Prevailing wage rates · New Mexico · Wage determination
Prevailing wage rates: Catron, Chaves, Curry and 11 more counties, New Mexico
Highway construction · NM20260036 modification 1, published May 18, 2026
The short answer
This sheet sets 66 classifications for highway work in Catron, Chaves, Curry and 11 more counties, New Mexico. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.97 an hour (laborer, common or general (grant)) to $35.56 (electrician, including traffic signalization). Your contract may lock an earlier modification.
What changed this year
First published January 2, 2026, this sheet is now on modification 1, but none of its modifications has changed a rate.
Latest change
May 18, 2026 · modification 1
Classification names reworded; no change among the 66 lines we could match
SAM.gov reworded this sheet’s classification names in this modification, so not every line can be matched to the one before. Only lines matched with certainty are compared here; nothing is guessed. If your trade is not listed, compare it against your contract’s copy.
Compared line by line from each modification as published on SAM.gov. A line we could not pair with certainty is left out rather than guessed.
Rates by classification
These are the rates in modification 1 as published on SAM.gov. The determination and modification written into your contract are the ones that bind you; check that number before relying on this table. Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from and its year; a survey year long past means the rate has not been surveyed since. A marker means the group changed in this modification. In the Since column, a dash means SAM.gov reworded the line during the year and it cannot be matched to the first publication with certainty. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.
| Classification | Basic rate | Fringe | Total | Source |
|---|---|---|---|---|
| SUNM2011-004 · Survey of contractors in NM, August 26, 2011 | ||||
| TRUCK DRIVER: WATER TRUCK (LEA) | $15.07 | $0.26 | $15.33 | Survey, 2011 |
TRUCK DRIVER: WATER TRUCK…Full textTRUCK DRIVER: WATER TRUCK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.39 | $0.26 | $14.65 | Survey, 2011 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (LEA) | $12.84 | $0.26 | $13.10 | Survey, 2011 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (EDDY) | $12.60 | $0.26 | $12.86 | Survey, 2011 |
TRUCK DRIVER: PICKUP AND PILOT CAR…Full textTRUCK DRIVER: PICKUP AND PILOT CAR (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $12.70 | $0.26 | $12.96 | Survey, 2011 |
| TRUCK DRIVER: FLATBED TRUCK (ROOSEVELT) | $13.26 | $0.26 | $13.52 | Survey, 2011 |
| TRUCK DRIVER: FLATBED TRUCK (LEA) | $13.05 | $0.26 | $13.31 | Survey, 2011 |
| TRUCK DRIVER: FLATBED TRUCK (EDDY) | $12.71 | $0.26 | $12.97 | Survey, 2011 |
TRUCK DRIVER: FLATBED TRUCK…Full textTRUCK DRIVER: FLATBED TRUCK (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, SIERRA, SOCORRO) | $12.96 | $0.26 | $13.22 | Survey, 2011 |
| TRUCK DRIVER: DUMP TRUCK (LEA) | $14.61 | $0.26 | $14.87 | Survey, 2011 |
TRUCK DRIVER: DUMP TRUCK…Full textTRUCK DRIVER: DUMP TRUCK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.60 | $0.26 | $14.86 | Survey, 2011 |
| TRUCK DRIVER: DISTRIBUTOR (EDDY) | $13.70 | $0.26 | $13.96 | Survey, 2011 |
TRUCK DRIVER: DISTRIBUTOR…Full textTRUCK DRIVER: DISTRIBUTOR (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LEA, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.81 | $0.26 | $14.07 | Survey, 2011 |
| TRUCK DRIVER (TRACTOR HAUL TRUCK) | $14.00 | $0.00 | $14.00 | Survey, 2011 |
| TRUCK DRIVER (SEMI-TRAILER TRUCK) | $16.58 | $0.26 | $16.84 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $15.40 | $0.26 | $15.66 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCREED | $15.70 | $0.26 | $15.96 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: SCRAPER | $15.91 | $0.26 | $16.17 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (LEA) | $17.41 | $0.26 | $17.67 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (DEBACA) | $14.19 | $0.75 | $14.94 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: ROLLER (ASPHALT, DIRT, AND SHEEPSFOOT) (CATRON, CHAVES, CURRY, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $15.86 | $0.26 | $16.12 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: OILER | $15.79 | $0.26 | $16.05 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: MECHANIC (LEA) | $20.69 | $0.26 | $20.95 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: MECHANIC (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.44 | $0.26 | $19.70 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) | $16.12 | $0.26 | $16.38 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $18.02 | $0.26 | $18.28 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $17.16 | $0.26 | $17.42 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $16.25 | $0.26 | $16.51 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $18.06 | $0.26 | $18.32 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (LEA) | $16.88 | $0.26 | $17.14 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (EDDY) | $14.87 | $0.26 | $15.13 | Survey, 2011 |
POWER EQUIPMENT OPERATOR…Full textPOWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (CATRON, CHAVES, CURRY, DEBACA, GRANT, HIDALGO, LINCOLN, LUNA, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $19.92 | $0.26 | $20.18 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (TRENCHER) | $16.31 | $0.26 | $16.57 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (PILEDRIVER) | $17.82 | $0.26 | $18.08 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (MILLING MACHINE) | $16.59 | $0.26 | $16.85 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (DISTRIBUTOR) | $14.50 | $0.26 | $14.76 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (CRUSHER) | $16.53 | $0.26 | $16.79 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (BROOM) | $15.48 | $0.26 | $15.74 | Survey, 2011 |
| POWER EQUIPMENT OPERATOR: (ASPHALT/CONCRETE PAVER, LAYDOWN MACHINE, AND PLANT) | $15.42 | $0.26 | $15.68 | Survey, 2011 |
| PAINTER (BRUSH, ROLLER, AND SPRAY) | $15.41 | $0.44 | $15.85 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (OTERO) | $12.73 | $0.35 | $13.08 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (LUNA, ROOSEVELT) | $12.56 | $0.35 | $12.91 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (LEA) | $11.61 | $0.35 | $11.96 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (GRANT) | $10.62 | $0.35 | $10.97 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (EDDY) | $11.78 | $0.35 | $12.13 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (DEBACA) | $11.33 | $0.35 | $11.68 | Survey, 2011 |
| LABORER, COMMON OR GENERAL (CATRON, CHAVES, CURRY, HIDALGO, LINCOLN, SIERRA, SOCORRO) | $11.67 | $0.35 | $12.02 | Survey, 2011 |
| LABORER (POWER/AIR TOOL OPERATOR, INCLUDES JACK HAMMER) | $13.91 | $0.86 | $14.77 | Survey, 2011 |
| LABORER (PIPELAYER) | $19.28 | $0.00 | $19.28 | Survey, 2011 |
| LABORER (MASON TENDER-BRICK/CEMENT/CONCRETE) | $11.39 | $0.79 | $12.18 | Survey, 2011 |
| LABORER (GRADE CHECKER) | $16.18 | $1.60 | $17.78 | Survey, 2011 |
| LABORER (FLAGGER/CONE SETTER) | $12.56 | $0.35 | $12.91 | Survey, 2011 |
| LABORER (ASPHALT RAKER) | $13.00 | $0.35 | $13.35 | Survey, 2011 |
| IRONWORKER, STRUCTURAL | $21.77 | $6.03 | $27.80 | Survey, 2011 |
| IRONWORKER, REINFORCING (LEA) | $21.77 | $6.03 | $27.80 | Survey, 2011 |
IRONWORKER, REINFORCING…Full textIRONWORKER, REINFORCING (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $21.66 | $6.03 | $27.69 | Survey, 2011 |
| INSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (LEA) | $14.62 | $0.30 | $14.92 | Survey, 2011 |
INSTALLER: (GUARDRAILS…Full textINSTALLER: (GUARDRAILS, HANDRAILS AND SIGNS) (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.58 | $0.35 | $13.93 | Survey, 2011 |
HIGHWAY/PARKING LOT STRIPING…Full textHIGHWAY/PARKING LOT STRIPING: INCLUDES HIGHWAY LINE/PARKING LOT LINE STRIPING AND LINE STRIPING TRUCK DRIVER | $15.93 | $0.35 | $16.28 | Survey, 2011 |
| ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION (LEA) | $24.90 | $8.56 | $33.46 | Survey, 2011 |
ELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION…Full textELECTRICIAN, INCLUDING TRAFFIC SIGNALIZATION (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $26.21 | $9.35 | $35.56 | Survey, 2011 |
| CEMENT MASON/CONCRETE FINISHER (LEA) | $13.74 | $0.68 | $14.42 | Survey, 2011 |
CEMENT MASON/CONCRETE FINISHER…Full textCEMENT MASON/CONCRETE FINISHER (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $14.17 | $0.55 | $14.72 | Survey, 2011 |
| CARPENTER, INCLUDES FORM WORK (LUNA) | $13.11 | $0.44 | $13.55 | Survey, 2011 |
| CARPENTER, INCLUDES FORM WORK (LEA) | $13.30 | $0.44 | $13.74 | Survey, 2011 |
CARPENTER, INCLUDES FORM WORK…Full textCARPENTER, INCLUDES FORM WORK (CATRON, CHAVES, CURRY, DEBACA, EDDY, GRANT, HIDALGO, LINCOLN, OTERO, ROOSEVELT, SIERRA, SOCORRO) | $13.93 | $0.44 | $14.37 | Survey, 2011 |
Modification history
| Modification 0 | January 2, 2026 |
| Modification 1 | May 18, 2026 (current) |
Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).
Questions people ask
- Which rate do I pay on NM20260036?
- The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
- My trade is not on this sheet. What do I do?
- Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
- Does modification 1 apply to my contract?
- Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.
How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator
Put these rates on a certified payroll.
Start here and NM20260036 is already filled in when you set up the job. CertifiedHours loads this sheet, checks every line against it as you type hours, and prints the WH-347. Free for one payroll a month.
Start a payroll on this sheetOn this sheet
- 66 classifications in 1 rate groups
- 0 from agreements, 1 from surveys
- Counties: Catron, Chaves, Curry, De Baca, Eddy, Grant, Hidalgo, Lea, Lincoln, Luna, Otero, Roosevelt, Sierra, Socorro