CertifiedHours

Prevailing wage rates · New York · Wage determination

Prevailing wage rates: Broome and Chenango Counties, New York

Building, Heavy, Highway construction · NY20260004 modification 2, published May 18, 2026

The short answer

This sheet sets 86 classifications for building, heavy, highway work in Broome and Chenango Counties, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $26.92 an hour (electrician line construction telephone) to $107.51 (electrician, line construction). Your contract may lock an earlier modification.

Scope

Excludes building construction in Chenango County

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0030-004 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2023
HAZARDOUS MATERIAL HANDLER

SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

$38.50$25.04$63.54Agreement
ASBESTOS/INSULATOR WORKER…
Full text

ASBESTOS/INSULATOR WORKER: INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT. (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

$43.25$27.29$70.54Agreement
ASBE0030-004 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
HAZARDOUS MATERIAL HANDLER

SCOPE OF WORK: DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEM (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

$38.50$25.04$63.54Agreement
ASBESTOS/INSULATOR WORKER…
Full text

ASBESTOS/INSULATOR WORKER: INCLUDES APPLICATION OF ALL MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS. ALSO THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS, CURTAIN WALLS AND ALL LEAD ABATEMENT. (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

$43.25$27.29$70.54Agreement
BOIL0197-004 · Boilermakers agreement, January 1, 2025
BOILERMAKER BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)$43.34$27.66$71.00Agreement
BRNY0003-002 · Bricklayers agreement, July 1, 2025
MARBLE, TILE AND TERRAZZO FINISHERS…
Full text

MARBLE, TILE AND TERRAZZO FINISHERS: BUILDING CONSTRUCTION, BROOME COUNTY (BINGHAMTON CHAPTER)

$34.34$28.46$62.80Agreement
MARBLE MASONS, TILE LAYERS…
Full text

MARBLE MASONS, TILE LAYERS, AND TERRAZZO WORKERS: BUILDING CONSTRUCTION, BROOME COUNTY (BINGHAMTON CHAPTER)

$34.34$28.46$62.80Agreement
CEMENT MASONS: HEAVY AND HIGHWAY CONSTRUCTION…
Full text

CEMENT MASONS: HEAVY AND HIGHWAY CONSTRUCTION, BROOME & CHENANGO COUNTIES (BINGHAMTON CHAPTER)

$38.63$25.05$63.68Agreement
BRICKLAYERS, CEMENT MASONS…
Full text

BRICKLAYERS, CEMENT MASONS, STONE MASONS, POINTERS, CAULKERS AND CLEANERS: BUILDING CONSTRUCTION, BROOME COUNTY (BINGHAMTON CHAPTER)

$34.34$28.46$62.80Agreement
CARP0277-010 · Carpenters agreement, July 1, 2025
CARPENTER: MILLWRIGHTS BUILDING CONSTRUCTION BROOME COUNTY

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND HIS SCHEDULED DAY AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$31.69$21.92$53.61Agreement
CARPENTER, BUILDING CONSTRUCTION…
Full text

CARPENTER, BUILDING CONSTRUCTION: CARPENTERS, CARPET LAYER, DRYWALL APPLICATOR, FLOOR COVERER, LATHER (BROOME COUNTY).

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND HIS SCHEDULED DAY AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$31.69$21.92$53.61Agreement
CARPENTER HEAVY & HIGHWAY CONSTRUCTION CHENANGO COUNTY

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND HIS SCHEDULED DAY AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$44.52$27.16$71.68Agreement
CARPENTER HEAVY & HIGHWAY CONSTRUCTION BROOME COUNTY

FOOTNOTES: A. PAID HOLIDAYS: INDEPENDENCE DAY AND LABOR DAY, PROVIDED THE EMPLOYEE WORKS HIS SCHEDULED DAY BEFORE AND HIS SCHEDULED DAY AFTER THE HOLIDAY AND IS ON THE PAYROLL IN THE PAYROLL WEEK IN WHICH THE HOLIDAY FALLS

$39.52$27.16$66.68Agreement
ELEC0043-003 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN CHENANGO (TWPS OF COLUMBUS, NEW BERLIN & SHERBURNE): HEAVY AND HIGHWAY$50.50$35.03$85.53Agreement
ELEC0325-002 · Electrical Workers (IBEW) agreement, June 1, 2025
ELECTRICIAN (BROOME…
Full text

ELECTRICIAN (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (ENTIRE COUNTY, EXCEPT COLUMBUS, NEW BERLIN AND SHERBURNE TOWNSHIPS) HEAVY AND HIGHWAY)

$42.68$33.06$75.74Agreement
CABLE SPLICER (BROOME…
Full text

CABLE SPLICER (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (ENTIRE COUNTY, EXCEPT COLUMBUS, NEW BERLIN AND SHERBURNE TOWNSHIPS) HEAVY AND HIGHWAY)

$50.43$33.29$83.72Agreement
ELEC1249-010 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN (LINE CONSTRUCTION…
Full text

ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): MECHANIC (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN (LINE CONSTRUCTION…
Full text

ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): LINEMAN & TECHNICIAN (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46Agreement
ELECTRICIAN (LINE CONSTRUCTION…
Full text

ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$44.93$30.85$75.78Agreement
ELECTRICIAN (LINE CONSTRUCTION…
Full text

ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER) (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN (LINE CONSTRUCTION…
Full text

ELECTRICIAN (LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): FLAGMAN (BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY))

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59Agreement
ELEC1249-011 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$64.59$42.92$107.51Agreement
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$42.82$105.96Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION, (SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION): GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$52.33$31.36$83.69Agreement
ELECTRICIAN LINE CONSTRUCTION SUBSTATION…
Full text

ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK…
Full text

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : GROUNDMAN TRUCK DRIVER BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77Agreement
ELEC1249-012 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$20.53$6.39$26.92Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY) A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.81$6.99$47.80Agreement
ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT…
Full text

ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$38.73$6.93$45.66Agreement
ELEV0062-003 · Elevator Constructors agreement, January 1, 2025
ELEVATOR MECHANIC BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$58.44$38.44$96.88Agreement
ENGI0158-005 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS:, BUILDING:: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY-DUTY GREASER, BOILERS AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, SELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DISEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELTCRETE POWER PACK (BELCRETE SYSTEM SEEDING AND MULCHING MACHINES PUMPS. (BROOME COUNTY) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$46.54$32.80$79.34Agreement
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS:, BUILDING: GROUP B BACKHOES (RUBBER TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDRO HAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORE AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBROTAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER. (BROOME COUNTY) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$48.85$32.80$81.65Agreement
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS:, BUILDING: GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE, FULL SWING), GRADALLS, POWER ROAD GRADER ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT, TRACTOR ROAD PAVER, BOOM TRUCKS 5 TONS AND UNDER, MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER DRILL-HYDRAULIC ROCK DRILL. (BROOME COUNTY) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$49.31$32.80$82.11Agreement
POWER EQUIPMENT OPERATORS…
Full text

POWER EQUIPMENT OPERATORS: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCKS OVER 5 TONS BROOME COUNTY (BUILDING) HAZARDOUS WORK- ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $3.00 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$51.71$32.80$84.51Agreement
ENGI0158-019 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS: GROUP 3$53.82$33.55$87.37Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$58.61$33.55$92.16Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$60.30$33.55$93.85Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$61.80$33.55$95.35Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$63.30$33.55$96.85Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$56.39$33.55$89.94Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$57.30$33.55$90.85Agreement
IRON0060-001 · Ironworkers agreement, July 1, 2025
IRONWORKER: STRUCTURAL…
Full text

IRONWORKER: STRUCTURAL, ORNAMENTAL, REINFORCING, PRE-CAST CONCRETE ERECTOR, MACHINERY MOVER & RIGGER, FENCE ERECTOR, STONE DERRICKMAN, WELDER, SHEETER, SHEETER BUCKER-UP (BROOME; CHENANGO (TWPS. OF AFTON, BAINBRIDGE, COVENTRY, GERMAN, GREENE, GILFORD, MCDONOUGH, NORWICH, OXFORD, PRESTON, AND SMITHVILLE):)

$37.16$30.68$67.84Agreement
IRON0440-003 · Ironworkers agreement, July 1, 2025
IRONWORKER: STRUCTURAL…
Full text

IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMEN, REINFORCEMENT, RIGGER, MACHINERY MOVER, FENCE ERECTOR, STONE DERRICKMAN (CHENANGO (TWPS. OF COLUMBUS, NEW BERLIN, NORTH NORWICH, PLYMOUTH, SHERBURNE AND SMYRNA):)

$35.50$31.39$66.89Agreement
LABO0017-003 · Laborers agreement, June 1, 2023
LABORER HEAVY AND HIGHWAY GROUP 4…
Full text

LABORER HEAVY AND HIGHWAY GROUP 4 ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$46.75$30.40$77.15Agreement
LABORER HEAVY AND HIGHWAY GROUP 3…
Full text

LABORER HEAVY AND HIGHWAY GROUP 3 INGERSOLL RAND HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$41.90$30.40$72.30Agreement
LABORER HEAVY AND HIGHWAY GROUP 2…
Full text

LABORER HEAVY AND HIGHWAY GROUP 2 GENERAL LABORERS, CHUCK TENDERS, HANDLING AND DISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSEMEN, CONCRETE MEN, VIBRATOR MEN, MASON TENDER, MORTAR MEN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTERS, PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPELINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER CORE DRILL, ROCK SPLITTER, HILTI GUN, AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR SPRAYER AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND ACOUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINING WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK, GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CATCH BASIN OR INLET INSTALLING, LASER MEN, GROUND MAN ON MILLING MACHINE TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$38.40$30.40$68.80Agreement
LABORER HEAVY AND HIGHWAY GROUP 1…
Full text

LABORER HEAVY AND HIGHWAY GROUP 1 FLAGPERSON, GATEPERSON TWPS. OF COLUMBUS, SHERBURNE AND NEW BERLIN IN CHENANGO COUNTY

FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS

$38.40$30.40$68.80Agreement
LABO0785-012 · Laborers agreement, July 1, 2024
LABORER LABORER HEAVY AND HIGHWAY: GROUP 5…
Full text

LABORER LABORER HEAVY AND HIGHWAY: GROUP 5 ASBESTOS AND HAZARDOUS WASTE REMOVAL (BROOME; CHENANGO (REMAINDER OF COUNTIES))

$38.76$25.60$64.36Agreement
LABORER LABORER HEAVY AND HIGHWAY: GROUP 4…
Full text

LABORER LABORER HEAVY AND HIGHWAY: GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (BROOME; CHENANGO (REMAINDER OF COUNTIES)).$ 36.16 25.60 LABORER LABORER HEAVY AND HIGHWAY: GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWDERMAN (BROOME; CHENANGO (REMAINDER OF COUNTIES))

$35.96$25.60$61.56Agreement
LABORER LABORER HEAVY AND HIGHWAY: GROUP 2…
Full text

LABORER LABORER HEAVY AND HIGHWAY: GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE, BIN CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1\2' AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL AND AIR TOOL OPERATORS, WRECKING LABORERS (BROOME; CHENANGO (REMAINDER OF COUNTIES))

$35.76$25.60$61.36Agreement
LABORER LABORER HEAVY AND HIGHWAY: GROUP 1…
Full text

LABORER LABORER HEAVY AND HIGHWAY: GROUP 1 LABORERS, FLAGGERS, OUTBOARD AND HAND BOATS (BROOME; CHENANGO (REMAINDER OF COUNTIES))

$35.56$25.60$61.16Agreement
LABO0785-013 · Laborers agreement, July 1, 2024
LABORER LABORERS BUILDING: GROUP 3…
Full text

LABORER LABORERS BUILDING: GROUP 3 ASBESTOS AND HAZARDOUS WASTE REMOVAL BROOME (REMAINDER OF COUNTY)

$28.50$22.46$50.96Agreement
LABORER LABORERS BUILDING: GROUP 2…
Full text

LABORER LABORERS BUILDING: GROUP 2 MASONRY FORKLIFTS, BOB CATS, ROCK DRILLING EQUIPMENT AND BLASTERS BROOME (REMAINDER OF COUNTY)

