CertifiedHours

Prevailing wage rates · Nevada · Wage determination

Prevailing wage rates: Douglas County, Nevada

Highway construction · NV20260095 modification 1, published July 30, 2026

The short answer

This sheet sets 57 classifications for highway work in Douglas County, Nevada. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $38.53 an hour (truck driver) to $123.27 (piledriver: diver-diving (wet pay)). Your contract may lock an earlier modification.

What changed this year

First published June 22, 2026, this sheet is now on modification 1, and its rates have changed in 1 modification. Of the 57 rates we can follow line by line from the first publication to today, 7 are higher.

If you bid the job or set pay from an earlier copy, find your trades below. The rates that bind you are the ones in the modification written into your contract.

Latest change

July 30, 2026 · modification 1

7 rates raised

  • Piledriver: 5 rates raised by $4.00 to $7.66 an hour
  • Bricklayer: 1 rate raised by $3.65 an hour
  • Carpenter: 1 rate raised by $4.00 an hour
Every line that changed (7)
ClassificationWasNowChange
Bricklayer: Journeyman$42.85 + $17.88$45.94 + $18.44+$3.65 (+6.0%)
Carpenter: Journeyman$40.07 + $24.35$43.13 + $25.29+$4.00 (+6.2%)
Piledriver: Journeyman Driverman$40.57 + $24.35$43.63 + $25.29+$4.00 (+6.2%)
Piledriver: Certified Welder$41.57 + $24.35$44.63 + $25.29+$4.00 (+6.1%)
Piledriver: Tender$44.63 + $24.35$47.99 + $25.29+$4.30 (+6.2%)
Piledriver: Stand By Diver$45.63 + $24.35$48.99 + $25.29+$4.30 (+6.1%)
Piledriver: Diver-Diving (Wet Pay)$91.26 + $24.35$97.98 + $25.29+$7.66 (+6.6%)

Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.

Rates by classification

These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSince Jun 22Source
SANV2025-001 · SANV, October 1, 2025
Boilermaker: Journeyman$76.62—$76.62no changeSANV
Bricklayer: Journeyman$45.94$18.44$64.38+$3.65 (+6.0%)SANV
Carpenter: Journeyman$43.13$25.29$68.42+$4.00 (+6.2%)SANV
Cement Mason: Journeyman$43.06$13.86$56.92no changeSANV
Electrician-Neon Sign: Journeyman$63.15—$63.15no changeSANV
Electrician-Wireman: Wireman$48.50$29.99$78.49no changeSANV
Electrician-Wireman: Cable Splicer$55.78$30.66$86.44no changeSANV
Fence Erector: Journeyman$35.70$17.58$53.28no changeSANV
Flagperson: Journeyman$33.58$17.58$51.16no changeSANV
Highway Stripers: Journeyman$38.20$17.58$55.78no changeSANV
Hod Carrier-Brick Mason Tender: Journeyman$35.95$17.58$53.53no changeSANV
Ironworker: Journeyman$51.85$39.12$90.97no changeSANV
Laborers: Landscape$30.29$17.58$47.87no changeSANV
Laborers: Group 1…
Full text

Laborers: Group 1 (All cleanup work of debris, grounds, ard buiding including windows and tile; Dumpmen or Spotter (other than asphalt); Handling ard Servicing of Flares, Watchmen; Gereral Laborer; Guideposts and Highway Signs; Guardrail Erection ard Dismantling; Limber, Brushloader ard Piler; Pavement Marking and Highway Striping; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry set paver work; Traffic Barrier Erector)

$35.45$17.58$53.03no changeSANV
Laborers: Group 1-A (Flagger)$33.58$17.58$51.16no changeSANV
Laborers: Group 2…
Full text

Laborers: Group 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, clearning, oiling and moving to thenext point of installation; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood ormetal) handling, clearning and stripping of Loading and unloading, Carrying and handling of all rods and materials for use in reinforcing concrete; Railroad Trackmen (maintenance, repair or builders); Sloper; Semi-Skilled Wrecker (salvaging of building materials other than those listed in Group 3) Waterproofing work; Epoxy rebar/dowels adn anchoring dowel baskets; Placement pouring of concrete including any epoxy resin or similar materials, rodding, spreading, and tamping concrete, brooming or brusing, hand application of curing compunds, applying topping (wet or dry) colors or grits, and exposed finishes for architectural work; Concrete patching, dry packing, chipping, stoning, and grouting; Concrete cold Whether/rain protection and curing; Placement/anchoring of all earth stabilization/filters fabrics; Mechanically stabilized Earth (MSE) and keystone type retaining walls rigging, placing, aligning, backfilling and installation of dead men and any stabilization components)

$35.55$17.58$53.13no changeSANV
Laborers: Group 3…
Full text

Laborers: Group 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chairsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precase or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector including safety, chain link, turtle, field and barbe wire fencing; Form Raiser, Slip Forms; Grouting of Concrete Walls, Windows and Door Jams; Headerboardmen; Jackhammer, Pavement Breaker, Air Spade; Mastic Worker (wet or dry); Pipewrapper, Kettlemen, Potmen, and men applying ashphalt, creosote and similar type materials; All Power Tools (air, gas, or electric), Post Driver; Riprap-Stonepaver and RockSlinger, including placing of sack concrete wet or dry Rototiller; Rigging and Signaling in connection with Laboeres' work; Sandblaster, Potmen, Gunmen or Nozzlemen water blasting not covered in group 6; Vibra-screed; All Demolition and wrecking work including but not limited to any torch work cutting, burning, plasma are, dust control, and salvaging (removing and salvaging of all materials, windows, doors, plumbing, and electrical fixtures) and use of customary tolls and equipment for demolition and wrecking; All underpinning foundation work, digging and underpinning pits, removal of debris with tuggers or other methods, cutting, handling and installing all shoring boards and lagging boards used for underpinning and foundation work, placement and tying of steel reinforcing for underpinning piers, all tiebacks and soil nail work drilling and grouting, all soldier beam work and us of customary toools and eqiupment for underpinning foundation work.)

$35.70$17.58$53.28no changeSANV
Laborers: Group 3A…
Full text

Laborers: Group 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hard trowels or hard floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsurr; Concrete grinding machines (the terms does not include Rotomill machines for highway overlay grinding); Trowelig machines; Floating machines; Finishing of epoixy or resin materials; Operator of skill saw; Laser Screed; Laser Level)

$39.13$17.58$56.71no changeSANV
Laborers: Group 4…
Full text

Laborers: Group 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model TWM-2A, Gardner Denver Model DN 143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire fabric and use of customary tools and equipment for high scaling; Concrete pump operator; Heavy Duty Vibrator with Stinger 5"" diameter or over; Pipelayer, Caulker and Bander; Pipelayer-waterline, Sewerline, Gasoline, Conduit and all other types of composition for any purpose buried under ground outside of building including, stringing, trench shoring, backfilling sanding, caution taping, all walk behind equipment and spotting; Laborer work in connection with micro tunneling, directional drilling and pipe-jacking; Cathodic protection, grounding for piepe work; cleaning of Utility Lines; Slip Lining of Utility Lines (including operation of Eqiupment); TV Monitoring and Groutind of Utility Lines; Asphalt Rakers and Ashalt dump Man; All mechanical and pressurized pipe work, including the installation of pipe above below ground, cathodic protection, bolt up, and support installation in connection to water conveyance, production, purification, filtration and treatment facilites.)

$35.95$17.58$53.53no changeSANV
Laborers: Group 5…
Full text

Laborers: Group 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all power and explosives of any type, regardless of method used for such loading and placing Asbestos removal; Lead abatement; Hazardous waste; Material removal)

$36.25$17.58$53.83no changeSANV
Laborers: Group 5A…
Full text

Laborers: Group 5A (Pavement Marking and Highway Striping; Pavement Marking; Pavement Marking and Highway Striping work includes but is not limited to: All work by and any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.)

$38.20$17.58$55.78no changeSANV
Laborers: (Group 6) Nozzleman, Rodmen$35.25$17.58$52.83no changeSANV
Laborers: (Group 6) Gunmen, Materialmen$35.25$17.58$52.83no changeSANV
Laborers: (Group 6) Reboundmen$35.60$17.58$53.18no changeSANV
Operating Engineers: Group 1A (Oiler (Construction); Partsman)$41.07$34.85$75.92no changeSANV
Operating Engineers: Group 2…
Full text

Operating Engineers: Group 2 (Compressor Operator; Material Loader and /or Conveyor Operator (handling bulding materials); Pump Operator)

$41.60$34.85$76.45no changeSANV
Operating Engineers: Group 3…
Full text

Operating Engineers: Group 3 (Bobcat or similar loader, 1/4 cu . yd. or less; Corcrete Curing Machines (streets, highways, airports, canals); Conveyor Belt Operator (tunnel); Forklift (under 20); Engineer Generating Plant (500 K. W.); Mixer Box Operator (concrete plant); Motorman; Rodman/Chainman; Rotomist Operator; Olier (truck crane))

$41.87$34.85$76.72no changeSANV
Operating Engineers: Group 4…
Full text

Operating Engineers: Group 4 (Concrete Mixer Operator, Skip type; Dink Operator; Forklift (20' or over) or Lumber Stacker; Ross Carrier; Skip Loader Operator (under one (1) cu. Yd.); Tie Spacer)

$42.61$34.85$77.46no changeSANV
Operating Engineers: Group 5…
Full text

Operating Engineers: Group 5 (Concrete Mixer (over one (1) cu. Yd.); Concrete Pumps or Pumpcrete Guns; Elevator and Material Hoist (one (1) drum); Groundman for Asphalt Milling and similar)

$42.92$34.85$77.77no changeSANV
Operating Engineers: Group 6…
Full text

Operating Engineers: Group 6 (Auger Type drilling equipment up to and includting 30 ft. depth digging capacity M.R.C; Boom Truck or Dua-Purpose a-Frame Truck; B.L.H Lima Road Pactor or similar; Chip Box Spreader (Flaherty type or similar); Concrete Batch Plant (wet or dry); Concrete Saws (highways, streets, airports, canals); Locomotives (over thirty (30) tons); Maginnis International Full Slab Vibrator (airports, highways, canals, and warehouses); Mechanical Fishers (concrete) (Clary, Johnson Bidwell Bridge Deck or similar types); Mechanical Burn, Curb and /or Curb and Gutter Machine (concrete or asphalt); Pavement Breaker, Truck Mounted, with compressor combination; Pavement Breaker or Tamper (with or without compressor combination); Power Jumbo Operator (setting slip-forms, etc., in tunnels); Roller Operator (except asphalt); Self-Propelled Tape Machine; Self-Propelled Compactor (single engine); Self-Propelled Power Sweeper Operator; Slip-Form Pum (power-driven by hydraulic, electric, air, gas, etc. lifiting device for concrete forms; Small Rubber-Tied Tractors; Snooper Crane, Paxton-Mitchell or similar; Stationary Pipe Wrapping, Cleaning and Bending Machine Operator)

$43.08$34.85$77.93no changeSANV
Operating Engineers: Group 7…
Full text

Operating Engineers: Group 7 (Auger Type drilling equipment over 30 ft. depth digging capacity M.R.C; Compressor (over 2); Concrete Conveyor or Concrete Pump, truck or equipment mounted (any assistance requried shall be performed by an Assistant to Engineer) Boom length to apply Concrete Conveyor, Building site; Drilling and Boring Machine, vertical and horizontal (not to apply to waterliners, wagon drills or jack hammers); Crusher Plant Engineer; Generators; Instrument Man; Kolman Loader; Material Hoist (two (2) or more drums); Mine or Shaft Hoist; Pipe bending Machines (pipeline only); Pipe Cleaning Machines (tractor-propelled and supported); Pipe Wrapping Machines (tractor-propelled and supported); Portable Crushing and Screening Plants; Post Driller And/or Driver; Pumps (over 2); Screedman (except asphaltic or concrete paving); Self-Propelled Boom-Type Lifting Device (center mount) (on ten (10) ton capacity or less); Slusher Operator; Soil Tester (Certified); Surface Heater and Planer Operator; Trenching Machine (maximum digging capacity three (3) ft. depth) (Any assistance in the operation, if needed, shall be performed by an Assistant to Engineer); Truck-Type Loader; Welding Machines (gasoline or diesel))

