Prevailing wage rates: Delaware County, New York

Heavy, Highway construction · NY20260021 modification 2, published July 30, 2026

The short answer

This sheet sets 81 classifications for heavy, highway work in Delaware County, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $26.92 an hour (electrician line construction telephone) to $107.74 (power equipment operators (steel erection): group 1). Your contract may lock an earlier modification.

Scope

Heavy Construction

Highway Construction

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0040-001 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
ASBESTOS WORKERS/INSULATOR…
Full text

ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.)

$41.74$27.58$69.32Agreement
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS)

$41.74$27.58$69.32Agreement
BOIL0197-001 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.34$27.66$71.00Agreement
BRNY0003-017 · Bricklayers agreement, July 1, 2025
CEMENT MASON (BINGHAMTON CHAPTER)$38.63$25.05$63.68Agreement
CARP0277-018 · Carpenters agreement, July 1, 2025
CARPENTER$39.52$27.16$66.68Agreement
ELEC0325-003 · Electrical Workers (IBEW) agreement, June 1, 2025
CABLE SPLICER (TOWNSHIPS OF DAVENPORT…
Full text

CABLE SPLICER (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH OF THE DELAWARE RIVER.)

$50.43$33.29$83.72Agreement
ELECTRICIAN (TOWNSHIPS OF DAVENPORT…
Full text

ELECTRICIAN (TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH OF THE DELAWARE RIVER.)

$42.68$33.06$75.74Agreement
ELEC0363-005 · Electrical Workers (IBEW) agreement, April 1, 2024
ELECTRICIAN (DELAWARE COUNTY (PORTION OF))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$46.50$40.57$87.07Agreement
ELEC1249-003 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELEC1249-004 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK…
Full text

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77Agreement
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES…
Full text

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$64.59$42.92$107.51Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$49.25$31.15$80.40Agreement
ELEC1249-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.81$6.99$47.80Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$20.53$6.39$26.92Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$38.73$6.93$45.66Agreement
ENGI0825-014 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1 AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES, INCLUDING OVERHEAD AN STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS, FRONT END LOADERS (5 YDS. AND OVER), GRADALLS, GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS, (COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE), MUCKING MACHINES,PAVEMENT AND CONCRETE BREAKER (SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE APPLICABLE), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMIUM RATE APPLICABLE), ROADWAY SURFACE GRINDER SCOOPER (LOADER AND SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH MACHINES, TUNNEL BORING MACHINES. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$61.72$37.50$99.22Agreement
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3…
Full text

POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (AIROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GREADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLD DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES; CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; VACUUM BLASTING MACHINE OPERATOR. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$58.22$37.50$95.72Agreement
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4…
Full text

POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$56.59$37.50$94.09Agreement
POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5…
Full text

POWER EQUIPMENT OPERATORS (HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$52.88$37.50$90.38Agreement
POWER EQUIPMENT OPERATORS: GROUP 6…
Full text

POWER EQUIPMENT OPERATORS: GROUP 6 HELICOPTERS PILOT NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$63.54$37.50$101.04Agreement
POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2…
Full text

POWER EQUIPMENT OPERATORS: HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANING; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST"") HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO- BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; ""STRADDLE"" CARRIER, ROSE AND SIMILAR TYPES; VACUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING) NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM $0 .50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$60.13$37.50$97.63Agreement
ENGI0825-015 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$68.58$37.50$106.08Agreement
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 7…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 7 HELICOPTER PILOT . NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$65.74$37.50$103.24Agreement
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75

PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS

$62.35$37.50$99.85Agreement
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75

PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.

$60.70$37.50$98.20Agreement
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3…
Full text

POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75

PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.

$58.56$37.50$96.06Agreement
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4…
Full text

POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75

PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.

$57.10$37.50$94.60Agreement
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 5…
Full text

POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75

PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.

$53.34$37.50$90.84Agreement
POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 6…
Full text

POWER EQUIPMENT OPERATORS (OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75

PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS

$64.28$37.50$101.78Agreement
POWER EQUIPMENT OPERATORS (STEEL ERECTION) : GROUP 3…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION) : GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$61.29$37.50$98.79Agreement
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$70.24$37.50$107.74Agreement
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$58.63$37.50$96.13Agreement
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$57.10$37.50$94.60Agreement
POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 6…
Full text

POWER EQUIPMENT OPERATORS (STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$53.34$37.50$90.84Agreement
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS

$69.96$37.50$107.46Agreement
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS

$68.37$37.50$105.87Agreement
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4…
Full text

POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS

$61.28$37.50$98.78Agreement
POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 5…
Full text

POWER EQUIPMENT OPERATORS (TANK ERECTION): GROUP 5: OILER NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS

$54.07$37.50$91.57Agreement
POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3…
Full text

POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS

$64.85$37.50$102.35Agreement
IRON0012-001 · Ironworkers agreement, July 1, 2024
IRONWORKERS: (SHEETER)$38.75$25.48$64.23Agreement
IRONWORKERS: (STRUCTURAL…
Full text

IRONWORKERS: (STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN)

$38.50$25.48$63.98Agreement
LABO0017-004 · Laborers agreement, June 1, 2023
LABORERS: HEAVY & HIGHWAY: GROUP 2…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 2: GENERAL LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, SCAFFOLD, BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER, PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENENCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPELINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TARACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLEMAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO- REMEDIATION, LEAD OR HAZARDOUS MATERAILS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINIGN WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CAATCH BASIN OR INLET INSTALLING, LASER MEN. GROUND MAN ON MILLING MACHINE. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$44.80$32.45$77.25Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 3…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND, HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$49.40$32.45$81.85Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 4…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$54.70$32.45$87.15Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 1:$40.80$32.45$73.25Agreement
LABO0785-014 · Laborers agreement, July 1, 2024
LABORERS: HEAVY AND HIGHWAY GROUP 1$35.56$25.60$61.16Agreement
LABORERS: HEAVY AND HIGHWAY GROUP 2…
Full text

LABORERS: HEAVY AND HIGHWAY GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2'AND SINGLE DIAPHRAM), NOZZLER (ASPHALT GUNNITE, SEEDING AND SNADBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY

$35.76$25.60$61.36Agreement
LABORERS: HEAVY AND HIGHWAY GROUP 3…
Full text

LABORERS: HEAVY AND HIGHWAY GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY

$35.96$25.60$61.56Agreement
LABORERS: HEAVY AND HIGHWAY GROUP 4…
Full text

LABORERS: HEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY

$36.16$25.60$61.76Agreement
LABORERS: HEAVY AND HIGHWAY GROUP 5…
Full text

LABORERS: HEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE REMOVAL (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER)

FOOTNOTE: A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY

$38.76$25.60$64.36Agreement
PAIN0004-006 · Painters and Allied Trades agreement, May 1, 2023
PAINTERS: (BRIDGES)$42.06$30.59$72.65Agreement
PAIN0677-003 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER$30.00$31.95$61.95Agreement
PLUM0021-004 · Plumbers and Pipefitters agreement, May 1, 2025
Group definitions, zones and premiums for PLUM0021-004
PLUMBER (ZONE 2 MIDDLETOWN AND ROXBERRY TOWNSHIPS).$ 60.66 45.35
PLUM0112-001 · Plumbers and Pipefitters agreement, May 1, 2024
PLUMBER AND STEAMFITTER: SOUTHERN ZONE (REMAINDER OF COUNTY)$42.63$32.24$74.87Agreement
ROOF0203-001 · Roofers agreement, June 1, 2023
ROOFER$30.50$19.84$50.34Agreement
SHEE0112-004 · Sheet Metal Workers agreement, May 1, 2023
SHEET METAL WORKER$35.94$20.89$56.83Agreement
TEAM0317-010 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 1…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$37.27$29.29$66.56Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 2 TANDEMS; BATCH TRUCKS; MECHANIC

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$37.27$29.29$66.56Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 3…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$37.27$29.29$66.56Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 4…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNIT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$37.47$29.29$66.76Agreement
TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 5…
Full text

TRUCK DRIVERS (HEAVY & HIGHWAY): GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY

$37.47$29.29$66.76Agreement

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026
Modification 2July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260021?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.