$28.50$22.46$50.96Agreement
LABORER LABORERS BUILDING: GROUP 1 COMMON LABORERS BROOME (REMAINDER OF COUNTY)$26.50$22.46$48.96Agreement
PAIN0004-056 · Painters and Allied Trades agreement, May 1, 2024
PAINTERS: (SWING SCAFFOLD…
Full text

PAINTERS: (SWING SCAFFOLD, BOATSWAIN CHAIR, SPRAY, SANDBLASTING, STEAM CLEANING, ACID AND HIGH PRESSURE WATER, PAPERHANGERS, VINYL HANGERS, POWER GRINDERS W/RESPIRATOR)

$28.10$23.83$51.93Agreement
PAINTERS: (STRUCTURAL STEEL…
Full text

PAINTERS: (STRUCTURAL STEEL (BUILDINGS) SPRAY WORK).$ 28.10 23.83 PAINTERS: (SPRAY WORK/STEEPLE JACK (OVER 100 FT))

$28.50$23.83$52.33Agreement
PAINTERS: (SPRAY EPOXY)$29.00$23.83$52.83Agreement
PAINTERS: (PAINTERS AND TAPERS)$28.88$23.83$52.71Agreement
PAINTERS: (EPOXY-BRUSH & ROLLER)$28.60$23.83$52.43Agreement
PAIN0677-003 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER$30.00$31.95$61.95Agreement
PLUM0112-010 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER/PIPEFITTER…
Full text

PLUMBER/PIPEFITTER: SOUTHERN ZONE (BROOME COUNTY (BUILDING, HEAVY, AND HIGHWAY) TOWNSHIPS OF LISLE, TRIANGLE, BARKER, NANTICOKE, NEWARK VALLEY, OWEGO, MAINE, UNION, VESTAL, KIRKWOOD, CONKLIN, CHENANGO, FENTON, COLESVILLE, WINDSOR AND STANFORD CHENANGO COUNTY (HEAVY AND HIGHWAY) TOWNSHIPS OF LINKLAEN, OTSELIC, SMYRNA, SHERBURNE, COLUMBUS, PITCHER, PHARSALIA, PLYMOUTH, NORTH NORWICH, NEW BERLIN, GERMAN, MCDONOUGH, PRESTON, NORWICH, SMITHVILLE, OXFORD, GUILFORD)

$44.91$33.31$78.22Agreement
ROOF0203-004 · Roofers agreement, June 1, 2023
ROOFER ( BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)$30.50$19.84$50.34Agreement
SFNY0669-005 · SFNY, January 1, 2026
SPRINKLER FITTER BROOME (BUILDING, HEAVY, AND HIGHWAY) AND CHENANGO (HEAVY AND HIGHWAY)$45.06$30.71$75.77SFNY
SHEE0058-002 · Sheet Metal Workers agreement, May 1, 2025
SHEETMETAL WORKER (HVAC DUCT INSTALLATION ONLY)…
Full text

SHEETMETAL WORKER (HVAC DUCT INSTALLATION ONLY): PROJECTS WITH SHEETMETAL WORK CONTRACTS TOTALLING $10 MILLION OR LESS (CHENANGO COUNTY (HEAVY AND HIGHWAY):)

$36.29$23.31$59.60Agreement
SHEET METAL WORKER…
Full text

SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION: PROJECTS OVER $10 MILLION (CHENANGO COUNTY (HEAVY AND HIGHWAY):)

$46.29$23.31$69.60Agreement
SHEE0112-003 · Sheet Metal Workers agreement, May 1, 2023
SHEET METAL WORKER (BROOME COUNTY)$35.94$20.89$56.83Agreement
TEAM0317-009 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK-DUMP; TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF LOADED

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS

$37.47$29.29$66.76Agreement
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF LOADED; STRADDLE (ROSS) CARRIER; SELF CONTAINED CONCRETE UNIT

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS

$37.47$29.29$66.76Agreement
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTORS TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS

$37.27$29.29$66.56Agreement
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS; BATCH TRUCKS MECHANICS

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS

$37.27$29.29$66.56Agreement
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICKUPS; PANEL TRUCKS; FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS); SINGLE-AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMEN

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAYS

$37.27$29.29$66.56Agreement

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260004?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator