CertifiedHours

Prevailing wage rates · New York · Wage determination

Prevailing wage rates: Albany, Columbia, Fulton and 7 more counties, New York

Building, Heavy, Highway construction · NY20260002 modification 2, published May 18, 2026

The short answer

This sheet sets 120 classifications for building, heavy, highway work in Albany, Columbia, Fulton and 7 more counties, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $26.92 an hour (electrician line construction telephone) to $115.10 (elevator mechanic (columbia county). Your contract may lock an earlier modification.

Scope

Excludes Building Construction in COLUMBIA, FULTON, GREENE & MONTGOMERY Counties

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
ASBE0040-002 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS)

$41.74$27.58$69.32Agreement
ASBESTOS/INSULATOR WORKER…
Full text

ASBESTOS/INSULATOR WORKER (SCOPE OF WORK: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE, COVERINGS, COATING AND FINISHING TO ALL TYPES OF MECHANICAL SYSTEMS.)

$41.74$27.58$69.32Agreement
BOIL0197-002 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.34$27.66$71.00Agreement
BRNY0002-019 · Bricklayers agreement, December 3, 2025
BRICKLAYER (BRICKLAYERS…
Full text

BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS)

$41.79$22.33$64.12Agreement
CARP0279-006 · Carpenters agreement, July 1, 2025
CARPENTERS: CARPENTERS…
Full text

CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND GREENE COUNTIES))

$44.72$31.23$75.95Agreement
CARP0291-005 · Carpenters agreement, July 1, 2025
CARPENTERS: (WASHINGTON COUNTY BUILDING)$36.38$24.65$61.03Agreement
CARPENTERS: (SARATOGA COUNTY BUILDING)$36.38$24.65$61.03Agreement
CARP0291-008 · Carpenters agreement, July 1, 2025
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION…
Full text

CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES)

$44.28$24.50$68.78Agreement
CARPENTERS & SOFT FLOOR LAYERS…
Full text

CARPENTERS & SOFT FLOOR LAYERS: BUILDING CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES)

$36.38$24.65$61.03Agreement
CARP0291-010 · Carpenters agreement, July 1, 2024
CARPENTERS: DIVERS$69.28$24.50$93.78Agreement
CARPENTERS: (DIVERS (DRY DAY))$45.28$24.50$69.78Agreement
CARPENTERS: (CARPENTERS)$44.28$24.50$68.78Agreement
ELEC0236-001 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN (ALBANY…
Full text

ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON)

$48.00$32.09$80.09Agreement
ELEC0363-004 · Electrical Workers (IBEW) agreement, April 1, 2024
ELECTRICIAN (GREENE COUNTY (PORTION OF))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$46.50$40.57$87.07Agreement
ELEC1249-003 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95Agreement
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59Agreement
ELEC1249-004 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$55.40$31.78$87.18Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$35.34$30.12$65.46Agreement
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$64.59$42.92$107.51Agreement
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96Agreement
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES…
Full text

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK…
Full text

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77Agreement
ELEC1249-007 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: MECHANIC (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$43.35$30.73$74.08Agreement
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$54.19$35.69$89.88Agreement
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY. (COLUMBIA COUNTY)

$43.53$30.75$74.28Agreement
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40Agreement
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN DIGGING MACHINE OPERATOR (COLUMBIA COUNTY)

$48.77$31.31$80.08Agreement
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$32.51$29.93$62.44Agreement
ELEC1249-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$38.73$6.93$45.66Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$20.53$6.39$26.92Agreement
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.81$6.99$47.80Agreement
ELEV0035-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR CONSTRUCTOR…
Full text

ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ, CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT AND GREENPORT); FULTON; GREENE (TOWNS OF DURHAM, GREENVILLE, NEW BALTIMORE, COXCSACKIE AND ATHENS); MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND WASHINGTON COUNTIES).

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$57.73$38.44$96.17Agreement
ELEV0138-004 · Elevator Constructors agreement, January 1, 2026
ELEVATOR MECHANIC (COLUMBIA COUNTY…
Full text

ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS OF HUNTER AND CATSKILL))

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$76.12$38.98$115.10Agreement
ENGI0158-008 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$51.01$33.20$84.21Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) EXCLUDING MONTGOMERY COUNTY GROUP A(1): CRANE PREMIUMS: 1 OVER 150'- $1.00 2 OVER 200'- $2.00 HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$55.42$33.20$88.62Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$53.91$33.20$87.11Agreement
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER), MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER, DRILL-HYDRAULIC ROCK DRILL. (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$54.93$33.20$88.13Agreement
ENGI0158-026 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS: GROUP 3$53.82$33.55$87.37Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$58.91$33.55$92.46Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$60.30$33.55$93.85Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$61.80$33.55$95.35Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$63.30$33.55$96.85Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$56.39$33.55$89.94Agreement
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$57.30$33.55$90.85Agreement
IRON0012-011 · Ironworkers agreement, July 1, 2024
IRONWORKERS:: STRUCTURAL…
Full text

IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)

$38.50$25.48$63.98Agreement
IRONWORKERS:: SHEETER…
Full text

IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)

$38.75$25.48$64.23Agreement
IRONWORKERS:: SHEETER…
Full text

IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)

$38.75$25.48$64.23Agreement
IRON0440-007 · Ironworkers agreement, July 1, 2025
IRONWORKER: STRUCTURAL…
Full text

IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS. OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN, PALATINE, ST. JOHNSVILLE):)

$35.50$31.39$66.89Agreement
LABO0017-001 · Laborers agreement, July 1, 2019
LABORER GROUP 4…
Full text

LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$48.00$27.15$75.15Agreement
LABORER GROUP 3…
Full text

LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons

$43.15$27.15$70.30Agreement
LABORER GROUP 2…
Full text

LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER; PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPE LINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND CAUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINING WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CATCH BASIN OR INLET INSTALLING, LASER MEN. GROUND MAN ON MILLING MACHINE (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$38.90$27.15$66.05Agreement
LABORER GROUP 1…
Full text

LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$34.15$27.15$61.30Agreement
LABORER (ASBESTOS, LEAD…
Full text

LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED (COLUMBIA COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND THE CITY OF HUDSON)

$43.15$27.15$70.30Agreement
LABORER (ASBESTOS, LEAD…
Full text

LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED (COLUMBIA COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND THE CITY OF HUDSON) HEAVY & HIGHWAY

$38.90$27.15$66.05Agreement
LABO0035-001 · Laborers agreement, July 1, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$22.90$20.64$43.54Agreement
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)).

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$22.65$20.64$43.29Agreement
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$22.50$20.64$43.14Agreement
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.

$24.00$20.64$44.64Agreement
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$23.00$20.64$43.64Agreement
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$24.00$20.64$44.64Agreement
LABORERS (HEAVY & HIGHWAY) GROUP 4…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.65$23.74$52.39Agreement
LABORERS (HEAVY & HIGHWAY) GROUP 3…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.45$23.74$52.19Agreement
LABORERS (HEAVY & HIGHWAY) GROUP 2…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORER'S TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.25$23.74$51.99Agreement
LABORERS (HEAVY & HIGHWAY) GROUP 1…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.05$23.74$51.79Agreement
LABO0157-001 · Laborers agreement, July 1, 2023
LABORER HEAVY & HIGHWAY: GROUP 5…
Full text

LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$41.69$26.75$68.44Agreement
LABORER HEAVY & HIGHWAY: GROUP 4…
Full text

LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$39.79$26.75$66.54Agreement
LABORER HEAVY & HIGHWAY: GROUP 3…
Full text

LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$39.59$26.75$66.34Agreement
LABORER HEAVY & HIGHWAY: GROUP 2…
Full text

LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"") AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING, AND SAND BLASTING), LABORERS ON CHAIN FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERS FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES.

$39.39$26.75$66.14Agreement
LABORER HEAVY & HIGHWAY: GROUP 1…
Full text

LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$39.19$26.75$65.94Agreement
LABO0190-001 · Laborers agreement, July 1, 2024
LABORERS: BUILDING: GROUP 2…
Full text

LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR LESS EXCLUDING DEMOLITION WORK, (COMPLETE RAZING OF STRUCTURES) WILL RECEIVE 75% OF BASIC WAGE SCALE WITH FULL FRINGES WILL APPLY ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON, SARATOGA)

$37.51$26.68$64.19Agreement
LABORERS: BUILDING: GROUP 1…
Full text

LABORERS: BUILDING: GROUP 1 COMMON LABORERS ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON, SARATOGA)

$36.16$26.68$62.84Agreement
LABO0190-002 · Laborers agreement, July 1, 2024
LABORERS: HEAVY & HIGHWAY: GROUP 5…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$44.19$27.65$71.84Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 4…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$42.29$27.65$69.94Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 3…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$42.09$27.65$69.74Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 2…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATED BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPERS, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING, AND SAND BLASTING) LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AIR TOOL OPERATORS, AND WRECKING ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.89$27.65$69.54Agreement
LABORERS: HEAVY & HIGHWAY: GROUP 1…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.69$27.65$69.34Agreement
LABO0235-006 · Laborers agreement, May 1, 2023
LABORERS: HEAVY & HIGHWAY GROUP 3…
Full text

LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; ASPHALT SCREEDMAN; DRILLERS (ALL); LASER BEAM OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$43.90$27.80$71.70Agreement
LABORERS: HEAVY & HIGHWAY GROUP 2…
Full text

LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWDERMAN; HIGHSCALERS POWER BUGGY OPERATOR; STEEL ROD CARRIER; VIBRATORY OPERATOR; OTHER MACHINE OPERATOR; WRECKING; VIBRATOR OPERATOR-COMPACTOR; GUNITE AND SANDBLASTING; WATER PUMP 2"" OR UNDER; NIPPER; CHUCKER; ASPHALT WORKERS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$42.80$27.80$70.60Agreement
LABORERS: HEAVY & HIGHWAY GROUP 1…
Full text

LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL CUSTODIAL WORK; TRAFFIC DIRECTORS; TEMPORARY HEAT OR LIGHT TENDERS; TOOL ROOMS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$36.45$27.80$64.25Agreement
PAIN0009-013 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER$37.25$33.54$70.79Agreement
PAIN0155-002 · Painters and Allied Trades agreement, May 1, 2021
PAINTERS:: SPRAY RATE (COLUMBIA AND GREENE COUNTIES)$36.94$24.66$61.60Agreement
PAINTERS: PAINTER/PAPERHANGER (COLUMBIA AND GREENE COUNTIES)$35.94$24.66$60.60Agreement
PAINTERS: LEAD ABATEMENT WORK (COLUMBIA AND GREENE COUNTIES)$35.94$24.66$60.60Agreement
PAINTERS: DRYWALL FINISHER (COLUMBIA AND GREENE COUNTIES)$35.94$24.66$60.60Agreement
PAIN0201-001 · Painters and Allied Trades agreement, May 1, 2025
PAINTERS: ZONE 2 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #2 ALL OF WASHINGTON COUNTY$33.50$21.69$55.19Agreement
PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS…
Full text

PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #2 ALL OF WASHINGTON COUNTY

$34.50$21.69$56.19Agreement
PAINTERS: ZONE 1 (PAINTERS…
Full text

PAINTERS: ZONE 1 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

$33.50$21.69$55.19Agreement
PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS…
Full text

PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

$34.50$21.69$56.19Agreement
PAIN0806-002 · Painters and Allied Trades agreement, October 1, 2024
PAINTERS: STRUCTURAL STEEL AND BRIDGE…
Full text

PAINTERS: STRUCTURAL STEEL AND BRIDGE (ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON)

$56.25$55.14$111.39Agreement
PLUM0007-001 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER/PIPEFITTER…
Full text

PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; SARATOGA (TOWNS OF CHARLTON, CLIFTON PARK, GALWAY, HALFMOON, MILTON, STILLWATER AND WATERFORD))

$55.26$29.12$84.38Agreement
PLUM0112-019 · Plumbers and Pipefitters agreement, May 1, 2023
PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF CANAJOHARIE AND MINDEN)$31.40$31.70$63.10Agreement
PLUM0773-002 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER/PIPEFITTER (SARATOGA (REMAINDER OF COUNTY); WASHINGTON COUNTY:)$44.88$33.60$78.48Agreement
ROOF0203-003 · Roofers agreement, June 1, 2023
ROOFER (SCHOHARIE COUNTY:)$30.50$19.84$50.34Agreement
ROOF0241-001 · Roofers agreement, July 1, 2025
ROOFER$38.05$24.27$62.32Agreement
SFNY0669-001 · SFNY, January 1, 2026
SPRINKLER FITTER$47.85$28.94$76.79SFNY
SHEE0083-001 · Sheet Metal Workers agreement, June 1, 2019
SHEET METAL WORKER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. IF ANY OF THESE HOLIDAYS FALL ON A SATURDAY OR SUNDAY, EITHER THE PRECEDING FRIDAY OR FOLLOWING MONDAY WILL BE OBSERVED AS THE HOLIDAY

$33.73$33.04$66.77Agreement
TEAM0294-003 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.69$31.42$73.11Agreement
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.52$31.42$72.94Agreement
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC, FUEL TRUCK

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.38$31.42$72.80Agreement
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS, BATCH TRUCKS, MECHANICS

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.29$31.42$72.71Agreement
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE AXLE DUMP TRUCKS, DUMPSTERS, RECEIVERS, GREASERS, TRUCK TIREMAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.23$31.42$72.65Agreement
TEAM0294-004 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2…
Full text

TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2 EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY TRAILERS (EXCLUDING MONTGOMERY COUNTY)

FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 YEARS

$33.95$30.79$64.74Agreement
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1…
Full text

TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1 STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS ON SITE (INCLUDING NOZZLE) (EXCLUDING MONTGOMERY COUNTY)

FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 YEARS

$33.65$30.79$64.44Agreement

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260002?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator