Prevailing wage rates: Albany, Columbia, Fulton and 7 more counties, New York

Building, Heavy, Highway construction · NY20260002 modification 2, published May 18, 2026

The short answer

This sheet sets 120 classifications for building, heavy, highway work in Albany, Columbia, Fulton and 7 more counties, New York. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $43.14 an hour (laborers building construction) to $115.10 (elevator mechanic). Your contract may lock an earlier modification.

Scope

Excludes Building Construction in COLUMBIA, FULTON, GREENE & MONTGOMERY Counties

What changed this year

First published January 2, 2026, this sheet is now on modification 2, and its rates have changed in 2 modifications. Of the 77 rates we can follow line by line from the first publication to today, 1 is higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

May 18, 2026 · modification 2

Classification names reworded; 27 fringe formulas changed among the 77 lines we could match

  • Electrician: 6 fringe formulas changed
  • Electrician line construction: 5 fringe formulas changed
  • Laborers building construction: 5 fringe formulas changed
  • Truck drivers: 4 fringe formulas changed
  • Laborer: 2 fringe formulas changed
  • Electrician line construction telephone: 1 fringe formula changed
  • Elevator constructor: 1 fringe formula changed
  • Elevator mechanic: 1 fringe formula changed
  • and 2 more trades

SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.

Every line that changed (27)
ClassificationWasNowChange
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$42.29 + 7%+27.70$42.29 + $30.66changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$52.86 + 7%+31.90$52.86 + $35.60changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$47.57 + 7%+27.70$47.57 + $31.03changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$42.29 + 7%+27.70$42.29 + $30.66changed
ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER O…$31.72 + 7%+27.65$31.72 + $29.87changed
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSA…$43.35 + 7%+27.70$43.35 + $30.73changed
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSA…$54.19 + 7%+31.90$54.19 + $35.69changed
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSA…$43.53 + 7%+27.70$43.53 + $30.75changed
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSA…$49.25 + 7%+27.70$49.25 + $31.15changed
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSA…$48.77 + 7%+27.90$48.77 + $31.31changed
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSA…$32.51 + 7%+27.65$32.51 + $29.93changed
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLI…$40.81 + 3%+5.77$40.81 + $6.99changed
ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF CLAVERACK, HILLSDALE, GHENT, STOCKPORT,…$57.73 + 38.435+a+b$57.73 + $38.44changed
ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE, GALLATIN, GER…$76.12 + 38.985+a+b$76.12 + $38.98changed
LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE C…$48.00 + 27.15+a$48.00 + $27.15changed
LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4""""…$43.15 + 27.15+a$43.15 + $27.15changed
LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA, O…$22.90 + 20.64+a$22.90 + $20.64changed
LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEH…$22.65 + 20.64+a$22.65 + $20.64changed
LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AN…$22.50 + 20.64+a$22.50 + $20.64changed
LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE)…$23.00 + 20.64+a$23.00 + $20.64changed
LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON (TWPS OF CAROGA, EPHRATA, OPPEN…$24.00 + 20.64+a$24.00 + $20.64changed
LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; PLACING AND MAINTENANCE OF ALL FLARES, CON…$36.45 + 27.80+a$36.45 + $27.80changed
SHEET METAL WORKER$33.73 + 33.04+a$33.73 + $33.04changed
TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIP…$41.69 + 31.42+a$41.69 + $31.42changed
TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYP…$41.52 + 31.42+a$41.52 + $31.42changed
TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBU…$41.38 + 31.42+a$41.38 + $31.42changed
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS, BATCH TRUCKS, MECHANICS$41.29 + 31.42+a$41.29 + $31.42changed

Earlier modifications

  • January 30, 2026 · modification 11 rate raised, 1 fringe formula changed
    • Elevator mechanic: 1 fringe formula changed
    • Sprinkler fitter: 1 rate raised by $2.32 an hour
    Every line that changed (2)
    ClassificationWasNowChange
    ELEVATOR MECHANIC$73.07 + 38.435+a+b$76.12 + 38.985+a+bchanged
    SPRINKLER FITTER$45.06 + $29.41$47.85 + $28.94+$2.32 (+3.1%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 2 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jan 2Source
ASBE0040-002 · Asbestos Workers and Heat & Frost Insulators agreement, May 1, 2025
HAZARDOUS MATERIAL HANDLER…
Full text

HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANCIAL SYSTEMS)

$41.74$27.58$69.32no changeAgreement, 2025
ASBESTOS/INSULATOR WORKER…
Full text

ASBESTOS/INSULATOR WORKER (SCOPE OF WORK: INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE, COVERINGS, COATING AND FINISHING TO ALL TYPES OF MECHANICAL SYSTEMS.)

$41.74$27.58$69.32no changeAgreement, 2025
BOIL0197-002 · Boilermakers agreement, January 1, 2025
BOILERMAKER$43.34$27.66$71.00no changeAgreement, 2025
BRNY0002-019 · Bricklayers agreement, December 3, 2025
BRICKLAYER (BRICKLAYERS…
Full text

BRICKLAYER (BRICKLAYERS, STONE MASONS, CEMENT MASONS, PLASTERERS, POINTERS, CAULKERS & CLEANERS)

$41.79$22.33$64.12no changeAgreement, 2025
CARP0279-006 · Carpenters agreement, July 1, 2025
CARPENTERS: CARPENTERS…
Full text

CARPENTERS: CARPENTERS, MILLWRIGHTS, PILE DRIVERS (HEAVY AND HIGHWAY CONSTRUCTION (COLUMBIA AND GREENE COUNTIES))

$44.72$31.23$75.95no changeAgreement, 2025
CARP0291-005 · Carpenters agreement, July 1, 2025
CARPENTERS: (WASHINGTON COUNTY BUILDING)$36.38$24.65$61.03no changeAgreement, 2025
CARPENTERS: (SARATOGA COUNTY BUILDING)$36.38$24.65$61.03no changeAgreement, 2025
CARP0291-008 · Carpenters agreement, July 1, 2025
CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION…
Full text

CARPENTERS: HEAVY & HIGHWAY CONSTRUCTION (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES)

$44.28$24.50$68.78no changeAgreement, 2025
CARPENTERS & SOFT FLOOR LAYERS…
Full text

CARPENTERS & SOFT FLOOR LAYERS: BUILDING CONSTRUCTION (EXCLUDING MONTGOMERY COUNTY) (ALBANY, FULTON, MONTGOMERY, RENSSELAER, SCHENECTADY AND SCHOHARIE COUNTIES)

$36.38$24.65$61.03no changeAgreement, 2025
CARP0291-010 · Carpenters agreement, July 1, 2024
CARPENTERS: DIVERS$69.28$24.50$93.78no changeAgreement, 2024
CARPENTERS: (DIVERS (DRY DAY))$45.28$24.50$69.78no changeAgreement, 2024
CARPENTERS: (CARPENTERS)$44.28$24.50$68.78no changeAgreement, 2024
ELEC0236-001 · Electrical Workers (IBEW) agreement, June 1, 2024
ELECTRICIAN (ALBANY…
Full text

ELECTRICIAN (ALBANY; COLUMBIA; FULTON; GREENE (THAT PORTION NORTH OF A LINE FOLLOWING THE SOUTH LIMITS OF THE CITY OF CATSKILL); MONTGOMERY; RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; WASHINGTON)

$48.00$32.09$80.09no changeAgreement, 2024
ELEC0363-004 · Electrical Workers (IBEW) agreement, April 1, 2024
ELECTRICIAN (GREENE COUNTY (PORTION OF))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$46.50$40.57$87.07—Agreement, 2024
ELEC1249-003 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$52.86$35.60$88.46changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$47.57$31.03$78.60changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER)

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$42.29$30.66$72.95changedAgreement, 2025
ELECTRICIAN LINE CONSTRUCTION…
Full text

ELECTRICIAN LINE CONSTRUCTION: LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN

FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY

$31.72$29.87$61.59changedAgreement, 2025
ELEC1249-004 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation:)$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins

$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation:)$61.56$36.21$97.77—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation:)$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$55.40$31.78$87.18—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation:)$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :)

$35.34$30.12$65.46—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION…
Full text

ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation)

$64.59$42.92$107.51—Agreement, 2025
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation:)$63.14$33.82$96.96—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES…
Full text

ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARY INSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND MAN TRUCK DRIVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK…
Full text

ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$61.56$36.21$97.77—Agreement, 2025
ELEC1249-007 · Electrical Workers (IBEW) agreement, May 5, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: MECHANIC (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$43.35$30.73$74.08changedAgreement, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$54.19$35.69$89.88changedAgreement, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY. (COLUMBIA COUNTY)

$43.53$30.75$74.28changedAgreement, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$49.25$31.15$80.40changedAgreement, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN DIGGING MACHINE OPERATOR (COLUMBIA COUNTY)

$48.77$31.31$80.08changedAgreement, 2025
ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE…
Full text

ELECTRICIAN, LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN (COLUMBIA COUNTY).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$32.51$29.93$62.44changedAgreement, 2025
ELEC1249-008 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$38.73$6.93$45.66—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$20.53$6.39$26.92—Agreement, 2025
ELECTRICIAN LINE CONSTRUCTION TELEPHONE…
Full text

ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY

$40.81$6.99$47.80changedAgreement, 2025
ELEV0035-001 · Elevator Constructors agreement, January 1, 2025
ELEVATOR CONSTRUCTOR…
Full text

ELEVATOR CONSTRUCTOR (ALBANY; COLUMBIA (TOWNS OF CLAVERACK, HILLSDALE, GHENT, STOCKPORT, AUSTERLITZ, CANAAN, NEW LEBANON, CHATHAM, KINDERHOOK, STYVESANT AND GREENPORT); FULTON; GREENE (TOWNS OF DURHAM, GREENVILLE, NEW BALTIMORE, COXCSACKIE AND ATHENS); MONTGOMERY, RENSSELAER, SARATOGA, SCHENECTADY, SCHOHARIE AND WASHINGTON COUNTIES).

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$57.73$38.44$96.17changedAgreement, 2025
ELEV0138-004 · Elevator Constructors agreement, January 1, 2026
ELEVATOR MECHANIC (COLUMBIA COUNTY…
Full text

ELEVATOR MECHANIC (COLUMBIA COUNTY (THE TOWNS OF ANCRAM, CLERMONT, COPAKE, GALLATIN, GERMANTOWN, LIVINGSTON, AND TAGHKANIC); GREEN COUNTY (THE TOWNS OF HUNTER AND CATSKILL))

FOOTNOTE: A.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY

$76.12$38.98$115.10changedAgreement, 2026
ENGI0158-008 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: GROUP C FORK LIFT, HIGH LIFT, LULL, OILER, FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING MACHINES, PUMPS (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$51.01$33.20$84.21no changeAgreement, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR: GROUP A(1) CRANE, HYDRAULIC CRANES, TOWER CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 TONS) EXCLUDING MONTGOMERY COUNTY GROUP A(1): CRANE PREMIUMS: 1 OVER 150'- $1.00 2 OVER 200'- $2.00 HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$55.42$33.20$88.62no changeAgreement, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR (BUILDING): GROUP B BACKHOE, (RUBBER-TIRED BACKHOE/LOADER COMBINATION), BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER HOISTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER, MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$53.91$33.20$87.11no changeAgreement, 2025
POWER EQUIPMENT OPERATOR…
Full text

POWER EQUIPMENT OPERATOR (BUILDING): GROUP A SHOVEL, ALL EXCAVATORS (INCLUDING RUBBER TIRE FULL SWING), GRADALLS, POWER ROAD GRADER, ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND UNDER), MAINTENANCE ENGINEER, SELF CONTAINED CRAWLER, DRILL-HYDRAULIC ROCK DRILL. (EXCLUDING MONTGOMERY COUNTY) HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR RATE.

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY

$54.93$33.20$88.13no changeAgreement, 2025
ENGI0158-026 · Operating Engineers agreement, July 1, 2025
POWER EQUIPMENT OPERATORS: GROUP 3$53.82$33.55$87.37no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 7 MASTER MECHANIC

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$58.91$33.55$92.46no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 6 CRANES 49 TONS AND BELOW

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$60.30$33.55$93.85no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 5 CRANES 50 TONS AND OVER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$61.80$33.55$95.35no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 4 TOWER CRANES

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$63.30$33.55$96.85no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 2 ASPHALT PAVER, BACKHOE (TRACTOR MOUNTED, RUBBER TIRED), BITUMINOUS RECYCLER MACHINE, BITUMINOUS SPREADER AND MIXER, BLACKTOP PLANT (NONAUTOMATED), BLAST OR ROTARY DRILL (TRUCK OR TRACTOR MOUNTED), BORING MACHINE, CAGE HOIST, CENTRAL MIX PLANT (NONAUTOMATED) AND ALL CONCRETE BATCHING PLANTS, CHERRY PICKER (5 TONS CAPACITY AND UNDER), CONCRETE PAVER (OVER 16S), CRAWLER DRILL, SELF-CONTAINED, CRUSHER, DIESEL POWER UNIT, DRILL RIGS, TRACTOR MOUNTED, FRONT END LOADER (UNDER 4 CU. YD.), GREASEMAN/LUBRICATION ENGINEER, HIPRESSURE BOILER (15 LBS. AND OVER), HOIST (ONE DRUM), HYDRO-AXE, KOLMAN PLANT LOADER AND SIMILAR TYPE LOADERS, L.C.M. WORK BOAT OPERATOR, LOCOMOTIVE MIXER (FOR STABILIZED BASE SELFPROPELLED), MONORAIL MACHINE, PLANT ENGINEER, PROFILER (105 H.P. AND UNDER), GRINDER, POST HOLE DIGGER AND POST DRIVER, POWER BROOM (TOWED), POWER HEATERMAN, POWER SWEEPER, REVINIUS WIDENER, ROLLER (GRADE AND FILL), SCARIFIER, RIDE-ON, SHELL WINDER, SKID STEER LOADER (BOBCAT OR SIMILAR), SPAN-SAW, RIDE-ON, STEAM CLEANER, PUG MILL, PUMP CRETE READY MIX CONCRETE PLANT REFRIGERATION EQUIPMENT (FOR SOIL STABILIZATION)ROAD WIDENER, ROLLER (ALL ABOVE SUBGRADE), SEA MULE, SELF-CONTAINED RIDE-ON ROCK DRILL, EXCLUDING AIR-TRACK TYPE DRILL, SKIDDER, TRACTOR WITH DOZER AND/OR PUSHER, TRENCHER. TUGGER HOIST, VERMEER SAW (RIDE ON, ANY SIZE OR TYPE), WINCH, WINCH CAT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$56.39$33.55$89.94no changeAgreement, 2025
POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1…
Full text

POWER EQUIPMENT OPERATORS (HEAVY & HIGHWAY): GROUP 1 ASPHALT CURB MACHINE, SELF PROPELLED, SLIPFORM, AUTOMATED CONCRETE SPREADER (CMI TYPE), AUTOMATIC FINE GRADER, BACKHOE (EXCEPT TRACTOR MOUNTED, RUBBER TIRED), BACKHOE EXCAVATOR FULL SWING (CAT 212 OR SIMILAR TYPE), BACK FILLING MACHINE, BELT PLACER (CMI TYPE), BLACKTOP PLANT (AUTOMATED), BOOM TRUCK , CABLEWAY, CAISSON AUGER, CENTRAL MIX CONCRETE PLANT (AUTOMATED), CONCRETE CURB MACHINE, SELF PROPELLED, SLIPFORM, CONCRETE PUMP, CRANE, CHERRY PICKER, DERRICKS (STEEL ERECTION), DRAGLINE, OVERHEAD CRANE (GANTRY OR STRADDLE TYPE), PILE DRIVER, TRUCK CRANE, DIRECTIONAL DRILLING MACHINE, DREDGE, DUAL DRUM PAVER, EXCAVATOR (ALL PURPOSE HYDRAULICALLY OPERATED) (GRADALL OR SIMILAR), FRONT END LOADER ( 4 CU. YD. AND OVER), HEAD TOWER (SAUERMAN OR EQUAL), HOIST (TWO OR THREE DRUM), HOLLAND LOADER, MAINTENANCE ENGINEER, MINE HOIST, MUCKING MACHINE OR MOLE PAVEMENT BREAKER(SP) WERTGEN; PB-4 AND SIMILAR TYPE, POWER GRADER, PROFILER (OVER 105 H.P.) QUAD 9, QUARRY MASTER (OR EQUIVALENT), SCRAPER, FIREMAN, FORM TAMPER, GROUT PUMP, GUNITE MACHINE, HAMMERS (HYDRAULIC SELF-PROPELLED), HYDRA-SPIKER, RIDE-ON, HYDRAULIC PUMP (JACKING SYSTEM), HYDRO-BLASTER (WATER), MULCHING MACHINE, OILER, PARAPET CONCRETE OR PAVEMENT, SHOVEL, SIDE BOOM, SLIP FORM PAVER, TRACTOR DRAWN, BELTTYPE LOADER, TRUCK OR TRAILER MOUNTED LOG , CHIPPER (SELF FEEDER), TUG OPERATOR (MANNED RENTED EQUIPMENT EXCLUDED), TUNNEL SHOVEL

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$57.30$33.55$90.85no changeAgreement, 2025
IRON0012-011 · Ironworkers agreement, July 1, 2024
IRONWORKERS:: STRUCTURAL…
Full text

IRONWORKERS:: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)

$38.50$25.48$63.98no changeAgreement, 2024
IRONWORKERS:: SHEETER…
Full text

IRONWORKERS:: SHEETER, BUCKER-UP (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)

$38.75$25.48$64.23—Agreement, 2024
IRONWORKERS:: SHEETER…
Full text

IRONWORKERS:: SHEETER (ALBANY; COLUMBIA; FULTON (ALBIN, BLEECKER, BROAD, JOHNSTOWN, MAYFIELD, NORTHAMPTON AND PERTH); GREENE, MONTGOMERY (AMSTERDAM, CHARLESTON, FLORIDA, GLEN, MOHAWK AND ROOT); RENSSELAER, SARATOGA; SCHENECTADY; SCHOHARIE; AND WASHINGTON COUNTIES:)

$38.75$25.48$64.23—Agreement, 2024
IRON0440-007 · Ironworkers agreement, July 1, 2025
IRONWORKER: STRUCTURAL…
Full text

IRONWORKER: STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCEMENT, AND STONE DERRICKMAN (FULTON (TWPS. OF CAROGA, EPHRATAH, OPPENHEIM, STRATFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN, PALATINE, ST. JOHNSVILLE):)

$35.50$31.39$66.89no changeAgreement, 2025
LABO0017-001 · Laborers agreement, July 1, 2019
LABORER GROUP 4…
Full text

LABORER GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$48.00$27.15$75.15changedAgreement, 2019
LABORER GROUP 3…
Full text

LABORER GROUP 3: Ingersoll Rand heavy duty crawler-master HCMZ, any drill using a 4"""" or larger bit, asbestos, toxic, bio-remediation, phyto-remediation, lead or hazardous material abatement when protective clothing and equipment is required, all working foremen including grade, pipe concrete, clearing, blacktop, drill, paving and blaster etc., Hydraulic drill or similar, forklift for masonry only, Blaster and asphalt screedman GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, President's Day, Memorial Day, Independence Day, Lincoln's Birthday, Labor Day, Election Day, Veterans Day, Thanksgiving Day, Christmas Day, provided the employee is an employee of the company prior to the scheduled holiday and reports to work the first day following the holiday unless prevented from doing so for legitimate reasons

