Prevailing wage rates: Allegany County, New York

Highway construction · NY20260047 modification 2, published May 18, 2026

The short answer

This sheet sets 65 classifications for highway work in Allegany County, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $56.83 an hour (sheet metal worker) to $97.77 (electrician, line construction: lineman & technician (substation:)). Your contract may lock an earlier modification.

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications. Of the 27 rates we can follow line by line from the first publication to today, 1 is higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

May 18, 2026 · modification 2

Classification names reworded; 11 fringe formulas changed among the 27 lines we could match

  • Electrician line construction: 5 fringe formulas changed
  • Operating engineer: 3 fringe formulas changed
  • Truck drivers: 2 fringe formulas changed
  • Electrician line construction telephone: 1 fringe formula changed

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (11)
ClassificationWasNowChange
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$42.29 + 7%+27.70$42.29 + $30.66changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$52.86 + 7%+31.90$52.86 + $35.60changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$47.57 + 7%+27.70$47.57 + $31.03changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$42.29 + 7%+27.70$42.29 + $30.66changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$31.72 + 7%+27.65$31.72 + $29.87changed
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLI…$40.81 + 3%+5.77$40.81 + $6.99changed
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC$56.81 + 35.75+a$56.81 + $35.75changed
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND$58.38 + 35.75+a$58.38 + $35.75changed
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER$59.88 + 35.75+a$59.88 + $35.75changed
TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HI…$35.83 + 31.58+a$35.83 + $31.58changed
TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS);…$35.48 + 31.58+a$35.48 + $31.58changed

Earlier modifications

  • January 30, 2026 · modification 11 rate raised
    • Sprinkler fitter: 1 rate raised by $2.32 an hour
    Every line that changed (1)
    ClassificationWasNowChange
    SPRINKLER FITTER$45.06 + $29.41$47.85 + $28.94+$2.32 (+3.1%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
BRNY0003-016 · Bricklayers agreement, July 1, 2025
CEMENT MASON/CONCRETE FINISHER (HEAVY & HIGHWAY CONSTRUCTION)$38.63$25.05$63.68no changeAgreement, 2025
CARP0276-003 · Carpenters agreement, July 1, 2024
PILEDRIVER HEAVY AND HIGHWAY CONSTRUCTION

FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$41.66$28.46$70.12no changeAgreement, 2024
CARPENTER HEAVY AND HIGHWAY CONSTRUCTION

FOOTNOTE: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND AFTER THE HOLIDAY AND IS ON THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$38.18$26.11$64.29no changeAgreement, 2024
CARP0276-018 · Carpenters agreement, July 1, 2024
CARPENTER, PILEDRIVER…
Full text

CARPENTER, PILEDRIVER (HEAVY AND HIGHWAY CONSTRUCTION) (ALLEGANY COUNTY (THE TOWNSHIP OF ALFRED))

$41.66$28.46$70.12no changeAgreement, 2024
CARPENTER (HEAVY AND HIGHWAY CONSTRUCTION) (ALLEGANY COUNTY (THE TOWNSHIP OF ALFRED))$38.18$26.11$64.29no changeAgreement, 2024
ELEC1249-003 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59changedAgreement, 2025
ELEC1249-004 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$64.59$42.92$107.51—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES…
Full text

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK…
Full text

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77—Agreement, 2025
ELEC1249-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$38.73$6.93$45.66—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$20.53$6.39$26.92—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.81$6.99$47.80changedAgreement, 2025
ENGI0158-024 · Operating Engineers agreement, July 1, 2025
OPERATING ENGINEER: MASTER MECHANIC (TUNNEL AND SHAFT). FOR EXCAVATION AND PAVING

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS

$60.84$35.00$95.84—Agreement, 2025
OPERATING ENGINEER: MASTER MECHANIC (EXCAVATING AND PAVING). FOR EXCAVATION AND PAVING

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY. EXCAVATION AND PAVING CLASSIFICATIONS

