Prevailing wage rates: Lea County, New Mexico

Building construction · NM20260020 modification 1, published May 18, 2026

The short answer

This sheet sets 41 classifications for building work in Lea County, New Mexico. Each line is a basic hourly rate plus a fringe rate, and the sum is the minimum you must pay for that work, from $10.84 an hour (laborer: landscape & irrigation) to $59.67 (plumber (excluding hvac pipe installation)). Your contract may lock an earlier modification.

Rates by classification

Total is the basic rate plus the fringe. Source is the agreement or survey the rate came from; a marker means the group changed in this modification. A dagger (†) means the fringe carries a footnote or percentage the total does not include; read the group’s notes.

ClassificationBasic rateFringeTotalSource
CARP1319-008 · Carpenters agreement, January 1, 2025
CARPENTER (METAL STUD INSTALLATION ONLY)$29.09$16.20$45.29Agreement
ELEC0611-018 · Electrical Workers (IBEW) agreement, January 1, 2025
ELECTRICIAN, EXCLUDING LOW VOLTAGE WIRING FOR ALARMS…
Full text

ELECTRICIAN, EXCLUDING LOW VOLTAGE WIRING FOR ALARMS: ZONE 1. ZONE 1: MILEAGE CALCULATED FROM THE MAIN POST OFFICE IN THE FOLLOWING TOWNS: ALBUQUERQUE-40 MILES, ARTESIA-12 MILES, BELEN-12 MILES, CARLSBAD-12 MILES, CARRIZOZO-12 MILES, CLOVIS-12 MILES, ESPANOLA-14 MILES, FARMINGTON-6 MILES, GALLUP-10 MILES, HOBBS-12 MILES, LAS VEGAS-8 MILES, LOS LUNAS-12 MILES, LOVINGTON-12 MILES, PORTALES-12 MILES, RATON-6 MILES, ROSWELL-12 MILES, RUIDOSO-12 MILES, SANTA FE-10 MILES, TUCUMCARI-6 MILES. ZONE 2: EXTENDING UP TO 20 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 9% ABOVE ZONE 1 RATE. ZONE 3: EXTENDING UP TO 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 15% ABOVE ZONE 1 RATE. ZONE 4: EXTENDING MORE THAN 30 MILES BEYOND ZONE 1, EXCEPT ALBURQUERQUE, SHALL RECEIVE 26% ABOVE ZONE 1 RATE

$40.30$13.41$53.71Agreement
ENGI0953-007 · Operating Engineers agreement, January 1, 2024
POWER EQUIPMENT OPERATOR ((8) CRANE)$31.43$4.65$36.08Agreement
POWER EQUIPMENT OPERATOR ((4) BOBCAT/SKID LOADER, LOADER (FRONT END))$27.70$4.65$32.35Agreement
POWER EQUIPMENT OPERATOR ((2) ROLLER(DIRT AND GRADE COMPACTION))$26.75$4.65$31.40Agreement
IRON0495-009 · Ironworkers agreement, January 1, 2023
IRONWORKER: ORNAMENTAL$28.05$18.11$46.16Agreement
IRONWORKER, STRUCTURAL (METAL BUILDING ERECTION ONLY)$28.05$18.11$46.16Agreement
PLUM0412-007 · Plumbers and Pipefitters agreement, January 2, 2025
PLUMBER (EXCLUDING HVAC PIPE INSTALLATION)$43.07$16.60$59.67Agreement
PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION$43.07$16.60$59.67Agreement
SHEE0049-012 · Sheet Metal Workers agreement, January 1, 2024
SHEET METAL WORKER (HVAC DUCT AND SYSTEM INSTALLATION ONLY)$37.50$18.51$56.01Agreement
SUNM2010-008 · Survey of contractors in NM, November 9, 2010
TRUCK DRIVER: WATER TRUCK$16.25$5.00$21.25Survey
TRUCK DRIVER: PICKUP TRUCK$15.91$3.13$19.04Survey
TRUCK DRIVER: DUMP TRUCK$15.36$5.00$20.36Survey
TILE SETTER$19.00$0.00$19.00Survey
TILE FINISHER$14.02$0.00$14.02Survey
SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION$22.01$9.65$31.66Survey
ROOFER$13.24$0.50$13.74Survey
PLASTERER$17.65$7.15$24.80Survey
PAINTER: BRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING$16.58$1.79$18.37Survey
OPERATOR: GRADER/BLADE$21.39$4.94$26.33Survey
OPERATOR: FORKLIFT$21.13$4.83$25.96Survey
OPERATOR: BACKHOE$22.13$4.30$26.43Survey
LABORER: PIPELAYER$13.78$2.20$15.98Survey
LABORER: MASON TENDER - CEMENT/CONCRETE$11.51$0.85$12.36Survey
LABORER: MASON TENDER - BRICK$13.77$4.35$18.12Survey
LABORER: LANDSCAPE & IRRIGATION$10.60$0.24$10.84Survey
LABORER: COMMON OR GENERAL$13.12$3.79$16.91Survey
IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION$22.20$8.06$30.26Survey
IRONWORKER, REINFORCING$20.84$7.68$28.52Survey
INSULATOR - BATT$24.44$8.43$32.87Survey
GLAZIER$20.15$3.95$24.10Survey
FLOOR LAYER: CARPET$22.31$0.30$22.61Survey
DRYWALL FINISHER/TAPER$19.64$2.75$22.39Survey
CEMENT MASON/CONCRETE FINISHER$17.72$3.72$21.44Survey
ELECTRICIAN (Low Voltage Wiring for Alarms)$28.25$6.62$34.87Survey
CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION…
Full text

CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION

$20.46$5.61$26.07Survey
CARPENTER (FORM WORK ONLY)$19.79$6.14$25.93Survey
CARPENTER (DRYWALL HANGING ONLY)$21.39$2.85$24.24Survey
CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY)$20.79$0.00$20.79Survey
BRICKLAYER$20.36$5.74$26.10Survey
BOILERMAKER$21.77$3.98$25.75Survey

Modification history

Modification 0January 2, 2026
Modification 1May 18, 2026 (current)

Published by the Wage and Hour Division; read from sam.gov. The sheet is checked for a newer modification each day. Contracts awarded since January 1, 2017 also carry Executive Order 13706 paid sick leave (one hour per 30 worked, up to 56 a year).

Questions people ask

Which rate do I pay on NM20260020?
The line for the classification of work actually performed: the basic rate plus the fringe. You may pay the fringe into benefit plans, as cash on every hour, or a mix. Overtime after 40 hours is 1.5 times the basic rate; fringe is paid on every hour and never multiplied.
My trade is not on this sheet. What do I do?
Do not borrow the nearest name. Ask the contracting agency for a conformance on Standard Form 1444 before the first week of that work, and note it as pending on the payroll.
Does modification 1 apply to my contract?
Only if it was in force when your contract was awarded (generally at bid opening). An earlier modification locked into the contract keeps applying, except on option years, added scope and indefinite-quantity contracts. The number and modification are on the first page of the exhibit in your contract.

How to read a wage determination · Paying the fringe in cash or through plans · Overtime on these rates · Fringe credit calculator