CertifiedHours

Prevailing wage rates · New York · Wage determination

Prevailing wage rates: Dutchess, Orange, Sullivan and Ulster Counties, New York

Building, Heavy, Highway construction · NY20260007 modification 3, published October 8, 2026

The short answer

This sheet sets 152 classifications for building, heavy, highway work in Dutchess, Orange, Sullivan and Ulster Counties, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $26.92 an hour (electrician) to $131.30 (diver (dutchess and orange counties)). Your contract may lock an earlier modification.

Scope

Excludes building construction in Sullivan County

What changed this year

First published January 2, 2026, this sheet is now on modification 3, and its rates have changed in 2 modifications. Of the 92 rates we can follow line by line from the first publication to today, 3 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

October 8, 2026 · modification 3

Classification names reworded; no change among the 109 lines we could match

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Earlier modifications

  • May 18, 2026 · modification 2Classification names reworded; 38 fringe formulas changed among the 95 lines we could match
    • Power equipment operator: 16 fringe formulas changed
    • Electrician: 12 fringe formulas changed
    • Truck drivers: 6 fringe formulas changed
    • Boilermaker: 1 fringe formula changed
    • Electrician line construction telephone: 1 fringe formula changed
    • Elevator mechanic: 1 fringe formula changed
    • Laborers: 1 fringe formula changed

    SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

    Every line that changed (38)
    ClassificationWasNowChange
    BOILERMAKER$68.88 + 49.83+a$68.88 + $49.83changed
    ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNT…$51.50 + 3%+40.67+a$51.50 + $42.22changed
    ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES).$51.50 + 3%+40.67+a$51.50 + $42.22changed
    ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$43.35 + 7%+27.70$43.35 + $30.73changed
    ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$54.19 + 7%+31.90$54.19 + $35.69changed
    ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$43.35 + 7%+27.70$43.35 + $30.73changed
    ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$43.35 + 7%+27.70$43.35 + $30.73changed
    ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$48.77 + 7%+27.90$48.77 + $31.31changed
    ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$32.51 + 7%+27.65$32.51 + $29.93changed
    ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…$49.25 + 7%+27.70$49.25 + $31.15changed
    ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…$61.56 + 7%+31.90$61.56 + $36.21changed
    ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…$55.40 + 7%+27.90$55.40 + $31.78changed
    ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…$35.34 + 7%+27.65$35.34 + $30.12changed
    ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLI…$40.81 + 3%+5.77$40.81 + $6.99changed
    ELEVATOR MECHANIC$76.12 + 38.985+a+b$76.12 + $38.98changed
    POWER EQUIPMENT OPERATOR GROUP 6 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILD…$49.26 + 31.32+a$49.26 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 5B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$47.00 + 31.32+a$47.00 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 5A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$61.95 + 31.32+a$61.95 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 5 (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUILD…$49.53 + 31.32+a$49.53 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 4B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$45.94 + 31.32+a$45.94 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 4A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$54.33 + 31.32+a$54.33 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 3B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$52.25 + 31.32+a$52.25 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 3A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$54.88 + 31.32+a$54.88 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 2A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$56.97 + 31.32+a$56.97 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 1B (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$54.41 + 31.32+a$54.41 + $31.32changed
    POWER EQUIPMENT OPERATOR GROUP 1A (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF) BUIL…$59.04 + 31.32+a$59.04 + $31.32changed
    POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLAN…$44.19 + 35.25+a$44.19 + $35.25changed
    POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK).…$51.57 + 35.25+a$51.57 + $35.25changed
    POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT;…$56.81 + 35.25+a$56.81 + $35.25changed
    POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (POUGH…$59.67 + 35.25+a$59.67 + $35.25changed
    POWER EQUIPMENT OPERATOR, HEAVY & HIGHWAY: GROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-…$57.84 + 35.25+a$57.84 + $35.25changed
    LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CON…$36.45 + 27.80+a$36.45 + $27.80changed
    TRUCK DRIVERS: GROUP 5 DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON…$36.90 + 46.37+a$36.90 + $46.37changed
    TRUCK DRIVERS: GROUP 4 DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN.$37.02 + 46.37+a$37.02 + $46.37changed
    TRUCK DRIVERS: GROUP 3 DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXE…$37.13 + 46.37+a$37.13 + $46.37changed
    TRUCK DRIVERS: GROUP 2 DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 3…$37.35 + 46.37+a$37.35 + $46.37changed
    TRUCK DRIVERS: GROUP 1A DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 T…$39.03 + 46.37+a$39.03 + $46.37changed
    TRUCK DRIVERS: GROUP 1 DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGO…$37.91 + 46.37+a$37.91 + $46.37changed
  • January 30, 2026 · modification 13 rates raised, 1 fringe formula changed
    • Elevator mechanic: 1 fringe formula changed
    • Laborer: 1 rate raised by $11.05 an hour
    • Laborer dutchess county: 1 rate raised by $12.05 an hour
    • Sprinkler fitter: 1 rate raised by $1.30 an hour
    Every line that changed (4)
    ClassificationWasNowChange
    ELEVATOR MECHANIC$73.07 + 38.435+a+b$76.12 + 38.985+a+bchanged
    LABORER DUTCHESS COUNTY (Asbestos, lead, toxic and hazardous waste abatement and any oth…$35.95 + $27.15$45.40 + $29.75+$12.05 (+19.1%)
    LABORER GROUP 2$37.75 + $27.15$46.20 + $29.75+$11.05 (+17.0%)
    SPRINKLER FITTER$57.20 + $31.36$57.20 + $32.66+$1.30 (+1.5%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 3 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
ASBE0040-003 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)

$41.74$27.58$69.32no changeAgreement, 2025
INSULATOR/ASBESTOS WORKER…
Full text

INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (SULLIVAN AND ULSTER COUNTIES)

$41.74$27.58$69.32no changeAgreement, 2025
ASBE0091-002 · Asbestos Workers and Heat & Frost Insulators agreement, June 2, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE COUNTIES)

$46.62$49.30$95.92no changeAgreement, 2025
INSULATOR/ASBESTOS WORKER…
Full text

INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) (DUTCHESS AND ORANGE COUNTIES)

$46.62$49.30$95.92no changeAgreement, 2025
BOIL0005-001 · Boilermakers agreement, January 1, 2025
BOILERMAKER (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE)

$68.88$49.83$118.71changedAgreement, 2025
BRNY0005-001 · Bricklayers agreement, June 1, 2024
BRICKLAYER (BUILDING CONSTRUCTION)…
Full text

BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES)

$46.45$37.50$83.95—Agreement, 2024
BRICKLAYER (BUILDING CONSTRUCTION)…
Full text

BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO))

$47.44$38.00$85.44—Agreement, 2024
BRICKLAYER (HEAVY CONSTRUCTION)…
Full text

BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER COUNTIES)

$46.45$37.50$83.95—Agreement, 2024
BRICKLAYER (HEAVY CONSTRUCTION)…
Full text

BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE COUNTY (TOWN OF TUXEDO))

$47.44$38.00$85.44—Agreement, 2024
BRICKLAYER (HIGHWAY CONSTRUCTION)…
Full text

BRICKLAYER (HIGHWAY CONSTRUCTION): BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND ULSTER COUNTIES)

$46.45$37.50$83.95—Agreement, 2024
CARP0279-005 · Carpenters agreement, July 1, 2025
CARPENTERS (BUILDING CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS$44.72$31.23$75.95—Agreement, 2025
CARPENTERS (HEAVY AND HIGHWAY CONSTRUCTION): CARPENTERS, MILLWRIGHTS, PILE DRIVERS$44.72$31.23$75.95—Agreement, 2025
CARP0740-002 · Carpenters agreement, July 1, 2025
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES)$47.83$43.03$90.86no changeAgreement, 2025
CARP1556-005 · Carpenters agreement, July 1, 2024
DIVER (DUTCHESS AND ORANGE COUNTIES)$75.46$55.84$131.30no changeAgreement, 2024
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES)$55.00$55.84$110.84no changeAgreement, 2024
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE COUNTIES)$60.59$55.84$116.43no changeAgreement, 2024
ELEC0363-001 · Electrical Workers (IBEW) agreement, April 1, 2025
ELECTRICIAN (DUTCHESS…
Full text

ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER AND SULLIVAN COUNTIES) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY)

$51.50$42.22$93.72changedAgreement, 2025
ELECTRICIAN (ORANGE AND DUTCHESS…
Full text

ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF FISHKILL, EAST FISHKILL AND BEACON) COUNTIES). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY)

$51.50$42.22$93.72changedAgreement, 2025
ELEC1249-002 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER…
Full text

ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$32.51$29.93$62.44changedAgreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER…
Full text

ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR). (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$48.77$31.31$80.08changedAgreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER…
Full text

ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER). (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$43.35$30.73$74.08—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER…
Full text

ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$43.35$30.73$74.08—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER…
Full text

ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): LINEMAN AND TECHNICIAN. (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$54.19$35.69$89.88changedAgreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER…
Full text

ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS): MECHANIC. (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$43.35$30.73$74.08changedAgreement, 2025
ELEC1249-004 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): LINEMAN AND TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN DIGGING MACHINE OPERATOR . (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES): MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): CABLE SPLICER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$63.14$33.82$96.96—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUND MAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUNDMAN DIGGING MACHINE OPERATOR. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): LINEMAN & TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION)…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): CABLE SPLICER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$64.59$42.92$107.51—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN DIGGING MACHINE OPERATOR. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): LINEMAN & TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES…
Full text

ELECTRICIAN (LINE CONSTRUCTION - SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY.)

$49.25$31.15$80.40—Agreement, 2025
ELEC1249-005 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY)

$35.34$30.12$65.46changedAgreement, 2025
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE OPERATOR) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY)

$55.40$31.78$87.18changedAgreement, 2025
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): LINEMAN & TECHNICIAN (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY)

$61.56$36.21$97.77changedAgreement, 2025
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): MECHANIC (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN COUNTY)

$49.25$31.15$80.40—Agreement, 2025
ELEC1249-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): CABLE SPLICER (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.)

$40.81$6.99$47.80changedAgreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): GROUNDMAN (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.)

$20.53$6.39$26.92—Agreement, 2025
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE…
Full text

ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT): INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY.)

$38.73$6.93$45.66—Agreement, 2025
ELEV0138-001 · Elevator Constructors agreement, January 1, 2026
ELEVATOR MECHANIC (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING…
Full text

ELEVATOR MECHANIC (ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. AND B.

PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.)

$76.12$38.98$115.10changedAgreement, 2026
ENGI0137-001 · Operating Engineers agreement, March 4, 2024
POWER EQUIPMENT OPERATOR GROUP 1A…
Full text

POWER EQUIPMENT OPERATOR GROUP 1A (BUILDING CONSTRUCTION): CARRIER- TRAILER HORSE; CONCRETE-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPERSTRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. (CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 TON UP TO 25 TON) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$59.04$31.32$90.36changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 1B…
Full text

POWER EQUIPMENT OPERATOR GROUP 1B (BUILDING CONSTRUCTION): COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$54.41$31.32$85.73changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 2A…
Full text

POWER EQUIPMENT OPERATOR GROUP 2A (BUILDING CONSTRUCTION): COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$56.97$31.32$88.29changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 3A…
Full text

POWER EQUIPMENT OPERATOR GROUP 3A (BUILDING CONSTRUCTION): ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR). (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$54.88$31.32$86.20changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 3B…
Full text

POWER EQUIPMENT OPERATOR GROUP 3B (BUILDING CONSTRUCTION): COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$52.25$31.32$83.57changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 4A…
Full text

POWER EQUIPMENT OPERATOR GROUP 4A (BUILDING CONSTRUCTION): AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE GRADING MACHINE; ROOF HOIST (TUGGER HOIST); TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$54.33$31.32$85.65changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 4B…
Full text

POWER EQUIPMENT OPERATOR GROUP 4B (BUILDING CONSTRUCTION): COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$45.94$31.32$77.26changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING CONSTRUCTION): MOTORIZED ROLLER (WALK BEHIND) (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$49.53$31.32$80.85changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5A…
Full text

POWER EQUIPMENT OPERATOR GROUP 5A (BUILDING CONSTRUCTION): MASTER MECHANIC (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$61.95$31.32$93.27changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5B…
Full text

POWER EQUIPMENT OPERATOR GROUP 5B (BUILDING CONSTRUCTION): UTILITY MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$47.00$31.32$78.32changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 6…
Full text

POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING CONSTRUCTION): WAREHOUSE MAN (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))

$49.26$31.32$80.58changedAgreement, 2024
ENGI0137-007 · Operating Engineers agreement, March 4, 2024
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$68.63$35.25$103.88—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1-A (HEAVY & HIGHWAY): AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON (BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM MACHINE; SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION EQUIPMENT, WHIRLY (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$60.42$35.25$95.67—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1-B (HEAVY & HIGHWAY): ROAD PAVER, ASPHALT (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$63.70$35.25$98.95—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2-A (HEAVY & HIGHWAY): BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$57.84$35.25$93.09changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2-B (HEAVY & HIGHWAY): MECHANIC (OUTSIDE) ALL TYPES (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$59.67$35.25$94.92changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 3…
Full text

POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR. (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$56.81$35.25$92.06changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4-A (HEAVY & HIGHWAY): SERVICE MEN (FUEL OR GREASE TRUCK). (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$51.57$35.25$86.82changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4-B (HEAVY & HIGHWAY): OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$44.19$35.25$79.44changedAgreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY):OILER (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$64.02$35.25$99.27—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5-A-1 (HEAVY & HIGHWAY): MASTER MECHANIC (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$64.02$35.25$99.27—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5-A-2 (HEAVY & HIGHWAY): ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$77.82$35.25$113.07—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5-A-3 (HEAVY & HIGHWAY): ENGINEER-- PILE DRIVER (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$75.13$35.25$110.38—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5-A-4 (HEAVY & HIGHWAY): HOIST ENGINEER- STEEL -SUB STRUCTURE (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$70.41$35.25$105.66—Agreement, 2024
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5-A-5 (HEAVY & HIGHWAY): JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF)

$59.19$35.25$94.44—Agreement, 2024
ENGI0158-006 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS GROUP A…
Full text

POWER EQUIPMENT OPERATORS GROUP A (BUILDING CONSTRUCTION): SHOVEL, ALL EXCAVATOR (EXCEPT TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER). (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)

$54.93$33.20$88.13no changeAgreement, 2025
POWER EQUIPMENT OPERATORS GROUP A(1)…
Full text

POWER EQUIPMENT OPERATORS GROUP A(1) (BUILDLING CONSTRUCTION): CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) (GROUP A(1) CRANE PREMIUMS: OVER 150', ADD $1.00. OVER 200', ADD $2.00.) (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)

$55.42$33.20$88.62no changeAgreement, 2025
POWER EQUIPMENT OPERATORS GROUP B…
Full text

POWER EQUIPMENT OPERATORS GROUP B (BUILDING CONSTRUCTION) BACKHOE, (TRACTOR MOUNTED RUBBER TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)

$53.91$33.20$87.11no changeAgreement, 2025
POWER EQUIPMENT OPERATORS GROUP C…
Full text

POWER EQUIPMENT OPERATORS GROUP C (BUILDLING CONSTRUCTION): FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS. (NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE)

$51.01$33.20$84.21no changeAgreement, 2025
ENGI0158-018 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$57.30$33.55$90.85no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2 (HEAVY & HIGHWAY): ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$56.39$33.55$89.94no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 3…
Full text

POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): A FRAME WINCH HOIST ON TRUCK , ARTICULATED HEAVY HAULER, AGGREGATE PLANT, ASPHALT OR CONCRETE GROOVING, MACHINE (RIDE ON), BALLAST REGULATOR, RIDE-ON BOILER (USED IN CONJUNCTION WITH PRODUCTION), BITUMINOUS HEATER, SELF-PROPELLED, BOAT (POWERED), CEMENT AND BIN OPERATOR, COMPRESSORS, DUST COLLECTORS, FORK LIFT, GENERATORS, PUMPS, WELDING MACHINES, LIGHT PLANTS, HEATERS (HANDS-OFF EQUIPMENT), CONCRETE PAVEMENT SPREADER AND FINISHER, CONCRETE PAVER OR MIXER (16S AND UNDER), CONCRETE SAW (SELF-PROPELLED), CONVEYOR, DECK HAND, DIRECTIONAL DRILL MACHINE LOCATOR, DRILL, (CORE), DRILL, (WELL,) FARM TRACTOR WITH ACCESSORIES, FINE GRADE MACHINE, TAMPER, RIDE-ON, TIE EXTRACTOR, RIDE-ON, TIE HANDLER, RIDE-ON, TIE INSERTER, RIDE-ON, TIE SPACER, RIDE-ON, TIRE REPAIR, TRACK LINER, RIDE-ON, TRACTOR, TRACTOR (WITH TOWED ACCESSORIES), VIBRATORY COMPACTOR, VIBRO TAMP, WELL POINT. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$53.82$33.55$87.37no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4 (HEAVY & HIGHWAY): TOWER CRANES. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$63.30$33.55$96.85no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & HIGHWAY): CRANES 50 TONS AND OVER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$61.80$33.55$95.35no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 6…
Full text

POWER EQUIPMENT OPERATOR GROUP 6 (HEAVY & HIGHWAY): CRANES 49 TONS AND BELOW. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$60.30$33.55$93.85no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 7…
Full text

POWER EQUIPMENT OPERATOR GROUP 7 (HEAVY & HIGHWAY): MASTER MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.) (NORTHERN PART OF DUTCHESS (TO THE NORTHERN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE.)

