Prevailing wage rates: Warren County, New York

Building, Heavy, Highway construction · NY20260039 modification 2, published May 18, 2026

The short answer

This sheet sets 76 classifications for building, heavy, highway work in Warren County, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $26.92 an hour (electrician line construction telephone) to $107.51 (electrician, line construction). Your contract may lock an earlier modification.

Scope

Building Construction Projects

Heavy Construction Projects

Highway Construction Projects

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0040-001 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS)

$41.74$27.58$69.32Agreement
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.)

$41.74$27.58$69.32Agreement
BOIL0197-001 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.34$27.66$71.00Agreement
BRNY0002-004 · Bricklayers agreement, July 1, 2024
BRICKLAYER, MARBLE, TILE AND TERRAZZO FINISHERS (ALBANY CHAPTER)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, JULY THE 4TH, LABOR DAY, THANKGIVING DAY (PROVIDED THE EMPLOYEE IS EMPLOYED ONE DAY BEFORE AND ONE DAY AFTER THE HOLIDAY

$29.38$19.16$48.54Agreement
CARP0291-011 · Carpenters agreement, July 1, 2025
CARPENTER (HEAVY & HIGHWAY CONSTRUCTION)$44.28$24.50$68.78Agreement
CARPENTER (BUILDING CONSTRUCTION)$36.38$24.65$61.03Agreement
ELEC0236-003 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN$48.00$32.09$80.09Agreement
ELEC1249-003 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59Agreement
ELEC1249-004 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$64.59$42.92$107.51Agreement
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96Agreement
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES…
Full text

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK…
Full text

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77Agreement
ELEC1249-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$38.73$6.93$45.66Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$20.53$6.39$26.92Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.81$6.99$47.80Agreement
ELEV0035-002 · Elevator Constructors agreement, January 1, 2025
ELEVATOR CONSTRUCTOR

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$57.73$38.44$96.17Agreement
ENGI0158-003 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) BUILDING HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY.

$55.42$33.20$88.62Agreement
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS (BUILDING): GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$51.01$33.20$84.21Agreement
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$53.91$33.20$87.11Agreement
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER), MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER, DRILL-HYDRAULIC ROCK DRILL. HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$54.93$33.20$88.13Agreement
ENGI0158-029 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS: GROUP 3$53.82$33.55$87.37Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$58.91$33.55$92.46Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$60.30$33.55$93.85Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$61.80$33.55$95.35Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$63.30$33.55$96.85Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$56.39$33.55$89.94Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$57.30$33.55$90.85Agreement
IRON0012-010 · Ironworkers agreement, July 1, 2024
IRONWORKERS: (STRUCTURAL…
Full text

IRONWORKERS: (STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN)

$38.50$25.48$63.98Agreement
IRONWORKERS: (SHEETER, BUCKER-UP)$38.75$25.48$64.23Agreement
IRONWORKERS: (SHEETER)$38.75$25.48$64.23Agreement
LABO1822-001 · Laborers agreement, July 1, 2023
LABORERS: GROUP 5 HAZARDOUS WASTE, ASBESTOS ABATEMENT AND REMOVAL. HEAVY & HIGHWAY

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$34.27$27.80$62.07Agreement
LABORERS: GROUP 4 BLASTER, FORM SETTERS, STONE OR GRANITE CURB SETTERS. HEAVY & HIGHWAY

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.67$27.80$59.47Agreement
LABORERS: GROUP 3…
Full text

LABORERS: GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE) ACETYLENE TORCH OPERATOR, ASPHALT RAKER, POWDERMAN. HEAVY & HIGHWAY

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.47$27.80$59.27Agreement
LABORERS: GROUP 2…
Full text

LABORERS: GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACK HAMMER, MASON TENDER, MORTAR MIXER PAVERMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS OF LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPE LAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM) NOZZLE (ASPHALT, GUNITE, SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABOR. HEAVY & HIGHWAY

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.27$27.80$59.07Agreement
LABORERS: GROUP 1 BASIC RATE, FLAGMAN OUTBOARD AND HAND BOATS. HEAVY & HIGHWAY