$43.15$27.15$70.30changedAgreement, 2019
LABORER GROUP 2…
Full text

LABORER GROUP 2: GENERAL LABORERS, CHUCK TENDER, HANDLING AND DISTRIBUTING DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING, BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, TRAFFIC STRIPER, SCAFFOLD BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER; PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL TEMPORARY REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS, TOOL ROOM, DEWATERING PUMP MEN, PITMAN, DUMPMEN, SNOW REMOVAL AND FIREWATCH, ASPHALT MAN, JOINT SETTER, SIGNAL PERSON, PIPELAYER, PIPE LINING AND RELINING, WELLPOINTS, CONDUIT AND DUCT LAYER, WIRE PULLER, RIP RAP AND DRY STONE LAYER, STEEL ROD CARRIER, CORE DRILL, ROCK SPLITTER, HILTI GUN AIR OR ELECTRIC, JACKHAMMER, BUSH HAMMER, PAVEMENT BREAKER, CHIPPING HAMMER, WAGON DRILL, AIR TRACK, JIB RIG, JOY DRILL, GUNITE AND SAND BLASTING, COAL PASSER AND OTHER MACHINE OPERATORS, POWER TOOL OPERATOR, SPRAYER AND NOZZLE MAN ON MULCHING AND SEEDING MACHINE, ALL GUARD RAIL AND FENCE, ALL SEEDING AND SOD LAYING, ALL LANDSCAPE WORK, GRADE CHECKER, ALL BRIDGE WORK, WALK BEHIND SELF-PROPELLED POWER SAW, GRINDER, GROOVER OR SIMILAR TYPE MACHINE, WALK BEHIND TAMPER AND ROLLER OF ALL TYPES, SALVAGE, STRIPPING, WRECKING AND DISMANTLING LABORER (INCLUDING BARMAN, CUTTING TORCH AND BURNER MAN), SHEETING AND SHORING COMING UNDER LABORERS JURISDICTION, BIT GRINDER, OPERATOR OF FORM PIN PULLER AND DRIVERS, SANDBLASTING, JOINT AND JET SEALER, FILLING AND WIRING BASKETS FOR GABION WALLS, PERMANENT SIGN MAN, MEDIAN BARRIER, STA-WALL OR SIMILAR TYPE PRODUCT, CHAIN SAW OPERATOR, RAILROAD TRACK LABORER, WATERPROOFER, PRE-STRESSED AND PRE-CAST CONCRETE BRICK, BLOCK AND STONE PAVERS, POWER TOOLS USED TO PERFORM WORK USUALLY DONE BY LABORERS, POWER BUGGY AND PUMPCRETE OPERATOR, FIREPROOF, PLASTER AND CAUSTIC PUMP, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIALS ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS NOT REQUIRED, POWER BRUSH CUTTER, RETENTION LINERS, ARTIFICIAL TURF, RETAINING WALLS, WALK BEHIND SURFACE PLANER, WELDING RELATED TO LABORERS WORK, REMOTE CONTROLLED EQUIPMENT NORMALLY OPERATED BY LABORERS, ALL TECHNICIAN WORK INCLUDING BUT NOT LIMITED TO STITCHING, SEAMING, HEAT WELDING, FIREPROOF SPRAYER, MORTAR MIXER, CONCRETE FINISHER, FORM SETTER FOR CONCRETE CURBS AND FLATWORK. GUNITE NOZZLE MAN, STONE CUTTERS, GRANITE STONE LAYER, MANHOLE, CATCH BASIN OR INLET INSTALLING, LASER MEN. GROUND MAN ON MILLING MACHINE (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$38.90$27.15$66.05—Agreement, 2019
LABORER GROUP 1…
Full text

LABORER GROUP 1: FLAGPERSON, GATEPERSON (GREENE COUNTY (TOWNSHIP OF CATSKILL) HEAVY & HIGHWAY)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LINCOLN'S BIRTHDAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING THE HOLIDAY UNLESS PREVENTED FROM DOING SO FOR LEGITIMATE REASONS

$34.15$27.15$61.30—Agreement, 2019
LABORER (ASBESTOS, LEAD…
Full text

LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 2- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED (COLUMBIA COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND THE CITY OF HUDSON)

$43.15$27.15$70.30—Agreement, 2019
LABORER (ASBESTOS, LEAD…
Full text

LABORER (ASBESTOS, LEAD, TOXIC AND HAZARDOUS WASTE ABATEMENT AND ANY OTHER ENVIRONMENTAL RELATED WORK) HEAVY & HIGHWAY) GROUP 1- ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE EQUIPMENT AND CLOTHING ARE NOT REQUIRED (COLUMBIA COUNTY (TOWNSHIPS OF GREENPORT, CLAVERACK, CLERMONT, GERMANTOWN, LIVINGSTON, HILLSDALE, TAGHKANIC, GALLATIN, COPAKE, ANCRAM, PHILMONT, AND THE CITY OF HUDSON) HEAVY & HIGHWAY

$38.90$27.15$66.05—Agreement, 2019
LABO0035-001 · Laborers agreement, July 1, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, WAGON DRILL OPERATOR (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$22.90$20.64$43.54changedAgreement, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, PIPELAYERS, MOTOR MIXERS, MOTOR BUGGY OPERATOR (WALK BEHIND) POWER LIFT (WALK BEHIND) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)).

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$22.65$20.64$43.29changedAgreement, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, LABORERS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$22.50$20.64$43.14changedAgreement, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, HAZARDOUS WASTE REMOVAL INCLUDES WETTING, STRIPPING, REMOVAL, SCRAPPING, VACCUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY.