$43.26$34.85$78.11—Agreement, 2025
OPERATING ENGINEER: GROUP 7 (HEAVY AND HIGHWAY) MASTER MECHANIC

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$56.81$35.75$92.56changedAgreement, 2025
OPERATING ENGINEER: GROUP 6 (HEAVY AND HIGHWAY) CRANES 49 TONS AND

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$58.38$35.75$94.13changedAgreement, 2025
OPERATING ENGINEER: GROUP 5 (HEAVY AND HIGHWAY) GROUP 5: CRANES 50 TONS AND OVER

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$59.88$35.75$95.63changedAgreement, 2025
OPERATING ENGINEER: GROUP 4…
Full text

OPERATING ENGINEER: GROUP 4 (TUNNEL AND SHAFT): CRANE, FRICTION OR LATTICE TYPE WITH BOOM LENGTH 200 FEET AND OVER

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$51.41$35.00$86.41—Agreement, 2025
OPERATING ENGINEER: GROUP 4 (HEAVY AND HIGHWAY)TOWER CRANES

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$61.38$35.75$97.13—Agreement, 2025
OPERATING ENGINEER: GROUP 4…
Full text

OPERATING ENGINEER: GROUP 4 (EXCAVATING AND PAVING) COMPRESSOR (ANY SIZE, BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE MIXER (16S AND UNDER), CONCRETE SAW-SELF PROPELLED; FIREMAN; FORM TAMPER; MULCHING MACHINE; POWER HEATERMAN; PUMPS REGARDLESS OF MOTIVE POWER NO MORE THAN 3 IN NUMBER NOT TO EXCEED 12"" IN TOTAL CAPACITY; REVINIUS WIDENER; STEAM CLEANER; TRACTOR

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$36.61$34.85$71.46—Agreement, 2025
OPERATING ENGINEER: GROUP 3…
Full text

OPERATING ENGINEER: GROUP 3 (TUNNEL AND SHAFT): ""A"" FRAME TRUCK; BALLAST REGULATOR (RIDE ON); COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS; DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEM; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT (UNDER 15 FT); GROUND PUMP OVER 5 CU. FT (MANUFACTURERS RATING); GUNITE MACHINE; HAMMERS (HYDRAULIC SELF PROPELLED); HYDRA-SPIKER (RIDE ON); HYDRA BLASTER (WATER); HYDRA BLASTER; MOTORIZED FORM CARRIER; POST HOLE DIGGER AND POST DRIVER; POWER SWEEPER; ROLLER (GRADE AND FILL); SCARIFER (RIDE ON); SPAN SAW (RIDE ON); SUBMERSIBLE ELECTRIC PUMP (WHEN USED IN LIEU OF WELL POINTS); TAMPER (RIDE ON); TIE EXTRACTOR (RIDE ON); TIE HANDLER (RIDE ON); TIE INSERTER (RIDER ON); TIE SPACER (RIDE ON); TRACK LINER (RIDE ON); TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT AGGREGATE PLANT; BOILER (USED IN CONJUNCTION WITH PRODUCTION); CEMENT AND BIN OPERATOR; COMPRESSORS (3 OR LESS NOT TO EXCEED 1200 CFM COMBINED CAPACITY); COMPRESSORS (ANY SIZE; BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; PUMPS; WELDING MACHINES; LIGHT PLANTS (3 OR LESS OF ANY TYPE OR COMBINATION); CONCRETE PAVER OR MIXER (16S AND UNDER); CONCRETE SAW (SELF PROPELLED); FIREMAN; FORM TAMPER; GREASEMAN; HYDRAULIC PUMP (JACKING SYSTEM); JUNIOR ENGINEER; LIGHT PLANTS; MULCHING MACHINE; OILER; PARAPET CONCRETE OR PAVEMENT GRINDER; POWER BROOM (TOWED); POWER HEATERMAN (WHEN USED FOR PRODUCTION); REVINIUS WIDENER; SHELL WINDER; STEAM CLEANER; TRACTOR