$43.33$34.85$78.18no changeSANV
Operating Engineers: Group 8…
Full text

Operating Engineers: Group 8 (Articulated on-Site Dump Trucks; Asphalt Plant Engineer; Apshalt Milling Machine; Cast-In-Place Pipe-Laying Machine; Combination Slusher and Motor Operator; Concrete Batch Plant (multiple units); Dozer Operator; Drill Doctor; Elevating Grader Operator; Stiff Frame Off Road Haul Trucks; Grooving and Grinding Machine (highways); Ken Seal Operator; Marination Plant; Loader (up to and including two and one-half (2 1/2) cu. yds); Mechanical Finishers or Spreader Machine (asphalt, Barber-Greene or similar); Shuttle Buggy; Mechanical Trench Shield; Mixermobile; Push Cats; Road Oil Mixing Machine Operator Wood-Mixer (and other similr Pugmill equipment); Roller Operator (asphalt); Rubber-Tired Earthmoving Equipment (up to and including thirty-five (35) cu. yds. ""struck"" M.R.C., Euclids, T-Pulls, DW10, 20, 21 and similar); Water Pull; Screedman (Barber-Greene and similar) (asphaltic or concrete paving); Self-Propelled Compactors with Dozer; Hyster 450, Cat 825 or similar; Sheepfoot; Small Tractor (with boom); Soil Stabilizer (P&H or equal); Timber Skidder (rubber-tired) or similar equipment; Track Loader; Tractor-Drawn Scraper; Tractor Operator; Tractor-Mounted Compressor Drill Combination; Trenching Machine Operator (over three (3) feet depth); Tri-Batch Paver; Tunnerl Badger or Tunnel Boring Machine Operator; Tunnel Mole Boring Machine; Vermeer T-600b Rock Cutter; Vacuum Truck (excludes trailer mounted vaccums))

$43.87$34.85$78.72no changeSANV
Operating Engineers: Group 9…
Full text

Operating Engineers: Group 9 (Chicago Boom; Comination Backhoe and Loader (up to and including 3/8 cu. Yd.); Combination Mixer and Compressor (gunite); heavy Duty Repairman and /or Welder; Lull Hi-Lift (twenty (20) feet or over); Mucking Machine; Sub-Grader (Gurries or other types) Tractor (with Boom) (D6 or larger); Track-Layer-Type Earthmoving Machine (single engine with tandem scrapers))

$44.24$34.85$79.09no changeSANV
Operating Engineers: Group 10…
Full text

Operating Engineers: Group 10 (Boom-Type Backfilling Machine; Bridge Crane; Cary-Lift or similar; Chemical Grouting Machine; Chief of Party; Derricks (two (2) Group 10 Operators required when swing engine remote from hoist); Derrick Barges (except excavation work); Euclid Loader and similar types; Heavy Duty Repairman; Heavy Duty Rotary Drill Rigs; Lift-Slab (Vagtborg and similar types); Loader (over two and one-half (2 1/2 cu. yds. up to an including four (4) cu. yds.); Locomotive (over one hundred (100) tons, single or multiple units); Multiple-Engine Earthmoving Machines (Euclid Dozers, etc.) Pre-Stress Wire Wrapping Machine; Rubber-Tired Scraper, Self-Loading; Single-Engine Scraper (over thirty-five (35) cu. yds.); Shuttle Car (Reclaim Station); Train Loading Station; Trenching Machine multi-engine with sloping attachments (Jefco or similar); Vacuum Cooling Plant; Whirley Crane (up to and including twenty-five (25) tons))

$44.59$34.85$79.44no changeSANV
Operating Engineers: Group 10A…
Full text

Operating Engineers: Group 10A (Backhoe-Hydraulic (up to an including one (1) cu. Yd.); Backhoe (up to an including one (1) cu.yd) (Cable); CMI Dual Lane Auto-Grader SP30 or similar type; Cranes (not over twenty-five (25) tons) (hammerhead and gantry); Finish Blade; Gradalls (up to and including one (1) cu. yd.); Motor Patrol Operator; Power Shovels, Clamshells, Draglines, Cranes (up to and including one (1) cu. yd); Rubber-Tired Scraper, Self- Loading (twin engine); Self-Propelled Boom- Type Lifting Device, center mount (over 10 tons up to and including 25 tons))

$44.78$34.85$79.63no changeSANV
Operating Engineers: Group 11…
Full text

Operating Engineers: Group 11 (Automatic Asphalt or Concrete Slip-Form Paver; Automatic Railroad Car Dumper; Canal Trimmer; Cary Lift, Campbell or similar type; Cranes (over twenty-five (25) tons); Euclid Loader when controlled from the Pullcat; Finish Blade; Gradesetter, Grade Checker; Highline Cableway Operator; Loader (over four (4) cu. yds. up to an including tweleve (12) cu. yds.); Multi-Engine Earthmoving Equipment (up to and including seventy-five (75) cu. yds. struck m.r.c); Multi-Engine Scrapers (when used to Push Pull); Power Shovels, Clamshells, Draglines, Backhoes Gradalls (over one (1) cu. yd. and up to and including seven (7) cu. yds. m.r.c); Self-Propelled Boom-Type Lifing Device (center mount( over 25 tons m.r.c); Self-Propelled Compactor (with multiple-propulsion power units); Single-Engine Rubber-Tired Earthmoving Machine, with Tandem Scraper; Slip-Form Paver (concrete or asphalt); Tandem Cats and Scraper; Tower Crane Mobile (including Rail Mount); Truck Mounted Hydraulic Crane when remote control equipped (over 10 tons up to and including 25 tons); Universal Liebher and Tower Cranes (and similar types); Wheel Excavator (up to an including seven hundred fifty (750) cu. yds. per hour); Whirley Cranes (over twenty-five (25) tons))

$45.02$34.85$79.87no changeSANV
Operating Engineers: Group 11A…
Full text

Operating Engineers: Group 11A (Band Wagons (in conjuction with Wheel Excavators); Operator of Helicopter (when used in construction work); Loader (over twelve (12) cu. yds.); Multi-Engine Earthmoving Equipment (over seventy-five (75) cu. Yds. ""stuck"" m.r.c); Power Shovels, Clamshells, Draglines, Backhoes, and Gradalls (over seven 7 cu. yds. m.r.c.); Remote-Controlled Earth Moving Equipment; Wheel Excavator (over seven hundred fifty (750) cu. yds. per hour))

$46.66$34.85$81.51no changeSANV
Operating Engineers: Group 11B (Holland Loader or similar or Loader (over 18 cu. Yds.))$47.47$34.85$82.32no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 1…
Full text

Operating Engineers Steel Fabricator & Erector: Group 1 (Cranes over 100 tons; Derrick over 100 tons; Self-Propelled Boom Type Devices over 100 tons)

$53.61$34.85$88.46no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 1 Truck Crane Oiler$47.44$34.85$82.29no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 1 Oiler$45.48$34.85$80.33no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 2…
Full text

Operating Engineers Steel Fabricator & Erector: Group 2 (Cranes over 45 tons up to and including 100 tons; Derrick, 100 tons and under; Self-Propelled Boom Type Lifting Device, over 45 tons; Tower Crane)

$52.10$34.85$86.95no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 2 Truck Crane Oiler$47.19$34.85$82.04no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 2 Oiler$45.27$34.85$80.12no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 3…
Full text

Operating Engineers Steel Fabricator & Erector: Group 3 (Cranes, 45 tons and under; Self-Propelled Boom Type Lifting Device, 45 tons and under)

$50.86$34.85$85.71no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 3 Truck Crane Oiler$46.97$34.85$81.82no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 3 Oiler$45.05$34.85$79.90no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 3 Hydraulic$46.64$34.85$81.49no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 4…
Full text

Operating Engineers Steel Fabricator & Erector: Group 4 (Chicago Boom; Forklift, 10 tons and over; Heavy Duty Repairman/Welder)

$49.13$34.85$83.98no changeSANV
Operating Engineers Steel Fabricator & Erector: Group 5 (Boom Cat)$48.03$34.85$82.88no changeSANV
Piledriver: Journeyman Driverman$43.63$25.29$68.92+$4.00 (+6.2%)SANV
Piledriver: Certified Welder$44.63$25.29$69.92+$4.00 (+6.1%)SANV
Piledriver: Tender$47.99$25.29$73.28+$4.30 (+6.2%)SANV
Piledriver: Stand By Diver$48.99$25.29$74.28+$4.30 (+6.1%)SANV
Piledriver: Diver-Diving (Wet Pay)$97.98$25.29$123.27+$7.66 (+6.6%)SANV
Traffic Barrier Erector$35.45$17.58$53.03no changeSANV
Truck Driver$38.53—$38.53no changeSANV

Modification history

Modification 0June 22, 2026
Modification 1July 30, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NV20260095?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator

Put these rates on a certified payroll.

Start here and NV20260095 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.

Start a payroll on this sheet

On this sheet

  • 57 classifications in 1 rate groups
  • 0 from agreements, 0 from surveys
  • Counties: Douglas