$24.00$20.64$44.64—Agreement, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, BLASTERS, FORM SETTERS, MOTORBUGGY OPERATOR (RIDER TYPE) (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)).

PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY

$23.00$20.64$43.64changedAgreement, 2017
LABORERS BUILDING CONSTRUCTION…
Full text

LABORERS BUILDING CONSTRUCTION, ASBESTOS REMOVAL (FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE))

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$24.00$20.64$44.64changedAgreement, 2017
LABORERS (HEAVY & HIGHWAY) GROUP 4…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.65$23.74$52.39—Agreement, 2017
LABORERS (HEAVY & HIGHWAY) GROUP 3…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 3: ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.45$23.74$52.19—Agreement, 2017
LABORERS (HEAVY & HIGHWAY) GROUP 2…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORER'S TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING AND SAND BLASTING), LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.25$23.74$51.99—Agreement, 2017
LABORERS (HEAVY & HIGHWAY) GROUP 1…
Full text

LABORERS (HEAVY & HIGHWAY) GROUP 1: COMMON LABORERS, FLAGMAN, OUTBOARD AND HAND BOATS FULTON (TWPS OF CAROGA, EPHRATA, OPPENHEIM, AND STRAFORD); MONTGOMERY (TWPS OF CANAJOHARIE, MINDEN AND PALATINE, ROOT AND ST. JOHNSVILLE)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$28.05$23.74$51.79—Agreement, 2017
LABO0157-001 · Laborers agreement, July 1, 2023
LABORER HEAVY & HIGHWAY: GROUP 5…
Full text

LABORER HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$41.69$26.75$68.44no changeAgreement, 2023
LABORER HEAVY & HIGHWAY: GROUP 4…
Full text

LABORER HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$39.79$26.75$66.54no changeAgreement, 2023
LABORER HEAVY & HIGHWAY: GROUP 3…
Full text

LABORER HEAVY & HIGHWAY: GROUP 3: ALL ROCK DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATOR, AND ASPHALT PAVER, POWDERMAN FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$39.59$26.75$66.34no changeAgreement, 2023
LABORER HEAVY & HIGHWAY: GROUP 2…
Full text

LABORER HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"") AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING, AND SAND BLASTING), LABORERS ON CHAIN FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AND AIR TOOL OPERATORS, WRECKING LABORERS FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES.

$39.39$26.75$66.14no changeAgreement, 2023
LABORER HEAVY & HIGHWAY: GROUP 1…
Full text

LABORER HEAVY & HIGHWAY: GROUP 1: Common laborers, flagman, outboard & hand boats FULTON (TWPS. OF BLEEKER, MAYFIELD, NORTHHAMPTON, JOHNSTOWN, BROADALBIN AND PERTH); MONTGOMERY (TWPS. OF MOHAWK, GLEN, CHARLESTON, AMSTERDAM, AND FLORIDA); SARATOGA (TWPS. OF DAY, HADLEY, EDINBURG, CORINTH, MOREAU, SOUTH GLENS FALLS, PROVIDENCE, GREENFIELD, WILTON, NORTHCUMBERLAND, GALWAY, MILTON, SARATOGA SPRINGS, CHARLTON, BALLSTON, MALTA AND CLIFTON PARK); SCHENECTADY AND SCHOHARIE COUNTIES

$39.19$26.75$65.94no changeAgreement, 2023
LABO0190-001 · Laborers agreement, July 1, 2024
LABORERS: BUILDING: GROUP 2…
Full text

LABORERS: BUILDING: GROUP 2 HAZARDOUS WASTE REMOVAL COMMERCIAL PROJECTS VALUED AT $800,000 OR LESS AND/OR INDUSTRIAL PROJECTS VALUED AT $100,000 OR LESS EXCLUDING DEMOLITION WORK, (COMPLETE RAZING OF STRUCTURES) WILL RECEIVE 75% OF BASIC WAGE SCALE WITH FULL FRINGES WILL APPLY ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON, SARATOGA)

$37.51$26.68$64.19no changeAgreement, 2024
LABORERS: BUILDING: GROUP 1…
Full text

LABORERS: BUILDING: GROUP 1 COMMON LABORERS ALBANY; GREEN; RENSSELAER COUNTY, WASHINGTON COUNTY, SARATOGA COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON, SARATOGA)

$36.16$26.68$62.84no changeAgreement, 2024
LABO0190-002 · Laborers agreement, July 1, 2024
LABORERS: HEAVY & HIGHWAY: GROUP 5…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 5: HAZARDOUS WASTE REMOVAL ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$44.19$27.65$71.84no changeAgreement, 2024
LABORERS: HEAVY & HIGHWAY: GROUP 4…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 4: BLASTERERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$42.29$27.65$69.94no changeAgreement, 2024
LABORERS: HEAVY & HIGHWAY: GROUP 3…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 3: ALL ROCK AIR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS, AND ASPHALT PAVER, POWDERMAN ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$42.09$27.65$69.74no changeAgreement, 2024
LABORERS: HEAVY & HIGHWAY: GROUP 2…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 2: BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATED BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTAR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPERS, DRILL DOCTOR, TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2"" AND SINGLE DIAPHRAGM), NOZZLE (ASPHALT, GUNNITE, SEEDING, AND SAND BLASTING) LABORERS ON CHAIN LINK FENCE ERECTION, ROCK SPLITTER AND POWER UNIT, PUSHER TYPE CONCRETE SAW AND ALL OTHER GAS, ELECTRIC, OIL, AIR TOOL OPERATORS, AND WRECKING ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.89$27.65$69.54no changeAgreement, 2024
LABORERS: HEAVY & HIGHWAY: GROUP 1…
Full text

LABORERS: HEAVY & HIGHWAY: GROUP 1: COMMON LABORERS, FLAGMEN, OUTBOARD AND HAND BOATS ALBANY; RENSSELAER; COLUMBIA (TWPS. OF STUYVESANT, STOCKPORT, KINDERHOOK, NEW LEBANON, CANNAN, GHENT, CHATHAM, AUSTERLITZ). GREENE (EXCEPT CATSKILL TOWNSHIP). WASHINGTON COUNTY. SARATAGO COUNTY (TOWNSHIPS OF STILLWATER, HALFMOON SARATOGA)

FOOTNOTE: PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY

$41.69$27.65$69.34no changeAgreement, 2024
LABO0235-006 · Laborers agreement, May 1, 2023
LABORERS: HEAVY & HIGHWAY GROUP 3…
Full text

LABORERS: HEAVY & HIGHWAY GROUP 3 ASPHALT RAKER; ASPHALT SCREEDMAN; DRILLERS (ALL); LASER BEAM OPERATOR; FORM SETTER/ALIGNERS; BLASTERS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$43.90$27.80$71.70—Agreement, 2023
LABORERS: HEAVY & HIGHWAY GROUP 2…
Full text

LABORERS: HEAVY & HIGHWAY GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN; SIGNAL MAN; PIPELAYERS; RIP RAP; DRY STONE LAYER; JACK HAMMER; POWDERMAN; HIGHSCALERS POWER BUGGY OPERATOR; STEEL ROD CARRIER; VIBRATORY OPERATOR; OTHER MACHINE OPERATOR; WRECKING; VIBRATOR OPERATOR-COMPACTOR; GUNITE AND SANDBLASTING; WATER PUMP 2"" OR UNDER; NIPPER; CHUCKER; ASPHALT WORKERS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$42.80$27.80$70.60—Agreement, 2023
LABORERS: HEAVY & HIGHWAY GROUP 1…
Full text

LABORERS: HEAVY & HIGHWAY GROUP 1 FLAGPERSON; PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES; TRAFFIC CONTROL CUSTODIAL WORK; TRAFFIC DIRECTORS; TEMPORARY HEAT OR LIGHT TENDERS; TOOL ROOMS COLUMBIA (TWPS. OF GREENPORT, CLAVERACK, HILLSDALE, LIVINGSTON, GERMANTOWN, TAGHKANIC, COPAKE, CLERMONT, GALLATIN, ANCRAM)

FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, AND CHRISTMAS DAY

$36.45$27.80$64.25changedAgreement, 2023
PAIN0009-013 · Painters and Allied Trades agreement, May 1, 2025
GLAZIER$37.25$33.54$70.79no changeAgreement, 2025
PAIN0155-002 · Painters and Allied Trades agreement, May 1, 2021
PAINTERS:: SPRAY RATE (COLUMBIA AND GREENE COUNTIES)$36.94$24.66$61.60no changeAgreement, 2021
PAINTERS: PAINTER/PAPERHANGER (COLUMBIA AND GREENE COUNTIES)$35.94$24.66$60.60no changeAgreement, 2021
PAINTERS: LEAD ABATEMENT WORK (COLUMBIA AND GREENE COUNTIES)$35.94$24.66$60.60no changeAgreement, 2021
PAINTERS: DRYWALL FINISHER (COLUMBIA AND GREENE COUNTIES)$35.94$24.66$60.60no changeAgreement, 2021
PAIN0201-001 · Painters and Allied Trades agreement, May 1, 2025
PAINTERS: ZONE 2 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #2 ALL OF WASHINGTON COUNTY$33.50$21.69$55.19—Agreement, 2025
PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS…
Full text

PAINTERS: ZONE 2 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #2 ALL OF WASHINGTON COUNTY

$34.50$21.69$56.19—Agreement, 2025
PAINTERS: ZONE 1 (PAINTERS…
Full text

PAINTERS: ZONE 1 (PAINTERS, DRYWALL FINISHERS, SPRAY) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

$33.50$21.69$55.19—Agreement, 2025
PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS…
Full text

PAINTERS: ZONE 1 (LEAD ABATEMENT WORKERS, STRUCTURAL STEEL) ZONE #1 ENTIRE COUNTIES OF ALBANY, FULTON, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY AND SARATOGA

$34.50$21.69$56.19—Agreement, 2025
PAIN0806-002 · Painters and Allied Trades agreement, October 1, 2024
PAINTERS: STRUCTURAL STEEL AND BRIDGE…
Full text

PAINTERS: STRUCTURAL STEEL AND BRIDGE (ALBANY, COLUMBIA, FULTON, GREENE, MONTGOMERY, RENNSELAER, SCHOHARIE, SCHENECTADY, SARATOGA AND WASHINGTON)

