Prevailing wage rates: Bernalillo, Sandoval, Torrance and Valencia Counties, New Mexico

Highway construction · NM20260033 modification 1, published May 18, 2026

The short answer

This sheet sets 21 classifications for highway work in Bernalillo, Sandoval, Torrance and Valencia Counties, New Mexico. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $12.17 an hour (laborer, common or general (bernallilo, torrance, and valencia)) to $35.36 (electrician (including traffic signalization & installation)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
SUNM2011-001 · Survey of contractors in NM, August 25, 2011
TRUCK DRIVER: WATER TRUCK$13.51$1.51$15.02Survey
TRUCK DRIVER: DUMP TRUCK (SANDOVAL, TORRANCE, VALENCIA)$14.51$0.26$14.77Survey
TRUCK DRIVER: DUMP TRUCK (BERNALLILO)$14.46$0.26$14.72Survey
POWER EQUIPMENT OPERATOR: OILER (BERNALILO, SANDOVAL, TORRANCE, & VALENCIA)$22.08$8.72$30.80Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (SANDOVAL, TORRANCE, VALENCIA)$16.59$0.26$16.85Survey
POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (BERNALLILO)$16.78$0.26$17.04Survey
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (SANDOVAL, TORRANCE, VALENCIA)$14.91$0.26$15.17Survey
POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER (BERNALLILO)$14.73$0.26$14.99Survey
POWER EQUIPMENT OPERATOR: (TRENCHER)$15.22$0.26$15.48Survey
POWER EQUIPMENT OPERATOR: (EXCAVATOR/TRACKHOE)$20.10$0.26$20.36Survey
POWER EQUIPMENT OPERATOR: (BROOM SWEEPER)$16.67$1.57$18.24Survey
POWER EQUIPMENT OPERATOR: (BACKHOE)$20.92$3.62$24.54Survey
LABORER, COMMON OR GENERAL (SANDOVAL)$11.85$0.35$12.20Survey
LABORER, COMMON OR GENERAL (BERNALLILO, TORRANCE, AND VALENCIA)$11.82$0.35$12.17Survey
LABORER (TRAFFIC CONTROL (INCLUDES FLAGGER AND CONE SETTER))$14.27$0.35$14.62Survey
IRONWORKER, REINFORCING$22.61$6.03$28.64Survey
ELECTRICIAN (INCLUDING TRAFFIC SIGNALIZATION & INSTALLATION)$25.91$9.45$35.36Survey
CEMENT MASON/CONCRETE FINISHER (SANDOVAL, TORRANCE, AND VALENCIA)$15.58$0.26$15.84Survey
CEMENT MASON/CONCRETE FINISHER (BERNALLILO)$15.35$0.26$15.61Survey
CARPENTER, INCLUDING FORM WORK (SANDOVAL, TORRANCE, AND VALENCIA)$13.70$0.44$14.14Survey
CARPENTER, INCLUDING FORM WORK (BERNALLLILO)$13.73$0.44$14.17Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NM20260033?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.