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$54.42$35.00$89.42—Agreement, 2025
OPERATING ENGINEER: GROUP 3…
Full text

OPERATING ENGINEER: GROUP 3 (HEAVY AND HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$51.80$35.75$87.55—Agreement, 2025
OPERATING ENGINEER: GROUP 3…
Full text

OPERATING ENGINEER: GROUP 3 (EXCAVATING AND PAVING) COMPRESSORS (4 NOT TO EXCEED 2000 CFM COMBINED CAPACITY; OR 3 OR LESS WITH MORE THAN 1200 CFM BUT NOT TO EXCEED 2000 CFM); COMPRESSORS (ANY SIZE BUT SUBJECT TO OTHER PROVISIONS FOR COMPRESSORS); DUST COLLECTORS; GENERATORS; WELDING MACHINES (4 OF ANY TYPE OR COMBINATION); CONCRETE PAVEMENT SPREADERS AND FINISHERS; CONVEYOR; DRILL (CORE); DRILL (WELL); ELECTRIC PUMP USED IN CONJUNCTION WITH WELL POINT SYSTEMS; FARM TRACTOR WITH ACCESSORIES; FINE GRADE MACHINE; FORK LIFT; GUNITE MACHINE; HAMMERS-HYDRAULIC-SELF PROPELLED; LOCOMOTIVE; POST HOLE DIGGER AND POST DRIVER; PUMPS (REGARDLESS OF MOTIVE POWER, NOT MORE THAN 4 IN NUMBER NOT TO EXCEED 20"" IN TOTAL CAPACITY); SUBMERSIBLE ELECTRIC PUMPS WHEN USED IN LIEU OF WELL POINTS, TRACTOR WITH TOWED ACCESSORIES; VIBRATORY COMPACTOR; VIBRO TAMP; WELL POINT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$40.10$34.85$74.95—Agreement, 2025
OPERATING ENGINEER: GROUP 2…
Full text

OPERATING ENGINEER: GROUP 2 (TUNNEL AND SHAFT): AUTOMATED CENTRAL MIX CONCRETE PLANT; BACKHOE (TOPSIDE); BACKHOE (TRACTOR MOUNTED,RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER (5 TONS CAPACITY AND UNDER); COMPRESSORS (4 OR LESS EXCEEDING 2000 CFM COMBINED CAPACITY); CONCRETE PAVER (OVER 16S); CONCRETE PUMP; CRANE (TOPSIDE); CRUSHER; DIESEL POWER UNIT; DRILL RIGS, TRACTOR MOUNTED; FRONT END LOADER (UNDER 4 CU. YDS); GRAYCO EPOXY MACHINE; HI-PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); HOIST (TWO OR THREE DRUM) (TOPSIDE); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; L.C.M. WORK BOAT OPERATOR; LOCOMOTIVE; MAINTENANCE ENGINEER (TOPSIDE); MAINTENANCE GREASEMAN; MIXER (FOR STABILIZED BASE SELF-PROPELLED); MONORIAL MACHINE; PLANT ENGINEER; PERSONNEL HOIST; PUMP CRETE; READY MIX CONCRETE PLANT; REFRIGERATION EQUIPMENT (FROM SOIL STABILIZATION); ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SEA MULE; SHOTCRETE MACHINE; SHOVEL (TOPSIDE); TRACTOR WITH DOZER AND/OR PUSHER; TRENCHER; TUGGER HOIST; TUNNEL LOCOMOTIVE; WELDER; WINCH; WINCH CAT

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$57.21$35.00$92.21—Agreement, 2025
OPERATING ENGINEER: GROUP 2…
Full text

OPERATING ENGINEER: GROUP 2 (HEAVY AND HIGHWAY) ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$54.68$35.75$90.43—Agreement, 2025
OPERATING ENGINEER: GROUP 2…
Full text