$58.91$33.55$92.46no changeAgreement, 2025
ENGI0825-007 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATOR GROUP 1…
Full text

POWER EQUIPMENT OPERATOR GROUP 1 (BUILDING, HEAVY & HIGHWAY): AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPE); UTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES,INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SELF-PROPELLED, HYDRAULIC DRILL, SELF-POWERED DRILL DRAGLINES, ELEVATOR GRADERS, FRONT END LOADERS (5 YDS. AND OVER), GRADALLS, GRADER: RAGO, HELICOPTERS (COPILOT), HELICOPTERS, (COMMUNICATION ENGINEER), LOCOMOTIVE (LARGE), MUCKING MACHINES, PAVEMENT AND CONCRETE BREAKER (SUPERHAMMER, HOE RAM, BROKK 250 AND SIMILAR TYPES), PILE DRIVER (LENGTH OF BOOM INCLUDING LENGTH OF LEADS SHALL DETERMINE PREMIUM RATE APPLICABLE), ROADWAY SURFACE GRINDER SCOOPER (LOADER AND SHOVEL), SHOVELS, TREE CHOOPER WITH BOOM, TRENCH MACHINES, TUNNEL BORING MACHINES. (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$61.72$37.50$99.22—Agreement, 2025
POWER EQUIPMENT OPERATOR GROUP 2…
Full text

POWER EQUIPMENT OPERATOR GROUP 2 (BUILDING, HEAVY & HIGHWAY): ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRY-ALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 2 YDS.), GRADERS (FINISH); GROOVE CUTTING MACHINE (RIDE ON TYPE), HEATER PLANER; HOISTS: (ALL TYPE HOISTS, SHALL ALSO INCLUDE STEAM, GAS, DIESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM, CONCRETE, BRICK SHAFT, CAISSON, SNORKEL ROOF, AND OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE). LONG BOOM RATE TO BE APPLIED IF HOIST IS ""OUTSIDE MATERIAL LOWER HOIST""; HYDRAULIC CRANES-10TONS AND UNDER; HYDRO-AXE; HYDRO-BLASTER; JACKET (SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE: NOT HAND JACK OR PILE LOAD TEST TYPE), LOG SKIDDER; PANS, PAVERS (ALL) CONCRETE; PLATE AND FRAME FILTER PRESS; PUMPCRETE MACHINES; SQUEEZE CRETE AND CONCRETE PUMPING (REGARDLESS OF SIZE); SCRAPERS; SIDEBOOMS; STRADDLE CARRIER, ROSS AND SIMILAR TYPES; VACUUM TRUCK; WHIP HAMMER; WINCH TRUCKS (HOISTING). (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$60.13$37.50$97.63no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 3…
Full text

POWER EQUIPMENT OPERATOR GROUP 3 (BUILDING, HEAVY & HIGHWAY): ASPHALT CURBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER; AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINES (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON-SITE; BELT CONVEYOR SYSTEMS; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (A:ROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENTY OR MOUNTED ON DUAL PURPOSE TRUCKS, ON JOB SITE OR IN CONDUCTION WITH JOB SITE, IN LOADING AND UNLOADING OF CONCRETE, CEMENT, FLY ASH, INSTANTCRETE, OR SIMILAR TYPE MATERIALS); COMPRESSOR 92 OR 3 IN BATTERY); CONCRETE FINISHING MACHINES; CONCRETE SAWS AND CUTTERS (RIDE ON TYPE); CONCRETE SPREADERS, HETZEL, REXOMATIC AND SIMILAR TYPES; CONCRETE VIBRATORS; CONVEYORS, UNDER 125 FT), CRUSHING MACHINES, DITCHING MACHINE, SMALL (DITCHWITCH, VERMEER OR SIMILAR TYPE); DOPE DOTS (MECHANICAL WITH OR WITHOUT PUMP), DUMPSTERS; ELEVATOR; FIREMAN; FORKLIFTS (ECONOMOBILE, LULL, AND SIMILAR TYPES OF EQUIPMENT); FRONT END LOADERS (1 YD. AND OVER BUT LESS THAN 2 YDS.); GENERATORS (2 OR 3 IN BATTERY/ WITHIN 100 FT); GIRAFFE GRINDERS, GRADERS AND MOTOR PATROLS; GROUT PUMP; GUNNITE MACHINES (EXCLUDING NOZZLE); HAMMER VIBRATORY (IN CONDUCTION WITH GENERATORS); HOISTS (ROOF, TUGGERAERIAL PLATFROM HOIST AND HOUSE CARS), HOPPERS, HOPPERS DOORS (POWER OPERATED); HYDRO-BLASTER (WHERE REQUIRED); LADDERS (MOTORIZED); LADDERVATOR; LOCOMOTIVE, DINKY TYPE; MAINTENANCE, UTILITY MAN; MECHANICS; MIXERS (EXCEPTING PAVING MIXERS); MOTOR PATROLS AND GRADERS; PAVEMENT BREAKERS, SMALL, SELF-PROPELLED RIDE ON TYPE (ALSO MAINTAINS COMPRESSOR OR HYDRAULIC UNIT); PAVEMENT BREAKER, TRUCK MOUNTED; PIPE BENDING MACHINE (POWER); PITCH PUMP; PLASTER PUMP (REGARDLESS OF SIZE); POST HOLE DIGGER (POST POUNDER AND AUGER); ROD BENDING MACHINES (POWER); ROLLER, BLACK TOP; SCALES, (POWER); SEAMAN PULVERIZING MIXER; SHOULDER WIDENER; SILOS; SKIMMER MACHINES (BOOM TYPE); STEEL CUTTING MACHINE, SERVICES AND MAINTAINS; TAMROCK DRILL; TRACTORS; TUG CAPTAIN; VIBRATING PLANTS (USED IN CONDUCTION WITH UNLOADING); WELDER AND REPAIR MACHINES. CONCRETE CLEANING/DECONTAMINATION MACHINE OPERATOR; DIRECTIONAL BORING MACHINE; HEAVY EQUIPMENT ROBOTICS OPERATOR; MASTER ENVIRONMENTAL MAINTENANCE OPERATOR; ULTRA HIGH PRESSURE WATERJET CUTTING TOOL SYSTEM OPERATOR; MAINTENANCE OPERATOR; VACUUM BLASTING MACHINE OPERATOR (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$58.22$37.50$95.72no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 4…
Full text

POWER EQUIPMENT OPERATOR GROUP 4 (BUILDING, HEAVY & HIGHWAY): BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TYPE INCLUDING PROPANE, NATURAL GAS OR FLOWTYPE UNITS); LIGHTS, PORTABLE GENERATING LIGHT PLANTS; MIXERS, CONCRETE SMALL; MULCHING EQUIPMENT (OPERATION AND MAINTENANCE OF); PUMPS (2 OF LESS THAN 4 INCH SUCTION); PUMPS 94 INCH SUCTION AND OVER INCLUDING SUBMERSIBLE PUMPS); PUMPS (DIESEL ENGINE AND HYDRAULIC); IMMATERIAL OF POWER; ROAD FINISHING MACHINES (SMALL TYPE); ROLLERS, GRADE, FULL OR STONE BASE; SEEDING EQUIPMENT (OPERATION AND MAINTENCE OF); SPRINKLER AND WATER PUMP TRUCKS (USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); STEAM JENNIES AND BOILERS, IRRESPECTIVE OF USE; STONE SPREADER; TAMPING MACHINES, VIBRATING RIDE ON; TEMPORARY HEATING PLANT (NELSON OR OTHER TYPE, INCLUDING PROPANE, NATURAL GAS OR FLOW TYPE UNITS); WATER AND SPRINKLER TRUCKS (USED ON JOB SITE IN CONDUCTION WITH JOB SITE); WELDING MACHINES-WITHIN 100 FT (GAS, AND /OR ELECTRIC CONVERTERS OF ANY TYPE, SINGLE, TOW OR THREE IN A BATTERY). WELDING SYSTEM, MULTIPLE (RECTIFIER TRANSFORMER TYPE) WELL POINT SYSTEMS (INCLUDING INSTALLATION BY BULL GANG AND MAINTENANCE OF); OFF ROAD BACK DUMPS. (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$56.59$37.50$94.09no changeAgreement, 2025
POWER EQUIPMENT OPERATOR GROUP 5…
Full text

POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING, HEAVY & HIGHWAY): OILER (NOTES: HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM, $0.50). (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$61.72$37.50$99.22—Agreement, 2025
POWER EQUIPMENT OPERATOR GROUP 6…
Full text

POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING, HEAVY & HIGHWAY): HELICOPTER PILOT (ORANGE, ULSTER AND SULLIVAN COUNTIES) NOTES: HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM .50 A.

PAID HOLIDAYS: NEW YEARS DAY, WASHINGTON'S BIRTHDAY MEMORIAL DAY, JULY 4TH, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS

$63.54$37.50$101.04no changeAgreement, 2025
ENGI0825-008 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$62.35$37.50$99.85no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$60.70$37.50$98.20no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3…
Full text

POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$58.56$37.50$96.06no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4…
Full text

POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$57.06$37.50$94.56no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 5…
Full text

POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR AND MAINTENANCE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$53.34$37.50$90.84—Agreement, 2025
POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6…
Full text

POWER EQUIPMENT OPERATORS - OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES GROUP 6: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$64.28$37.50$101.78no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 1: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$70.24$37.50$107.74no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 2: CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$68.58$37.50$106.08no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 3…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 3: ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$61.29$37.50$98.79no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 4…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 4: AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$58.63$37.50$96.13no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 5…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 5: COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$57.10$37.50$94.60no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 6…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 6: OILER. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$53.34$37.50$90.84—Agreement, 2025
POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 7…
Full text

POWER EQUIPMENT OPERATORS - STEEL ERECTION (BUILDING CONSTRUCTION) GROUP 7: HELICOPTER PILOT. (NOTES: HYDROGRAPHIC PREMIUM, $0.50. HAZMAT PREMIUM, 20%. TUNNEL PREMIUM, $0.75.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$65.74$37.50$103.24no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 1…
Full text

POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$69.96$37.50$107.46no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 2…
Full text

POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$68.37$37.50$105.87no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 3…
Full text

POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 3: HELICOPTER PILOT ENGINEER. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$64.85$37.50$102.35no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 4…
Full text

POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE CONSTRUCTION JOB SITED OR IN CONJUCTION WITH THE JOB SITE. (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$61.28$37.50$98.78no changeAgreement, 2025
POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 5…
Full text

POWER EQUIPMENT OPERATORS - TANK ERECTION (BUILDING CONSTRUCTION) GROUP 5: OILER (NOTES: TUNNEL PREMIUM, $0.75. HAZMAT PREMIUM, 20%. HYDROGRAPHIC PREMIUM $0.50) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR�S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS.) (ORANGE, ULSTER AND SULLIVAN COUNTIES)

$54.07$37.50$91.57no changeAgreement, 2025
IRON0417-001 · Ironworkers agreement, July 1, 2025
IRONWORKER (ADDITIONAL FRINGE BENEFITS INLCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY.)

$42.63$53.70$96.33—Agreement, 2025
LABO0017-002 · Laborers agreement, June 1, 2025
LABORER - ASBESTOS…
Full text

LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (HEAVY & HIGHWAY) GROUP 1: ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY) (DUTCHESS COUNTY)

$44.80$32.45$77.25—Agreement, 2025
LABORER - ASBESTOS…
Full text

LABORER - ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (HEAVY & HIGHWAY) GROUP 2: ASBESTOS TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY) (DUTCHESS COUNTY)

$49.40$32.45$81.85—Agreement, 2025
LABORER - ASBESTOS…
Full text

LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (BUILDING CONSTRUCTION) GROUP 1: ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (DUTCHESS COUNTY)

$45.40$29.75$75.15+$12.05 (+19.1%)Agreement, 2025
LABORER - ASBESTOS…
Full text

LABORER - ASBESTOS, LEAD, TOXIC, AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK (BUILDING CONSTRUCTION) GROUP 2: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (DUTCHESS COUNTY)

$46.20$29.75$75.95+$11.05 (+17.0%)Agreement, 2025
LABORER - TUNNEL, SHAFT, & CAISSON WORK - GROUP 1…
Full text

LABORER - TUNNEL, SHAFT, & CAISSON WORK - GROUP 1: LABORER, PIT AND DUMPMAN, CHUCK TENDER, BRAKEMAN AND POWDER; MINER AND ALL MAVHINE MEN, SAFETY MINER, ALL SHAFT WORK, CASSON WORK, DRILLING, BLOW PIPE, ALL AIR TOOLS, TUGGER SCALING, NIPPER GUNNITING SROM POT TO NOZZLE, BIT GRINDER, SINGAL MAN (TOP AND BOTTOM), SHIFT STEWARD, CONCRETE MAN, SHIELD DRIVEN TUNNEL, MIXED FACE AND SOFT GROUND LINER PLATE TUNNEL IN FREE AIR. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY)

$48.05$29.50$77.55—Agreement, 2025
LABORER (BUILDING CONSTRUCTION) GROUP 1…
Full text

LABORER (BUILDING CONSTRUCTION) GROUP 1: CUSTODIAL WORK, FLAG PERSON, PORTABLE GENERATOR TENDER, PORTABLE PUMP TENDER, PITMAN AND DUMPMAN, FIREWATCH, TEMPORARY HEAT TENDER, TEMPORARY LIGHT TENDER, TRAFFIC CONTROL, TOOL ROOM TENDER; ARTIFICIAL TURF, AIR CHIPPING HAMMER ACOUSTIC PUMP AND MIXER, CARPENTER TENDER, CONCRETE, CONCRETE CURB AND SIDEWALK FORM SETTER, CONCRETE FORM STRIPPING, CONCRETE SEALING, CONCRETE CURING, CONCRETE FINISHER, CONCRETE VIBRATOR, COMPRESSOR, CLEAN UP AFTER TRADES, DISMANTLING DEMOLITION, EXCAVATION, FIREPROOFING, FOUNDATION AND BUILDING PIPING, PUMP AND MIXER, GUNITE, GENERAL CLEAN UP, GRADE CHECKER, GRADING AND BACKFILLING, HOISTS, HOD CARRIER, LANDSCAPING, MASON TENDER, MULTI BUILDING TRADES TENDER, JACKHAMMER, PAVEMENT BREAKER, POURED GYPSUM ROOF WORK, POWER TAMPERS, POWER WALK BEHIND ROLLER, PRESSURE BLASTING, POWER MIXER, SCAFFOLDING, SNOW REMOVAL, SIGNAL PERSON, SANDBLASTING, STYROFOAM AND SIMILAR INSTALLATION, RADIO CONTROL EQUIPMENT INCLUDING BUT NOT LIMITED TO RADIO CONTROL TAMPERS AND ROLLERS, RADIO CONTROL EXCAVATOR, ALL ERECTING AND DISMANTLING OF SCAFFOLD FOR MASONRY REGARDLESS OF HEIGHT, WALKING AND RIDING POWER BUGGIES, TEMPORARY WEATHER PROTECTION, WRECKING, WATERPROOFING, STONE AND TILE TENDERS, RADIO CONTROLLED HAMMERS AND BREAKERS, UNLOADING OF TRUCKS, AIR TRACK, ASSEMBLING AND PLACING GABION BASKETS, ASPHALT, BLASTER, BOB CAT TYPE MACHINE FOR DEMO AND CLEAN UP, CHAIN LINK FENCE, CHAIN SAW, CHIPPING HAMMER, CONCRETE CONVEYOR BELT, SAW, CORE DRILL, CORRUGATED PIPE, CONSTRUCTION SPECIALIST, CLEANING MACHINE, CONCRETE FORM SETTER, CONDUIT LAYER, CUTTING TORCH, DISCHARGE PIPE, DRILL CHUCK TENDER, DUCT BANK LAYER, EXPLOSIVE HANDLER, HYDRAULIC SPLITTER, GRANITE OR STONE CURBING, HANDLER, JOY AND JIB DRILL, INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ DRILL MACHINES OR EQUIVALENT, LASER LEVEL, NONMETALLIC PIPE LAYER, METALLIC PIPE LAYER, LEROI HYDRAULIC DRILL OR SIMILAR, MEGA MIXER, POWER FORK LIFT, PRESTRESSED AND PRECAST CONCRETE, POWER BRUSH CUTTER, PUMP CRETE MACHINE, RETAINING WALLS, RIP RAP, RETENTION AND TOXIC AND HAZARDOUS WASTE LINERS, SETTING OF BLOCK, SETTING OF BLOCK, SETTING OF BRICK, SETTING OF STONE, SOUND BARRIERS, TRANSIT UNDER LABORERS JURISDICTION, TOW BEHIND CONCRETE OR GROUT PUMP, TRAFFIC AND PEDESTRIAN STRIPPING, SURFACE PLANNER, MANUFACTURED CURB, WALK BEHIND DURFACE PLANNER, WAGON DRILL, WELDING; * ASBESTOS ABATEMENT WORK, LEAD ABATEMENT WORK, TOXIC AND HAZARDOUS WASTE RELATED WORK; WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED. (ORANGE AND ULSTER COUNTIES)

$35.95$27.15$63.10—Agreement, 2025
LABORER (BUILDING CONSTRUCTION) GROUP 2…
Full text

LABORER (BUILDING CONSTRUCTION) GROUP 2: FORKLIFT FOR MASONRY PURPOSES (ORANGE AND ULSTER COUNTIES)

$37.75$27.15$64.90—Agreement, 2025
LABORER (BUILDING CONSTRUCTION) GROUP 3…
Full text

LABORER (BUILDING CONSTRUCTION) GROUP 3: ASBESTOS ABATEMENT WORK, TOXIC AND HAZARDOUS ABATEMENT, LEAD ABATEMENT WORK, ENVIRONMENTAL WORK. (ORANGE AND ULSTER COUNTIES)

$40.50$27.15$67.65—Agreement, 2025
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 1…
Full text

LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 1: FLAGPERSON, GATEPERSON (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY)(ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$40.80$32.45$73.25—Agreement, 2025
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 2…
Full text

LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CRUB AND SIDEWALK FROM SETTER; PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPELINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICITION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINING WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CATCH BASIN OR INLET INSTALLING, LASE MEN. GROUND MAN ON MILLING MACHINE. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$44.80$32.45$77.25—Agreement, 2025
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 3…
Full text

LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 3: INGERSOLL RAND EAVY DUTY CRAWLER MASTER TYPE HCMZ ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$49.40$32.45$81.85—Agreement, 2025
LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 4…
Full text

LABORER (HEAVY & HIGHWAY CONSTRUCTION) GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIALABATEMENT FOREMAN. (FOOTNOTE: ADDITIONAL PAID BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY) (ORANGE, ULSTER, AND SULLIVAN COUNTIES)

$54.70$32.45$87.15—Agreement, 2025
LABO0235-003 · Laborers agreement, June 1, 2025
LABORERS (BUILDING CONSTRUCTION) GROUP 1…
Full text

LABORERS (BUILDING CONSTRUCTION) GROUP 1: MASON TENDERS, CARPENTER TENDERS, LABORER STRIPPING AND CLEANING FORMS, LABORER GRADING AND DIGGING DITCHES, SWEEPERS, CLEANERS. (DUTCHESS COUNTY)

$41.10$32.90$74.00no changeAgreement, 2025
LABORERS (BUILDING CONSTRUCTION) GROUP 2…
Full text

LABORERS (BUILDING CONSTRUCTION) GROUP 2: HOD CARRIERS, PLASTERERS' TENDERS, SCAFFOLD BUILDERS (PADLOCK AND SELF-SUPPORTING SCAFFOLD 14 FT. OR UNDER ALL RUNWAYS, MORTAR MIXERS) MACHINE AND HAND, CONCRETE MIXERS BY MACHINE UNDER 21E, VIBRATORS, FORM SETTERS, ASPHALT RAKERS, HANDLING REINFORCEMENT RODS, DRILLERS, JACKHAMMER, OPERATOR, SIGNALMAN, GUNNITING, MOTORBUGS, WATER PUMP 2"""" OR UNDER BARCO MACHINE, WRECKERS, PAVING BREAKERS, POWER SAW OPERATORS, OTHER MACHINE OPERATORS. (DUTCHESS COUNTY)

$42.22$32.90$75.12no changeAgreement, 2025
LABORERS (BUILDING CONSTRUCTION) GROUP 3: BLASTERS, LASER BEAM OPERATOR. (DUTCHESS COUNTY)$43.45$32.90$76.35no changeAgreement, 2025
LABO0235-005 · Laborers agreement, May 1, 2023
LABORERS (HEAVY & HIGHWAY) GROUP 1…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 1: FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHT, SIGNS, BARRICADES, TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOMS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY)

$36.45$27.80$64.25changedAgreement, 2023
LABORERS (HEAVY & HIGHWAY) GROUP 2…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 2: GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACKHAMMER, POWDERMAN, HIGHSCALERS, POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2"" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY)

$42.80$27.80$70.60—Agreement, 2023
LABORERS (HEAVY & HIGHWAY) GROUP 3…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 3: ASPHALT RAKER, ASPHLAT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, GOOD FRIDAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, THANKSGIVING DAY AND CHRISTMAS DAY AND VETERAN'S DAY.) (DUTCHESS COUNTY)

$43.90$27.80$71.70—Agreement, 2023
PAIN0009-004 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES)$49.20$57.20$106.40no changeAgreement, 2025
PAIN0155-003 · Painters and Allied Trades agreement, May 1, 2021
PAINTERS: DRYWALL FINISHERS$35.94$24.66$60.60no changeAgreement, 2021
PAINTERS: LEAD ABATEMENT WORK$35.94$24.66$60.60no changeAgreement, 2021
PAINTERS: PAINTER/PAPERHANGER$35.94$24.66$60.60no changeAgreement, 2021
PAINTERS: SPRAY RATE$36.94$24.66$61.60no changeAgreement, 2021
PAIN0806-008 · Painters and Allied Trades agreement, October 1, 2024
PAINTER: STRUCTURAL STEEL AND BRIDGE (DUTCHESS, ORANGE, SULLIVAN AND ULSTER COUNTIES)$56.25$55.14$111.39no changeAgreement, 2024
PLUM0021-005 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER/PIPEFITTER (ZONE 2 DUTCHESS COUNTY AND THE REMAINDER OF ULSTER COUNTY)$60.66$45.35$106.01no changeAgreement, 2025
PLUM0373-002 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER; STEAMFITTER…
Full text

PLUMBER; STEAMFITTER (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK)

$53.20$46.57$99.77no changeAgreement, 2025
REFRIGERATION MECHANIC…
Full text

REFRIGERATION MECHANIC (ORANGE COUNTY TOWNS OF LAKEVILLE, FOUR CORNERS, STERLING FOREST, TUXEDO PARK, SOUTHFIELDS, ARDEN, NEWBURGH JUNCTION, GREENWOOD LAKE, MONROE, HARRIMAN, WOODBURY FALLS, WOODBURY, WOODBURY STATION, CENTRAL VALLEY, AND THE PALISADES INTERSTATE PARK AND BEAR MOUNTAIN PARK)

$41.99$37.38$79.37no changeAgreement, 2025
PLUM0373-003 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER; STEAMFITTER…
Full text

PLUMBER; STEAMFITTER (SULLIVAN COUNTY (TOWNSHIPS OF LUMBERLAND, FORESTBURGH, HIGHLAND, TUSTEN, MAMAKATING, FALLSBURGH, THOMPSON, BETHEL, COCHECTON, DELAWARE, FREEMONT, CALLICOON, LIBERTY, MONTICELLO, NEVERSINK AND ROCKLAND); ORANGE COUNTY (REMAINING TOWNSHIPS) AND ULSTER COUNTY (TOWNS OF SHAWANGURK, WAWARSING, PLATTEKILL, MARLBORO AND ELLENVILLE UP TO NAPANOCH PRISON))

$53.20$46.57$99.77no changeAgreement, 2025
ROOF0008-002 · Roofers agreement, May 1, 2025
ROOFER$50.25$32.62$82.87no changeAgreement, 2025
SFNY0669-002 · SFNY, January 1, 2026
SPRINKLER FITTER$57.20$32.66$89.86+$1.30 (+1.5%)SFNY
SHEE0038-001 · Sheet Metal Workers agreement, July 1, 2025
SHEET METAL WORKER$55.29$47.43$102.72no changeAgreement, 2025
TEAM0445-001 · Teamsters agreement, May 1, 2025
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1- DRIVERS ON LETOURNEAU TRACTORS, DOUBLE BARREL EUCLIDS, ATHEY WAGONS AND SIMILAR EQUIPMENT (EXCEPT WHEN HOOKED TO SCRAPERS), I-BEAM AND POLE TRAILERS, DRIVERS OF ROAD OIL DISTRIBUTORS, TIRE TRUCKS AND TRACTORS AND TRAILERS WITH 5 AXLES AND OVER, ARTICULATED BACK DUMPS AND ARTICULATED WATER TRUCKS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.)

$37.91$46.37$84.28changedAgreement, 2025
TRUCK DRIVERS: GROUP 1A…
Full text

TRUCK DRIVERS: GROUP 1A- DRIVERS ON DETACHABLE GOOSENECK LOW BED TRAILERS RATED OVER 35 TONS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.)

$39.03$46.37$85.40changedAgreement, 2025
TRUCK DRIVERS: GROUP 2…
Full text

TRUCK DRIVERS: GROUP 2- DRIVERS ON ALL EQUIPMENT 25 YARDS AND OVER, UP TO AND INCLUDING 30 YARD BODIES AND CABLE DUMP TRAILERS AND POWDER AND DYNAMITE TRUCKS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.)

$37.35$46.37$83.72changedAgreement, 2025
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3- DRIVERS ON ALL EQUIPMENT UP TO AND INCLUDING 24 YARD BODIES, MIXER TRUCKS, DUMP CRETE TRUCKS AND SIMILAR TYPES OF EQUIPMENT, FUEL TRUCKS, BATCH TRUCKS AND ALL OTHER TRACTOR TRAILERS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.)

$37.13$46.37$83.50changedAgreement, 2025
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4- DRIVERS ON TRI AXLES, TEN-WHEELERS, GREASE TRUCKS AND TILLERMEN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.)

$37.02$46.37$83.39changedAgreement, 2025
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5- DRIVERS ON PICK-UP TRUCKS USED FOR MATERIALS & PARTS, DRIVERS ON ESCORT MAN OVER-THE-ROAD AND DRIVERS ON STRAIGHT TRUCKS. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING

PAID HOLIDAYS: NEW YEAR'S DAY, LABOR DAY, PRESIDENT'S DAY, PRESIDENTIAL ELECTION DAY, VETERANS DAY, DECORATION DAY, INDEPENDENCE DAY, THANKSGIVING DAY AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS TWO DAYS IN ANY CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS.)

$36.90$46.37$83.27changedAgreement, 2025

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026
Modification 3October 8, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260007?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 3 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and NY20260007 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 152 classifications in 33 rate groups
  • 32 from agreements, 0 from surveys
  • Counties: Dutchess, Orange, Sullivan, Ulster