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$31.27$27.80$59.07Agreement
LABO1822-002 · Laborers agreement, July 1, 2018
LABORERS:, BUILDING…
Full text

LABORERS:, BUILDING: GROUP F WORKERS IN KILNS, LIQUOR TANKS, BOILERS, ETC., ASBESTOS AND/OR HAZARDOUS WASTE WORKER A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$25.18$21.45$46.63Agreement
LABORERS:, BUILDING: GROUP E BLASTER A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$23.68$21.45$45.13Agreement
LABORERS:, BUILDING: GROUP D ACETYLENE TORCH OPERATOR ON DEMOLITION WORK & CUTTING PIPE A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$23.68$21.45$45.13Agreement
LABORERS:, BUILDING…
Full text

LABORERS:, BUILDING: GROUP C SAND BLASTER CONSTRUCTION CLEAN UP, DRILLER, WAGONJACK OR WAGON DRILL OPERATOR, METAL AND CRUB FORM SETTER, ASPHALT RAKER, TAIL OR SCREW MAN ON PAVING MACHINE (IF NOT FOREMAN) A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$23.68$21.45$45.13Agreement
LABORERS:, BUILDING…
Full text

LABORERS:, BUILDING: GROUP B CONCRETE OR PLASTER PUMP OPERATOR, BUILDING DEMOLITION AND WRECKING A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$23.68$21.45$45.13Agreement
LABORERS:, BUILDING…
Full text

LABORERS:, BUILDING: GROUP A LABORERS, MULT-TRADE TENDER, PIPELAYER, SELF-PROPELLED EQUIPMENT OPERATOR A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$23.68$21.45$45.13Agreement
PAIN0009-014 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER$37.25$33.54$70.79Agreement
PAIN0201-004 · Painters and Allied Trades agreement, May 1, 2025
PAINTERS: PAINTERS, DRYWALL FINISHERS, SPRAY (ZONE #2)$33.50$21.69$55.19Agreement
PAINTERS: LEAD ABATEMENT WORKERS (ZONE #2)$34.50$21.69$56.19Agreement
PAIN0806-005 · Painters and Allied Trades agreement, October 1, 2014
PAINTERS: (STRUCTURAL STEEL AND BRIDGE)$48.75$35.63$84.38Agreement
PLUM0773-003 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER AND STEAMFITTER$44.88$33.60$78.48Agreement
ROOF0241-001 · Roofers agreement, July 1, 2025
ROOFER$38.05$24.27$62.32Agreement
SFNY0669-001 · SFNY, January 1, 2026
SPRINKLER FITTER$47.85$28.94$76.79SFNY
SHEE0083-002 · Sheet Metal Workers agreement, June 1, 2019
SHEET METAL WORKER A.

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. IF ANY OF THESE HOLIDAYS FALL ON A SATURDAY OR SUNDAY, EITHER THE PRECEDING FRIDAY OR FOLLOWING MONDAY WILL BE OBSERVED AS THE HOLIDAY

$33.73$33.04$66.77Agreement
TEAM0294-001 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 2 (HEAVY AND HIGHWAY CONSTRUCTION)$41.29$31.42$72.71Agreement
TRUCK DRIVERS: GROUP 1 (HEAVY AND HIGHWAY CONSTRUCTION)$41.52$31.42$72.94Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY CONSTRUCTION): GROUP 5…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY CONSTRUCTION): GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.69$31.42$73.11Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY CONSTRUCTION): GROUP 4…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY CONSTRUCTION): GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.52$31.42$72.94Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY CONSTRUCTION): GROUP 3…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY CONSTRUCTION): GROUP 3 SEMI-TRAILERS, LOW-BOY TRUCKS ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC, FUEL TRUCK.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.38$31.42$72.80Agreement
TEAM0294-002 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 2 (BUILDING CONSTRUCTION)$33.95$30.79$64.74Agreement
TRUCK DRIVERS: GROUP 1 (BUILDING CONSTRUCTION)$33.65$30.79$64.44Agreement

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260039?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.