OPERATING ENGINEER: GROUP 2 (EXCAVATING AND PAVING) BACKHOE (TRACTOR MOUNTED, RUBBER TIRED); BITUMINOUS SPREADER AND MIXER; BLACKTOP PLANT (NON AUTOMATED); BORING MACHINE; CAGE HOIST; CENTRAL MIX PLANT (NON AUTOMATED) AND ALL CONCRETE BATCHING PLANTS; CHERRY PICKER, 5 TONS AND UNDER; COMPRESSOR (4 OR LESS) EXCEEDING 2000 CFM COMBINED CAPACITY; CONCRETE PAVER OVER 16S; CONCRETE PUMP; CRUSHER; DRILL RIGS (TRACTOR MOUNTED); FRONT END LOADER (UNDER 4 CU. YDS); HI- PRESSURE BOILER (15 LBS AND OVER); HOIST (ONE DRUM); KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS; MAINTENANCE ENGINEER; MAINTENANCE GREASE MAN; MECHANICAL SLURRY MACHINE; MIXER FOR STABILIZED BASE SELF PROPELLED; MONORAIL MACHINE; PLANT ENGINEER; POWER BROOM; POWER GRADER; PUMP CRETE; READY MIX CONCRETE PLANT; ROAD WIDENER; ROLLER (ALL ABOVE SUB-GRADE); SIDE BOOM; TRACTOR SCRAPER; TRACTOR WITH DOZER AND OR PUSHER; TRENCHER; WINCH

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$40.79$34.85$75.64—Agreement, 2025
OPERATING ENGINEER: GROUP 1…
Full text

OPERATING ENGINEER: GROUP 1 (TUNNEL AND SHAFT) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL

FOOTNOTE: B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$58.43$35.00$93.43—Agreement, 2025
OPERATING ENGINEER: GROUP 1…
Full text

OPERATING ENGINEER: GROUP 1 (HEAVY AND HIGHWAY) AUTOMATED CONCRETE SPREADER (CMI OR EQUIVALENT); AUTOMATED FINE GRADE MACHINE (CMI); BACKHOE; BELT PLACER (CMI OR SIMILAR); BLACKTOP SPREADER (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX PLANT (AUTOMATED); CHERRY PICKER (5 TONS); CONCRETE CURB MACHINE (SELF-PROPELLED SLIPFORM); CONCRETE PUMP; CRANE; CRANE SHAFT; CRANE UNDERGROUND; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DREDGE; DUAL DRUM PAVER; EXCAVATOR (ALL PURPOSE-HYDRAULICLY OPERATED GRADALL OR SIMILAR); FORK LIFT (FACTORY RATED 15' AND OVER); FRONT END LOADER (4CU YD AND OVER); HEAD TOWER (SAUERMAN OR EQUAL); HOIST; SHAFT; HOIST (TWO OR THREE DRUM); HOLLAND LOADER; MAINTENANCE ENGINEER (SHAFT AND TUNNEL); MINE HOIST; MINING MACHINE (MOLE AND SIMILAR TYPES); MUCKING MACHINE OR MOSE; OVERHEAD CRANE (GANTRY OR STRADDLE TYPE); PILE DRIVER; POWER GRADER; QUAD 9, QUARRY MASTER (OR EQUIVALENT); SCRAPER; SHOVEL; SIDE BOOM; SLIP FORM PAVER; TRIPPER/MAINTENANCE ENGINEER (SHAFT AND TUNNEL); TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE; TRUCK OR TRAILER MOUNTED LOG CHIPPER (SELF FEEDER); TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED); TUNNEL SHOVEL

FOOTNOTE: B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$55.38$35.75$91.13—Agreement, 2025
OPERATING ENGINEER: GROUP 1…
Full text

