRESSOR ON TUNNEL WORK (LOW PRESSURE); ASPHALT PLANT ENGINEER; BOBCAT-TYPE AND/OR SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; HIGHWAY DRILLS (ALL TYPES); LOCOMOTIVE (NARROW GAUGE); MATERIAL HOIST/ELEVATOR; MIXER, CONCRETE (MORE THAN ONE BAG CAPACITY); MIXER, ONE BAG CAPACITY (SIDE LOADER); POWER BOILER (OVER 15 LBS. PRESSURE) PUMP OPERATOR INSTALLING & OPERATING WELL POINTS; PUMP (4' & OVER DISCHARGE); RAILROAD TIE INSERTER/REMOVER; ROLLER, ASPHALT; ROTOVATOR (LIME SOIL STABILIZER); SWITCH & TIE TAMPERS (WITHOUT LIFTING & ALIGNING DEVICE); UTILITY OPERATOR (SMALL EQUIPMENT); AND WELDING MACHINES: ARTICULATING/STRAIGHT BED END DUMPS IF ASSIGNED (MINUS $4.00 PER HOUR). (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $42.98 | $16.41 | $59.39 | — | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 4…Full textPOWER EQUIPMENT OPERATOR: GROUP 4- BACKFILLER; BALLAST RE-LOCATOR; BARS, JOINT & MESH INSTALLING MACHINE; BATCH PLANT; BORING MACHINE OPERATOR (48' OR LESS); BULL FLOATS; BURLAP & CURING MACHINE; CONCRETE PLANT (CAPACITY 4 YD. & UNDER); CONCRETE SAW (MULTIPLE); CONVEYOR (HIGHWAY); CRUSHER; DECKHAND; FARM-TYPE TRACTOR WITH ATTACHMENTS (HIGHWAY); FINISHING MACHINE; FIREPERSON, FLOATING EQUIPMENT (ALL TYPES); FORK LIFT; FORM TRENCHER; HYDRO HAMMER EXCEPT MASONARY; HYDRO SEEDER; PAVEMENT BREAKER; PLANT MIXER; POST DRIVER; POST HOLE DIGGER (POWER AUGER); POWER BRUSH BURNER; POWER FORM HANDLING EQUIPMENT; ROAD WIDENING TRENCHER; ROLLER (BRICK, GRADE, & MACADAM); SELF-PROPELLED POWER SPREADER; SELF-PROPELLED POWER SUBGRADER; STEAM FIREPERSON; TRACTOR (PULLING SHEEPFOOT, ROLLER OR GRADER); AND VIBRATORY COMPACTOR WITH INTEGRAL POWER. (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $41.80 | $16.41 | $58.21 | — | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 5…Full textPOWER EQUIPMENT OPERATOR: GROUP 5- COMPRESSOR (PORTABLE, SEWER, HEAVY & HIGHWAY); DRUM FIREPERSON (ASPHALT PLANT); GENERATOR; MASONARY FORKLIFT; INBOARD-OUTBOARD MOTOR BOAT LAUNCH; OIL HEATER (ASPHALT PLANT); OILER/HELPER; POWER DRIVEN HEATER; POWER SWEEPER & SCRUBBER; PUMP (UNDER 4' DISCHARGE); SIGNALPERSON; TIRE REPAIRPERSON; VAC/ALLS; CRANES-COMPACT, TRACK OR RUBBER UNDER 4,000 POUND CAPACITY; FUELING AND GREASING; AND CHAINMEN. (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $36.34 | $16.41 | $52.75 | — | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 6…Full textPOWER EQUIPMENT OPERATOR: GROUP 6- MASTER MECHANIC & BOOM FROM 150 TO 180. (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $45.14 | $16.41 | $61.55 | — | Agreement, 2024 |
POWER EQUIPMENT OPERATOR: GROUP 7…Full textPOWER EQUIPMENT OPERATOR: GROUP 7- BOOM FROM 180 AND OVER. (ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN, BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON, COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON, HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES, HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN, LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE, MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING, PERRY, PICKAWAY, PIKE, PREBLE, PTNAM, RICHLAND, ROSS, SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD, AND YANDOT COUNTIES) | $45.14 | $16.41 | $61.55 | — | Agreement, 2024 |
| ENGI0066-023 · Operating Engineers agreement, June 1, 2023 | |||||
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 1…Full textPOWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 1- RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $37.19 | $24.30 | $61.49 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 2…Full textPOWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 2 - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WITH SHEAR ATTACHED; BACKHOE-REAR PIVOTAL SWING; BATCH PLANT-CENTRAL MIX CONCRETE; BATCH PLANT, PORTABLE CONCRETE; BERM BUILDER-AUTOMATIC; BOAT DERRICK; BOAT-TUG; BORING MACHINE ATTACHED TO TRACTOR; BULLCLAM; VULLDOZER; C.M.I. ROAD BUILDER & SIMILAR TYPE; CABLE PLACER &LATYER; CARRIER-STRADDLE; CARRYALL-SCRAPER OR SCOPP; CHICAGO BOOM; COMPACTOR WITH BLAD ATTACHED; CONCRETE SAW (VERMEER OR SIMILAR TYPE); CONCRETE SPREADER FINISHER; COMBINATION, BIDWELL MACHINE; CRANE; CRANE-ELECTRIC OVERHEAD; CRANE-ROUGH TERRAIN; CRANE-SIDE BOOM; CRANE-TRUCK; CRANE-TOWER; DERRICK-BOOM; DERRICK-CAR; DIGGER -WHEEL (NOT TRENCHER OR ROAD WIDENER); DOUBLE NINE; DRAG LINE; DREDGE; DRILL-KENNY OR SIMILAR TYPE; EASY POUR MEDIAN BARRIER MACHINE (OR SIMILAR TYPE); ELECTROMATIC; FRANKIE PILE; GRADALL; GRADER; GURRY; SELF-PROPELLED; HEAVY EQUIPMENT ROBOTICS OPERATOR/MECHANIC; HOIST-MONORAIL; HOIST-STATIONARY & MOBILE TRACTOR; HOIST, 2 OR 3 DRUM; HORIZONTAL DIRECTIONAL DRILL OPERATOR; JACKALL; JUMBO MACHINE; KOCAL & KUHLMAN; LAND-SEAGOING VEHICLE; LOADER, ELEVATING; LOADER, FRONT END; LOADER, SKID STEER; LOCOMOTIVE; MECHANIC/WELDER; METRO CHIP HARVESTER WITH BOO; MUCKING MACHINE; PAVER-ASPHALT FINISHING MACHINE; PAVER-ROAD CONCRETE; PAVER-SLIP FORM (C.M.I. OR SIMILAR); PLACE CRETE MACHINE WITH BOOM; POST DRIVER (CARRIER MOUNTED); POWER DRIVEN HYDRAULIC PUMP & JACK (WHEN USED IN SLIP FORM OR LIFT SLAB CONSTRUCTION); PUMP CRETE MACHINE; REGULATOR-BALLAST; HYRAULIC POWER UNIT NOT ATTACHED TO RIG FOR PILE DRILLINGS; RIGS-DRILLING; ROTO MILL OR SIMILAR FULL LANE (8' WIDE & OVER); ROTO MILL OR SIMILAR TYPE (UNDER 8'); SHOVEL; SLIP FORM CURB MACHINE; SPEEDWING; SPIKEMASTER; STONECRUSHER; TIE PULLER & LOADER; TIE TAMPER; TRACTOR-DOUBLE BOOM; TRACTOR WITH ATTACHMENTS; TRUCK-BOOM; TRUCK-TIRE; TRENCH MACHINE; TUNNEL MACHINE (MARK 21 JAVA OR SIMILAR) & WHIRLEY (OR SIMILAR TYPE) (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $36.92 | $24.30 | $61.22 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 3…Full textPOWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 3 - ASPHALT PLANT; BENDING MACHINE (PIPELINE OR TYPE); BORING MACHINE, MOTOR DRIVEN; CHIP HARVESTER WITHOUT BOOM; CLEANING MACHINE, PIPELINE TYPE; COATING MACHINE, PIPELINE TYPE; COMPACTOR; CONCRETE BELT PLACER; CONCRETE FINISHER; CONCRETE PLANER OR ASPHALT; CONCRETE SPREADER; ELEVATOR; FORK LIFT (HOME BUILDING ONLY); FORK LIFT & LULLS; FORK LIFT WALK BEHIND (HOISTING OVER 1 BUCK HIGH); FORM LINE MACHINE; GREASE TRUCK OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC SCAFFOLD (HOISTING BUILDING MATERIALS); PAVING BREAKER (SELF=PROPELLED OR RIDDEN); PIPE DREAM; POT FIREPERSON (POWER AGITATED); REFRIGERATION PLANT; ROAD WIDENER; ROLLER; SASGEN DERRICK; SEEDING MACHINE; SOIL STABILIZER (PUMP TYPE); SPRAY CURE MACHINE, SELF-PROPELLED; STRAW BLOWER MACHINE; SUB-GRADER; TUBE FINISHER OR BROOM C.M.I. OR SIMILAR TYPE; & TUGGER HOIST. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $32.06 | $24.30 | $56.36 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 4…Full textPOWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 4 - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPERATOR; COMPRESSOR; CONVEYOR; CURB BUILDER, SELF-PROPELLED; DRILL WAGON; GENERATOR SET; GENERATOR-STEAM; HEATER-PORTABLE POWER; HYDRAULIC MANIUPLATOR CRANE; JACK-HYDRAULIC POWER DRIVEN; JACK-HYARAULIC (RAILROAD); LADAVATOR; MINOR MACHINE OPERATOR; MIXER-CONCRETE; MULCHING MACHINE; PIN PULLER; POWER BROOM; PULVERIZER; PUMP; ROAD FINISHING MAHINC (PULL TYPE); SAW-CONCRETE-SELF-PROPELLED (HIGHWAY WORK); SIGNAL PERSON; SPRAY CURE MACHINE-MOTOR POWERED; STUMP CUTTER; TRACTOR; TRENCHER FORM; WATER BLASTER; STEAM JENNY; SYPHON; VIBRATOR-GASOLINE; & WELDING MACHINE. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $28.77 | $24.30 | $53.07 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 5…Full textPOWER EQUIPMENT OPERATOR: ALL OTHER WORK GROUP 5 - BRAKEPERSON; FIREPERSON; & OILER. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $25.94 | $24.30 | $50.24 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1…Full textPOWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - A & B - RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $44.63 | $24.30 | $68.93 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2…Full textPOWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - A & B - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WITH SHEAR ATTACHED; BACKHOE-REAR PIVOTAL SWING; BATCH PLANT-CENTRAL MIX CONCRETE; BATCH PLANT, PORTABLE CONCRETE; BERM BUILDER-AUTOMATIC; BOAT DERRICK; BOAT-TUG; BORING MACHINE ATTACHED TO TRACTOR; BULLCLAM; VULLDOZER; C.M.I. ROAD BUILDER & SIMILAR TYPE; CABLE PLACER &LATYER; CARRIER-STRADDLE; CARRYALL-SCRAPER OR SCOPP; CHICAGO BOOM; COMPACTOR WITH BLAD ATTACHED; CONCRETE SAW (VERMEER OR SIMILAR TYPE); CONCRETE SPREADER FINISHER; COMBINATION, BIDWELL MACHINE; CRANE; CRANE-ELECTRIC OVERHEAD; CRANE-ROUGH TERRAIN; CRANE-SIDE BOOM; CRANE-TRUCK; CRANE-TOWER; DERRICK-BOOM; DERRICK-CAR; DIGGER -WHEEL (NOT TRENCHER OR ROAD WIDENER); DOUBLE NINE; DRAG LINE; DREDGE; DRILL-KENNY OR SIMILAR TYPE; EASY POUR MEDIAN BARRIER MACHINE (OR SIMILAR TYPE); ELECTROMATIC; FRANKIE PILE; GRADALL; GRADER; GURRY; SELF-PROPELLED; HEAVY EQUIPMENT ROBOTICS OPERATOR/MECHANIC; HOIST-MONORAIL; HOIST-STATIONARY & MOBILE TRACTOR; HOIST, 2 OR 3 DRUM; HORIZONTAL DIRECTIONAL DRILL OPERATOR; JACKALL; JUMBO MACHINE; KOCAL & KUHLMAN; LAND-SEAGOING VEHICLE; LOADER, ELEVATING; LOADER, FRONT END; LOADER, SKID STEER; LOCOMOTIVE; MECHANIC/WELDER; METRO CHIP HARVESTER WITH BOO; MUCKING MACHINE; PAVER-ASPHALT FINISHING MACHINE; PAVER-ROAD CONCRETE; PAVER-SLIP FORM (C.M.I. OR SIMILAR); PLACE CRETE MACHINE WITH BOOM; POST DRIVER (CARRIER MOUNTED); POWER DRIVEN HYDRAULIC PUMP & JACK (WHEN USED IN SLIP FORM OR LIFT SLAB CONSTRUCTION); PUMP CRETE MACHINE; REGULATOR-BALLAST; HYRAULIC POWER UNIT NOT ATTACHED TO RIG FOR PILE DRILLINGS; RIGS-DRILLING; ROTO MILL OR SIMILAR FULL LANE (8' WIDE & OVER); ROTO MILL OR SIMILAR TYPE (UNDER 8'); SHOVEL; SLIP FORM CURB MACHINE; SPEEDWING; SPIKEMASTER; STONECRUSHER; TIE PULLER & LOADER; TIE TAMPER; TRACTOR-DOUBLE BOOM; TRACTOR WITH ATTACHMENTS; TRUCK-BOOM; TRUCK-TIRE; TRENCH MACHINE; TUNNEL MACHINE (MARK 21 JAVA OR SIMILAR) & WHIRLEY (OR SIMILAR TYPE) (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $44.30 | $24.30 | $68.60 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3…Full textPOWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - A & B - ASPHALT PLANT; BENDING MACHINE (PIPELINE OR TYPE); BORING MACHINE, MOTOR DRIVEN; CHIP HARVESTER WITHOUT BOOM; CLEANING MACHINE, PIPELINE TYPE; COATING MACHINE, PIPELINE TYPE; COMPACTOR; CONCRETE BELT PLACER; CONCRETE FINISHER; CONCRETE PLANER OR ASPHALT; CONCRETE SPREADER; ELEVATOR; FORK LIFT (HOME BUILDING ONLY); FORK LIFT & LULLS; FORK LIFT WALK BEHIND (HOISTING OVER 1 BUCK HIGH); FORM LINE MACHINE; GREASE TRUCK OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC SCAFFOLD (HOISTING BUILDING MATERIALS); PAVING BREAKER (SELF=PROPELLED OR RIDDEN); PIPE DREAM; POT FIREPERSON (POWER AGITATED); REFRIGERATION PLANT; ROAD WIDENER; ROLLER; SASGEN DERRICK; SEEDING MACHINE; SOIL STABILIZER (PUMP TYPE); SPRAY CURE MACHINE, SELF-PROPELLED; STRAW BLOWER MACHINE; SUB-GRADER; TUBE FINISHER OR BROOM C.M.I. OR SIMILAR TYPE; & TUGGER HOIST(COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $38.47 | $24.30 | $62.77 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4…Full textPOWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - A & B - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPERATOR; COMPRESSOR; CONVEYOR; CURB BUILDER, SELF-PROPELLED; DRILL WAGON; GENERATOR SET; GENERATOR-STEAM; HEATER-PORTABLE POWER; HYDRAULIC MANIUPLATOR CRANE; JACK-HYDRAULIC POWER DRIVEN; JACK-HYARAULIC (RAILROAD); LADAVATOR; MINOR MACHINE OPERATOR; MIXER-CONCRETE; MULCHING MACHINE; PIN PULLER; POWER BROOM; PULVERIZER; PUMP; ROAD FINISHING MAHINC (PULL TYPE); SAW-CONCRETE-SELF-PROPELLED (HIGHWAY WORK); SIGNAL PERSON; SPRAY CURE MACHINE-MOTOR POWERED; STUMP CUTTER; TRACTOR; TRENCHER FORM; WATER BLASTER; STEAM JENNY; SYPHON; VIBRATOR-GASOLINE; & WELDING MACHINE. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $34.52 | $24.30 | $58.82 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5…Full textPOWER EQUIPMENT OPERATOR: ASBESTOS; HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - A & B - BRAKEPERSON; FIREPERSON; & OILER. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $31.13 | $24.30 | $55.43 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1…Full textPOWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 1 - C & D - RIG, PILE DRIVER OR CAISSON TYPE; & RIG, PILE HYDRAULIC UNIT ATTACHED. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $40.91 | $24.30 | $65.21 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2…Full textPOWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 2 - C & D - ASPHALT HEATER PLANER; BACKFILLER WITH DRAG ATTACHMENT; BACKHOE; BACKHOE WITH SHEAR ATTACHED; BACKHOE-REAR PIVOTAL SWING; BATCH PLANT-CENTRAL MIX CONCRETE; BATCH PLANT, PORTABLE CONCRETE; BERM BUILDER-AUTOMATIC; BOAT DERRICK; BOAT-TUG; BORING MACHINE ATTACHED TO TRACTOR; BULLCLAM; VULLDOZER; C.M.I. ROAD BUILDER & SIMILAR TYPE; CABLE PLACER &LATYER; CARRIER-STRADDLE; CARRYALL-SCRAPER OR SCOPP; CHICAGO BOOM; COMPACTOR WITH BLAD ATTACHED; CONCRETE SAW (VERMEER OR SIMILAR TYPE); CONCRETE SPREADER FINISHER; COMBINATION, BIDWELL MACHINE; CRANE; CRANE-ELECTRIC OVERHEAD; CRANE-ROUGH TERRAIN; CRANE-SIDE BOOM; CRANE-TRUCK; CRANE-TOWER; DERRICK-BOOM; DERRICK-CAR; DIGGER -WHEEL (NOT TRENCHER OR ROAD WIDENER); DOUBLE NINE; DRAG LINE; DREDGE; DRILL-KENNY OR SIMILAR TYPE; EASY POUR MEDIAN BARRIER MACHINE (OR SIMILAR TYPE); ELECTROMATIC; FRANKIE PILE; GRADALL; GRADER; GURRY; SELF-PROPELLED; HEAVY EQUIPMENT ROBOTICS OPERATOR/MECHANIC; HOIST-MONORAIL; HOIST-STATIONARY & MOBILE TRACTOR; HOIST, 2 OR 3 DRUM; HORIZONTAL DIRECTIONAL DRILL OPERATOR; JACKALL; JUMBO MACHINE; KOCAL & KUHLMAN; LAND-SEAGOING VEHICLE; LOADER, ELEVATING; LOADER, FRONT END; LOADER, SKID STEER; LOCOMOTIVE; MECHANIC/WELDER; METRO CHIP HARVESTER WITH BOO; MUCKING MACHINE; PAVER-ASPHALT FINISHING MACHINE; PAVER-ROAD CONCRETE; PAVER-SLIP FORM (C.M.I. OR SIMILAR); PLACE CRETE MACHINE WITH BOOM; POST DRIVER (CARRIER MOUNTED); POWER DRIVEN HYDRAULIC PUMP & JACK (WHEN USED IN SLIP FORM OR LIFT SLAB CONSTRUCTION); PUMP CRETE MACHINE; REGULATOR-BALLAST; HYRAULIC POWER UNIT NOT ATTACHED TO RIG FOR PILE DRILLINGS; RIGS-DRILLING; ROTO MILL OR SIMILAR FULL LANE (8' WIDE & OVER); ROTO MILL OR SIMILAR TYPE (UNDER 8'); SHOVEL; SLIP FORM CURB MACHINE; SPEEDWING; SPIKEMASTER; STONECRUSHER; TIE PULLER & LOADER; TIE TAMPER; TRACTOR-DOUBLE BOOM; TRACTOR WITH ATTACHMENTS; TRUCK-BOOM; TRUCK-TIRE; TRENCH MACHINE; TUNNEL MACHINE (MARK 21 JAVA OR SIMILAR) & WHIRLEY (OR SIMILAR TYPE) (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $40.61 | $24.30 | $64.91 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3…Full textPOWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 3 - C & D - ASPHALT PLANT; BENDING MACHINE (PIPELINE OR TYPE); BORING MACHINE, MOTOR DRIVEN; CHIP HARVESTER WITHOUT BOOM; CLEANING MACHINE, PIPELINE TYPE; COATING MACHINE, PIPELINE TYPE; COMPACTOR; CONCRETE BELT PLACER; CONCRETE FINISHER; CONCRETE PLANER OR ASPHALT; CONCRETE SPREADER; ELEVATOR; FORK LIFT (HOME BUILDING ONLY); FORK LIFT & LULLS; FORK LIFT WALK BEHIND (HOISTING OVER 1 BUCK HIGH); FORM LINE MACHINE; GREASE TRUCK OPERATOR; GROUT PUMP; GUNNITE MACHINE; HORIZONTAL DIRECTIONAL DRILL LOCATOR; SINGLE DRUM HOIST WITH OR WITHOUT TOWER; HUCK BOLTING MACHINE; HYDRAULIC SCAFFOLD (HOISTING BUILDING MATERIALS); PAVING BREAKER (SELF=PROPELLED OR RIDDEN); PIPE DREAM; POT FIREPERSON (POWER AGITATED); REFRIGERATION PLANT; ROAD WIDENER; ROLLER; SASGEN DERRICK; SEEDING MACHINE; SOIL STABILIZER (PUMP TYPE); SPRAY CURE MACHINE, SELF-PROPELLED; STRAW BLOWER MACHINE; SUB-GRADER; TUBE FINISHER OR BROOM C.M.I. OR SIMILAR TYPE; & TUGGER HOIST(COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $35.27 | $24.30 | $59.57 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4…Full textPOWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 4 - C & D - AIR CURTAIN DESTRUCTOR & SIMILAR TYPE; BATCH PLANT-JOB RELATED; BOILER OPERATOR; COMPRESSOR; CONVEYOR; CURB BUILDER, SELF-PROPELLED; DRILL WAGON; GENERATOR SET; GENERATOR-STEAM; HEATER-PORTABLE POWER; HYDRAULIC MANIUPLATOR CRANE; JACK-HYDRAULIC POWER DRIVEN; JACK-HYARAULIC (RAILROAD); LADAVATOR; MINOR MACHINE OPERATOR; MIXER-CONCRETE; MULCHING MACHINE; PIN PULLER; POWER BROOM; PULVERIZER; PUMP; ROAD FINISHING MAHINC (PULL TYPE); SAW-CONCRETE-SELF-PROPELLED (HIGHWAY WORK); SIGNAL PERSON; SPRAY CURE MACHINE-MOTOR POWERED; STUMP CUTTER; TRACTOR; TRENCHER FORM; WATER BLASTER; STEAM JENNY; SYPHON; VIBRATOR-GASOLINE; & WELDING MACHINE. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $31.65 | $24.30 | $55.95 | — | Agreement, 2023 |
POWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5…Full textPOWER EQUIPMENT OPERATOR: HAZARDOUS/TOXIC WASTE PROJECTS GROUP 5 - C & D - BRAKEPERSON; FIREPERSON; & OILER. (COLUMBIANA, MAHONING & TRUMBULL COUNTIES) | $28.53 | $24.30 | $52.83 | — | Agreement, 2023 |
| IRON0017-002 · Ironworkers agreement, May 1, 2024 | |||||
IRONWORKER: ORNAMENTAL…Full textIRONWORKER: ORNAMENTAL, REINFORCING, & STRUCTURAL (ASHTABULA (NORTH OF ROUTE 6, STARTING AT THE GEAUGA COUNTY LINE, PROCEEDING EAST TO STATE ROUTE 45), CUYAHOGA, ERIE (EASTERN 2/3), GEAUGA, HURON (EAST OF A LINE DRAWN FROM THE NORTH BORDER THROUGH MONROEVILLE & WILLARD), LAKE, LORAIN, MEDINA (NORTH OF OLD RTE. #224), PORTAGE (WEST OF A LINE FROM MIDDLEFIELD TO SHALERSVILLE TO DEERFIELD), AND SUMMIT (NORTH OF OLD RTE. #224, INCLUDING CITY LIMITS OF BARBERTON) COUNTIES) | $36.83 | $29.01 | $65.84 | no change | Agreement, 2024 |
| IRON0017-010 · Ironworkers agreement, May 1, 2024 | |||||
IRONWORKER: STRUCTURAL…Full textIRONWORKER: STRUCTURAL, INCLUDING METAL BUILDING ERECTION & REINFORCING (ASHTABULA (EASTERN PART FROM LAKE ERIE ON THE NORTH TO ROUTE #322 ON THE SOUTH TO INCLUDE CONNEAUT, KINGSVILLE, SHEFFIELD, DENMARK, DORSET, CHERRY VALLEY, WAYNE, MONROE, PIERPONT, RICHMOND, ANDOVER & WILLIAMSFIELD TOWNSHIPS)) | $36.83 | $29.01 | $65.84 | — | Agreement, 2024 |
| IRON0044-001 · Ironworkers agreement, June 1, 2025 | |||||
IRONWORKER, REINFORCING…Full textIRONWORKER, REINFORCING (ADAMS (WESTERN PART), BROWN, BUTLER (SOUTHERN PART), CLERMONT, CLINTON (SOUTH OF A LINE DRAWN FROM BLANCHESTER TO LYNCHBURG), HAMILTON, HIGHLAND (EXCLUDING EASTERN ONE-FIFTH & PORTION OF COUNTY INSIDE LINES DRAWN FROM MARSHALL TO LYNCHBURG FROM THE NORTHERN COUNTY LINE THROUGH E. MONROE TO MARSHALL) AND WARREN (SOUTH OF A LINE DRAWN FROM BLANCHESTER THROUGH MORROW TO THE WEST COUNTY LINE) COUNTIES) | $38.27 | $23.90 | $62.17 | no change | Agreement, 2025 |
| IRON0044-002 · Ironworkers agreement, June 1, 2025 | |||||
IRONWORKER: FENCE ERECTOR…Full textIRONWORKER: FENCE ERECTOR (CLINTON (SOUTH OF A LINE DRAWN FROM BLANCHESTER TO LYNCHBURG), HAMILTON, HIGHLAND (EXCLUDING EASTERN ONE-FIFTH & PORTION OF COUNTY INSIDE LINES DRAWN FROM MARSHALL TO LYNCHBURG FROM THE NORTHERN COUNTY LINE THROUGH E. MONROE TO MARSHALL) & WARREN (SOUTH OF A LINE DRAWN FROM BLANCHESTER THROUGH MORROW TO THE WEST COUNTY LINE)) | $35.88 | $23.90 | $59.78 | no change | Agreement, 2025 |
IRONWORKER: ORNAMENTAL…Full textIRONWORKER: ORNAMENTAL; STRUCTURAL (CLINTON (SOUTH OF A LINE DRAWN FROM BLANCHESTER TO LYNCHBURG), HAMILTON, HIGHLAND (EXCLUDING EASTERN ONE-FIFTH & PORTION OF COUNTY INSIDE LINES DRAWN FROM MARSHALL TO LYNCHBURG FROM THE NORTHERN COUNTY LINE THROUGH E. MONROE TO MARSHALL) & WARREN (SOUTH OF A LINE DRAWN FROM BLANCHESTER THROUGH MORROW TO THE WEST COUNTY LINE)) | $37.77 | $23.90 | $61.67 | no change | Agreement, 2025 |
| IRON0055-003 · Ironworkers agreement, July 1, 2024 | |||||
IRONWORKER: ALL OTHER WORK…Full textIRONWORKER: ALL OTHER WORK (CRAWFORD (AREA BETWEEN LINES DRAWN FROM WHERE HWY #598 & #30 MEET THROUGH N. LIBERTY TO THE NORTHERN BORDER & FROM SAID HWY JUNCTION POINT DUE WEST TO THE BORDER), DEFIANCE (S. OF A LINE DRAWN FROM WHERE RTE. #66 MEETS THE NORTHERN LINE THROUGH INDEPENDENCE TO THE EASTERN COUNTY BORDER), ERIE (WESTERN 1/3), FULTON, HANCOCK, HARDIN (NORTH OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHERN LINE ON THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHEN LINE OF THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM THE NORTHERN BORDER THROUGH MONROEVILLE & WILLARD), LUCAS, OTTAWA, PUTNAM (EAST OF A LINE DRAWN FROM THE NORTHERN BORDER DOWN THROUGH MILLER CITY TO WHERE #696 MEETS THE SOURTHERN BORDER), SANDUSKY, SENECA, WILLIAMS (EAST OF A LINE DRAWN FROM PIONEER THROUGH STRYKER TO THE SOUTHERN BORDER), WOOD & WYANDOT (NORTH OF RTE. #30)) | $29.77 | $21.30 | $51.07 | — | Agreement, 2024 |
IRONWORKER: FENCE ERECTOR…Full textIRONWORKER: FENCE ERECTOR (CRAWFORD (AREA BETWEEN LINES DRAWN FROM WHERE HWY #598 & #30 MEET THROUGH N. LIBERTY TO THE NORTHERN BORDER & FROM SAID HWY JUNCTION POINT DUE WEST TO THE BORDER), DEFIANCE (S. OF A LINE DRAWN FROM WHERE RTE. #66 MEETS THE NORTHERN LINE THROUGH INDEPENDENCE TO THE EASTERN COUNTY BORDER), ERIE (WESTERN 1/3), FULTON, HANCOCK, HARDIN (NORTH OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHERN LINE ON THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHEN LINE OF THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM THE NORTHERN BORDER THROUGH MONROEVILLE & WILLARD), LUCAS, OTTAWA, PUTNAM (EAST OF A LINE DRAWN FROM THE NORTHERN BORDER DOWN THROUGH MILLER CITY TO WHERE #696 MEETS THE SOURTHERN BORDER), SANDUSKY, SENECA, WILLIAMS (EAST OF A LINE DRAWN FROM PIONEER THROUGH STRYKER TO THE SOUTHERN BORDER), WOOD & WYANDOT (NORTH OF RTE. #30)) | $29.77 | $21.30 | $51.07 | — | Agreement, 2024 |
IRONWORKER: FLAT ROAD MESH…Full textIRONWORKER: FLAT ROAD MESH (CRAWFORD (AREA BETWEEN LINES DRAWN FROM WHERE HWY #598 & #30 MEET THROUGH N. LIBERTY TO THE NORTHERN BORDER & FROM SAID HWY JUNCTION POINT DUE WEST TO THE BORDER), DEFIANCE (S. OF A LINE DRAWN FROM WHERE RTE. #66 MEETS THE NORTHERN LINE THROUGH INDEPENDENCE TO THE EASTERN COUNTY BORDER), ERIE (WESTERN 1/3), FULTON, HANCOCK, HARDIN (NORTH OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHERN LINE ON THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHEN LINE OF THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM THE NORTHERN BORDER THROUGH MONROEVILLE & WILLARD), LUCAS, OTTAWA, PUTNAM (EAST OF A LINE DRAWN FROM THE NORTHERN BORDER DOWN THROUGH MILLER CITY TO WHERE #696 MEETS THE SOURTHERN BORDER), SANDUSKY, SENECA, WILLIAMS (EAST OF A LINE DRAWN FROM PIONEER THROUGH STRYKER TO THE SOUTHERN BORDER), WOOD & WYANDOT (NORTH OF RTE. #30)) | $26.40 | $24.62 | $51.02 | — | Agreement, 2024 |
IRONWORKER: TUNNES & CAISSONS UNDER PRESSURE…Full textIRONWORKER: TUNNES & CAISSONS UNDER PRESSURE (CRAWFORD (AREA BETWEEN LINES DRAWN FROM WHERE HWY #598 & #30 MEET THROUGH N. LIBERTY TO THE NORTHERN BORDER & FROM SAID HWY JUNCTION POINT DUE WEST TO THE BORDER), DEFIANCE (S. OF A LINE DRAWN FROM WHERE RTE. #66 MEETS THE NORTHERN LINE THROUGH INDEPENDENCE TO THE EASTERN COUNTY BORDER), ERIE (WESTERN 1/3), FULTON, HANCOCK, HARDIN (NORTH OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHERN LINE ON THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM MAYSVILLE TO A POINT 4 MILES SOUTH OF THE NORTHEN LINE OF THE EASTERN LINE), HENRY, HURON (WEST OF A LINE DRAWN FROM THE NORTHERN BORDER THROUGH MONROEVILLE & WILLARD), LUCAS, OTTAWA, PUTNAM (EAST OF A LINE DRAWN FROM THE NORTHERN BORDER DOWN THROUGH MILLER CITY TO WHERE #696 MEETS THE SOURTHERN BORDER), SANDUSKY, SENECA, WILLIAMS (EAST OF A LINE DRAWN FROM PIONEER THROUGH STRYKER TO THE SOUTHERN BORDER), WOOD & WYANDOT (NORTH OF RTE. #30)) | $35.50 | $29.20 | $64.70 | — | Agreement, 2024 |
| IRON0147-002 · Ironworkers agreement, June 1, 2025 | |||||
IRONWORKER (ALLEN (NORTHERN HALF)…Full textIRONWORKER (ALLEN (NORTHERN HALF), DEFIANCE (NORTHERN PART, EXCLUDING SOUTH OF A LINE DRAWN FROM WHERE RTE. #66 MEETS THE NORTHERN LINE THROUGH INDEPENDENCE TO THE EASTERN COUNTY BORDER), MERCER (NORTHERN HALF), PAULDING, PUTNAM (WESTERN PART, EXCLUDING EAST OF A LINE DRAWN FROM THE NORTHERN BORDER DOWN THROUGH MILLER CITY TO WHERE #696 MEETS THE SOUTHERN BORDER), VAN WERT, AND WILLIAMS (WESTERN PART, EXCLUDING EAST OF A LINE DRAWN FROM PIONEER THROUGH STRYKER TO THE SOUTHERN BORDER) COUNTIES) | $38.00 | $26.39 | $64.39 | no change | Agreement, 2025 |
| IRON0172-002 · Ironworkers agreement, June 1, 2025 | |||||
IRONWORKER (CHAMPAIGN…Full textIRONWORKER (CHAMPAIGN (EASTERN ONE-THIRD), CLARK (EASTERN ONE-FOURTH), COSHOCTON (WEST OF A LINE BEGINNING AT THE NORTHWESTERN COUNTY LINE GOING THROUGH WALHONDING & TUNNEL HILL TO THE SOUTHERN COUNTY LINE), CRAWFORD (SOUTH OF RTE. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (EXCLUDING A LINE DRAWN FROM ROUNDHEAD TO MAYSVILLE), HIGHLAND (EASTERN ONE-FIFTH), HOCKING, JACKSON (NORTHERN HALF), KNOX, LICKING, LOGAN (EASTERN ONE-THIRD), MADISON, MARION, MORROW, MUSKINGUM (WEST OF A LINE | $40.87 | $23.15 | $64.02 | no change | Agreement, 2025 |
| IRON0207-004 · Ironworkers agreement, June 1, 2025 | |||||
IRONWORKER: LAYOUT…Full textIRONWORKER: LAYOUT; SHEETER (ASHTABULA (SOUTHERN PART STARTING AT THE GEAUGA COUNTY LINE), COLUMBIANA (E. OF A LINE FROM DAMASCUS TO HIGHLANDTOWN), MAHONING (N. OF OLD ROUTE #224), PORTAGE (E. OF A LINE FROM MIDDLEFIELD TO SHALERSVILLE TO DEERFIELD) & TRUMBULL) | $37.26 | $28.16 | $65.42 | no change | Agreement, 2025 |
IRONWORKER: ORNAMENTAL…Full textIRONWORKER: ORNAMENTAL; REINFORCING; STRUCTURAL (ASHTABULA (SOUTHERN PART STARTING AT THE GEAUGA COUNTY LINE), COLUMBIANA (E. OF A LINE FROM DAMASCUS TO HIGHLANDTOWN), MAHONING (N. OF OLD ROUTE #224), PORTAGE (E. OF A LINE FROM MIDDLEFIELD TO SHALERSVILLE TO DEERFIELD) & TRUMBULL) | $36.26 | $28.16 | $64.42 | no change | Agreement, 2025 |
| IRON0290-002 · Ironworkers agreement, June 1, 2025 | |||||
IRONWORKER (ALLEN (SOUTHERN HALF)…Full textIRONWORKER (ALLEN (SOUTHERN HALF), AUGLAIZE, BUTLER (NORTH OF A LINE DRAWN FROM EAST TO THE WEST COUNTY LINE GOING THROUGH OXFORD, DARRTOWN & WOODSDALE), CHAMPAIGN (EXCLUDING EAST OF A LINE DRAWN FROM CATAWLA TO THE POINT WHERE #68 INTERSECTS THE NORTHERN COUNTY LINE), CLARK (WESTERN TWO-THIRDS), CLINTON (EXCLUDING SOUTH OF A LINE DRAWN FROM BLANCHESTER TO LYNCHBURG), DARKE, GREENE, HIGHLAND (INSIDE LINES DRAWN FROM MARSHALL TO LYNCHBURG & FROM THE NORTHERN COUNTY LINE THROUGH EAST MONROE TO MARSHALL), LOGAN (WEST OF A LINE DRAWN FROM WEST LIBERTY TO WHERE THE NORTHERN COUNTY LINE MEETS THE WESTERN COUNTY LINE OF HARDIN), MERCER (SOUTHERN HALF), MIAMI, MONTGOMERY, PREBLE, SHELBY, & WARREN (EXCLUDING SOUTH OF A LINE DRAWN FROM BLANCHESTER THROUGH MORROW TO THE WESTERN COUNTY LINE) COUNTIES) | $37.39 | $25.35 | $62.74 | — | Agreement, 2025 |
| IRON0549-003 · Ironworkers agreement, December 1, 2022 | |||||
IRONWORKER (BELMONT…Full textIRONWORKER (BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM (EXCLUDING PORTION WEST OF A LINE STARTING AT ADAMS MILL GOING TO ADAMSVILLE AND GOING FROM ADAMSVILLE THROUGH BLUE ROCK TO THE SOUTH BORDER)) | $35.19 | $25.66 | $60.85 | no change | Agreement, 2022 |
| IRON0550-004 · Ironworkers agreement, May 1, 2024 | |||||
IRONWORKERS: STRUCTURAL…Full textIRONWORKERS: STRUCTURAL, ORNAMENTAL AND REINFORCING (ASHLAND, CARROLL, COLUMBIANA (W. OF A LINE FROM DAMASCUS TO HIGHLANDTOWN), COSHOCTON (E. OF A LINE BEGINNING AT NW CO. LINE GOING THROUGH WALHONDING & TUNNEL HILL TO THE SOUTH CO. LINE), HOLMES, HURON (S. OF OLD RTE. #224), MAHONING (S. OF OLD RTE. #224), MEDINA (S. OF OLD RTE. #224), PORTAGE (S. OF OLD RTE. #224), RICHLAND, STARK, SUMMIT (S. OF OLD RTE. #224, EXCLUDING CITY LIMITS OF BARBERTON), TUSCARAWAS, & WAYNE) | $34.70 | $22.88 | $57.58 | no change | Agreement, 2024 |
| IRON0769-004 · Ironworkers agreement, June 1, 2025 | |||||
| IRONWORKER (ADAMS (EASTERN HALF), GALLIA, JACKSON (SOUTHERN HALF), LAWRENCE & SCIOTO) | $39.70 | $29.59 | $69.29 | no change | Agreement, 2025 |
| IRON0787-003 · Ironworkers agreement, June 1, 2025 | |||||
| IRONWORKER (ATHENS, MEIGS, MORGAN, NOBLE, AND WASHINGTON COUNTIES) | $36.10 | $24.65 | $60.75 | no change | Agreement, 2025 |
| LABO0265-008 · Laborers agreement, May 1, 2024 | |||||
LABORER GROUP 1…Full textLABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN (BATCH TRUCK); GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER (CONSTRUCTION); LANDSCAPE LABORER; MESH HANDLERS & PLACER; RIGHT-OF-WAY LABORER; RIPRAP LABORER & GROUTER; SCAFFOLD ERECTOR; SEAL COATING; SURFACE TREATMENT OR ROAD MIX LABORER; SIGN INSTALLER; SLURRY SEAL; UTILITY MAN; BRIDGE MAN; HANDYMAN; WATERPROOFING LABORER; FLAGPERSON; HAZARDOUS WASTE (LEVEL D); DIVER TENDER; ZONE PERSON & TRAFFIC CONTROL. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (REMAINING COUNTIES OF OHIO) | $35.52 | $14.45 | $49.97 | — | Agreement, 2024 |
LABORER GROUP 1…Full textLABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN (BATCH TRUCK); GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER (CONSTRUCTION); LANDSCAPE LABORER; MESH HANDLERS & PLACER; RIGHT-OF-WAY LABORER; RIPRAP LABORER & GROUTER; SCAFFOLD ERECTOR; SEAL COATING; SURFACE TREATMENT OR ROAD MIX LABORER; SIGN INSTALLER; SLURRY SEAL; UTILITY MAN; BRIDGE MAN; HANDYMAN; WATERPROOFING LABORER; FLAGPERSON; HAZARDOUS WASTE (LEVEL D); DIVER TENDER; ZONE PERSON & TRAFFIC CONTROL. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (CUYAHOGA, GEAUGA & LAKE COUNTIES) | $37.18 | $14.45 | $51.63 | — | Agreement, 2024 |
LABORER GROUP 1…Full textLABORER GROUP 1- ASPHALT LABORER; CARPENTER TENDER; CONCRETE CURING APPLICATOR; DUMP MAN (BATCH TRUCK); GUARDRAIL AND FENCE INSTALLER; JOINT SETTER; LABORER (CONSTRUCTION); LANDSCAPE LABORER; MESH HANDLERS & PLACER; RIGHT-OF-WAY LABORER; RIPRAP LABORER & GROUTER; SCAFFOLD ERECTOR; SEAL COATING; SURFACE TREATMENT OR ROAD MIX LABORER; SIGN INSTALLER; SLURRY SEAL; UTILITY MAN; BRIDGE MAN; HANDYMAN; WATERPROOFING LABORER; FLAGPERSON; HAZARDOUS WASTE (LEVEL D); DIVER TENDER; ZONE PERSON & TRAFFIC CONTROL. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (ASHTABULA, ERIE, HURON, LORAIN, LUCAS, MAHONING, MEDINA, OTTAWA, PORTAGE, SANDUSKY, STARK, SUMMIT, TRUMBULL & WOOD COUNTIES) | $35.95 | $14.45 | $50.40 | — | Agreement, 2024 |
LABORER GROUP 2…Full textLABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS (GAS, ELECTRIC, AIR); MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR POWER WHEELBARROW; PAINT STRIPER; SHEETING & SHORING MAN; SURFACE GRINDER MAN; PLASTIC FUSING MACHINE OPERATOR; PUG MILL OPERATOR; & VACUUM DEVICES (WET OR DRY); RODDING MACHINE OPERATOR; DIVER; SCREWMAN OR PAVER; SCREED PERSON; WATER BLAST, HAND HELD WAND; PUMPS 4"" & UNDER (GAS, AIR OR ELECTRIC) & HAZARDOUS WASTE (LEVEL C); AIR TRACK AND WAGON DRILL; BOTTOM PERSON; COFFERDAM (BELOW 25 FT. DEEP); CONCRETE SAW PERSON; CUTTING WITH BURNING TORCH; FORM SETTER; HAND SPIKER (RAILROAD); PIPELAYER; TUNNEL LABORER (WITHOUT AIR) & CAISSON; UNDERGROUND PERSON (WORKING IN SEWER AND WATERLINE, CLEANING, REPAIRING & RECONDITIONING); SANDBLASTER NOZZLE PERSON; & HAZARDOUS WASTE (LEVEL B). TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (REMAINING COUNTIES OF OHIO) | $35.69 | $14.45 | $50.14 | — | Agreement, 2024 |
LABORER GROUP 2…Full textLABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS (GAS, ELECTRIC, AIR); MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR POWER WHEELBARROW; PAINT STRIPER; SHEETING & SHORING MAN; SURFACE GRINDER MAN; PLASTIC FUSING MACHINE OPERATOR; PUG MILL OPERATOR; & VACUUM DEVICES (WET OR DRY); RODDING MACHINE OPERATOR; DIVER; SCREWMAN OR PAVER; SCREED PERSON; WATER BLAST, HAND HELD WAND; PUMPS 4"" & UNDER (GAS, AIR OR ELECTRIC) & HAZARDOUS WASTE (LEVEL C); AIR TRACK AND WAGON DRILL; BOTTOM PERSON; COFFERDAM (BELOW 25 FT. DEEP); CONCRETE SAW PERSON; CUTTING WITH BURNING TORCH; FORM SETTER; HAND SPIKER (RAILROAD); PIPELAYER; TUNNEL LABORER (WITHOUT AIR) & CAISSON; UNDERGROUND PERSON (WORKING IN SEWER AND WATERLINE, CLEANING, REPAIRING & RECONDITIONING); SANDBLASTER NOZZLE PERSON; & HAZARDOUS WASTE (LEVEL B). TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (CUYAHOGA, GEAUGA & LAKE COUNTIES) | $37.35 | $14.45 | $51.80 | — | Agreement, 2024 |
LABORER GROUP 2…Full textLABORER GROUP 2- ASPHALT RAKER; CONCRETE PUDDLER; KETTLE MAN PIPELINE); MACHINE DRIVEN TOOLS (GAS, ELECTRIC, AIR); MASON TENDER; BRICK PAVER; MORTAR MIXER; POWER BUGGY OR POWER WHEELBARROW; PAINT STRIPER; SHEETING & SHORING MAN; SURFACE GRINDER MAN; PLASTIC FUSING MACHINE OPERATOR; PUG MILL OPERATOR; & VACUUM DEVICES (WET OR DRY); RODDING MACHINE OPERATOR; DIVER; SCREWMAN OR PAVER; SCREED PERSON; WATER BLAST, HAND HELD WAND; PUMPS 4"" & UNDER (GAS, AIR OR ELECTRIC) & HAZARDOUS WASTE (LEVEL C); AIR TRACK AND WAGON DRILL; BOTTOM PERSON; COFFERDAM (BELOW 25 FT. DEEP); CONCRETE SAW PERSON; CUTTING WITH BURNING TORCH; FORM SETTER; HAND SPIKER (RAILROAD); PIPELAYER; TUNNEL LABORER (WITHOUT AIR) & CAISSON; UNDERGROUND PERSON (WORKING IN SEWER AND WATERLINE, CLEANING, REPAIRING & RECONDITIONING); SANDBLASTER NOZZLE PERSON; & HAZARDOUS WASTE (LEVEL B). TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (ASHTABULA, ERIE, HURON, LORAIN, LUCAS, MAHONING, MEDINA, OTTAWA, PORTAGE, SANDUSKY, STARK, SUMMIT, TRUMBULL & WOOD COUNTIES) | $36.12 | $14.45 | $50.57 | — | Agreement, 2024 |
LABORER GROUP 3…Full textLABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER (MECHANICAL JOINTS & UTILITY PIPELINE); YARNER; HAZARDOUS WASTE (LEVEL A); CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS (WITH AIR-PRESSURIZED - $1.00 PREMIUM); CURB SETTER & CUTTER; GRADE CHECKER; UTILITY PIPELINE TAPPER; WATERLINE; AND CAULKER. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (REMAINING COUNTIES OF OHIO) | $36.02 | $14.45 | $50.47 | — | Agreement, 2024 |
LABORER GROUP 3…Full textLABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER (MECHANICAL JOINTS & UTILITY PIPELINE); YARNER; HAZARDOUS WASTE (LEVEL A); CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS (WITH AIR-PRESSURIZED - $1.00 PREMIUM); CURB SETTER & CUTTER; GRADE CHECKER; UTILITY PIPELINE TAPPER; WATERLINE; AND CAULKER. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (CUYAHOGA, GEAUGA & LAKE COUNTIES) | $37.68 | $14.45 | $52.13 | — | Agreement, 2024 |
LABORER GROUP 3…Full textLABORER GROUP 3- BLASTER; MUCKER; POWDER PERSON; TOP LANDER; WRENCHER (MECHANICAL JOINTS & UTILITY PIPELINE); YARNER; HAZARDOUS WASTE (LEVEL A); CONCRETE SPECIALIST; CONCRETE CREW IN TUNNELS (WITH AIR-PRESSURIZED - $1.00 PREMIUM); CURB SETTER & CUTTER; GRADE CHECKER; UTILITY PIPELINE TAPPER; WATERLINE; AND CAULKER. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (ASHTABULA, ERIE, HURON, LORAIN, LUCAS, MAHONING, MEDINA, OTTAWA, PORTAGE, SANDUSKY, STARK, SUMMIT, TRUMBULL & WOOD COUNTIES) | $36.45 | $14.45 | $50.90 | — | Agreement, 2024 |
LABORER GROUP 4…Full textLABORER GROUP 4- MINER (WITH AIR-PRESSURIZED - $1.00 PREMIUM); & GUNITE NOZZLE PERSON. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (ASHTABULA, ERIE, HURON, LORAIN, LUCAS, MAHONING, MEDINA, OTTAWA, PORTAGE, SANDUSKY, STARK, SUMMIT, TRUMBULL & WOOD COUNTIES) | $36.90 | $14.45 | $51.35 | — | Agreement, 2024 |
LABORER GROUP 4…Full textLABORER GROUP 4- MINER (WITH AIR-PRESSURIZED - $1.00 PREMIUM); & GUNITE NOZZLE PERSON. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (REMAINING COUNTIES OF OHIO) | $36.47 | $14.45 | $50.92 | — | Agreement, 2024 |
LABORER GROUP 4…Full textLABORER GROUP 4- MINER (WITH AIR-PRESSURIZED - $1.00 PREMIUM); & GUNITE NOZZLE PERSON. TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING. (CUYAHOGA, GEAUGA & LAKE COUNTIES) | $38.13 | $14.45 | $52.58 | — | Agreement, 2024 |
LABORER: SEWAGE PLANTS…Full textLABORER: SEWAGE PLANTS, WASTE PLANTS, WATER TREATMENT FACILITIES, PUMPING STATIONS, & ETHANOL PLANTS CONSTRUCTION. (CUYAHOGA AND GEAUGA COUNTIES ONLY) | $38.56 | $14.45 | $53.01 | — | Agreement, 2024 |
| PAIN0006-002 · Painters and Allied Trades agreement, May 1, 2023 | |||||
PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 1…Full textPAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE)) | $30.75 | $18.95 | $49.70 | no change | Agreement, 2023 |
PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 2…Full textPAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE)) | $31.15 | $18.95 | $50.10 | no change | Agreement, 2023 |
PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 3…Full textPAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 3- SPRAY PAINTING; CLOSED STEEL ABOVE 55 FEET; BRIDGES & OPEN STRUCTURAL STEEL; TANKS - WATER TOWERS; BRIDGE PAINTERS; BRIDGE RIGGERS; CONTAINMENT BUILDERS (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE)) | $31.45 | $18.95 | $50.40 | no change | Agreement, 2023 |
PAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 4…Full textPAINTER- COMMERCIAL NEW WORK; REMODELING; & RENOVATIONS: GROUP 4- BRIDGE BLASTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE)) | $37.01 | $18.95 | $55.96 | no change | Agreement, 2023 |
PAINTER- COMMERCIAL REPAINT GROUP 1…Full textPAINTER- COMMERCIAL REPAINT GROUP 1- BRUSH; & ROLLER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE)) | $29.25 | $18.95 | $48.20 | no change | Agreement, 2023 |
PAINTER- COMMERCIAL REPAINT GROUP 2…Full textPAINTER- COMMERCIAL REPAINT GROUP 2- SANDBLASTING & BUFFING (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. OF THE EAST-WEST TURNPIKE) & SUMMIT (N. OF THE EAST-WEST TURNPIKE)) | $29.65 | $18.95 | $48.60 | no change | Agreement, 2023 |
| PAINTER- COMMERCIAL REPAINT GROUP 3- SPRAY PAINTING | $29.95 | $18.95 | $48.90 | no change | Agreement, 2023 |
| PAIN0007-002 · Painters and Allied Trades agreement, July 1, 2025 | |||||
PAINTER: NEW COMMERCIAL WORK: GROUP 1…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 1- BRUSH; SPRAY & SANDBLASTING POT TENDER. (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $33.66 | $23.88 | $57.54 | no change | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 2…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 2- REFINERIES & REFINERY TANKS; SURFACES 30 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 3…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 3- SWING STAGE & CHAIR (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 4…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 4- LEAD ABATEMENT (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 5…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 5- ALL METHODS OF SPRAY (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 6…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 6- SOLVENT-BASED CATALIZED EPOXY MATERIALS OF 2 OR MORE COMPONENT MATERIALS, TO INCLUDE SOLVENT-BASED CONVERSION VARNISH (EXCLUDING WATER BASED) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 7…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 7- SPRAY SOLVENT BASED MATERIAL; SAND & ABRASIVE BLASTING (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 8…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 8- TOWERS; TANKS; BRIDGES; STACKS OVER 30 FEET (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
PAINTER: NEW COMMERCIAL WORK: GROUP 9…Full textPAINTER: NEW COMMERCIAL WORK: GROUP 9- EPOXY SPRAY (EXCLUDING WATER BASED) (REPAINT IS 90% OF GROUP RATE) (FULTON, HENRY, LUCAS, OTTAWA (EXCLUDING ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH, & GENOVA) & WOOD COUNTIES) | $34.66 | $23.88 | $58.54 | — | Agreement, 2025 |
| PAIN0012-008 · Painters and Allied Trades agreement, May 1, 2019 | |||||
| PAINTER: GROUP 1- BRIDGE EQUIPMENT TENDER; BRIDGE/CONTAINMENT BUILDER (BUTLER COUNTY) | $21.95 | $10.20 | $32.15 | no change | Agreement, 2019 |
| PAINTER: GROUP 2- BRUSH & ROLLER (BUTLER COUNTY) | $25.30 | $10.20 | $35.50 | no change | Agreement, 2019 |
| PAINTER: GROUP 3- SPRAY (BUTLER COUNTY) | $25.80 | $10.20 | $36.00 | no change | Agreement, 2019 |
| PAINTER: GROUP 4- SANDBLASTING; & WATERBLASTING (BUTLER COUNTY) | $26.05 | $10.20 | $36.25 | no change | Agreement, 2019 |
PAINTER: GROUP 5…Full textPAINTER: GROUP 5- ELEVATED TANKS; STEEPLEJACK WORK; BRIDGE; & LEAD ABATEMENT (BUTLER COUNTY) | $26.30 | $10.20 | $36.50 | no change | Agreement, 2019 |
| PAIN0012-010 · Painters and Allied Trades agreement, May 1, 2019 | |||||
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGE EQUIPMENT TENDER…Full textPAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGE EQUIPMENT TENDER AND CONTAINMENT BUILDER (BROWN, CLERMONT, HAMILTON & WARREN) | $21.95 | $10.20 | $32.15 | — | Agreement, 2019 |
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGES WHEN HIGHEST…Full textPAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRIDGES WHEN HIGHEST POINT OF CLEARANCE IS 60 FEET OR MORE; & LEAD ABATEMENT PROJECTS (BROWN, CLERMONT, HAMILTON & WARREN) | $26.30 | $10.20 | $36.50 | — | Agreement, 2019 |
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRUSH & ROLLER…Full textPAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING BRUSH & ROLLER (BROWN, CLERMONT, HAMILTON & WARREN) | $25.30 | $10.20 | $35.50 | — | Agreement, 2019 |
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SANDBLASTING & HOPPER TENDER…Full textPAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SANDBLASTING & HOPPER TENDER; WATER BLASTING (BROWN, CLERMONT, HAMILTON & WARREN) | $26.05 | $10.20 | $36.25 | — | Agreement, 2019 |
PAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SPRAY…Full textPAINTER HEAVY & HIGHWAY BRIDGES- GUARDRAILS-LIGHTPOLES- STRIPING SPRAY (BROWN, CLERMONT, HAMILTON & WARREN) | $25.80 | $10.20 | $36.00 | — | Agreement, 2019 |
| PAIN0093-001 · Painters and Allied Trades agreement, December 1, 2024 | |||||
PAINTER: BRIDGES; LOCKS…Full textPAINTER: BRIDGES; LOCKS; DAMS; TENSION TOWERS; & ENERGIZED SUBSTATIONS (ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE AND WASHINGTON COUNTIES) | $36.44 | $24.46 | $60.90 | no change | Agreement, 2024 |
PAINTER: POWER GENERATING FACILITIES…Full textPAINTER: POWER GENERATING FACILITIES (ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE AND WASHINGTON COUNTIES) | $33.29 | $24.46 | $57.75 | no change | Agreement, 2024 |
| PAIN0249-002 · Painters and Allied Trades agreement, May 1, 2025 | |||||
| PAINTER: GROUP 1: BRUSH & ROLLER (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $29.15 | $13.97 | $43.12 | no change | Agreement, 2025 |
PAINTER: GROUP 2…Full textPAINTER: GROUP 2: SWING, SCAFFOLD BRIDGES; STRUCTURAL STEEL; OPEN ACID TANK; HIGH TENSION ELECTRICAL EQUIPMENT; & HOT PIPES (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $33.09 | $13.97 | $47.06 | no change | Agreement, 2025 |
PAINTER: GROUP 3…Full textPAINTER: GROUP 3: SPRAY; SANDBLAST; STEAMCLEAN; LEAD ABATEMENT (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $29.90 | $13.97 | $43.87 | no change | Agreement, 2025 |
| PAINTER: GROUP 4: STEEPLEJACK WORK (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $30.10 | $13.97 | $44.07 | no change | Agreement, 2025 |
| PAINTER: GROUP 5: COAL TAR (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $30.65 | $13.97 | $44.62 | no change | Agreement, 2025 |
PAINTER: GROUP 6…Full textPAINTER: GROUP 6: BRIDGE EQUIPMENT TENDER & OR CONTAINMENT BUILDER (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $37.86 | $13.97 | $51.83 | no change | Agreement, 2025 |
PAINTER: GROUP 7…Full textPAINTER: GROUP 7: TANKS, STACKS & TOWERS (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $33.86 | $13.97 | $47.83 | no change | Agreement, 2025 |
PAINTER: GROUP 8…Full textPAINTER: GROUP 8: BRIDGE BLASTER, RIGGER (CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $40.86 | $13.97 | $54.83 | no change | Agreement, 2025 |
| PAIN0356-002 · Painters and Allied Trades agreement, September 1, 2009 | |||||
PAINTER: BRIDGE EQUIPMENT TENDERS AND CONTAINMENT BUILDERS…Full textPAINTER: BRIDGE EQUIPMENT TENDERS AND CONTAINMENT BUILDERS (KNOX, LICKING, MUSKINGUM, AND PERRY) | $27.93 | $7.25 | $35.18 | no change | Agreement, 2009 |
| PAINTER: BRIDGES; BLASTERS; AND RIGGERS (KNOX, LICKING, MUSKINGUM, AND PERRY) | $34.60 | $7.25 | $41.85 | — | Agreement, 2009 |
| PAINTER: BRUSH AND ROLLER (KNOX, LICKING, MUSKINGUM, AND PERRY) | $20.93 | $7.25 | $28.18 | no change | Agreement, 2009 |
PAINTER: SANDBLASTING…Full textPAINTER: SANDBLASTING; STEAM CLEANING; WATERBLASTING; AND HAZARDOUS WORK (KNOX, LICKING, MUSKINGUM, AND PERRY) | $25.82 | $7.25 | $33.07 | no change | Agreement, 2009 |
| PAINTER: SPRAY (KNOX, LICKING, MUSKINGUM, AND PERRY) | $21.40 | $7.25 | $28.65 | no change | Agreement, 2009 |
| PAINTER: STRUCTURAL STEEL AND SWING STAGE (KNOX, LICKING, MUSKINGUM, AND PERRY) | $25.42 | $7.25 | $32.67 | no change | Agreement, 2009 |
| PAINTER: TANKS; STACKS; AND TOWERS (KNOX, LICKING, MUSKINGUM, AND PERRY) | $28.63 | $7.25 | $35.88 | no change | Agreement, 2009 |
| PAIN0438-002 · Painters and Allied Trades agreement, December 1, 2023 | |||||
PAINTER: BRIDGES, LOCKS…Full textPAINTER: BRIDGES, LOCKS, DAMS, TENSION TOWERS & ENERGIZED SUBSTATIONS (BELMONT, HARRISON AND JEFFERSON COUNTIES) | $36.09 | $19.49 | $55.58 | no change | Agreement, 2023 |
| PAINTER: POWER GENERATING FACILITIES (BELMONT, HARRISON AND JEFFERSON COUNTIES) | $32.94 | $19.49 | $52.43 | no change | Agreement, 2023 |
| PAIN0476-001 · Painters and Allied Trades agreement, June 1, 2025 | |||||
| PAINTER: GROUP 1- PAINTERS, BRUSH & ROLLER (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $30.64 | $18.36 | $49.00 | no change | Agreement, 2025 |
| PAINTER: GROUP 2- BRIDGES (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $40.27 | $18.36 | $58.63 | — | Agreement, 2025 |
| PAINTER: GROUP 3- STRUCTURAL STEEL (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $40.27 | $18.36 | $58.63 | no change | Agreement, 2025 |
PAINTER: GROUP 4…Full textPAINTER: GROUP 4- SPRAY, EXCEPT BAR JOIST/DECK (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $31.14 | $18.36 | $49.50 | no change | Agreement, 2025 |
PAINTER: GROUP 5…Full textPAINTER: GROUP 5- EPOXY/MASTIC; SPRAY- BAR JOIST/DECK; WORKING ABOVE 50 FEET; AND SWINGSTAGES (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $31.29 | $18.36 | $49.65 | no change | Agreement, 2025 |
| PAINTER: GROUP 6- TANKS; SANDBLASTING (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $35.27 | $18.36 | $53.63 | no change | Agreement, 2025 |
| PAINTER: GROUP 7- TOWERS; STACKS (COLUMBIANA, MAHONING, AND TRUMBULL COUNITES) | $32.64 | $18.36 | $51.00 | no change | Agreement, 2025 |
| PAIN0555-002 · Painters and Allied Trades agreement, January 1, 2025 | |||||
| PAINTER: GROUP 1- CONTAINMENT BUILDER (ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO) | $33.32 | $21.54 | $54.86 | no change | Agreement, 2025 |
PAINTER: GROUP 2…Full textPAINTER: GROUP 2- BRUSH; ROLLER; POWER TOOLS, UNDER 40 FEET (ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO) | $35.02 | $21.54 | $56.56 | no change | Agreement, 2025 |
PAINTER: GROUP 3…Full textPAINTER: GROUP 3- SAND BLASTING; SPRAY; STEAM CLEANING; PRESSURE WASHING; EPOXY & TWO COMPONENT MATERIALS; LEAD ABATEMENT; HAZARDOUS WASTE; TOXIC MATERIALS; BULK & STORAGE TANKS OF 25,000 GALLON CAPACITY OR MORE; ELEVATED TANKS (ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO) | $36.72 | $21.54 | $58.26 | no change | Agreement, 2025 |
| PAINTER: GROUP 4- STACKS; BRIDGES (ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO) | $40.03 | $21.54 | $61.57 | no change | Agreement, 2025 |
| PAIN0639-001 · Painters and Allied Trades agreement, May 1, 2011 | |||||
| SIGN PAINTER & ERECTOR FOOTNOTES: A. 7 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY & 1 FLOATING DAY B. VACATION PAY: AFTER 1 YEAR'S SERVICE - 5 DAYS' PAID VACATION; AFTER 2, BUT LESS THAN 10 YEARS' SERVICE - 10 DAYS' PAID VACATION; AFTER 10, BUT LESS THAN 20 YEARS' SERVICE - 15 DAYS' PAID VACATION; AFTER 20 YEARS' SERVICE - 20 DAYS' PAID VACATION C. FUNERAL LEAVE UP TO 3 DAYS MAXIMUM PAID LEAVE FOR DEATH OF MOTHER, FATHER, BROTHER, SISTER, SPOUSE, CHILD, MOTHER-IN-LAW, FATHER-IN-LAW, GRANDPARENT AND INLAW PROVIDED EMPLOYEE ATTENDS FUNERAL | $20.61 | $3.50 | $24.11 | changed | Agreement, 2011 |
| PAIN0788-002 · Painters and Allied Trades agreement, June 1, 2024 | |||||
PAINTER: BRUSH & ROLLER…Full textPAINTER: BRUSH & ROLLER (ASHLAND, CRAWFORD, ERIE, HANCOCK, HURON, MARION, MORROW, OTTAWA (ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH & GENOA), RICHLAND, SANDUSKY, SENECA & WYANDOT) WINTER REPAINT: BETWEEN DECEMBER 1 TO MARCH 31 - 90%JR $.50 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: WHILE WORKING SWINGSTAGE, BOATSWAIN CHAIR, NEEDLE BEAM AND HORIZONTAL CABLE. WHILE OPERATING SPRAYGUNS, SANDBLASTING, COBBLASTING AND HIGH PRESSURE WATERBLASTING (4000PSI). $1.00 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: FOR THE APPLICATION OF CATALIZED EPOXY, INCLUDING LATEX EPOXY THAT IS DEEMED HAZARDOUS, LEAD ABATEMENT, OR FOR WORK OR MATERIAL WHERE SPECIAL PRECAUTIONS BEYOND NORMAL WORK DUTIES MUST BE TAKEN. FOR WORKING ON STACKS, TANKS, AND TOWERS OVER 40 FEET IN HEIGHT | $29.13 | $17.52 | $46.65 | no change | Agreement, 2024 |
PAINTER: STRUCTURAL STEEL…Full textPAINTER: STRUCTURAL STEEL (ASHLAND, CRAWFORD, ERIE, HANCOCK, HURON, MARION, MORROW, OTTAWA (ALLEN, BAY, BONO, CATAWBA ISLAND, CLAY CENTER, CURTICE, DANBURY, EAGLE BEACH, ELLISTON, ELMORE, ERIE, FISHBACK, GEM BEACH & GENOA), RICHLAND, SANDUSKY, SENECA & WYANDOT) WINTER REPAINT: BETWEEN DECEMBER 1 TO MARCH 31 - 90%JR $.50 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: WHILE WORKING SWINGSTAGE, BOATSWAIN CHAIR, NEEDLE BEAM AND HORIZONTAL CABLE. WHILE OPERATING SPRAYGUNS, SANDBLASTING, COBBLASTING AND HIGH PRESSURE WATERBLASTING (4000PSI). $1.00 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE CLASSIFICATION OF WORK: FOR THE APPLICATION OF CATALIZED EPOXY, INCLUDING LATEX EPOXY THAT IS DEEMED HAZARDOUS, LEAD ABATEMENT, OR FOR WORK OR MATERIAL WHERE SPECIAL PRECAUTIONS BEYOND NORMAL WORK DUTIES MUST BE TAKEN. FOR WORKING ON STACKS, TANKS, AND TOWERS OVER 40 FEET IN HEIGHT | $30.73 | $17.52 | $48.25 | no change | Agreement, 2024 |
| PAIN0813-005 · Painters and Allied Trades agreement, December 1, 2008 | |||||
| PAINTER: BASE RATE (GALLIA, LAWRENCE, MEIGS & VINTON) | $24.83 | $10.00 | $34.83 | no change | Agreement, 2008 |
| PAINTER: BRIDGES, LOCKS, DAMS & TENSION TOWERS (GALLIA, LAWRENCE, MEIGS & VINTON) | $27.83 | $10.00 | $37.83 | no change | Agreement, 2008 |
| PAIN0841-001 · Painters and Allied Trades agreement, July 1, 2025 | |||||
PAINTERS: GROUP 1…Full textPAINTERS: GROUP 1- BRUSH, ROLLER & PAPERHANGER (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $31.93 | $18.15 | $50.08 | no change | Agreement, 2025 |
PAINTERS: GROUP 2…Full textPAINTERS: GROUP 2- EPOXY APPLICATION (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $32.58 | $18.15 | $50.73 | no change | Agreement, 2025 |
PAINTERS: GROUP 3…Full textPAINTERS: GROUP 3- SWING SCAFFOLD, BOSUM CHAIR, & WINDOW JACK (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $32.68 | $18.15 | $50.83 | no change | Agreement, 2025 |
PAINTERS: GROUP 4…Full textPAINTERS: GROUP 4- SPRAY GUN OPERATOR OF ANY & ALL COATINGS (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $32.78 | $18.15 | $50.93 | no change | Agreement, 2025 |
PAINTERS: GROUP 5…Full textPAINTERS: GROUP 5- SANDBLAST, PAINTING OF STANDPIPES, ETC. FROM SCAFFOLDS, BRIDGE WORK AND/OR OPEN STRUCTURAL STEEL, STANDPIPES AND/OR WATER TOWERS (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $33.18 | $18.15 | $51.33 | no change | Agreement, 2025 |
PAINTERS: GROUP 6…Full textPAINTERS: GROUP 6- PUBLIC & COMMERCE TRANSPORTATION, STEEL OR GALVANIZED, BRIDGES, TUNNELS & RELATED SUPPORT ITEMS (CONCRETE) (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $38.60 | $18.15 | $56.75 | no change | Agreement, 2025 |
PAINTERS: GROUP 7…Full textPAINTERS: GROUP 7- SYNTHETIC EXTERIOR, DRYWALL FINISHER AND/OR TAPER, DRYWALL FINISHER AND FOLLOW-UP MAN USING AUTOMATIC TOOLS (MEDINA, PORTAGE (SOUTH OF AND INCLUDING OHIO TURNPIKE), AND SUMMIT (SOUTH OF AND INCLUDING OHIO TURNPIKE) COUNTIES) | $33.18 | $18.15 | $51.33 | — | Agreement, 2025 |
| PAIN0841-002 · Painters and Allied Trades agreement, July 1, 2025 | |||||
PAINTER: BRIDGES; TOWERS…Full textPAINTER: BRIDGES; TOWERS, POLES & STACKS; SANDBLASTING STEEL; STRUCTURAL STEEL & METALIZING (CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE) | $33.18 | $18.15 | $51.33 | no change | Agreement, 2025 |
| PAINTER: BRUSH & ROLLER (CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE) | $31.93 | $18.15 | $50.08 | no change | Agreement, 2025 |
PAINTER: SPRAY; TANK INTERIOR & EXTERIOR…Full textPAINTER: SPRAY; TANK INTERIOR & EXTERIOR (CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE) | $32.78 | $18.15 | $50.93 | no change | Agreement, 2025 |
| PAIN1020-002 · Painters and Allied Trades agreement, July 1, 2025 | |||||
PAINTER: BRUSH & ROLLER…Full textPAINTER: BRUSH & ROLLER (ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT, AND WILLIAMS COUNTIES) ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $27.59 | $18.54 | $46.13 | no change | Agreement, 2025 |
PAINTER: DRYWALL FINISHING & TAPING…Full textPAINTER: DRYWALL FINISHING & TAPING (ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT, AND WILLIAMS COUNTIES): LL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $28.34 | $18.54 | $46.88 | no change | Agreement, 2025 |
PAINTER: LEAD ABATEMENT…Full textPAINTER: LEAD ABATEMENT (ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT, AND WILLIAMS COUNTIES) ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $29.34 | $18.54 | $47.88 | no change | Agreement, 2025 |
PAINTER: SPRAY, SANDBLASTING PRESSURE CLEANING…Full textPAINTER: SPRAY, SANDBLASTING PRESSURE CLEANING, & REFINERY (ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT, AND WILLIAMS COUNTIES) ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $28.34 | $18.54 | $46.88 | no change | Agreement, 2025 |
PAINTER: SWING STAGE…Full textPAINTER: SWING STAGE, CHAIR, SPIDERS, & CHERRY PICKERS (ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT, AND WILLIAMS COUNTIES) ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $27.84 | $18.54 | $46.38 | no change | Agreement, 2025 |
PAINTER: WALLCOVERINGS…Full textPAINTER: WALLCOVERINGS (ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER, PAULDING, PUTNAM, SHELBY, VAN WERT, AND WILLIAMS COUNTIES) ALL SURFACES 40 FT. OR OVER WHERE MATERIAL IS APPLIED TO OR LABOR PERFORMED ON, ABOVE GROUND LEVEL (EXTERIOR), FLOOR LEVEL (INTERIOR) - $.50 PREMIUM APPLYING COAL TAR PRODUCTS - $1.00 PREMIUM | $28.34 | $18.54 | $46.88 | no change | Agreement, 2025 |
| PAIN1275-002 · Painters and Allied Trades agreement, May 1, 2025 | |||||
| PAINTER: BRIDGES (DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION) | $37.26 | $15.16 | $52.42 | no change | Agreement, 2025 |
PAINTER: BRUSH; ROLLER…Full textPAINTER: BRUSH; ROLLER (DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION) | $30.20 | $15.16 | $45.36 | no change | Agreement, 2025 |
PAINTER: SANDBLASTING…Full textPAINTER: SANDBLASTING; STEAMCLEANING; WATERBLASTING (3500 PSI OR OVER)& HAZARDOUS WORK (DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION) | $32.35 | $15.16 | $47.51 | no change | Agreement, 2025 |
| PAINTER: SPRAY (DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION) | $32.15 | $15.16 | $47.31 | no change | Agreement, 2025 |
PAINTER: STACKS; TANKS…Full textPAINTER: STACKS; TANKS; & TOWERS (DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION) | $34.46 | $15.16 | $49.62 | no change | Agreement, 2025 |
PAINTER: STRUCTURAL STEEL & SWING STAGE…Full textPAINTER: STRUCTURAL STEEL & SWING STAGE (DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS & UNION) | $30.50 | $15.16 | $45.66 | no change | Agreement, 2025 |
| PLAS0109-001 · Plasterers and Cement Masons agreement, June 1, 2025 | |||||
| PLASTERER (MEDINA, PORTAGE, STARK, AND SUMMIT COUNTIES) | $33.00 | $23.83 | $56.83 | no change | Agreement, 2025 |
| PLAS0109-003 · Plasterers and Cement Masons agreement, June 1, 2025 | |||||
| PLASTERER (CARROLL, HOLMES, TUSCARAWAS, AND WAYNE COUNTIES) | $33.00 | $23.83 | $56.83 | no change | Agreement, 2025 |
| PLAS0132-002 · Plasterers and Cement Masons agreement, July 1, 2025 | |||||
| PLASTERER (BROWN, BUTLER, CLERMONT, HAMILTON, HIGHLAND, WARREN COUNTIES) | $31.35 | $17.65 | $49.00 | no change | Agreement, 2025 |
| PLAS0404-002 · Plasterers and Cement Masons agreement, May 1, 2018 | |||||
| PLASTERER (ASHTABULA, CUYAHOGA, GEAUGA, AND LAKE COUNTIES) | $29.63 | $17.11 | $46.74 | no change | Agreement, 2018 |
| PLAS0404-003 · Plasterers and Cement Masons agreement, May 1, 2018 | |||||
| PLASTERER (LORAIN COUNTY) | $28.86 | $17.11 | $45.97 | no change | Agreement, 2018 |
| PLAS0526-022 · Plasterers and Cement Masons agreement, May 1, 2018 | |||||
| PLASTERER (COLUMBIANA, MAHONING, AND TRUMBULL COUNTIES) | $28.86 | $17.11 | $45.97 | no change | Agreement, 2018 |
| PLAS0526-023 · Plasterers and Cement Masons agreement, May 1, 2018 | |||||
| PLASTERER (BELMONT, HARRISON, AND JEFFERSON COUNTIES) | $28.21 | $17.11 | $45.32 | no change | Agreement, 2018 |
| PLAS0886-001 · Plasterers and Cement Masons agreement, July 1, 2025 | |||||
| PLASTERER (FULTON, HANCOCK, HENRY, LUCAS, PUTNAM, AND WOOD COUNTIES) | $36.65 | $25.60 | $62.25 | no change | Agreement, 2025 |
| PLAS0886-003 · Plasterers and Cement Masons agreement, July 1, 2025 | |||||
| PLASTERER (DEFIANCE, ERIE, HURON, OTTAWA, PAULDING, SANDUSKY, AND SENECA) | $36.65 | $25.60 | $62.25 | no change | Agreement, 2025 |
| PLAS0886-004 · Plasterers and Cement Masons agreement, July 1, 2025 | |||||
| PLASTERER (ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, AND VAN WERT) | $35.29 | $23.07 | $58.36 | no change | Agreement, 2025 |
| PLUM0042-002 · Plumbers and Pipefitters agreement, July 1, 2025 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (ASHLAND, CRAWFORD, ERIE, HURON, KNOX, LORAIN, MORROW, RICHLAND & WYANDOT) | $43.02 | $26.45 | $69.47 | no change | Agreement, 2025 |
| PLUM0050-002 · Plumbers and Pipefitters agreement, June 30, 2025 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD) | $51.00 | $32.56 | $83.56 | no change | Agreement, 2025 |
| PLUM0055-003 · Plumbers and Pipefitters agreement, May 5, 2025 | |||||
PLUMBER (ASHTABULA…Full textPLUMBER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, MEDINA (N. OF RTE. #18 & SMITH ROAD) & SUMMIT (N. OF RTE. #303, INCLUDING THE CORPORATE LIMITS OF THE CITY OF HUDSON)) | $44.86 | $30.03 | $74.89 | no change | Agreement, 2025 |
| PLUM0083-001 · Plumbers and Pipefitters agreement, July 1, 2023 | |||||
| PLUMBER AND STEAMFITTER (BELMONT & MONROE (NORTH OF RTE. #78)) | $35.94 | $37.35 | $73.29 | no change | Agreement, 2023 |
| PLUM0094-002 · Plumbers and Pipefitters agreement, May 1, 2025 | |||||
| PLUMBER/PIPEFITTER (CARROLL (NORTHEN HALF), STARK, AND WAYNE COUNTIES) | $47.48 | $27.14 | $74.62 | no change | Agreement, 2025 |
| PLUM0120-002 · Plumbers and Pipefitters agreement, May 1, 2025 | |||||
PIPEFITTER (ASHTABULA…Full textPIPEFITTER (ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN (THE C.E.I. POWER HOUSE IN AVON LAKE), MEDINA (N. OF RTE. #18) & SUMMIT (N. OF #303)) | $49.17 | $28.55 | $77.72 | no change | Agreement, 2025 |
| PLUM0162-002 · Plumbers and Pipefitters agreement, June 1, 2024 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (CHAMPAIGN, CLARK, CLINTON, DARKE, FAYETTE, GREENE, MIAMI, MONTGOMERY & PREBLE) | $43.05 | $27.18 | $70.23 | no change | Agreement, 2024 |
| PLUM0168-002 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
PLUMBER/PIPEFITTER…Full textPLUMBER/PIPEFITTER (MEIGS, MONROE (SOUTH OF RTE. #78), MORGAN (SOUTH OF RTE. #78) & WASHINGTON) | $40.92 | $37.20 | $78.12 | no change | Agreement, 2025 |
| PLUM0189-002 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (DELAWARE, FAIRFIELD, FRANKLIN, HOCKING, LICKING, MADISON, MARION, PERRY, PICKAWAY, ROSS & UNION) | $53.00 | $27.59 | $80.59 | +$10.40 (+14.8%) | Agreement, 2025 |
| PLUM0219-002 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
PLUMBER AND STEAMFITTER…Full textPLUMBER AND STEAMFITTER (MEDINA (RTE. #18 FROM EASTERN EDGE OF MEDINA CO., WEST TO EASTERN CORPORATE LIMITS OF THE CITY OF MEDINA, & ON THE COUNTY ROAD FROM THE WEST CORPORATE LIMITS OF MEDINA RUNNING DUE WEST TO AND THROUGH COMMUNITY OF RISLEY TO THE WESTERN EDGE OF MEDINA COUNTY - ALL TERRITORY SOUTH OF THIS LINE), PORTAGE, AND SUMMIT (S. OF RTE. #303) COUNTIES) | $46.87 | $28.39 | $75.26 | no change | Agreement, 2025 |
| PLUM0392-002 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
| PLUMBER/PIPEFITTER (BROWN, BUTLER, CLERMONT, HAMILTON & WARREN) | $43.30 | $27.40 | $70.70 | no change | Agreement, 2025 |
| PLUM0396-001 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
PLUMBER/PIPEFITTER…Full textPLUMBER/PIPEFITTER (COLUMBIANA (EXCLUDING WASHINGTON & YELLOW CREEK TOWNSHIPS & LIVERPOOL TWP. - SECS. 35 & 36 - WEST OF COUNTY ROAD #427), MAHONING AND TRUMBULL COUNTIES) | $40.55 | $29.25 | $69.80 | no change | Agreement, 2025 |
| PLUM0495-002 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (CARROLL (ROSE, MONROE, UNION, LEE, ORANGE, PERRY & LOUDON TOWNSHIPS), COLUMBIANA (WASHINGTON & YELLOW CREEK TOWNSHIPS & LIVERPOOL TOWNSHIP, SECS. 35 & 36, WEST OF COUNTY RD. #427), COSHOCTON, GUERNSEY, HARRISON, HOLMES, JEFFERSON, MORGAN (SOUTH TO STATE RTE. #78 & FROM MCCONNELSVILLE WEST ON STATE RTE. #37 TO THE PERRY COUNTY LINE), MUSKINGUM, NOBLE, AND TUSCARAWAS COUNTIES) | $39.32 | $37.60 | $76.92 | no change | Agreement, 2025 |
| PLUM0577-002 · Plumbers and Pipefitters agreement, June 1, 2025 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (ADAMS, ATHENS, GALLIA, HIGHLAND, JACKSON, LAWRENCE, PIKE, SCIOTO & VINTON) | $42.65 | $28.56 | $71.21 | no change | Agreement, 2025 |
| PLUM0776-002 · Plumbers and Pipefitters agreement, July 1, 2025 | |||||
PLUMBER, PIPEFITTER…Full textPLUMBER, PIPEFITTER, STEAMFITTER (ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY AND VAN WERT COUNTIES) | $42.76 | $30.81 | $73.57 | no change | Agreement, 2025 |
| TEAM0377-003 · Teamsters agreement, May 1, 2025 | |||||
TRUCK DRIVER: GROUP 1…Full textTRUCK DRIVER: GROUP 1- ASPHALT DISTRIBUTOR; BATCH; 4- WHEEL SERVICE; 4-WHEEL DUMP; OIL DISTRIBUTOR & TANDEM (STATEWIDE, EXCEPT CUYAHOGA, GEAUGA & LAKE) | $34.26 | $18.85 | $53.11 | no change | Agreement, 2025 |
TRUCK DRIVER: GROUP 2…Full textTRUCK DRIVER: GROUP 2- TRACTOR-TRAILER COMBINATION: FUEL; POLE TRAILER; READY MIX; SEMI-TRACTOR; & ASPHALT OIL SPRAYBAR MAN WHEN OPERATED FROM CAB; 5 AXLES & OVER; BELLY DUMP; END DUMP; ARTICULATED DUMP; HEAVY DUTY EQUIPMENT; LOW BOY; & TRUCK MECHANIC (STATEWIDE, EXCEPT CUYAHOGA, GEAUGA & LAKE) | $35.26 | $18.85 | $54.11 | no change | Agreement, 2025 |
| TEAM0436-002 · Teamsters agreement, May 1, 2025 | |||||
| TRUCK DRIVER: GROUP 1- STRAIGHT & DUMP, STRAIGHT FUEL (CUYAHOGA, GEAUGA & LAKE) | $34.92 | $19.30 | $54.22 | no change | Agreement, 2025 |
TRUCK DRIVER: GROUP 2…Full textTRUCK DRIVER: GROUP 2- SEMI FUEL, SEMI TRACTOR, EUCLIDS, DARTS, TANK, ASPHALT SPREADERS, LOW BOYS, CARRY-ALL, TOURNA-ROCKERS, HI-LIFTS, EXTRA LONG TRAILERS, SEMI-POLE TRAILERS, DOUBLE HOOK-UP TRACTOR TRAILERS INCLUDING TEAM TRACK & RAILROAD SIDING, SEMI-TRACTOR & TRI-AXLE TRAILER, TANDEM TRACTOR & TANDEM TRAILER, TAG ALONG TRAILER, EXPANDABLE TRAILER OR TOWING REQUIRING ROAD PERMITS, READY-MIX (AGITATOR OR NON-AGITATOR), BULK CONCRETE DRIVER, DRY BATCH TRUCK, ARTICULATED END DUMP (CUYAHOGA, GEAUGA & LAKE) | $35.73 | $19.30 | $55.03 | no change | Agreement, 2025 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 |
| Modification 2 | May 20, 2026 |
| Modification 3 | June 25, 2026 |
| Modification 4 | July 30, 2026 |
| Modification 5 | September 17, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on OH20260001?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 5 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and OH20260001 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 290 classifications in 138 rate groups
- 138 from agreements, 0 from surveys
- Counties: Adams, Allen, Ashland, Ashtabula, Athens, Auglaize, Belmont, Brown, Butler, Carroll, Champaign, Clark, Clermont, Clinton, Columbiana, Coshocton, Crawford, Cuyahoga, Darke, Defiance, Delaware, Erie, Fairfield, Fayette, Franklin, Fulton, Gallia, Geauga, Greene, Guernsey, Hamilton, Hancock, Hardin, Harrison, Henry, Highland, Hocking, Holmes, Huron, Jackson, Jefferson, Knox, Lake, Lawrence, Licking, Logan, Lorain, Lucas, Madison, Mahoning, Marion, Medina, Meigs, Mercer, Miami, Monroe, Montgomery, Morgan, Morrow, Muskingum, Noble, Ottawa, Paulding, Perry, Pickaway, Pike, Portage, Preble, Putnam, Richland, Ross, Sandusky, Scioto, Seneca, Shelby, Stark, Summit, Trumbull, Tuscarawas, Union, Van Wert, Vinton, Warren, Washington, Wayne, Williams, Wood, Wyandot