$56.25$55.14$111.39no changeAgreement, 2024
PLUM0007-001 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER/PIPEFITTER…
Full text

PLUMBER/PIPEFITTER (ALBANY; COLUMBIA; FULTON; GREENE; MONTGOMERY; RENSSELAER; SCHENECTADY; SARATOGA (TOWNS OF CHARLTON, CLIFTON PARK, GALWAY, HALFMOON, MILTON, STILLWATER AND WATERFORD))

$55.26$29.12$84.38no changeAgreement, 2025
PLUM0112-019 · Plumbers and Pipefitters agreement, May 1, 2023
PLUMBER, INCLUDING STEAMFITTING (TOWNSHIPS OF CANAJOHARIE AND MINDEN)$31.40$31.70$63.10no changeAgreement, 2023
PLUM0773-002 · Plumbers and Pipefitters agreement, May 1, 2025
PLUMBER/PIPEFITTER (SARATOGA (REMAINDER OF COUNTY); WASHINGTON COUNTY:)$44.88$33.60$78.48no changeAgreement, 2025
ROOF0203-003 · Roofers agreement, June 1, 2023
ROOFER (SCHOHARIE COUNTY:)$30.50$19.84$50.34no changeAgreement, 2023
ROOF0241-001 · Roofers agreement, July 1, 2025
ROOFER$38.05$24.27$62.32no changeAgreement, 2025
SFNY0669-001 · SFNY, January 1, 2026
SPRINKLER FITTER$47.85$28.94$76.79+$2.32 (+3.1%)SFNY
SHEE0083-001 · Sheet Metal Workers agreement, June 1, 2019
SHEET METAL WORKER

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY. IF ANY OF THESE HOLIDAYS FALL ON A SATURDAY OR SUNDAY, EITHER THE PRECEDING FRIDAY OR FOLLOWING MONDAY WILL BE OBSERVED AS THE HOLIDAY

$33.73$33.04$66.77changedAgreement, 2019
TEAM0294-003 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS: GROUP 5…
Full text

TRUCK DRIVERS: GROUP 5 (HEAVY & HIGHWAY) OFF-HIGHWAY TANDEM BACK DUMP, TWIN ENGINE EQUIPMENT AND DOUBLE HITCHED EQUIPMENT WHERE NOT SELF-LOADED

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.69$31.42$73.11changedAgreement, 2025
TRUCK DRIVERS: GROUP 4…
Full text

TRUCK DRIVERS: GROUP 4 (HEAVY & HIGHWAY) SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED, STRADDLE (ROSS) CARRIER, SELF-CONTAINED CONCRETE UNIT

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.52$31.42$72.94changedAgreement, 2025
TRUCK DRIVERS: GROUP 3…
Full text

TRUCK DRIVERS: GROUP 3 (HEAVY & HIGHWAY) SEMI-TRAILERS, LOW-BOY TRUCKS, ASPHALT DISTRIBUTOR TRUCKS, AGITATOR, MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES, TRUCK MECHANIC, FUEL TRUCK

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.38$31.42$72.80changedAgreement, 2025
TRUCK DRIVERS: GROUP 2 (HEAVY & HIGHWAY) TANDEMS, BATCH TRUCKS, MECHANICS

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.29$31.42$72.71changedAgreement, 2025
TRUCK DRIVERS: GROUP 1…
Full text

TRUCK DRIVERS: GROUP 1 (HEAVY & HIGHWAY) PICK-UPS, PANEL TRUCKS, FLATBOY MATERIAL TRUCKS (STRAIGHT JOBS), SINGLE AXLE DUMP TRUCKS, DUMPSTERS, RECEIVERS, GREASERS, TRUCK TIREMAN

FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE AND THE DAY AFTER THE HOLIDAY

$41.23$31.42$72.65—Agreement, 2025
TEAM0294-004 · Teamsters agreement, July 1, 2025
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2…
Full text

TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 2 EUCLID OR SIMILAR EQUIPMENT, LOWBOY OR LOWBOY TRAILERS (EXCLUDING MONTGOMERY COUNTY)

FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 YEARS

$33.95$30.79$64.74—Agreement, 2025
TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1…
Full text

TRUCK DRIVERS (BUILDING CONSTRUCTION): GROUP 1 STRAIGHT, WINCH, TRANSIT MIX ON JOB SITE, ROAD OILERS, DUMP, PANEL, PICK-UP, WATER AND FUEL TRUCKS ON SITE (INCLUDING NOZZLE) (EXCLUDING MONTGOMERY COUNTY)

FOOTNOTES: A. ONE WEEK VACATION AFTER 1 YEAR; 2 WEEKS VACATION AFTER 5 YEARS

$33.65$30.79$64.44—Agreement, 2025

Modification history

Modification 1January 30, 2026
Modification 2May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NY20260002?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 2 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and NY20260002 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 120 classifications in 38 rate groups
  • 37 from agreements, 0 from surveys
  • Counties: Albany, Columbia, Fulton, Greene, Montgomery, Rensselaer, Saratoga, Schenectady, Schoharie, Washington