OPERATING ENGINEER: GROUP 1 (EXCAVATING AND PAVING) ASPHALT PAVER; AUTOMATIC FINE GRADER; BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED); BLACKTOP PLANT (AUTOMATED); CABLEWAY; CAISSON AUGER; CENTRAL MIX CONCRETE PLANT (AUTOMATED); CHERRY PICKER- OVER 5 TON CAPACITY; CRANE; CRANES AND DERRICKS (STEEL ERECTION); DRAGLINE; DUAL DRUM PAVER; FRONT END LOADER (4 CU. YD. AND OVER); HOIST,(TOW OR 3 DRUM); PILE DRIVER; POWER GRADER WITH ELEVATION LOADER ATTACHMENT; QUARRY MASTER (OR EQUIVALENT); SHOVEL; SLIP FORM PAVER; TRACTOR DRAWN BELT-TYPE LOADER; TRUCK CRANE TUNNEL SHOVEL; EXCAVATOR, ALL PURPOSE HYDRAULICALLY OPERATED

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; CHRISTMAS DAY, REGARDLESS OF THE DAY OF THE WEEK ON WHICH THE HOLIDAY MAY FALL, PROVIDED THE EMPLOYEE WORKS EITHER ON THE WORK DAY IMMEDIATELY PRECEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY

$41.26$34.85$76.11—Agreement, 2025
IRON0006-001 · Ironworkers agreement, July 1, 2024
IRONWORKERS: WINDOW ERECTORS…
Full text

IRONWORKERS: WINDOW ERECTORS (TOWNSHIPS OF ALFRED, ALLEN ALMOND, ANDOVER, CENTERVILLE, RUSHFORD, NEW HUDSON, CUBA, CLARKSVILLE, GENESEE, HUME, CANEADEA, BELFAST, WIRT, FRIENDSHIP, BOLIVAR, ANGELICA, AMITY, SCIO, WELLSVILLE, WEST ALMOND, ALMA, GRANGER, WILLING, INDEPENDENCE)

$33.14$32.30$65.44no changeAgreement, 2024
IRONWORKERS: STRUCTURAL…
Full text

IRONWORKERS: STRUCTURAL, ORANMENTAL, REINFORCING STEEL, WELDERS, RIGGERS AND RODMEN (TOWNSHIPS OF ALFRED, ALLEN ALMOND, ANDOVER, CENTERVILLE, RUSHFORD, NEW HUDSON, CUBA, CLARKSVILLE, GENESEE, HUME, CANEADEA, BELFAST, WIRT, FRIENDSHIP, BOLIVAR, ANGELICA, AMITY, SCIO, WELLSVILLE, WEST ALMOND, ALMA, GRANGER, WILLING, INDEPENDENCE)

$35.49$32.30$67.79no changeAgreement, 2024
IRONWORKERS: FENCE ERECTORS…
Full text

IRONWORKERS: FENCE ERECTORS (TOWNSHIPS OF ALFRED, ALLEN ALMOND, ANDOVER, CENTERVILLE, RUSHFORD, NEW HUDSON, CUBA, CLARKSVILLE, GENESEE, HUME, CANEADEA, BELFAST, WIRT, FRIENDSHIP, BOLIVAR, ANGELICA, AMITY, SCIO, WELLSVILLE, WEST ALMOND, ALMA, GRANGER, WILLING, INDEPENDENCE)

$34.06$30.80$64.86no changeAgreement, 2024
IRON0033-008 · Ironworkers agreement, July 1, 2025
IRONWORKERS: SHEETER (TWNSHPS OF BIRDSALL, BRUNS, GROVE AND MIDDLESEX)$36.00$30.80$66.80no changeAgreement, 2025
IRONWORKERS: ORNAMENTAL…
Full text

IRONWORKERS: ORNAMENTAL, REINFORCING STONE DERRICKMAN, RIGGER, RODMAN, STRUCTURAL MACHINERY MOVERS FENCE ERECTORS, PRECAST CONCRETE ERECTOR (TWNSHPS OF BIRDSALL, BRUNS, GROVE AND MIDDLESEX)

$35.75$30.80$66.55no changeAgreement, 2025
LABO0621-004 · Laborers agreement, July 1, 2025
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 BLASTERS; FORM SETTER; STONE OR GRANITE CURB SETTERS; DESIGNATED ASPHALT RAKERS (NOT TO INCLUD COLD PATCH); TAIL OR SCREW OPERATOR ON ASPHALT PAVER. ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE); ACETYLENE TORCH OPERATORS; POWDERMEN

$34.33$28.69$63.02no changeAgreement, 2025
LABORERS: GROUP 1…
Full text

LABORERS: GROUP 1 FLAGMAN; OUTBOARD AND HAND BOATS; BULL FLOAT; CHAIN SAW; CONCRETE AGGREGATE BIN; CONCRETE BOOT; GIN BUGGY; HAND OR MECHINE VIBRATOR JACK HAMMER; MASON TENDER; MORTAR MIXER; PAVE- MENT BREAKER; HANDLER OF ALL STEEL MESH; SMALL GENERATOR FOR LABORERS TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE; PIPE LAYERS; VIBRATOR TYPE ROLLERS; TAMPER DRILL DOCTOR; WATER PUMP OPERATOR (1-1/2"" AND SINGLE DIAPHRAGAM); NOZZLE (ASPHALT, GUNITE, SEEDING AND SANDBLASTING); LABORERS ON CHAIN LINK FENCE ERECTION; ROCK SPLITTER AND POWER UNIT; PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS; WRECKING LABORERS

$33.93$28.69$62.62no changeAgreement, 2025
PAIN0004-019 · Painters and Allied Trades agreement, May 1, 2023
PAINTERS: BRIDGE PAINTING (HEAVY & HIGHWAY CONSTRUCTION)$42.06$30.59$72.65no changeAgreement, 2023
PLUM0022-007 · Plumbers and Pipefitters agreement, April 29, 2024
PLUMBER/PIPEFITTER…
Full text

PLUMBER/PIPEFITTER: (ZONE 2) ALLEGANY- THE TOWNSHIPS OF ALLEN, ALMA, AMITY, ANGELICA, BELFAST BOLIVAR, CANEADEA, CENTERVILLE, CLARKSVILLE, CUBA, FRIENDSHIP, GENESEE, GRANGER, HUME, NEW HUDSON, RUSHFORD, SCHIO, WIRT

$42.20$29.80$72.00no changeAgreement, 2024
SFNY0669-001 · SFNY, January 1, 2026
SPRINKLER FITTER$47.85$28.94$76.79+$2.32 (+3.1%)SFNY
SHEE0112-002 · Sheet Metal Workers agreement, May 1, 2023
SHEET METAL WORKER$35.94$20.89$56.83no changeAgreement, 2023
TEAM0317-001 · Teamsters agreement, June 1, 2025
TRUCK DRIVERS: GROUP 2…
Full text

TRUCK DRIVERS: GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT- EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRAFFLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNIT, OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE HITCHED EQUIPMENT SHERE NOT SELF LOADED.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$35.83$31.58$67.41changedAgreement, 2025
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS; SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC, FUEL TRUCK

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY; LAOBR DAY; THANKSGIVING DAY; CHRISTMAS DAY

$35.48$31.58$67.06changedAgreement, 2025
TEAM0317-005 · Teamsters agreement, June 1, 2025
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2…
Full text

TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 2 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE MOBILE UNIT; OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED (TOWNSHIPS OF ALMOND, ALFRED, BURNS, WEST ALMOND) A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$35.83$31.58$67.41—Agreement, 2025
TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1…
Full text

TRUCK DRIVER (HEAVY & HIGHWAY): GROUP 1 YARDMAN; PICKUPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN, TANDEMS; BATCH TRUCK; MECHANICS; SEMI- TRAILORS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK (TOWNSHIPS OF ALMOND, ALFRED, BURNS, WEST ALMOND) A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$35.48$31.58$67.06—Agreement, 2025

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260047?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and NY20260047 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 65 classifications in 16 rate groups
  • 15 from agreements, 0 from surveys
  • Counties: Allegany